Drawbridge Operation Regulation; Willamette River, Portland, OR, 29897-29898 [2012-12237]

Download as PDF Federal Register / Vol. 77, No. 98 / Monday, May 21, 2012 / Rules and Regulations operated where vessels contact a remote drawbridge operator via VHF–FM Channel 16 or telephone (507) 895– 6087. Mariners establish radio or telephone communications and request an opening. The remote operator ensures no trains are in the block and then opens the drawspan. Once opened to navigation it remains raised until the remote operator verifies safe vessel passage. This verification is conducted by radio or telephone confirmation with the passing vessel, video monitoring, and boat detection equipment. The temporary deviation period will start 12:01 a.m. on June 15, 2012 through 11:59 p.m. on July 15, 2012. During this time the drawspan will be opened on demand by a remote operator. This temporary deviation has been coordinated with waterway users. No objections were received. There are no alternate routes for vessels transiting this section of the Black River. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the designated time period. This temporary deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: May 7, 2012. Eric A. Washburn, Bridge Administrator, Western Rivers. [FR Doc. 2012–12229 Filed 5–18–12; 8:45 am] BILLING CODE 9110–04–P DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG–2012–0412] Drawbridge Operation Regulation; Willamette River, Portland, OR Coast Guard, DHS. Notice of temporary deviation from regulations. AGENCY: ACTION: The Coast Guard has issued a temporary deviation from the operating schedule that governs the upper deck of the Steel Bridge across the Willamette River, mile 12.1, at Portland, OR. This deviation is necessary to accommodate the efficient movement of light rail and roadway traffic associated with the Rose Parade in Portland, Oregon. This deviation allows the upper deck of the Steel Bridge to remain in the closed position to facilitate efficient movement of event patrons. ebenthall on DSK5SPTVN1PROD with RULES SUMMARY: VerDate Mar<15>2010 16:13 May 18, 2012 Jkt 226001 This deviation is effective from 7 a.m. on June 9, 2012 through 1 p.m. June 9, 2012. ADDRESSES: Documents mentioned in this preamble as being available in the docket are part of docket USCG–2012– 0412 and are available online by going to https://www.regulations.gov, inserting USCG–2012–0412 in the ‘‘Keyword’’ box and then clicking ‘‘Search’’. They are also available for inspection or copying at the Docket Management Facility (M–30), U.S. Department of Transportation, West Building Ground Floor, Room W12–140, 1200 New Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. FOR FURTHER INFORMATION CONTACT: If you have questions on this rule, call or email the Bridge Administrator, Coast Guard Thirteenth District; telephone 206–220–7282 email randall.d.overton@uscg.mil. If you have questions on viewing the docket, call Renee V. Wright, Program Manager, Docket Operations, telephone 202–366– 9826. SUPPLEMENTARY INFORMATION: Trimet of Portland and the Oregon Department of Transportation have requested that the upper deck of the Steel Bridge remain closed to vessel traffic to facilitate safe efficient movement of light rail and roadway traffic associated with the Rose Parade. The Steel Bridge crosses the Willamette River at mile 12.1 and is a double-deck lift bridge with a lower lift deck and an upper lift deck which operate independent of each other. When both decks are in the down position the bridge provides 26 feet of vertical clearance above Columbia River Datum 0.0. When the lower deck is in the up position the bridge provides 71 feet of vertical clearance above Columbia River Datum 0.0. This deviation does not affect the operating schedule of the lower deck which opens on signal. Vessels which do not require an opening of the upper deck of the bridge may continue to transit beneath the bridge and, if needed, may obtain an opening of the lower deck of the bridge for passage during this closure period of the upper deck. Under normal conditions the upper deck of the Steel Bridge operates in accordance with 33 CFR 117.897(c)(3)(ii) which states that from 8 a.m. to 5 p.m. Monday through Friday one hour advance notice shall be given for draw openings and at all other times two hours advance notice shall be given to obtain an opening. This deviation period is from 7 a.m. on June 9, 2012 through 1 p.m. June 9, 2012. The deviation allows the upper deck of the Steel Bridge across the Willamette DATES: PO 00000 Frm 00045 Fmt 4700 Sfmt 4700 29897 River, mile 12.1, to remain in the closed position and need not open for maritime traffic from 7 a.m. through 1 p.m. on June 9, 2012. The bridge shall operate in accordance to 33 CFR 117.897 at all other times. Waterway usage on this stretch of the Willamette River includes vessels ranging from commercial tug and barge to small pleasure craft. Mariners will be notified and kept informed of the bridge’s operational status via the Coast Guard Notice to Mariners publication and Broadcast Notice to Mariners as appropriate. The lift span will be required to open, if needed, for public vessels of the United States and Canada and for vessels engaged in emergency response operations during this closure period. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: May 8, 2012. Randall D. Overton, Bridge Administrator. [FR Doc. 2012–12232 Filed 5–18–12; 8:45 am] BILLING CODE 9110–04–P DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG–2012–0406] Drawbridge Operation Regulation; Willamette River, Portland, OR Coast Guard, DHS. Notice of temporary deviation from regulations. AGENCY: ACTION: The Coast Guard has issued a temporary deviation from the operating schedule that governs the upper deck of the Steel Bridge across the Willamette River, mile 12.1, at Portland, OR. This deviation is necessary to accommodate the efficient movement of light rail and roadway traffic associated with the Starlight Parade in Portland, Oregon. This deviation allows the upper deck of the Steel Bridge to remain in the closed position to facilitate efficient movement of event patrons. DATES: This deviation is effective from 7 p.m. on June 2, 2012 through 11:30 p.m. June 2, 2012. ADDRESSES: Documents mentioned in this preamble as being available in the docket are part of docket USCG–2012– 0406 and are available online by going to https://www.regulations.gov, inserting SUMMARY: E:\FR\FM\21MYR1.SGM 21MYR1 ebenthall on DSK5SPTVN1PROD with RULES 29898 Federal Register / Vol. 77, No. 98 / Monday, May 21, 2012 / Rules and Regulations USCG–2012–0406 in the ‘‘Keyword’’ box and then clicking ‘‘Search’’. They are also available for inspection or copying at the Docket Management Facility (M–30), U.S. Department of Transportation, West Building Ground Floor, Room W12–140, 1200 New Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. FOR FURTHER INFORMATION CONTACT: If you have questions on this rule, call or email the Bridge Administrator, Coast Guard Thirteenth District; telephone 206–220–7282 email randall.d.overton@uscg.mil. If you have questions on viewing the docket, call Renee V. Wright, Program Manager, Docket Operations, telephone 202–366– 9826. SUPPLEMENTARY INFORMATION: Trimet of Portland and the Oregon Department of Transportation have requested that the upper deck of the Steel Bridge remain closed to vessel traffic to facilitate safe efficient movement of light rail and roadway traffic associated with the Starlight Parade. The Steel Bridge crosses the Willamette River at mile 12.1 and is a double-deck lift bridge with a lower lift deck and an upper lift deck which operate independent of each other. When both decks are in the down position the bridge provides 26 feet of vertical clearance above Columbia River Datum 0.0. When the lower deck is in the up position the bridge provides 71 feet of vertical clearance above Columbia River Datum 0.0. This deviation does not affect the operating schedule of the lower deck which opens on signal. Vessels which do not require an opening of the upper deck of the bridge may continue to transit beneath the bridge and, if needed, may obtain an opening of the lower deck of the bridge for passage during this closure period of the upper deck. Under normal conditions the upper deck of the Steel Bridge operates in accordance with 33 CFR 117.897(c)(3)(ii) which states that from 8 a.m. to 5 p.m. Monday through Friday one hour advance notice shall be given for draw openings and at all other times two hours advance notice shall be given to obtain an opening. This deviation period is from 7 p.m. on June 2, 2012 through 11:30 p.m. June 2, 2012. The deviation allows the upper deck of the Steel Bridge across the Willamette River, mile 12.1, to remain in the closed position and need not open for maritime traffic from 7 p.m. through 11:30 p.m. on June 2, 2012. The bridge shall operate in accordance with 33 CFR 117.897 at all other times. Waterway usage on this stretch of the Willamette River includes vessels ranging from VerDate Mar<15>2010 16:13 May 18, 2012 Jkt 226001 commercial tug and barge to small pleasure craft. Mariners will be notified and kept informed of the bridge’s operational status via the Coast Guard Notice to Mariners publication and Broadcast Notice to Mariners as appropriate. The lift span will be required to open, if needed, for public vessels of the United States and Canada and for vessels engaged in emergency response operations during this closure period. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: May 7, 2012. Randall D. Overton, Bridge Administrator. [FR Doc. 2012–12237 Filed 5–18–12; 8:45 am] BILLING CODE 9110–04–P DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 165 [Docket No. USCG–2012–0380] Safety Zones; Annual Fireworks Events in the Captain of the Port Detroit Zone Coast Guard, DHS. Notice of enforcement of regulation. AGENCY: ACTION: The Coast Guard will enforce the safety zones for annual fireworks events in the Captain of the Port Detroit zone from 9:45 p.m. on May 25, 2012 through 11:15 p.m. on September 2, 2012. This action is necessary and intended to ensure safety of life on the navigable waters immediately prior to, during, and immediately after fireworks events. During the aforementioned period, the Coast Guard will enforce restrictions upon, and control movement of, vessels in a specified area immediately prior to, during, and immediately after fireworks events. During the enforcement period, no person or vessel may enter the safety zone without permission of the Captain of the Port. DATES: The regulations in 33 CFR 165.941 will be enforced at various times between 9:45 p.m. on May 25, 2012 through 11:15 p.m. on September 2, 2012. FOR FURTHER INFORMATION CONTACT: If you have questions on this notice, call or email Ensign Benjamin Nessia, SUMMARY: PO 00000 Frm 00046 Fmt 4700 Sfmt 4700 Waterways Branch Chief, Marine Safety Unit Toledo, 420 Madison Ave., Suite 700, Toledo, OH 43604; telephone (419) 418–6040; email Benjamin.B.Nessia@uscg.mil. The Coast Guard will enforce the safety zones listed in 33 CFR 165.941, Safety Zones; Annual Fireworks Events in the Captain of the Port Detroit Zone, at the following times for the following events: (1) Put-In-Bay Fourth of July Fireworks, Put-In-Bay, OH. The safety zone listed in 33 CFR 165.941(a)(6) will be enforced between from 9:30 p.m. until 11:00 p.m. on July 4, 2012. In case of inclement weather on July 4, 2012, this safety zone will be enforced from 9:30 p.m. until 11:00 p.m. on July 5, 2012. (2) Toledo Country Club Memorial Celebration and Fireworks, Toledo, OH. The safety zone listed in 33 CFR 165.941(a)(16) will be enforced from 9:45 p.m. until 10:30 p.m. on May 25, 2012. (3) Luna Pier Fireworks Show, Luna Pier, MI. The safety zone listed in 33 CFR 165.941(a)(17) will be enforced from 9:30 p.m. to 10:30 p.m. on July 7, 2012. (4) Toledo Country Club 4th of July Fireworks, Toledo, OH. The safety zone listed in 33 CFR 165.941(a)(18) will be enforced from 9:45 p.m. to 10:30 p.m. on June 29, 2012. (5) Perrysburg/Maumee 4th of July Fireworks, Perrysburg, OH. The safety zone listed in 33 CFR 165.941(a)(20) will be enforced from 10:00 p.m. to 10:30 p.m. on July 3, 2012. (6) Lakeside July 4th Fireworks, Lakeside, OH. The safety zone listed in 33 CFR 165.941(a)(21) will be enforced from 9:30 p.m. to 11:30 p.m. on July 4, 2012. (7) Catawba Island Club Fireworks, Catawba Island, OH. The safety zone listed in 33 CFR 165.941(a)(22) will be enforced from 9:15 p.m. to 9:45 p.m. on July 3, 2012. (8) Red, White and Blues Bang Fireworks, Huron, OH. The safety zone listed in 33 CFR 165.941(a)(23) will be enforced from 10:00 p.m. to 11:00 p.m. on July 7, 2012. (9) Huron Riverfest Fireworks, Huron, OH. The safety zone listed in 33 CFR 165.941(a)(24) will be enforced from 10:00 p.m. to 11:00 p.m. on July 13, 2012. (10) Lakeside Labor Day Fireworks, Lakeside OH. The safety zone listed in 33 CFR 165.941(a)(28) will be enforced from 9:15 p.m. to 11:15 p.m. on September 2, 2012. (11) Catawba Island Club Fireworks, Catawba Island, OH. The safety zone SUPPLEMENTARY INFORMATION: E:\FR\FM\21MYR1.SGM 21MYR1

Agencies

[Federal Register Volume 77, Number 98 (Monday, May 21, 2012)]
[Rules and Regulations]
[Pages 29897-29898]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-12237]


-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2012-0406]


Drawbridge Operation Regulation; Willamette River, Portland, OR

AGENCY: Coast Guard, DHS.

ACTION: Notice of temporary deviation from regulations.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard has issued a temporary deviation from the 
operating schedule that governs the upper deck of the Steel Bridge 
across the Willamette River, mile 12.1, at Portland, OR. This deviation 
is necessary to accommodate the efficient movement of light rail and 
roadway traffic associated with the Starlight Parade in Portland, 
Oregon. This deviation allows the upper deck of the Steel Bridge to 
remain in the closed position to facilitate efficient movement of event 
patrons.

DATES: This deviation is effective from 7 p.m. on June 2, 2012 through 
11:30 p.m. June 2, 2012.

ADDRESSES: Documents mentioned in this preamble as being available in 
the docket are part of docket USCG-2012-0406 and are available online 
by going to https://www.regulations.gov, inserting

[[Page 29898]]

USCG-2012-0406 in the ``Keyword'' box and then clicking ``Search''. 
They are also available for inspection or copying at the Docket 
Management Facility (M-30), U.S. Department of Transportation, West 
Building Ground Floor, Room W12-140, 1200 New Jersey Avenue SE., 
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, 
except Federal holidays.

FOR FURTHER INFORMATION CONTACT: If you have questions on this rule, 
call or email the Bridge Administrator, Coast Guard Thirteenth 
District; telephone 206-220-7282 email randall.d.overton@uscg.mil. If 
you have questions on viewing the docket, call Renee V. Wright, Program 
Manager, Docket Operations, telephone 202-366-9826.

SUPPLEMENTARY INFORMATION: Trimet of Portland and the Oregon Department 
of Transportation have requested that the upper deck of the Steel 
Bridge remain closed to vessel traffic to facilitate safe efficient 
movement of light rail and roadway traffic associated with the 
Starlight Parade. The Steel Bridge crosses the Willamette River at mile 
12.1 and is a double-deck lift bridge with a lower lift deck and an 
upper lift deck which operate independent of each other. When both 
decks are in the down position the bridge provides 26 feet of vertical 
clearance above Columbia River Datum 0.0. When the lower deck is in the 
up position the bridge provides 71 feet of vertical clearance above 
Columbia River Datum 0.0. This deviation does not affect the operating 
schedule of the lower deck which opens on signal. Vessels which do not 
require an opening of the upper deck of the bridge may continue to 
transit beneath the bridge and, if needed, may obtain an opening of the 
lower deck of the bridge for passage during this closure period of the 
upper deck. Under normal conditions the upper deck of the Steel Bridge 
operates in accordance with 33 CFR 117.897(c)(3)(ii) which states that 
from 8 a.m. to 5 p.m. Monday through Friday one hour advance notice 
shall be given for draw openings and at all other times two hours 
advance notice shall be given to obtain an opening. This deviation 
period is from 7 p.m. on June 2, 2012 through 11:30 p.m. June 2, 2012. 
The deviation allows the upper deck of the Steel Bridge across the 
Willamette River, mile 12.1, to remain in the closed position and need 
not open for maritime traffic from 7 p.m. through 11:30 p.m. on June 2, 
2012. The bridge shall operate in accordance with 33 CFR 117.897 at all 
other times. Waterway usage on this stretch of the Willamette River 
includes vessels ranging from commercial tug and barge to small 
pleasure craft. Mariners will be notified and kept informed of the 
bridge's operational status via the Coast Guard Notice to Mariners 
publication and Broadcast Notice to Mariners as appropriate. The lift 
span will be required to open, if needed, for public vessels of the 
United States and Canada and for vessels engaged in emergency response 
operations during this closure period.
    In accordance with 33 CFR 117.35(e), the drawbridge must return to 
its regular operating schedule immediately at the end of the designated 
time period. This deviation from the operating regulations is 
authorized under 33 CFR 117.35.

    Dated: May 7, 2012.
Randall D. Overton,
Bridge Administrator.
[FR Doc. 2012-12237 Filed 5-18-12; 8:45 am]