PPL Montana, LLC; Notice of Meeting, 31843 [2012-13026]
Download as PDF
Federal Register / Vol. 77, No. 104 / Wednesday, May 30, 2012 / Notices
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on May 31, 2012.
Dated: May 22, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–13000 Filed 5–29–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on June 20, 2012.
Federal Energy Regulatory
Commission
Dated: May 22, 2012.
Kimberly D. Bose,
Secretary.
[Docket No. EL12–70–000]
[FR Doc. 2012–13004 Filed 5–29–12; 8:45 am]
BILLING CODE 6717–01–P
srobinson on DSK4SPTVN1PROD with NOTICES
Unnamed Entity v. California
Independent System Operator Corp.;
Notice of Complaint
DEPARTMENT OF ENERGY
Take notice that on May 21, 2012,
pursuant to section 206 of the Federal
Power Act (FPA), 16 U.S.C. 824e, and
Rule 206 of the Commission’s Rules of
Practice and Procedure, 18 CFR part
206, Unnamed Entity (Complainant)
filed a formal complaint against
California Independent System Operator
Corp. (CAISO or Respondent) for the
Respondent’s decision to impose a
penalty on the Complainant under
section 37.6.2 of CAISO’s tariff for
allegedly providing untimely responses
to certain CAISO Department of Market
Monitoring (DMM) data requests.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
VerDate Mar<15>2010
17:58 May 29, 2012
Jkt 226001
Federal Energy Regulatory
Commission
[Docket No. EL12–62–000]
PPL Montana, LLC; Notice of Meeting
a. Date and Time of Meeting:
Thursday, June 7, 2012 at 1:00 p.m.
EDT.
b. Place: Federal Energy Regulatory
Commission, 888 First St. NE.,
Washington, DC 20426, Room 3M–1.
c. FERC Contact: Gary Cohen, (202)
502–8321 or gary.cohen@ferc.gov.
d. Purpose of Meeting: Commission
staff will meet with PPL Montana, LLC
(PPL Montana) and the Confederated
Salish and Kootenai Tribes to discuss
issues related to PPL Montana’s petition
for a declaratory order concerning
provisions of the license for Kerr
Hydroelectric Project No. 5.
e. All interested parties are hereby
invited to attend.
Dated: May 23, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–13026 Filed 5–29–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13318–002]
Swan Lake North Hydro, LLC; Notice of
Preliminary Permit Application
Accepted For Filing and Soliciting
Comments, Motions to Intervene, and
Competing Applications
On April 3, 2012, Swan Lake North
Hydro, LLC, filed an application for a
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
31843
successive preliminary permit, pursuant
to section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of the Swan Lake North Pumped Storage
Hydroelectric Project (project) to be
located near Klamath Falls in Klamath
County, Oregon and Newell in Modoc
County, California. The sole purpose of
a preliminary permit, if issued, is to
grant the permit holder priority to file
a license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following new facilities: (1) Two
111-foot-high, 6,560-foot-long (east) and
5.990-foot-long (west) rockfill dams
enclosing an upper reservoir; (2) an
upper reservoir with a surface area of
215 acres and a storage capacity of
10,622 acre-feet at a maximum surface
elevation of 5,491 feet above mean sea
level (msl); (3) a 100-foot-high, 5,245foot-long rockfill main dam and a 9-foothigh, 360-foot-long rockfill saddle dam
enclosing a lower reservoir; (4) a lower
reservoir with a surface area of 193 acres
and a storage capacity of 11,583 acrefeet at a maximum surface elevation of
4,275 feet msl; (5) a 30-foot-diameter,
2,570-foot-long horizontal power tunnel;
(6) a 30-foot-diameter, 1,200-foot-long
vertical shaft; (7) a 30-foot-diameter,
1,000-foot-long high pressure steel-lined
penstock branching into four 12.25-footdiameter, 640-foot-long steel-lined
penstocks going into the underground
powerhouse: (8) an underground
powerhouse with four 250-megawatt
(MW) reversible pump-turbine units
with a total installed capacity of 1,000
MW; (9) four 12.5-foot-diameter
manifold branches that will combine
into a single 26-foot-diameter, 5,000foot-long, partially steel-lined and
partially concrete-lined tailrace tunnel;
(10) a tailrace inlet/outlet structure
consisting of a concrete-lined approach
channel, trash racks, and two vertically
controlled slide gates; (11) a 30-footdiameter, 3,600-foot-long access tunnel;
(12) a permanent 24-foot-wide, 3.5-milelong haul road; (13) approximately 33
miles of 500-kilovolt (kV) transmission
line connecting to a terminal switchyard
to be constructed adjacent to the
existing California Oregon Transmission
Project 500-kV line in California; and
(14) appurtenant facilities. The project
would be a closed-loop system using
groundwater and would not use any
existing surface body of water. The
estimated annual generation of the
project would be 2,630 gigawatt-hours.
E:\FR\FM\30MYN1.SGM
30MYN1
Agencies
[Federal Register Volume 77, Number 104 (Wednesday, May 30, 2012)]
[Notices]
[Page 31843]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-13026]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL12-62-000]
PPL Montana, LLC; Notice of Meeting
a. Date and Time of Meeting: Thursday, June 7, 2012 at 1:00 p.m.
EDT.
b. Place: Federal Energy Regulatory Commission, 888 First St. NE.,
Washington, DC 20426, Room 3M-1.
c. FERC Contact: Gary Cohen, (202) 502-8321 or gary.cohen@ferc.gov.
d. Purpose of Meeting: Commission staff will meet with PPL Montana,
LLC (PPL Montana) and the Confederated Salish and Kootenai Tribes to
discuss issues related to PPL Montana's petition for a declaratory
order concerning provisions of the license for Kerr Hydroelectric
Project No. 5.
e. All interested parties are hereby invited to attend.
Dated: May 23, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-13026 Filed 5-29-12; 8:45 am]
BILLING CODE 6717-01-P