BMB Enterprises, Inc.; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Terms and Conditions, and Fishway Prescriptions, 28865-28866 [2012-11737]
Download as PDF
Federal Register / Vol. 77, No. 95 / Wednesday, May 16, 2012 / Notices
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: May 31, 2012.
Dated: May 10, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–11832 Filed 5–15–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 6764–036]
srobinson on DSK4SPTVN1PROD with NOTICES
BMB Enterprises, Inc.; Notice of
Application Accepted for Filing,
Soliciting Motions To Intervene and
Protests, Ready for Environmental
Analysis, and Soliciting Comments,
Recommendations, Terms and
Conditions, and Fishway Prescriptions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Amendment of
license.
b. Project No.: 6764–036.
c. Date Filed: December 5, 2011, and
supplemented on April 30, 2012.
d. Applicant: BMB Enterprises, Inc.
e. Name of Project: Sixmile Creek
Hydroelectric Project.
f. Location: When constructed, the
project will be located on the Sixmile
Creek in Sanpete County, Utah.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Brad F.
Hutchings, BMB Enterprises, Inc., 282
North 1350 East, Bountiful, Utah 84010;
telephone (801) 298–7383.
i. FERC Contact: Linda Stewart,
telephone: (202) 502–6680, and email
address: linda.stewart@ferc.gov.
j. Deadline for filing motions to
intervene and protests, comments,
recommendations, terms and
conditions, and fishway prescriptions is
60 days from the issuance of this notice;
reply comments are due 105 days from
the issuance date of this notice.
All documents may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
VerDate Mar<15>2010
18:41 May 15, 2012
Jkt 226001
eComment system at https://www.ferc.
gov/docs-filing/ecomment.asp. You
must include your name and contact
information at the end of your
comments. For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426. Please
include the project number (P–6764–
036) on any comments, motions, or
recommendations filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: BMB
Enterprises, Inc. (licensee) proposes to
modify various project facilities as
authorized in the October 16, 1987
Order Issuing License (Minor Project).
Instead of constructing a new
powerhouse containing two 325kilowatt (kW) turbine generating units
for a total installed capacity of 650 kW,
the licensee proposes to construct a new
powerhouse containing two 350-kW and
two 330-kW turbine generating units for
a total installed capacity of 1,360 kW.
The hydraulic capacity of the project
would increase from 20 to 40 cubic feet
per second. The licensee also proposes
to: modify the diversion structure and
install screens; increase the penstock
size from 24 to 30 inches in diameter;
and change the transmission line route.
Additionally, the licensee proposes to
modify the instream minimum flow
requirements pursuant to Article 103.1
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
1 The minimum flow requirement as specified in
Article 103 is a section 4(e) license condition
stipulated by the U.S. Forest Service.
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
28865
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the title ‘‘PROTEST’’,
‘‘MOTION TO INTERVENE’’,
‘‘COMMENTS,’’ ‘‘REPLY COMMENTS,’’
‘‘RECOMMENDATIONS,’’ ’’ TERMS
AND CONDITIONS,’’ or ‘‘FISHWAY
PRESCRIPTIONS;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, recommendations, terms and
conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). All comments,
recommendations, terms and conditions
or prescriptions should relate to project
works which are the subject of the
license amendment. Agencies may
obtain copies of the application directly
from the applicant. A copy of any
protest or motion to intervene must be
served upon each representative of the
applicant specified in the particular
application. If an intervener files
comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
E:\FR\FM\16MYN1.SGM
16MYN1
28866
Federal Register / Vol. 77, No. 95 / Wednesday, May 16, 2012 / Notices
must also serve a copy of the document
on that resource agency. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: May 9, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–11737 Filed 5–15–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[ Docket No. CP12–455–000]
srobinson on DSK4SPTVN1PROD with NOTICES
Pivotal Utility Holdings, Inc. d/b/a
Elkton Gas; Notice of Application
Take notice that on May 4, 2012,
Pivotal Utility Holdings, Inc. d/b/a
Elkton Gas (Elkton Gas), 125 B East High
Street, Elkton, Maryland 21921, filed an
abbreviated application pursuant to
Section 7(f) of the Natural Gas Act
(NGA) and Part 157 of the Commission’s
Regulations seeking a service area
determination to include 744 feet of
pipe and appurtenant facilities extended
from Maryland border into Delaware.
Elkton Gas also requests: (i) A finding
that Elkton Gas continues to qualify as
a local distribution company (LDC) in
Maryland, for purposes of section 311 of
the Natural Gas Policy Act of 1978
(NGPA); and (ii) a waiver of the
Commission’s accounting and reporting
requirements and other regulatory
requirements ordinarily applicable to
natural gas companies under the NGA
and NGPA. The filing may also be
viewed on the Web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
In early 2012, Elkton Gas has
determined that its Maryland LDC
system includes 744 feet of pipe and
appurtenant facilities crossing
Maryland/Delaware border in order to
reach a gate station owned and operated
by Eastern Shore Natural Gas Company
(Eastern Shore), known as the North
Gate Station. Elkton Gas does not
provide service in Delaware and is not
subject to regulation by the Delaware
Public Service Commission. Elkton Gas
VerDate Mar<15>2010
18:41 May 15, 2012
Jkt 226001
does not contemplate any changes in its
operations as a result of this change in
regulatory status. The purpose of
owning facilities in Delaware is to bring
gas to Maryland to serve Elkton Gas’
customers in Maryland.
Any questions regarding this
application should be directed to
Shannon Pierce, Senior Counsel, AGL
Resources Inc., Ten Peachtree Place,
Suite 1000, Atlanta, GA 30309; phone
number (404) 584–3394; or email:
spierce@aglresources.com.
Any person wishing to obtain legal
status by becoming a party to the
proceedings for this project should, on
or before the below listed comment
date, file with the Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426, a motion to
intervene in accordance with the
requirements of the Commission’s Rules
of Practice and Procedure (18 CFR
385.214 or 385.211) and the Regulations
under the NGA (18 CFR 157.10). A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies of all documents
filed by the applicant and by all other
parties. A party must submit original
and 7 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
Motions to intervene, protests and
comments may be filed electronically
via the Internet in lieu of paper, see, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
electronic filings.
Comment Date: 5:00 p.m. Eastern
Time on May 31, 2012.
Dated: May 10, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–11828 Filed 5–15–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13011–003]
Shelbyville Hydro LLC; Notice of
Application Accepted for Filing and
Soliciting Motions To Intervene and
Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
a. Type of Application: Major License.
b. Project No.: 13011–003.
c. Date filed: October 28, 2011.
d. Applicant: Shelbyville Hydro LLC
(Shelbyville Hydro), a wholly-owned
subsidiary of Symbiotics LLC.
e. Name of Project: Lake Shelbyville
Dam Hydroelectric Project.
f. Location: On the Kaskaskia River, in
Shelby County, Illinois at an existing
dam owned and operated by the U.S.
Corps of Engineers (Corps). The project
would occupy 3.24 acres of federal
lands managed by the Corps.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Brent L.
Smith, Chief Operating Officer,
Symbiotics LLC, 371 Upper Terrace,
Suite 2, Bend, OR 97702; Telephone
(541)–330–8779.
i. FERC Contact: Lesley Kordella,
(202) 502–6406 or
Lesley.Kordella@ferc.gov.
j. Deadline for filing motions to
intervene and protests: 60 days from the
issuance date of this notice.
All documents may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
The Commission’s Rules of Practice
and Procedures require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person on the official service list
for the project. Further, if an intervenor
files comments or documents with the
Commission relating to the merits of an
issue that may affect the responsibilities
of a particular resource agency, they
must also serve a copy of the document
on that resource agency.
k. This application has been accepted
for filing, but is not ready for
environmental analysis at this time.
l. Project Description: The project
would be located at an existing dam
owned and operated by the Corps (St.
E:\FR\FM\16MYN1.SGM
16MYN1
Agencies
[Federal Register Volume 77, Number 95 (Wednesday, May 16, 2012)]
[Notices]
[Pages 28865-28866]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-11737]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 6764-036]
BMB Enterprises, Inc.; Notice of Application Accepted for Filing,
Soliciting Motions To Intervene and Protests, Ready for Environmental
Analysis, and Soliciting Comments, Recommendations, Terms and
Conditions, and Fishway Prescriptions
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Amendment of license.
b. Project No.: 6764-036.
c. Date Filed: December 5, 2011, and supplemented on April 30,
2012.
d. Applicant: BMB Enterprises, Inc.
e. Name of Project: Sixmile Creek Hydroelectric Project.
f. Location: When constructed, the project will be located on the
Sixmile Creek in Sanpete County, Utah.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Brad F. Hutchings, BMB Enterprises, Inc., 282
North 1350 East, Bountiful, Utah 84010; telephone (801) 298-7383.
i. FERC Contact: Linda Stewart, telephone: (202) 502-6680, and
email address: linda.stewart@ferc.gov.
j. Deadline for filing motions to intervene and protests, comments,
recommendations, terms and conditions, and fishway prescriptions is 60
days from the issuance of this notice; reply comments are due 105 days
from the issuance date of this notice.
All documents may be filed electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and seven copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426. Please include the project number (P-6764-036) on any
comments, motions, or recommendations filed.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency.
k. Description of Request: BMB Enterprises, Inc. (licensee)
proposes to modify various project facilities as authorized in the
October 16, 1987 Order Issuing License (Minor Project). Instead of
constructing a new powerhouse containing two 325-kilowatt (kW) turbine
generating units for a total installed capacity of 650 kW, the licensee
proposes to construct a new powerhouse containing two 350-kW and two
330-kW turbine generating units for a total installed capacity of 1,360
kW. The hydraulic capacity of the project would increase from 20 to 40
cubic feet per second. The licensee also proposes to: modify the
diversion structure and install screens; increase the penstock size
from 24 to 30 inches in diameter; and change the transmission line
route. Additionally, the licensee proposes to modify the instream
minimum flow requirements pursuant to Article 103.\1\
---------------------------------------------------------------------------
\1\ The minimum flow requirement as specified in Article 103 is
a section 4(e) license condition stipulated by the U.S. Forest
Service.
---------------------------------------------------------------------------
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. You may also
register online at https://www.ferc.gov/docs-filing/esubscription.asp to
be notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or email
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: All filings must (1)
bear in all capital letters the title ``PROTEST'', ``MOTION TO
INTERVENE'', ``COMMENTS,'' ``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ''
TERMS AND CONDITIONS,'' or ``FISHWAY PRESCRIPTIONS;'' (2) set forth in
the heading the name of the applicant and the project number of the
application to which the filing responds; (3) furnish the name,
address, and telephone number of the person protesting or intervening;
and (4) otherwise comply with the requirements of 18 CFR 385.2001
through 385.2005. All comments, recommendations, terms and conditions
or prescriptions must set forth their evidentiary basis and otherwise
comply with the requirements of 18 CFR 4.34(b). All comments,
recommendations, terms and conditions or prescriptions should relate to
project works which are the subject of the license amendment. Agencies
may obtain copies of the application directly from the applicant. A
copy of any protest or motion to intervene must be served upon each
representative of the applicant specified in the particular
application. If an intervener files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they
[[Page 28866]]
must also serve a copy of the document on that resource agency. A copy
of all other filings in reference to this application must be
accompanied by proof of service on all persons listed in the service
list prepared by the Commission in this proceeding, in accordance with
18 CFR 4.34(b) and 385.2010.
Dated: May 9, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-11737 Filed 5-15-12; 8:45 am]
BILLING CODE 6717-01-P