Alta Wind VII, LLC, Alta Wind IX, LLC, Alta Wind X, LLC, Alta Wind XI, LLC, Alta Wind XII, LLC, Alta Wind XIII, LLC, Alta Wind XIV, LLC, Alta Wind XV, LLC, Alta Windpower Development, LLC, TGP Development Company, LLC; Notice of Petition for Declaratory Order, 29633 [2012-12075]
Download as PDF
Federal Register / Vol. 77, No. 97 / Friday, May 18, 2012 / Notices
Dated: May 14, 2012.
Kimberly D. Bose,
Secretary.
Reference Room in Washington, DC.
There is an eSubscription link on the
web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
[FR Doc. 2012–12070 Filed 5–17–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Dated: May 14, 2012.
Kimberly D. Bose,
Secretary.
[Docket No. ER12–1769–000]
mstockstill on DSK4VPTVN1PROD with NOTICES
Viridian Energy NG, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
[FR Doc. 2012–12071 Filed 5–17–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
This is a supplemental notice in the
above-referenced proceeding of Viridian
Energy NG, LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
Part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR Part 34, of
future issuances of securities and
assumptions of liability, is June 4, 2012.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
VerDate Mar<15>2010
18:21 May 17, 2012
Jkt 226001
Federal Energy Regulatory
Commission
[Docket No. EL12–68–000]
Alta Wind VII, LLC, Alta Wind IX, LLC,
Alta Wind X, LLC, Alta Wind XI, LLC,
Alta Wind XII, LLC, Alta Wind XIII, LLC,
Alta Wind XIV, LLC, Alta Wind XV, LLC,
Alta Windpower Development, LLC,
TGP Development Company, LLC;
Notice of Petition for Declaratory Order
Take notice that on May 10, 2012,
pursuant to Rule 207 of the Federal
Energy Regulatory Commission’s
(Commission) Rules of Practice and
Procedure, 18 CFR 385.207, Alta Wind
VII, LLC, Alta Wind IX, LLC, Alta Wind
X, LLC, Alta Wind XI, LLC, Alta Wind
XII, LLC, Alta Wind XIII, LLC, Alta
Wind XIV, LLC, Alta Wind XV, LLC,
Alta Windpower Development, LLC,
and TGP Development Company, LLC
(collectively, Petitioners), jointly
submitted a Petition for Declaratory
Order requesting the Commission to (1)
confirm the Petitioners’ priority to firm
transmission rights to the capacity of
three transmission lines to be
constructed by Alta VII and Alta IX to
interconnect the full planned capacity
of Petitioners’ wind and solar generation
projects to the integrated transmission
grid and (2) waive Order Numbers 888,
889, and 890, and the Standards of
Conduct, unless and until a third party
submits a valid request for transmission
service.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
29633
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on June 11, 2012.
Dated: May 14, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–12075 Filed 5–17–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL12–57–000]
MidAmerican Energy Company; Notice
of Petition for Declaratory Order
Take notice that on April 20, 2012,
pursuant to Rule 207 of the Federal
Energy Regulatory Commission’s
(Commission) Rules of Practice and
Procedure, 18 CFR 385.207,
MidAmerican Energy Company,
submitted a petition requesting the
Commission to issue a declaratory order
approving proposed re-delineation and
re-classification of its electric facilities
between transmission and local
distribution.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
E:\FR\FM\18MYN1.SGM
18MYN1
Agencies
[Federal Register Volume 77, Number 97 (Friday, May 18, 2012)]
[Notices]
[Page 29633]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-12075]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL12-68-000]
Alta Wind VII, LLC, Alta Wind IX, LLC, Alta Wind X, LLC, Alta
Wind XI, LLC, Alta Wind XII, LLC, Alta Wind XIII, LLC, Alta Wind XIV,
LLC, Alta Wind XV, LLC, Alta Windpower Development, LLC, TGP
Development Company, LLC; Notice of Petition for Declaratory Order
Take notice that on May 10, 2012, pursuant to Rule 207 of the
Federal Energy Regulatory Commission's (Commission) Rules of Practice
and Procedure, 18 CFR 385.207, Alta Wind VII, LLC, Alta Wind IX, LLC,
Alta Wind X, LLC, Alta Wind XI, LLC, Alta Wind XII, LLC, Alta Wind
XIII, LLC, Alta Wind XIV, LLC, Alta Wind XV, LLC, Alta Windpower
Development, LLC, and TGP Development Company, LLC (collectively,
Petitioners), jointly submitted a Petition for Declaratory Order
requesting the Commission to (1) confirm the Petitioners' priority to
firm transmission rights to the capacity of three transmission lines to
be constructed by Alta VII and Alta IX to interconnect the full planned
capacity of Petitioners' wind and solar generation projects to the
integrated transmission grid and (2) waive Order Numbers 888, 889, and
890, and the Standards of Conduct, unless and until a third party
submits a valid request for transmission service.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date. On or
before the comment date, it is not necessary to serve motions to
intervene or protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive email
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please email
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5:00 p.m. Eastern Time on June 11, 2012.
Dated: May 14, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-12075 Filed 5-17-12; 8:45 am]
BILLING CODE 6717-01-P