Elba Express Company, L.L.C.; Notice of Amendment to Petition To Amend Order Issuing Certificate, 28864-28865 [2012-11832]

Download as PDF 28864 Federal Register / Vol. 77, No. 95 / Wednesday, May 16, 2012 / Notices • Electronic record retention/storage cost: $37,411.25 [1,730 hours ÷ 2 = 865 hours * $28/hour 5 = $24,220; 6 electronic record storage cost: 865 * $15.25/year 7 = $13,191; total electronic record storage cost: $37,411]. Comments: Comments are invited on: (1) Whether the collection of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency’s estimate of the burden and cost of the collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collection; and (4) ways to minimize the burden of the collection of information on those who are to respond, including the use of automated collection techniques or other forms of information technology. Dated: May 10, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–11831 Filed 5–15–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP12–11–001] Elba Express Company, L.L.C.; Notice of Amendment to Petition To Amend Order Issuing Certificate srobinson on DSK4SPTVN1PROD with NOTICES Take notice that on May 3, 2012, Elba Express Company, L.L.C. (Elba Express), located at 569 Brookwood Village, Suite 501, Birmingham, Alabama 35209, filed an Amendment to its Petition To Amend Order Issuing Certificate (Amendment to Petition To Amend) in the above referenced docket pursuant to section 385.207 and 385.2001 of the Commission’s regulations under the Natural Gas Act (NGA) to amend their certificate issued in Docket No. CP06– 471–000. Elba Express filed a Petition To Amend Order Issuing Certificate on October 31, 2011 (Petition To Amend) in Docket No. CP12–11–000, requesting authorization to change the location of the Phase B Compression from Jenkins County, Georgia to Elbert County, Georgia. As noticed herein, this amendment requests the Commission 5 The Commission bases the $28/hour figure on a FERC staff study that included estimating public utility recordkeeping costs. 6 Only 50% of records are retained in electronic formats. 7 Per entity; the Commission bases this figure on the estimated cost to service and to store 1 GB of data (based on the aggregated cost of an IBM advanced data protection server). VerDate Mar<15>2010 19:33 May 15, 2012 Jkt 226001 consider a site in Hart County, Georgia, as the preferred site for the Phase B Compression. Elba Express notes that the horsepower and incremental capacity will remain the same as that requested in the Petition To Amend, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site Web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Any questions concerning this application may be directed to Pamela R. Donaldson, Principal Regulatory Analyst, Elba Express Company, L.L.C., 569 Brookwood Village, Suite 501, Birmingham, Alabama 35209, by telephone at (205) 325–3739 or by email at pam.donaldson@elpaso.com. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the PO 00000 Frm 00014 Fmt 4703 Sfmt 4703 service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 7 copies of filings made in the proceeding with the Commission and must mail a copy to the applicant and to every other party. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and seven copies of the protest or intervention to the Federal Energy regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to E:\FR\FM\16MYN1.SGM 16MYN1 Federal Register / Vol. 77, No. 95 / Wednesday, May 16, 2012 / Notices receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: May 31, 2012. Dated: May 10, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–11832 Filed 5–15–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 6764–036] srobinson on DSK4SPTVN1PROD with NOTICES BMB Enterprises, Inc.; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Terms and Conditions, and Fishway Prescriptions Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Amendment of license. b. Project No.: 6764–036. c. Date Filed: December 5, 2011, and supplemented on April 30, 2012. d. Applicant: BMB Enterprises, Inc. e. Name of Project: Sixmile Creek Hydroelectric Project. f. Location: When constructed, the project will be located on the Sixmile Creek in Sanpete County, Utah. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Brad F. Hutchings, BMB Enterprises, Inc., 282 North 1350 East, Bountiful, Utah 84010; telephone (801) 298–7383. i. FERC Contact: Linda Stewart, telephone: (202) 502–6680, and email address: linda.stewart@ferc.gov. j. Deadline for filing motions to intervene and protests, comments, recommendations, terms and conditions, and fishway prescriptions is 60 days from the issuance of this notice; reply comments are due 105 days from the issuance date of this notice. All documents may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the VerDate Mar<15>2010 18:41 May 15, 2012 Jkt 226001 eComment system at https://www.ferc. gov/docs-filing/ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Please include the project number (P–6764– 036) on any comments, motions, or recommendations filed. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Description of Request: BMB Enterprises, Inc. (licensee) proposes to modify various project facilities as authorized in the October 16, 1987 Order Issuing License (Minor Project). Instead of constructing a new powerhouse containing two 325kilowatt (kW) turbine generating units for a total installed capacity of 650 kW, the licensee proposes to construct a new powerhouse containing two 350-kW and two 330-kW turbine generating units for a total installed capacity of 1,360 kW. The hydraulic capacity of the project would increase from 20 to 40 cubic feet per second. The licensee also proposes to: modify the diversion structure and install screens; increase the penstock size from 24 to 30 inches in diameter; and change the transmission line route. Additionally, the licensee proposes to modify the instream minimum flow requirements pursuant to Article 103.1 l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket 1 The minimum flow requirement as specified in Article 103 is a section 4(e) license condition stipulated by the U.S. Forest Service. PO 00000 Frm 00015 Fmt 4703 Sfmt 4703 28865 number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: All filings must (1) bear in all capital letters the title ‘‘PROTEST’’, ‘‘MOTION TO INTERVENE’’, ‘‘COMMENTS,’’ ‘‘REPLY COMMENTS,’’ ‘‘RECOMMENDATIONS,’’ ’’ TERMS AND CONDITIONS,’’ or ‘‘FISHWAY PRESCRIPTIONS;’’ (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, recommendations, terms and conditions or prescriptions should relate to project works which are the subject of the license amendment. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they E:\FR\FM\16MYN1.SGM 16MYN1

Agencies

[Federal Register Volume 77, Number 95 (Wednesday, May 16, 2012)]
[Notices]
[Pages 28864-28865]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-11832]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP12-11-001]


Elba Express Company, L.L.C.; Notice of Amendment to Petition To 
Amend Order Issuing Certificate

    Take notice that on May 3, 2012, Elba Express Company, L.L.C. (Elba 
Express), located at 569 Brookwood Village, Suite 501, Birmingham, 
Alabama 35209, filed an Amendment to its Petition To Amend Order 
Issuing Certificate (Amendment to Petition To Amend) in the above 
referenced docket pursuant to section 385.207 and 385.2001 of the 
Commission's regulations under the Natural Gas Act (NGA) to amend their 
certificate issued in Docket No. CP06-471-000. Elba Express filed a 
Petition To Amend Order Issuing Certificate on October 31, 2011 
(Petition To Amend) in Docket No. CP12-11-000, requesting authorization 
to change the location of the Phase B Compression from Jenkins County, 
Georgia to Elbert County, Georgia. As noticed herein, this amendment 
requests the Commission consider a site in Hart County, Georgia, as the 
preferred site for the Phase B Compression. Elba Express notes that the 
horsepower and incremental capacity will remain the same as that 
requested in the Petition To Amend, all as more fully set forth in the 
application which is on file with the Commission and open to public 
inspection. The filing is available for review at the Commission in the 
Public Reference Room or may be viewed on the Commission's Web site Web 
at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket 
number excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC at 
FERCOnlineSupport@ferc.gov or call toll-free, (886) 208-3676 or TYY, 
(202) 502-8659.
    Any questions concerning this application may be directed to Pamela 
R. Donaldson, Principal Regulatory Analyst, Elba Express Company, 
L.L.C., 569 Brookwood Village, Suite 501, Birmingham, Alabama 35209, by 
telephone at (205) 325-3739 or by email at pam.donaldson@elpaso.com.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, 
within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before the comment date stated below file with the Federal Energy 
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a 
motion to intervene in accordance with the requirements of the 
Commission's Rules of Practice and Procedure (18 CFR 385.214 or 
385.211) and the Regulations under the NGA (18 CFR 157.10). A person 
obtaining party status will be placed on the service list maintained by 
the Secretary of the Commission and will receive copies of all 
documents filed by the applicant and by all other parties. A party must 
submit 7 copies of filings made in the proceeding with the Commission 
and must mail a copy to the applicant and to every other party. Only 
parties to the proceeding can ask for court review of Commission orders 
in the proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commentors will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commentors will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentors will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests and interventions in lieu of paper using the ``eFiling'' link 
at https://www.ferc.gov. Persons unable to file electronically should 
submit an original and seven copies of the protest or intervention to 
the Federal Energy regulatory Commission, 888 First Street NE., 
Washington, DC 20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to

[[Page 28865]]

receive email notification when a document is added to a subscribed 
docket(s). For assistance with any FERC Online service, please email 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: May 31, 2012.

    Dated: May 10, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-11832 Filed 5-15-12; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.