Combined Notice of Filings #1, 28868-28869 [2012-11805]
Download as PDF
srobinson on DSK4SPTVN1PROD with NOTICES
28868
Federal Register / Vol. 77, No. 95 / Wednesday, May 16, 2012 / Notices
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA
(18 CFR 157.10). A person obtaining
party status will be placed on the
service list maintained by the Secretary
of the Commission and will receive
copies of all documents filed by the
applicant and by all other parties. A
party must submit 7 copies of filings
made with the Commission and must
mail a copy to the applicant and to
every other party in the proceeding.
Only parties to the proceeding can ask
for court review of Commission orders
in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
VerDate Mar<15>2010
18:41 May 15, 2012
Jkt 226001
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 7 copies of the protest or
intervention to the Federal Energy
regulatory Commission, 888 First Street
NE., Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: May 31, 2012.
Dated: May 10, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–11833 Filed 5–15–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER12–1660–001.
Applicants: Tuscola Bay Wind, LLC.
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
Description: Amendment to Tuscola
Bay Wind, LLC MBR Tariff to be
effective 6/29/2012.
Filed Date: 5/8/12.
Accession Number: 20120508–5121.
Comments Due: 5 p.m. ET 5/29/12.
Docket Numbers: ER12–1713–001.
Applicants: Southwest Power Pool,
Inc.
Description: Amendment to 2415
Kansas Municipal Energy Agency
NITSA NOA to be effective 4/1/2012.
Filed Date: 5/9/12.
Accession Number: 20120509–5099.
Comments Due: 5 p.m. ET 5/30/12.
Docket Numbers: ER12–1744–000.
Applicants: Dennis Energy Company.
Description: Cancellation of Tariff to
be effective 5/8/2012.
Filed Date: 5/8/12.
Accession Number: 20120508–5125.
Comments Due: 5 p.m. ET 5/29/12.
Docket Numbers: ER12–1745–000.
Applicants: Copper Mountain Solar 2,
LLC.
Description: Copper Mountain Solar 2
LLC Concurrence to Joint Use
Agreement to be effective 5/8/2012.
Filed Date: 5/8/12.
Accession Number: 20120508–5136.
Comments Due: 5 p.m. ET 5/29/12.
Docket Numbers: ER12–1746–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Original Service
Agreement No. 3281; Queue No. W3–
101 to be effective 4/11/2012.
Filed Date: 5/9/12
Accession Number: 20120509–5034.
Comments Due: 5 p.m. ET 5/30/12.
Docket Numbers: ER12–1747–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Original Service
Agreement No. 3286; Queue No. X3–001
to be effective 4/13/2012.
Filed Date: 5/9/12.
Accession Number: 20120509–5035.
Comments Due: 5 p.m. ET 5/30/12.
Docket Numbers: ER12–1748–000.
Applicants: Midwest Independent
Transmission System Operator, Inc.
Description: G587 GIA to be effective
5/10/2012.
Filed Date: 5/9/12
Accession Number: 20120509–5057.
Comments Due: 5 p.m. ET 5/30/12.
Docket Numbers: ER12–1749–000.
Applicants: International
Transmission Company.
Description: Notice of Succession to
be effective 7/11/2012.
Filed Date: 5/9/12.
Accession Number: 20120509–5059.
Comments Due: 5 p.m. ET 5/30/12.
Docket Numbers: ER12–1750–000.
Applicants: Delmarva Power & Light
Company.
E:\FR\FM\16MYN1.SGM
16MYN1
Federal Register / Vol. 77, No. 95 / Wednesday, May 16, 2012 / Notices
Description: Construction Agreement
Between Delmarva and ODEC to be
effective 6/12/2012.
Filed Date: 5/9/12.
Accession Number: 20120509–5067.
Comments Due: 5 p.m. ET 5/30/12.
Docket Numbers: ER12–1751–000.
Applicants: Renewable Power
Strategies, LLC.
Description: Market-Based Rate Tariff
to be effective 6/8/2012.
Filed Date: 5/9/12.
Accession Number: 20120509–5079.
Comments Due: 5 p.m. ET 5/30/12.
Docket Numbers: ER12–1752–000.
Applicants: Nevada Power Company.
Description: Rate Schedule No. 127
SDG&E Ancillary Services Agreement to
be effective 5/10/2012.
Filed Date: 5/9/12.
Accession Number: 20120509–5090.
Comments Due: 5 p.m. ET 5/30/12.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: May 9, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–11805 Filed 5–15–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
srobinson on DSK4SPTVN1PROD with NOTICES
Federal Energy Regulatory
Commission
Notice of Commission Staff
Attendance
The Federal Energy Regulatory
Commission hereby gives notice that
members of the Commission’s staff may
attend the following meeting related to
the transmission planning activities of
the Southern Company Services, Inc.:
VerDate Mar<15>2010
18:41 May 15, 2012
Jkt 226001
2012 Southeastern Regional
Transmission Planning Process
(SERTP) Interim Meeting on Order No.
1000
May 17, 2012, 9:00 a.m.–12:00 p.m.,
Local Time.
The above-referenced meeting will be
a Telephone/Web Conferencing
meeting.
The above-referenced meeting is open
to stakeholders.
Further information may be found at:
www.southeasternrtp.com.
The discussions at the meeting
described above may address matters at
issue in the following proceeding:
Docket No. ER12–337, Mississippi
Power Company.
For more information, contact Valerie
Martin, Office of Energy Market
Regulation, Federal Energy Regulatory
Commission at (202) 502–6139 or
Valerie.Martin@ferc.gov.
Dated: May 10, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–11826 Filed 5–15–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL12–66–000; Docket No.
EL12–63–000]
Exelon Corporation, Public Service
Electric and Gas Company, PSEG
Power LLC, PSEG Energy Resources &
Trade LLC, v. Unnamed Participant,
PJM Interconnection, L.L.C.;
Independent Market Monitor for PJM v.
Unnamed Participant; Notice of
Complaint
Take notice that on May 8, 2012,
pursuant to sections 206(h) and 211 of
the Federal Energy Regulatory
Commission’s (Commission) Rules of
Practice and Procedure, 18 CFR 385.206
and 385.211 and section 206 of the
Federal Power Act, 16 U.S.C. 824(e),
Exelon Corporation, Public Service
Electric and Gas Company, PSEG Power
LLC, and PSEG Energy Resources &
Trade LLC (collectively, Joint
Complainants), filed a formal complaint
against Unnamed Participant and PJM
Interconnection, L.L.C. (PJM),
requesting that the Commission direct
PJM to reject any Sell Offer by Unnamed
Participant for Project X that does not
comply with the Minimum Offer Price
Rule and affect the price at which the
Base Residual Auction clears.
Joint Complainants state that the
Complaint was served: (1) By email on
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
28869
PJM and (2) electronically via the
Commission’s ECF system and all
parties in EL12–63. Joint Complainants
state that they are unable to confirm
service on Unnamed Participant because
its identity is not known.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on May 21, 2012.
Dated: May 9, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–11740 Filed 5–15–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PR07–6–002]
Worsham Steed Gas Storage, LLC;
Notice of Compliance Filing
Take notice that on May 2, 2012,
Worsham-Steed Gas Storage, LLC filed
E:\FR\FM\16MYN1.SGM
16MYN1
Agencies
[Federal Register Volume 77, Number 95 (Wednesday, May 16, 2012)]
[Notices]
[Pages 28868-28869]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-11805]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings 1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER12-1660-001.
Applicants: Tuscola Bay Wind, LLC.
Description: Amendment to Tuscola Bay Wind, LLC MBR Tariff to be
effective 6/29/2012.
Filed Date: 5/8/12.
Accession Number: 20120508-5121.
Comments Due: 5 p.m. ET 5/29/12.
Docket Numbers: ER12-1713-001.
Applicants: Southwest Power Pool, Inc.
Description: Amendment to 2415 Kansas Municipal Energy Agency NITSA
NOA to be effective 4/1/2012.
Filed Date: 5/9/12.
Accession Number: 20120509-5099.
Comments Due: 5 p.m. ET 5/30/12.
Docket Numbers: ER12-1744-000.
Applicants: Dennis Energy Company.
Description: Cancellation of Tariff to be effective 5/8/2012.
Filed Date: 5/8/12.
Accession Number: 20120508-5125.
Comments Due: 5 p.m. ET 5/29/12.
Docket Numbers: ER12-1745-000.
Applicants: Copper Mountain Solar 2, LLC.
Description: Copper Mountain Solar 2 LLC Concurrence to Joint Use
Agreement to be effective 5/8/2012.
Filed Date: 5/8/12.
Accession Number: 20120508-5136.
Comments Due: 5 p.m. ET 5/29/12.
Docket Numbers: ER12-1746-000.
Applicants: PJM Interconnection, L.L.C.
Description: Original Service Agreement No. 3281; Queue No. W3-101
to be effective 4/11/2012.
Filed Date: 5/9/12
Accession Number: 20120509-5034.
Comments Due: 5 p.m. ET 5/30/12.
Docket Numbers: ER12-1747-000.
Applicants: PJM Interconnection, L.L.C.
Description: Original Service Agreement No. 3286; Queue No. X3-001
to be effective 4/13/2012.
Filed Date: 5/9/12.
Accession Number: 20120509-5035.
Comments Due: 5 p.m. ET 5/30/12.
Docket Numbers: ER12-1748-000.
Applicants: Midwest Independent Transmission System Operator, Inc.
Description: G587 GIA to be effective 5/10/2012.
Filed Date: 5/9/12
Accession Number: 20120509-5057.
Comments Due: 5 p.m. ET 5/30/12.
Docket Numbers: ER12-1749-000.
Applicants: International Transmission Company.
Description: Notice of Succession to be effective 7/11/2012.
Filed Date: 5/9/12.
Accession Number: 20120509-5059.
Comments Due: 5 p.m. ET 5/30/12.
Docket Numbers: ER12-1750-000.
Applicants: Delmarva Power & Light Company.
[[Page 28869]]
Description: Construction Agreement Between Delmarva and ODEC to be
effective 6/12/2012.
Filed Date: 5/9/12.
Accession Number: 20120509-5067.
Comments Due: 5 p.m. ET 5/30/12.
Docket Numbers: ER12-1751-000.
Applicants: Renewable Power Strategies, LLC.
Description: Market-Based Rate Tariff to be effective 6/8/2012.
Filed Date: 5/9/12.
Accession Number: 20120509-5079.
Comments Due: 5 p.m. ET 5/30/12.
Docket Numbers: ER12-1752-000.
Applicants: Nevada Power Company.
Description: Rate Schedule No. 127 SDG&E Ancillary Services
Agreement to be effective 5/10/2012.
Filed Date: 5/9/12.
Accession Number: 20120509-5090.
Comments Due: 5 p.m. ET 5/30/12.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: May 9, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012-11805 Filed 5-15-12; 8:45 am]
BILLING CODE 6717-01-P