Grand Valley Irrigation Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, Protests, Recommendations, and Terms and Conditions, 31344-31345 [2012-12702]
Download as PDF
31344
Federal Register / Vol. 77, No. 102 / Friday, May 25, 2012 / Notices
Dated: May 18, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–12700 Filed 5–24–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14377–000]
mstockstill on DSK4VPTVN1PROD with NOTICES
Grand Valley Irrigation Company;
Notice of Application Accepted for
Filing and Soliciting Comments,
Motions To Intervene, Protests,
Recommendations, and Terms and
Conditions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Conduit
Exemption.
b. Project No.: 14377–000.
c. Date filed: March 26, 2012.
d. Applicant: Grand Valley Irrigation
District.
e. Name of Project: Dividers
Hydroelectric Project.
f. Location: The proposed Dividers
Hydroelectric Project would be located
on the Grand Valley Irrigation Canal
where the Mainline canal splits into the
Highline and the Lower Mainline in
Mesa County, Colorado. The land on
which all the project structures is
owned by the applicant.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. Charlie
Guenther, Grand Valley Irrigation
Company, 688 26 Road, Grand Junction,
CO 81506, phone (970) 242–2762.
i. FERC Contact: Kelly Houff, (202)
502–6393, Kelly.Houff@ferc.gov.
j. Status of Environmental Analysis:
This application is ready for
environmental analysis at this time, and
the Commission is requesting
comments, reply comments,
recommendations, terms and
conditions, and prescriptions.
k. Deadline for filing responsive
documents: Due to the small size of the
proposed project, as well as the resource
agency consultation letters filed with
the application, the 60-day timeframe
specified in 18 CFR 4.34(b) for filing all
comments, motions to intervene,
protests, recommendations, terms and
conditions, and prescriptions is
shortened to 30 days from the issuance
date of this notice. All reply comments
filed in response to comments
submitted by any resource agency,
Indian tribe, or person, must be filed
VerDate Mar<15>2010
17:55 May 24, 2012
Jkt 226001
with the Commission within 45 days
from the issuance date of this notice.
Comments, protests, and
interventions may be filed electronically
via the Internet in lieu of paper; see 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under https://www.ferc.gov/docsfiling/efiling.asp. The Commission
strongly encourages electronic filings.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person on the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, it must
also serve a copy of the document on
that resource agency.
l. Description of Project: The Dividers
Hydroelectric Project would consist of:
(1) An intake pipe approximately 110
feet in length; (2) a powerhouse
containing one proposed generating unit
with an installed capacity of 185
kilowatts; (3) a discharge pipe
approximately 25 feet in length; and (4)
appurtenant facilities. The applicant
estimates the project would have an
average annual generation of 770
megawatt-hours.
m. This filing is available for review
and reproduction at the Commission in
the Public Reference Room, Room 2A,
888 First Street NE., Washington, DC
20426. The filing may also be viewed on
the web at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number, P–14377, in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3676 or email
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659. A copy is also
available for review and reproduction at
the address in item h above.
n. Development Application—Any
qualified applicant desiring to file a
competing application must submit to
the Commission, on or before the
specified deadline date for the
particular application, a competing
development application, or a notice of
intent to file such an application.
Submission of a timely notice of intent
allows an interested person to file the
competing development application no
later than 120 days after the specified
deadline date for the particular
application. Applications for
preliminary permits will not be
accepted in response to this notice.
o. Notice of Intent—A notice of intent
must specify the exact name, business
address, and telephone number of the
prospective applicant, and must include
PO 00000
Frm 00055
Fmt 4703
Sfmt 4703
an unequivocal statement of intent to
submit a competing development
application. A notice of intent must be
served on the applicant(s) named in this
public notice.
p. Protests or Motions to Intervene—
Anyone may submit a protest or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210,
385.211, and 385.214. In determining
the appropriate action to take, the
Commission will consider all protests
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any protests or
motions to intervene must be received
on or before the specified deadline date
for the particular application.
q. All filings must (1) bear in all
capital letters the title ‘‘PROTEST’’,
‘‘MOTION TO INTERVENE’’, ‘‘NOTICE
OF INTENT TO FILE COMPETING
APPLICATION’’, ‘‘COMPETING
APPLICATION’’, ‘‘COMMENTS’’,
‘‘REPLY COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, recommendations, terms and
conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. Any of these documents
must be filed by providing the original
and seven copies to: The Secretary,
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426. An additional copy must be sent
to Director, Division of Hydropower
Administration and Compliance, Office
of Energy Projects, Federal Energy
Regulatory Commission, at the above
address. A copy of any protest or motion
to intervene must be served upon each
representative of the applicant specified
in the particular application. A copy of
all other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
E:\FR\FM\25MYN1.SGM
25MYN1
Federal Register / Vol. 77, No. 102 / Friday, May 25, 2012 / Notices
Dated: May 18, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–12702 Filed 5–24–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2232–595]
mstockstill on DSK4VPTVN1PROD with NOTICES
Duke Energy Carolinas, LLC; Notice of
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Application Type: Non-project use
of project lands and waters: Water
withdrawal.
b. Project No.: 2232–595.
c. Date Filed: April 19, 2012.
d. Applicant: Duke Energy Carolina,
LLC.
e. Name of Project: Catawba-Wateree
Project.
f. Location: The proposed non-project
use would be located on Lake Norman
in Lincoln County, North Carolina.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. Dennis
Whitaker, Duke Energy Carolinas, LLC,
Manager Lake Services, P.O. Box 1006,
Charlotte, NC 28201–1006, (704) 382–
1594.
i. FERC Contact: Ms. Andrea Claros,
(202) 502–8171, andrea.claros@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests, is
June 18, 2012.
All documents may be filed
electronically via the Internet. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov/docs-filing/
efiling.asp. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and
seven copies should be mailed to:
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE.,
Washington, DC 20426. Commenters
can submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments.
Please include the project number (P–
2232–595) on any comments, motions,
or recommendations filed.
k. Description of Request: Duke
Energy Carolinas, LLC requests
VerDate Mar<15>2010
17:55 May 24, 2012
Jkt 226001
Commission approval to allow Duke to
authorize the Cowan’s Ford Country
Club, Inc. to replace a raw water intake
pipeline, used for golf course irrigation,
on Lake Norman in Lincoln County,
North Carolina. An existing pump house
and water intake would be removed and
replaced with a new intake facility
located within 150 feet of the existing
intake, in a community access lot, on
0.083 acres of project property. The
maximum pumping rate would increase
from 320,000 gallons per day (GPD) to
340,000 GPD, and the maximum
instantaneous rate would increase from
1,050 gallon per minute (GPM) to 1,500
GPM. The increase in the maximum
instantaneous rate will allow for a
reduced watering time window.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov/docs-filing/
efiling.asp. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: All filings must (1) Bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
PO 00000
Frm 00056
Fmt 4703
Sfmt 4703
31345
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
which are the subject of the amendment.
Agencies may obtain copies of the
application directly from the applicant.
A copy of any protest or motion to
intervene must be served upon each
representative of the applicant specified
in the particular application. If an
intervener files comments or documents
with the Commission relating to the
merits of an issue that may affect the
responsibilities of a particular resource
agency, they must also serve a copy of
the document on that resource agency.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: May 18, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–12701 Filed 5–24–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER11–2780–002.
Applicants: Safe Harbor Water Power
Corporation.
Description: Safe Harbor Water Power
Corporation’s updated market power
analysis and notice of change in status
related to the merger of Exelon
Corporation and Constellation Energy
Group, Inc.
Filed Date: 4/11/12.
Accession Number: 20120411–5297.
Comments Due: 5 p.m. ET 6/8/12.
Docket Numbers: ER12–1811–000.
Applicants: Pacific Gas and Electric
Company.
Description: Notice of Termination of
the Gates E&P Agreement to be effective
3/15/2012.
E:\FR\FM\25MYN1.SGM
25MYN1
Agencies
[Federal Register Volume 77, Number 102 (Friday, May 25, 2012)]
[Notices]
[Pages 31344-31345]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-12702]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14377-000]
Grand Valley Irrigation Company; Notice of Application Accepted
for Filing and Soliciting Comments, Motions To Intervene, Protests,
Recommendations, and Terms and Conditions
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Conduit Exemption.
b. Project No.: 14377-000.
c. Date filed: March 26, 2012.
d. Applicant: Grand Valley Irrigation District.
e. Name of Project: Dividers Hydroelectric Project.
f. Location: The proposed Dividers Hydroelectric Project would be
located on the Grand Valley Irrigation Canal where the Mainline canal
splits into the Highline and the Lower Mainline in Mesa County,
Colorado. The land on which all the project structures is owned by the
applicant.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791a-825r.
h. Applicant Contact: Mr. Charlie Guenther, Grand Valley Irrigation
Company, 688 26 Road, Grand Junction, CO 81506, phone (970) 242-2762.
i. FERC Contact: Kelly Houff, (202) 502-6393, Kelly.Houff@ferc.gov.
j. Status of Environmental Analysis: This application is ready for
environmental analysis at this time, and the Commission is requesting
comments, reply comments, recommendations, terms and conditions, and
prescriptions.
k. Deadline for filing responsive documents: Due to the small size
of the proposed project, as well as the resource agency consultation
letters filed with the application, the 60-day timeframe specified in
18 CFR 4.34(b) for filing all comments, motions to intervene, protests,
recommendations, terms and conditions, and prescriptions is shortened
to 30 days from the issuance date of this notice. All reply comments
filed in response to comments submitted by any resource agency, Indian
tribe, or person, must be filed with the Commission within 45 days from
the issuance date of this notice.
Comments, protests, and interventions may be filed electronically
via the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and
the instructions on the Commission's Web site under https://www.ferc.gov/docs-filing/efiling.asp. The Commission strongly
encourages electronic filings.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person on the official service list for the
project. Further, if an intervenor files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, it must also serve a
copy of the document on that resource agency.
l. Description of Project: The Dividers Hydroelectric Project would
consist of: (1) An intake pipe approximately 110 feet in length; (2) a
powerhouse containing one proposed generating unit with an installed
capacity of 185 kilowatts; (3) a discharge pipe approximately 25 feet
in length; and (4) appurtenant facilities. The applicant estimates the
project would have an average annual generation of 770 megawatt-hours.
m. This filing is available for review and reproduction at the
Commission in the Public Reference Room, Room 2A, 888 First Street NE.,
Washington, DC 20426. The filing may also be viewed on the web at
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number, P-14377, in the docket number field to access the document. For
assistance, call toll-free 1-866-208-3676 or email
FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A copy is
also available for review and reproduction at the address in item h
above.
n. Development Application--Any qualified applicant desiring to
file a competing application must submit to the Commission, on or
before the specified deadline date for the particular application, a
competing development application, or a notice of intent to file such
an application. Submission of a timely notice of intent allows an
interested person to file the competing development application no
later than 120 days after the specified deadline date for the
particular application. Applications for preliminary permits will not
be accepted in response to this notice.
o. Notice of Intent--A notice of intent must specify the exact
name, business address, and telephone number of the prospective
applicant, and must include an unequivocal statement of intent to
submit a competing development application. A notice of intent must be
served on the applicant(s) named in this public notice.
p. Protests or Motions to Intervene--Anyone may submit a protest or
a motion to intervene in accordance with the requirements of Rules of
Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In
determining the appropriate action to take, the Commission will
consider all protests filed, but only those who file a motion to
intervene in accordance with the Commission's Rules may become a party
to the proceeding. Any protests or motions to intervene must be
received on or before the specified deadline date for the particular
application.
q. All filings must (1) bear in all capital letters the title
``PROTEST'', ``MOTION TO INTERVENE'', ``NOTICE OF INTENT TO FILE
COMPETING APPLICATION'', ``COMPETING APPLICATION'', ``COMMENTS'',
``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``TERMS AND CONDITIONS,'' or
``PRESCRIPTIONS;'' (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person protesting or intervening; and (4) otherwise comply with the
requirements of 18 CFR 385.2001 through 385.2005. All comments,
recommendations, terms and conditions or prescriptions must set forth
their evidentiary basis and otherwise comply with the requirements of
18 CFR 4.34(b). Agencies may obtain copies of the application directly
from the applicant. Any of these documents must be filed by providing
the original and seven copies to: The Secretary, Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426. An
additional copy must be sent to Director, Division of Hydropower
Administration and Compliance, Office of Energy Projects, Federal
Energy Regulatory Commission, at the above address. A copy of any
protest or motion to intervene must be served upon each representative
of the applicant specified in the particular application. A copy of all
other filings in reference to this application must be accompanied by
proof of service on all persons listed in the service list prepared by
the Commission in this proceeding, in accordance with 18 CFR 4.34(b)
and 385.2010.
[[Page 31345]]
Dated: May 18, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-12702 Filed 5-24-12; 8:45 am]
BILLING CODE 6717-01-P