Regency Field Services LLC, v. DCP Black Lake Pipe Holdings, LP; Notice of Complaint, 30002 [2012-12202]

Download as PDF 30002 Federal Register / Vol. 77, No. 98 / Monday, May 21, 2012 / Notices appropriate. The Respondent’s answer and all interventions, or protests must be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on June 11, 2012. Dated: May 15, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–12201 Filed 5–18–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. OR12–15–000] ebenthall on DSK5SPTVN1PROD with NOTICES Regency Field Services LLC, v. DCP Black Lake Pipe Holdings, LP; Notice of Complaint Take notice that on May 14, 2012, pursuant to sections 1(5), 1(6), 3(1), 8, 9, 13(1), 15(1), and 16(1) of the Interstate Commerce Act (ICA), 49 U.S.C. App. 1(5), 1(6), 3(1), 8, 9, 13(1), 15(1), and 16(1), and 18 CFR 343.3(c)(3) and 385.206, Regency Field Services LLC (Regency or Complainant) filed a complaint against DCP Black Lake Pipe Holdings, LP (Black Lake or Respondent) alleging that Black Lake has unlawfully and in an unjust and unreasonable manner assessed offspecification penalties against Regency associated with the transportation of Natural Gas Liquids pursuant to Rule 5 of Black Lake’s Rules and Regulations tariff (Tariff No. 79.1.0), filed with the VerDate Mar<15>2010 18:18 May 18, 2012 Jkt 226001 Commission on May 26, 2011 in Docket No. IS11–399–000. As Black Lake does not list contact persons on the Commission’s list of Corporate Officials, Regency certifies that copies of the complaint were served on the persons listed as the Issuer and Compiler of Black Lake’s Tariff No. 79.1.0. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondent’s answer and all interventions, or protests must be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on June 13, 2012. Dated: May 15, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–12202 Filed 5–18–12; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL12–69–000] Primary Power, LLC v. PJM Interconnection, LLC; Notice of Complaint Take notice that on May 14, 2012, pursuant to section 206 of the Rules and Practice and Procedure of the Federal Energy Regulatory Commission (Commission), 18 CFR 385.206 and sections 206 and 306 of the Federal Power Act, 16 U.S.C. 824(e) and 825(e), Primary Power, LLC (Complainant) filed a formal complaint against PJM Interconnection, LLC (PJM or Respondent) for the Respondent’s failure to designate the Complainant to construct, own, and finance two static VAR compensator (‘‘SVC’’) projects sponsored by the Complainant that have been included in the PJM Regional Transmission Expansion Plan. The Complainant requests that the Commission grant emergency, interim relief by directing PJM and the Incumbent Transmission Owners not to commence construction of the Primary Power SVC Projects while this Complaint is pending before the Commission. The Complainant states that a copy of the Complaint has been served on the contact for the Respondent as listed on the Commission list of Corporate Officials. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondent’s answer and all interventions, or protests must be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. E:\FR\FM\21MYN1.SGM 21MYN1

Agencies

[Federal Register Volume 77, Number 98 (Monday, May 21, 2012)]
[Notices]
[Page 30002]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-12202]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

 [Docket No. OR12-15-000]


Regency Field Services LLC, v. DCP Black Lake Pipe Holdings, LP; 
Notice of Complaint

    Take notice that on May 14, 2012, pursuant to sections 1(5), 1(6), 
3(1), 8, 9, 13(1), 15(1), and 16(1) of the Interstate Commerce Act 
(ICA), 49 U.S.C. App. 1(5), 1(6), 3(1), 8, 9, 13(1), 15(1), and 16(1), 
and 18 CFR 343.3(c)(3) and 385.206, Regency Field Services LLC (Regency 
or Complainant) filed a complaint against DCP Black Lake Pipe Holdings, 
LP (Black Lake or Respondent) alleging that Black Lake has unlawfully 
and in an unjust and unreasonable manner assessed off-specification 
penalties against Regency associated with the transportation of Natural 
Gas Liquids pursuant to Rule 5 of Black Lake's Rules and Regulations 
tariff (Tariff No. 79.1.0), filed with the Commission on May 26, 2011 
in Docket No. IS11-399-000.
    As Black Lake does not list contact persons on the Commission's 
list of Corporate Officials, Regency certifies that copies of the 
complaint were served on the persons listed as the Issuer and Compiler 
of Black Lake's Tariff No. 79.1.0.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. The Respondent's 
answer and all interventions, or protests must be filed on or before 
the comment date. The Respondent's answer, motions to intervene, and 
protests must be served on the Complainant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive email 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please email 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5:00 p.m. Eastern Time on June 13, 2012.

    Dated: May 15, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-12202 Filed 5-18-12; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.