Advisory Committee on Reactor Safeguards (ACRS); Meeting of the ACRS Subcommittee on Planning and Procedures; Notice of Meeting, 31045 [2012-12614]
Download as PDF
srobinson on DSK4SPTVN1PROD with NOTICES
Federal Register / Vol. 77, No. 101 / Thursday, May 24, 2012 / Notices
Subcommittee will gather information,
analyze relevant issues and facts, and
formulate proposed positions and
actions, as appropriate, for deliberation
by the Full Committee.
Members of the public desiring to
provide oral statements and/or written
comments should notify the Designated
Federal Official (DFO), Christopher
Brown (Telephone 301–415–7111 or
Email: Christopher.Brown@nrc.gov) five
days prior to the meeting, if possible, so
that appropriate arrangements can be
made. Thirty-five hard copies of each
presentation or handout should be
provided to the DFO thirty minutes
before the meeting. In addition, one
electronic copy of each presentation
should be emailed to the DFO one day
before the meeting. If an electronic copy
cannot be provided within this
timeframe, presenters should provide
the DFO with a CD containing each
presentation at least thirty minutes
before the meeting. Electronic
recordings will be permitted only
during those portions of the meeting
that are open to the public. Detailed
procedures for the conduct of and
participation in ACRS meetings were
published in the Federal Register on
October 17, 2011, (76 FR 64127–64128).
Detailed meeting agendas and meeting
transcripts are available on the NRC
Web site at https://www.nrc.gov/readingrm/doc-collections/acrs. Information
regarding topics to be discussed,
changes to the agenda, whether the
meeting has been canceled or
rescheduled, and the time allotted to
present oral statements can be obtained
from the Web site cited above or by
contacting the identified DFO.
Moreover, in view of the possibility that
the schedule for ACRS meetings may be
adjusted by the Chairman as necessary
to facilitate the conduct of the meeting,
persons planning to attend should check
with these references if such
rescheduling would result in a major
inconvenience.
If attending this meeting, please enter
through the One White Flint North
building, 11555 Rockville Pike,
Rockville, MD. After registering with
security, please contact Mr. Theron
Brown (240–888–9835) to be escorted to
the meeting room.
Dated: May 18, 2012.
Cayetano Santos,
Chief, Technical Support Branch, Advisory
Committee on Reactor Safeguards.
[FR Doc. 2012–12611 Filed 5–23–12; 8:45 am]
BILLING CODE 7590–01–P
VerDate Mar<15>2010
16:31 May 23, 2012
Jkt 226001
NUCLEAR REGULATORY
COMMISSION
Advisory Committee on Reactor
Safeguards (ACRS); Meeting of the
ACRS Subcommittee on Planning and
Procedures; Notice of Meeting
The ACRS Subcommittee on Planning
and Procedures will hold a meeting on
June 5, 2012, Room T–2B1, 11545
Rockville Pike, Rockville, Maryland.
The entire meeting will be open to
public attendance, with the exception of
a portion that may be closed pursuant
to 5 U.S.C. 552b (c)(2) and (6) to discuss
organizational and personnel matters
that relate solely to the internal
personnel rules and practices of the
ACRS, and information the release of
which would constitute a clearly
unwarranted invasion of personal
privacy.
The agenda for the subject meeting
shall be as follows:
Tuesday, June 5, 2012—11:00 a.m. Until
12:00 p.m.
The Subcommittee will discuss
proposed ACRS activities and related
matters. The Subcommittee will gather
information, analyze relevant issues and
facts, and formulate proposed positions
and actions, as appropriate, for
deliberation by the Full Committee.
Members of the public desiring to
provide oral statements and/or written
comments should notify the Designated
Federal Official (DFO), Antonio Dias
(Telephone 301–415–6805 or Email:
Antonio.Dias@nrc.gov) five days prior to
the meeting, if possible, so that
arrangements can be made. Thirty-five
hard copies of each presentation or
handout should be provided to the DFO
thirty minutes before the meeting. In
addition, one electronic copy of each
presentation should be emailed to the
DFO one day before the meeting. If an
electronic copy cannot be provided
within this timeframe, presenters
should provide the DFO with a CD
containing each presentation at least
thirty minutes before the meeting.
Electronic recordings will be permitted
only during those portions of the
meeting that are open to the public.
Detailed procedures for the conduct of
and participation in ACRS meetings
were published in the Federal Register
on October 17, 2011, (76 FR 64126–
64127).
Information regarding changes to the
agenda, whether the meeting has been
canceled or rescheduled, and the time
allotted to present oral statements can
be obtained by contacting the identified
DFO. Moreover, in view of the
possibility that the schedule for ACRS
PO 00000
Frm 00053
Fmt 4703
Sfmt 4703
31045
meetings may be adjusted by the
Chairman as necessary to facilitate the
conduct of the meeting, persons
planning to attend should check with
the DFO if such rescheduling would
result in a major inconvenience.
If attending this meeting, please enter
through the One White Flint North
building, 11555 Rockville Pike,
Rockville, MD. After registering with
security, please contact Mr. Theron
Brown (240–888–9835) to be escorted to
the meeting room.
Dated: May 17, 2012.
Cayetano Santos,
Chief, Reactor Safety Branch, Advisory
Committee on Reactor Safeguards.
[FR Doc. 2012–12614 Filed 5–23–12; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2012–0115; IA–11–036]
Order Prohibiting Involvement in NRC–
Licensed Activities; In the Matter of
´
Jaime Sanchez
I
´
´
Jaime Sanchez (Mr. Sanchez) is
President of S&R Engineering (S&R,
licensee) in San Juan, Puerto Rico. S&R
held License No. 52–30913–01 issued
by the U.S. Nuclear Regulatory
Commission (NRC or Commission)
pursuant to Title 10 of the Code of
Federal Regulations (10 CFR) Part 30 on
June 21, 2004. The license authorized
the possession, storage, and use of
licensed nuclear material in portable
gauges to measure the physical
properties of materials in accordance
with the conditions specified therein.
On October 29, 2009, the NRC issued an
Order to S&R due to S&R’s failure to pay
its license fees. The Order prohibited
S&R from using its licensed radioactive
material (one portable moisture density
gauge containing a cesium-137 sealed
source and an americium-241 sealed
source), and indicated that if S&R failed
to pay the fee within the required 30
days, S&R was required to dispose of or
transfer the gauge to an authorized
recipient within 60 days (by December
29, 2009) and to notify the NRC in
writing of the disposition of the gauge.
S&R did not pay the license fee, and did
not notify the NRC that it had
dispositioned the gauge.
II
In a letter dated August 1, 2011, the
´
NRC provided to Mr. Sanchez the
results of an investigation initiated by
the NRC’s Office of Investigations (OI).
´
The letter informed Mr. Sanchez that
E:\FR\FM\24MYN1.SGM
24MYN1
Agencies
[Federal Register Volume 77, Number 101 (Thursday, May 24, 2012)]
[Notices]
[Page 31045]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-12614]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
Advisory Committee on Reactor Safeguards (ACRS); Meeting of the
ACRS Subcommittee on Planning and Procedures; Notice of Meeting
The ACRS Subcommittee on Planning and Procedures will hold a
meeting on June 5, 2012, Room T-2B1, 11545 Rockville Pike, Rockville,
Maryland.
The entire meeting will be open to public attendance, with the
exception of a portion that may be closed pursuant to 5 U.S.C. 552b
(c)(2) and (6) to discuss organizational and personnel matters that
relate solely to the internal personnel rules and practices of the
ACRS, and information the release of which would constitute a clearly
unwarranted invasion of personal privacy.
The agenda for the subject meeting shall be as follows:
Tuesday, June 5, 2012--11:00 a.m. Until 12:00 p.m.
The Subcommittee will discuss proposed ACRS activities and related
matters. The Subcommittee will gather information, analyze relevant
issues and facts, and formulate proposed positions and actions, as
appropriate, for deliberation by the Full Committee.
Members of the public desiring to provide oral statements and/or
written comments should notify the Designated Federal Official (DFO),
Antonio Dias (Telephone 301-415-6805 or Email: Antonio.Dias@nrc.gov)
five days prior to the meeting, if possible, so that arrangements can
be made. Thirty-five hard copies of each presentation or handout should
be provided to the DFO thirty minutes before the meeting. In addition,
one electronic copy of each presentation should be emailed to the DFO
one day before the meeting. If an electronic copy cannot be provided
within this timeframe, presenters should provide the DFO with a CD
containing each presentation at least thirty minutes before the
meeting. Electronic recordings will be permitted only during those
portions of the meeting that are open to the public. Detailed
procedures for the conduct of and participation in ACRS meetings were
published in the Federal Register on October 17, 2011, (76 FR 64126-
64127).
Information regarding changes to the agenda, whether the meeting
has been canceled or rescheduled, and the time allotted to present oral
statements can be obtained by contacting the identified DFO. Moreover,
in view of the possibility that the schedule for ACRS meetings may be
adjusted by the Chairman as necessary to facilitate the conduct of the
meeting, persons planning to attend should check with the DFO if such
rescheduling would result in a major inconvenience.
If attending this meeting, please enter through the One White Flint
North building, 11555 Rockville Pike, Rockville, MD. After registering
with security, please contact Mr. Theron Brown (240-888-9835) to be
escorted to the meeting room.
Dated: May 17, 2012.
Cayetano Santos,
Chief, Reactor Safety Branch, Advisory Committee on Reactor Safeguards.
[FR Doc. 2012-12614 Filed 5-23-12; 8:45 am]
BILLING CODE 7590-01-P