Madison Farms; Notice of Declaration of Intention and Soliciting Comments, Protests, and/or Motions To Intervene, 29998-29999 [2012-12199]

Download as PDF 29998 Federal Register / Vol. 77, No. 98 / Monday, May 21, 2012 / Notices l995,5 see Explorer Pipeline Company, 71 FERC ¶ 61,416 at n.6 (1995). In addition to publishing the full text of this Notice in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print this Notice via the Internet through FERC’s Home Page (https:// www.ferc.gov) and in FERC’s Public Reference Room during normal business hours (8:30 a.m. to 5:00 p.m. Eastern time) at 888 First Street NE., Room 2A, Washington, DC 20426. The full text of this Notice is available on FERC’s Home Page at the eLibrary link. To access this document in eLibrary, type the docket number excluding the last three digits of this document in the docket number field and follow other directions on the search page. User assistance is available for eLibrary and other aspects of FERC’s Web site during normal business hours. For assistance, please contact the Commission’s Online Support at 1–866– 208–3676 (toll free) or 202–502–6652 (email at FERCOnlineSupport@ferc.gov), or the Public Reference Room at (202) 502–8371, TTY (202) 502–8659. Email the Public Reference Room at public.referenceroom@ferc.gov. Dated: May 15, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–12198 Filed 5–18–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. DI12–6–000] ebenthall on DSK5SPTVN1PROD with NOTICES Madison Farms; Notice of Declaration of Intention and Soliciting Comments, Protests, and/or Motions To Intervene Take notice that the following application has been filed with the Commission and is available for public inspection: a. Application Type: Declaration of Intention. b. Docket No.: DI12–6–000. c. Date Filed: April 18, 2012. d. Applicant: Madison Farms. e. Name of Project: Circle 49 and 50 Hydroelectric Project. f. Location: The proposed Circle 49 and 50 Hydroelectric Project will be located near the town of Echo, Umatilla County, Oregon, affecting T. 3 N, R. 27 E, sec. 17, Willamette Meridian. 5 For a listing of all prior multipliers issued by the Commission, see the Commission’s Web site, https://www.ferc.gov/industries/oil/gen-info/ pipeline-index.asp. VerDate Mar<15>2010 18:18 May 18, 2012 Jkt 226001 g. Filed Pursuant to: Section 23(b)(1) of the Federal Power Act, 16 U.S.C. 817(b). h. Applicant Contact: Kent Madison, 29299 Madison Road, Echo, OR 9826; telephone: (541) 376–8107; Fax: (541) 376–8618; email: www.Kmadison@eoni.com. i. FERC Contact: Any questions on this notice should be addressed to Henry Ecton, (202) 502–8768, or Email address: henry.ecton@ferc.gov. j. Deadline for filing comments, protests, and/or motions: June 15, 2012. Comments, Motions to Intervene, and Protests may be filed electronically via the Internet. See 18 CFR 385.2001(a)(l)(iii) and the instructions on the Commission’s Web site under the ‘‘eFiling’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. For more information on how to submit these types of filings, please go to the Commission’s Web site located at https://www.ferc.gov/ filing-comments.asp. Please include the docket number (DI12–6–000) on any comments, protests, and/or motions filed. k. Description of Project: The proposed Circle 49 and 50 Hydroelectric Project will be located on an existing irrigation canal system pipeline, and will consist of a 20-kW turbine generator at Circle 49, and a 24-kW turbine generator located at Circle 50, at pressure discharge valves. The power generated will be used to operate the pumps used for irrigation, supplemented by connection to the Umatilla Electric Cooperative, with a net metering arrangement. Water used in the irrigation system is taken from the Columbia River. When a Declaration of Intention is filed with the Federal Energy Regulatory Commission, the Federal Power Act requires the Commission to investigate and determine if the interests of interstate or foreign commerce would be affected by the project. The Commission also determines whether or not the project: (1) Would be located on a navigable waterway; (2) would occupy or affect public lands or reservations of the United States; (3) would utilize surplus water or water power from a government dam; or (4) if applicable, has involved or would involve any construction subsequent to 1935 that may have increased or would increase the project’s head or generating capacity, or have otherwise significantly PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 modified the project’s pre-1935 design or operation. l. Locations of the Application: Copies of this filing are on file with the Commission and are available for public inspection. This filing may be viewed on the web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the Docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOlineSupport@ferc.gov for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents—All filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTESTS’’, AND/OR ‘‘MOTIONS TO INTERVENE’’, as applicable, and the Docket Number of the particular application to which the filing refers. A copy of any Motion to Intervene must also be served upon each representative of the Applicant specified in the particular application. p. Agency Comments—Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. E:\FR\FM\21MYN1.SGM 21MYN1 Federal Register / Vol. 77, No. 98 / Monday, May 21, 2012 / Notices Dated: May 15, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–12199 Filed 5–18–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2197–098] ebenthall on DSK5SPTVN1PROD with NOTICES Georgia Power Company; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Non-project use of project lands and waters. b. Project No.: 2197–098. c. Date Filed: January 17, 2012. d. Applicant: Alcoa Power Generating Inc. e. Name of Project: Yadkin Hydroelectric Project. f. Location: The Yadkin Hydroelectric Project is located on the Yadkin River, near High Rock Reservoir in Rowan County, North Carolina. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Mashall Olson, Alcoa Power Generating Inc—Yadkin Division, P.O. Box 576, Badin, NC 28009. (704) 422–5622. i. FERC Contact: Jade Alvey at (202) 502–6864, or email: jade.alvey@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests: June 15, 2012. All documents may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Please include the project VerDate Mar<15>2010 18:18 May 18, 2012 Jkt 226001 number (P–2197–098) on any comments, motions, or recommendations filed. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Description of Request: Alcoa Power Generating Inc. requests Commission approval to grant Alcoa Power Generating Inc. (permittee) a permit, to conduct sand mining using a hydraulic dredge/barge operation, along the Yadkin River as it enters the upper portion of High Rock Reservoir. The mining operation would impact about 51 acres within the project boundary, to include a barge access area and return water discharge. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at Ameren’s shoreline office. Agencies may obtain copies of the application directly from the applicant. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214, respectively. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 29999 Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Documents: Any filing must (1) Bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person commenting, protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. Any filing made by an intervenor must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. Dated: May 15, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–12203 Filed 5–18–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #2 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC12–99–000. Applicants: Lowell Cogeneration Company Limited Partnership, Power City Partners, L.P. Description: Application for Authorization for Disposition of Jurisdictional Facilities and Request for Expedited Action of Lowell Cogeneration Company Limited Partnership, et al. Filed Date: 5/10/12. Accession Number: 20120510–5075. Comments Due: 5 p.m. ET 5/31/12. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER12–1742–001. Applicants: International Transmission Company. Description: Errata Filing to be effective 7/10/2012. Filed Date: 5/10/12. Accession Number: 20120510–5064. Comments Due: 5 p.m. ET 5/31/12. Docket Numbers: ER12–1755–000. E:\FR\FM\21MYN1.SGM 21MYN1

Agencies

[Federal Register Volume 77, Number 98 (Monday, May 21, 2012)]
[Notices]
[Pages 29998-29999]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-12199]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. DI12-6-000]


Madison Farms; Notice of Declaration of Intention and Soliciting 
Comments, Protests, and/or Motions To Intervene

    Take notice that the following application has been filed with the 
Commission and is available for public inspection:
    a. Application Type: Declaration of Intention.
    b. Docket No.: DI12-6-000.
    c. Date Filed: April 18, 2012.
    d. Applicant: Madison Farms.
    e. Name of Project: Circle 49 and 50 Hydroelectric Project.
    f. Location: The proposed Circle 49 and 50 Hydroelectric Project 
will be located near the town of Echo, Umatilla County, Oregon, 
affecting T. 3 N, R. 27 E, sec. 17, Willamette Meridian.
    g. Filed Pursuant to: Section 23(b)(1) of the Federal Power Act, 16 
U.S.C. 817(b).
    h. Applicant Contact: Kent Madison, 29299 Madison Road, Echo, OR 
9826; telephone: (541) 376-8107; Fax: (541) 376-8618; email: 
www.Kmadison@eoni.com.
    i. FERC Contact: Any questions on this notice should be addressed 
to Henry Ecton, (202) 502-8768, or Email address: henry.ecton@ferc.gov.
    j. Deadline for filing comments, protests, and/or motions: June 15, 
2012.
    Comments, Motions to Intervene, and Protests may be filed 
electronically via the Internet. See 18 CFR 385.2001(a)(l)(iii) and the 
instructions on the Commission's Web site under the ``eFiling'' link. 
If unable to be filed electronically, documents may be paper-filed. To 
paper-file, an original and eight copies should be mailed to: Kimberly 
D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First 
Street NE., Washington, DC 20426. For more information on how to submit 
these types of filings, please go to the Commission's Web site located 
at https://www.ferc.gov/filing-comments.asp. Please include the docket 
number (DI12-6-000) on any comments, protests, and/or motions filed.
    k. Description of Project: The proposed Circle 49 and 50 
Hydroelectric Project will be located on an existing irrigation canal 
system pipeline, and will consist of a 20-kW turbine generator at 
Circle 49, and a 24-kW turbine generator located at Circle 50, at 
pressure discharge valves. The power generated will be used to operate 
the pumps used for irrigation, supplemented by connection to the 
Umatilla Electric Cooperative, with a net metering arrangement. Water 
used in the irrigation system is taken from the Columbia River.
    When a Declaration of Intention is filed with the Federal Energy 
Regulatory Commission, the Federal Power Act requires the Commission to 
investigate and determine if the interests of interstate or foreign 
commerce would be affected by the project. The Commission also 
determines whether or not the project: (1) Would be located on a 
navigable waterway; (2) would occupy or affect public lands or 
reservations of the United States; (3) would utilize surplus water or 
water power from a government dam; or (4) if applicable, has involved 
or would involve any construction subsequent to 1935 that may have 
increased or would increase the project's head or generating capacity, 
or have otherwise significantly modified the project's pre-1935 design 
or operation.
    l. Locations of the Application: Copies of this filing are on file 
with the Commission and are available for public inspection. This 
filing may be viewed on the web at https://www.ferc.gov using the 
``eLibrary'' link. Enter the Docket number excluding the last three 
digits in the docket number field to access the document. You may also 
register online at https://www.ferc.gov/docs-filing/esubscription.asp to 
be notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3676 or email 
FERCOlineSupport@ferc.gov for TTY, call (202) 502-8659. A copy is also 
available for inspection and reproduction at the address in item (h) 
above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene--Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents--All filings must 
bear in all capital letters the title ``COMMENTS'', ``PROTESTS'', AND/
OR ``MOTIONS TO INTERVENE'', as applicable, and the Docket Number of 
the particular application to which the filing refers. A copy of any 
Motion to Intervene must also be served upon each representative of the 
Applicant specified in the particular application.
    p. Agency Comments--Federal, state, and local agencies are invited 
to file comments on the described application. A copy of the 
application may be obtained by agencies directly from the Applicant. If 
an agency does not file comments within the time specified for filing 
comments, it will be presumed to have no comments. One copy of an 
agency's comments must also be sent to the Applicant's representatives.


[[Page 29999]]


    Dated: May 15, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-12199 Filed 5-18-12; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.