Madison Farms; Notice of Declaration of Intention and Soliciting Comments, Protests, and/or Motions To Intervene, 29998-29999 [2012-12199]
Download as PDF
29998
Federal Register / Vol. 77, No. 98 / Monday, May 21, 2012 / Notices
l995,5 see Explorer Pipeline Company,
71 FERC ¶ 61,416 at n.6 (1995).
In addition to publishing the full text
of this Notice in the Federal Register,
the Commission provides all interested
persons an opportunity to view and/or
print this Notice via the Internet
through FERC’s Home Page (https://
www.ferc.gov) and in FERC’s Public
Reference Room during normal business
hours (8:30 a.m. to 5:00 p.m. Eastern
time) at 888 First Street NE., Room 2A,
Washington, DC 20426. The full text of
this Notice is available on FERC’s Home
Page at the eLibrary link. To access this
document in eLibrary, type the docket
number excluding the last three digits of
this document in the docket number
field and follow other directions on the
search page.
User assistance is available for
eLibrary and other aspects of FERC’s
Web site during normal business hours.
For assistance, please contact the
Commission’s Online Support at 1–866–
208–3676 (toll free) or 202–502–6652
(email at FERCOnlineSupport@ferc.gov),
or the Public Reference Room at (202)
502–8371, TTY (202) 502–8659. Email
the Public Reference Room at
public.referenceroom@ferc.gov.
Dated: May 15, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–12198 Filed 5–18–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. DI12–6–000]
ebenthall on DSK5SPTVN1PROD with NOTICES
Madison Farms; Notice of Declaration
of Intention and Soliciting Comments,
Protests, and/or Motions To Intervene
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Declaration of
Intention.
b. Docket No.: DI12–6–000.
c. Date Filed: April 18, 2012.
d. Applicant: Madison Farms.
e. Name of Project: Circle 49 and 50
Hydroelectric Project.
f. Location: The proposed Circle 49
and 50 Hydroelectric Project will be
located near the town of Echo, Umatilla
County, Oregon, affecting T. 3 N, R. 27
E, sec. 17, Willamette Meridian.
5 For a listing of all prior multipliers issued by the
Commission, see the Commission’s Web site,
https://www.ferc.gov/industries/oil/gen-info/
pipeline-index.asp.
VerDate Mar<15>2010
18:18 May 18, 2012
Jkt 226001
g. Filed Pursuant to: Section 23(b)(1)
of the Federal Power Act, 16 U.S.C.
817(b).
h. Applicant Contact: Kent Madison,
29299 Madison Road, Echo, OR 9826;
telephone: (541) 376–8107; Fax: (541)
376–8618; email:
www.Kmadison@eoni.com.
i. FERC Contact: Any questions on
this notice should be addressed to
Henry Ecton, (202) 502–8768, or Email
address: henry.ecton@ferc.gov.
j. Deadline for filing comments,
protests, and/or motions: June 15, 2012.
Comments, Motions to Intervene, and
Protests may be filed electronically via
the Internet. See 18 CFR
385.2001(a)(l)(iii) and the instructions
on the Commission’s Web site under the
‘‘eFiling’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426. For more
information on how to submit these
types of filings, please go to the
Commission’s Web site located at
https://www.ferc.gov/
filing-comments.asp. Please include the
docket number (DI12–6–000) on any
comments, protests, and/or motions
filed.
k. Description of Project: The
proposed Circle 49 and 50 Hydroelectric
Project will be located on an existing
irrigation canal system pipeline, and
will consist of a 20-kW turbine
generator at Circle 49, and a 24-kW
turbine generator located at Circle 50, at
pressure discharge valves. The power
generated will be used to operate the
pumps used for irrigation,
supplemented by connection to the
Umatilla Electric Cooperative, with a
net metering arrangement. Water used
in the irrigation system is taken from the
Columbia River.
When a Declaration of Intention is
filed with the Federal Energy Regulatory
Commission, the Federal Power Act
requires the Commission to investigate
and determine if the interests of
interstate or foreign commerce would be
affected by the project. The Commission
also determines whether or not the
project: (1) Would be located on a
navigable waterway; (2) would occupy
or affect public lands or reservations of
the United States; (3) would utilize
surplus water or water power from a
government dam; or (4) if applicable,
has involved or would involve any
construction subsequent to 1935 that
may have increased or would increase
the project’s head or generating
capacity, or have otherwise significantly
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
modified the project’s pre-1935 design
or operation.
l. Locations of the Application: Copies
of this filing are on file with the
Commission and are available for public
inspection. This filing may be viewed
on the web at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the Docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOlineSupport@ferc.gov for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents—All filings must bear in all
capital letters the title ‘‘COMMENTS’’,
‘‘PROTESTS’’, AND/OR ‘‘MOTIONS TO
INTERVENE’’, as applicable, and the
Docket Number of the particular
application to which the filing refers. A
copy of any Motion to Intervene must
also be served upon each representative
of the Applicant specified in the
particular application.
p. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
E:\FR\FM\21MYN1.SGM
21MYN1
Federal Register / Vol. 77, No. 98 / Monday, May 21, 2012 / Notices
Dated: May 15, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–12199 Filed 5–18–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2197–098]
ebenthall on DSK5SPTVN1PROD with NOTICES
Georgia Power Company; Notice of
Application for Amendment of License
and Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Non-project use
of project lands and waters.
b. Project No.: 2197–098.
c. Date Filed: January 17, 2012.
d. Applicant: Alcoa Power Generating
Inc.
e. Name of Project: Yadkin
Hydroelectric Project.
f. Location: The Yadkin Hydroelectric
Project is located on the Yadkin River,
near High Rock Reservoir in Rowan
County, North Carolina.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Mashall Olson,
Alcoa Power Generating Inc—Yadkin
Division, P.O. Box 576, Badin, NC
28009. (704) 422–5622.
i. FERC Contact: Jade Alvey at (202)
502–6864, or email: jade.alvey@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests: June
15, 2012.
All documents may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Secretary,
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426. Please include the project
VerDate Mar<15>2010
18:18 May 18, 2012
Jkt 226001
number (P–2197–098) on any
comments, motions, or
recommendations filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: Alcoa
Power Generating Inc. requests
Commission approval to grant Alcoa
Power Generating Inc. (permittee) a
permit, to conduct sand mining using a
hydraulic dredge/barge operation, along
the Yadkin River as it enters the upper
portion of High Rock Reservoir. The
mining operation would impact about
51 acres within the project boundary, to
include a barge access area and return
water discharge.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at Ameren’s shoreline
office. Agencies may obtain copies of
the application directly from the
applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
29999
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) Bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: May 15, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–12203 Filed 5–18–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC12–99–000.
Applicants: Lowell Cogeneration
Company Limited Partnership, Power
City Partners, L.P.
Description: Application for
Authorization for Disposition of
Jurisdictional Facilities and Request for
Expedited Action of Lowell
Cogeneration Company Limited
Partnership, et al.
Filed Date: 5/10/12.
Accession Number: 20120510–5075.
Comments Due: 5 p.m. ET 5/31/12.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER12–1742–001.
Applicants: International
Transmission Company.
Description: Errata Filing to be
effective 7/10/2012.
Filed Date: 5/10/12.
Accession Number: 20120510–5064.
Comments Due: 5 p.m. ET 5/31/12.
Docket Numbers: ER12–1755–000.
E:\FR\FM\21MYN1.SGM
21MYN1
Agencies
[Federal Register Volume 77, Number 98 (Monday, May 21, 2012)]
[Notices]
[Pages 29998-29999]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-12199]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. DI12-6-000]
Madison Farms; Notice of Declaration of Intention and Soliciting
Comments, Protests, and/or Motions To Intervene
Take notice that the following application has been filed with the
Commission and is available for public inspection:
a. Application Type: Declaration of Intention.
b. Docket No.: DI12-6-000.
c. Date Filed: April 18, 2012.
d. Applicant: Madison Farms.
e. Name of Project: Circle 49 and 50 Hydroelectric Project.
f. Location: The proposed Circle 49 and 50 Hydroelectric Project
will be located near the town of Echo, Umatilla County, Oregon,
affecting T. 3 N, R. 27 E, sec. 17, Willamette Meridian.
g. Filed Pursuant to: Section 23(b)(1) of the Federal Power Act, 16
U.S.C. 817(b).
h. Applicant Contact: Kent Madison, 29299 Madison Road, Echo, OR
9826; telephone: (541) 376-8107; Fax: (541) 376-8618; email:
www.Kmadison@eoni.com.
i. FERC Contact: Any questions on this notice should be addressed
to Henry Ecton, (202) 502-8768, or Email address: henry.ecton@ferc.gov.
j. Deadline for filing comments, protests, and/or motions: June 15,
2012.
Comments, Motions to Intervene, and Protests may be filed
electronically via the Internet. See 18 CFR 385.2001(a)(l)(iii) and the
instructions on the Commission's Web site under the ``eFiling'' link.
If unable to be filed electronically, documents may be paper-filed. To
paper-file, an original and eight copies should be mailed to: Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426. For more information on how to submit
these types of filings, please go to the Commission's Web site located
at https://www.ferc.gov/filing-comments.asp. Please include the docket
number (DI12-6-000) on any comments, protests, and/or motions filed.
k. Description of Project: The proposed Circle 49 and 50
Hydroelectric Project will be located on an existing irrigation canal
system pipeline, and will consist of a 20-kW turbine generator at
Circle 49, and a 24-kW turbine generator located at Circle 50, at
pressure discharge valves. The power generated will be used to operate
the pumps used for irrigation, supplemented by connection to the
Umatilla Electric Cooperative, with a net metering arrangement. Water
used in the irrigation system is taken from the Columbia River.
When a Declaration of Intention is filed with the Federal Energy
Regulatory Commission, the Federal Power Act requires the Commission to
investigate and determine if the interests of interstate or foreign
commerce would be affected by the project. The Commission also
determines whether or not the project: (1) Would be located on a
navigable waterway; (2) would occupy or affect public lands or
reservations of the United States; (3) would utilize surplus water or
water power from a government dam; or (4) if applicable, has involved
or would involve any construction subsequent to 1935 that may have
increased or would increase the project's head or generating capacity,
or have otherwise significantly modified the project's pre-1935 design
or operation.
l. Locations of the Application: Copies of this filing are on file
with the Commission and are available for public inspection. This
filing may be viewed on the web at https://www.ferc.gov using the
``eLibrary'' link. Enter the Docket number excluding the last three
digits in the docket number field to access the document. You may also
register online at https://www.ferc.gov/docs-filing/esubscription.asp to
be notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or email
FERCOlineSupport@ferc.gov for TTY, call (202) 502-8659. A copy is also
available for inspection and reproduction at the address in item (h)
above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene--Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents--All filings must
bear in all capital letters the title ``COMMENTS'', ``PROTESTS'', AND/
OR ``MOTIONS TO INTERVENE'', as applicable, and the Docket Number of
the particular application to which the filing refers. A copy of any
Motion to Intervene must also be served upon each representative of the
Applicant specified in the particular application.
p. Agency Comments--Federal, state, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
[[Page 29999]]
Dated: May 15, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-12199 Filed 5-18-12; 8:45 am]
BILLING CODE 6717-01-P