Combined Notice of Filings, 27449-27450 [2012-11275]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 77, No. 91 / Thursday, May 10, 2012 / Notices
unacceptable workflow interruptions
that could adversely impact the fleet.
The NNPP proposes to recapitalize
the infrastructure for transferring,
preparing, examining, and packaging
naval spent nuclear fuel and other
irradiated materials, to ensure these
capabilities are maintained for the vital
NNPP mission of supporting the naval
nuclear-powered fleet. The
recapitalization will be carried out as
two projects. The first project will be the
Spent Fuel Handling Recapitalization
Project; the second project will be the
Examination Recapitalization Project.
The NNPP was initially pursuing two
recapitalization projects in the same
time frame; however, since the initiation
of the NEPA process, the project
schedules have changed such that the
Spent Fuel Handling Recapitalization
Project has progressed further than the
Examination Recapitalization Project.
Preparing one EIS that includes both
projects would require decisions about
the Examination Recapitalization
Project too early in the design process
prior to having sufficient information to
fully analyze the environmental impacts
of the project. Additionally, funding
uncertainties have made the timing of
the Examination Recapitalization
Project speculative in nature. To ensure
an EIS is completed in support of the
Navy’s need for the Spent Fuel
Handling Recapitalization Project, it is
necessary to reduce the scope of the EIS
to cover only the Spent Fuel Handling
Recapitalization Project. The proposed
Examination Recapitalization Project
will be considered in the cumulative
impacts section of the EIS along with
other reasonably foreseeable projects on
the INL. A separate document will be
prepared in accordance with NEPA for
the Examination Recapitalization
Project once this project has been more
clearly defined.
The EIS will consider the
environmental effects related to the
Spent Fuel Handling Recapitalization
Project. The alternatives being evaluated
have been revised to remove aspects
related to an Examination
Recapitalization Project and to address
public comments received during initial
EIS scoping. The NNPP will evaluate
building a new facility at two potential
sites on the NRF, an ECF Overhaul
Alternative, and a No Action
Alternative:
• Alternative 1—Construct and
operate a new facility for spent fuel
handling capabilities at one of two
potential locations at the NRF on the
INL.
• Alternative 2—Overhaul the spent
fuel handling capabilities of the ECF at
NRF by implementing major
VerDate Mar<15>2010
17:18 May 09, 2012
Jkt 226001
infrastructure and water pool
refurbishment projects while performing
corrective maintenance and repair
actions as necessary.
• Alternative 3 (No Action)—
Maintain the spent fuel handling
capabilities of the ECF by continuing to
use the current ECF infrastructure while
performing corrective maintenance and
repairs necessary to keep the
infrastructure in good working order
(i.e., actions sufficient to sustain the
proper functioning of structures,
systems, and components).
The NNPP proposes to address the
issues listed below when considering
the potential impacts of the proposed
alternatives in the EIS. This list is
presented to facilitate public comment
during the scoping period and is not
intended to be comprehensive, or to
imply any predetermination of impacts.
Issues include:
• Potential impacts of emissions on
air and water quality.
• Potential impacts on plants,
animals, and their habitats, including
species that are listed by either State or
Federal government as threatened,
endangered, or of special concern.
• Potential impacts from postulated
accidents, as well as potential impacts
from acts of terrorism or sabotage.
• Potential effects on the public
health from exposure to hazardous
materials or radiological releases under
routine operations.
• Potential safety and health impacts
to workers.
• Impacts on cultural resources, such
as historic, archeological, and Native
American culturally important sites.
• Socioeconomic impacts to the
potentially affected communities.
• Compliance with applicable Federal
and state regulations.
• Potential disproportionately high
and adverse effects on low-income and
minority populations (environmental
justice).
• Cumulative impacts.
NEPA implementing regulations
require an early and open process for
determining the scope of an EIS and for
identifying the significant issues related
to the proposed action. Accordingly,
NNPP invites Federal agencies; Tribal,
State, and local governments; and the
general public to comment on the
revised scope of the EIS including
identification of reasonable alternatives
and specific issues that should be
addressed. All public comments
received as described above will be
considered during the development of
the EIS.
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
27449
Issued in Washington, DC, on May 4, 2012.
John M. McKenzie,
Director, Regulatory Affairs, Naval Nuclear
Propulsion Program.
[FR Doc. 2012–11292 Filed 5–9–12; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings in Existing Proceedings
Docket Numbers: RP12–465–000.
Applicants: Equitrans, L.P.
Description: Equitrans, L.P. Response
to FERC’s March 30 Order under RP12–
465.
Filed Date: 4/19/12.
Accession Number: 20120419–5249.
Comments Due: 5 p.m. ET 5/9/12.
Docket Numbers: RP12–719–000.
Applicants: Columbia Gas
Transmission, LLC.
Description: Negotiated Rate Service
Agreement—NNE to be effective 5/4/
2012.
Filed Date: 5/3/12.
Accession Number: 20120503–5052.
Comments Due: 5 p.m. ET 5/15/12.
Docket Numbers: RP12–720–000.
Applicants: CenterPoint Energy Gas
Transmission Company, LLC.
Description: CEGT LLC—May 3, 2012
Negotiated Rate Filing to be effective
5/3/2012.
Filed Date: 5/3/12.
Accession Number: 20120503–5094.
Comments Due: 5 p.m. ET 5/15/12.
Docket Numbers: RP12–721–000.
Applicants: Midwestern Gas
Transmission Company.
Description: Non-Conforming
Agreement Clean Up to be effective
6/4/2012.
Filed Date: 5/4/12.
Accession Number: 20120504–5079.
Comments Due: 5 p.m. ET 5/16/12.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
E:\FR\FM\10MYN1.SGM
10MYN1
27450
Federal Register / Vol. 77, No. 91 / Thursday, May 10, 2012 / Notices
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
and service can be found at: https://www.
ferc.gov/docs-filing/efiling/filing-req.
pdf. For other information, call (866)
208–3676 (toll free). For TTY, call (202)
502–8659.
Dated: May 4, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–11275 Filed 5–9–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
mstockstill on DSK4VPTVN1PROD with NOTICES
Filings Instituting Proceedings
Docket Numbers: RP12–668–000.
Applicants: WPX Energy Marketing,
LLC, Williams Energy Resources LLC.
Description: Joint Petition of WPX
Energy Marketing, LLC, et al. for
Limited Waiver of Capacity Release
Regulations.
Filed Date: 4/27/12.
Accession Number: 20120427–5410.
Comments Due: 5 p.m. ET 5/7/12.
Docket Numbers: RP12–708–000.
Applicants: Equitrans, L.P.
Description: Curtailment of Service
and Operational Flow Order Revisions
to be effective 6/1/2012.
Filed Date: 5/1/12.
Accession Number: 20120501–5226.
Comments Due: 5 p.m. ET 5/14/12.
Docket Numbers: RP12–709–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: Bay State 510066
Negotiated Rate to be effective
5/1/2012.
Filed Date: 5/1/12.
Accession Number: 20120501–5242.
Comments Due: 5 p.m. ET 5/14/12.
Docket Numbers: RP12–710–000.
Applicants: Wyoming Interstate
Company, L.L.C.
Description: WIC Quarterly Fuel filed
5–1–12 to be effective 6/1/2012.
Filed Date: 5/1/12.
Accession Number: 20120501–5292.
Comments Due: 5 p.m. ET 5/14/12.
Docket Numbers: RP12–711–000.
Applicants: Tennessee Gas Pipeline
Company, L.L.C.
Description: Regional Net Pipeline
Position (RNPP) to be effective 6/1/
2012.
VerDate Mar<15>2010
17:18 May 09, 2012
Jkt 226001
Filed Date: 5/1/12.
Accession Number: 20120501–5304.
Comments Due: 5 p.m. ET 5/14/12.
Docket Numbers: RP12–712–000.
Applicants: ETC Tiger Pipeline, LLC.
Description: Tiger Semi-Annual Fuel
Filing May 2012 to be effective 6/1/
2012.
Filed Date: 5/1/12.
Accession Number: 20120501–5315.
Comments Due: 5 p.m. ET 5/14/12.
Docket Numbers: RP12–713–000.
Applicants: El Paso Natural Gas
Company.
Description: Nomination Cycles
Update to be effective 6/1/2012.
Filed Date: 5/1/12.
Accession Number: 20120501–5317.
Comments Due: 5 p.m. ET 5/14/12.
Docket Numbers: RP12–714–000.
Applicants: Dominion Transmission,
Inc.
Description: DTI—May 1, 2012
Negotiated Rate Agreements to be
effective 5/2/2012.
Filed Date: 5/1/12.
Accession Number: 20120501–5320.
Comments Due: 5 p.m. ET 5/14/12.
Docket Numbers: RP12–715–000.
Applicants: Ruby Pipeline, L.L.C.
Description: FL&U and EPC Rate
Adjustment Filing to be effective 6/1/
2012.
Filed Date: 5/1/12.
Accession Number: 20120501–5321.
Comments Due: 5 p.m. ET 5/14/12.
Docket Numbers: RP12–716–000.
Applicants: CenterPoint Energy Gas
Transmission Company, LLC.
Description: CEGT LLC—May 1, 2012
Negotiated Rate Filing to be effective
5/1/2012.
Filed Date: 5/1/12.
Accession Number: 20120501–5325.
Comments Due: 5 p.m. ET 5/14/12.
Docket Numbers: RP12–717–000.
Applicants: Hardy Storage Company,
LLC.
Description: RAM 2012 to be effective
6/1/2012.
Filed Date: 5/1/12.
Accession Number: 20120501–5329.
Comments Due: 5 p.m. ET 5/14/12.
Docket Numbers: RP12–718–000.
Applicants: Gulf South Pipeline
Company, LP.
Description: Capacity Negotiated Rate
Agreement filing—Chesapeake 34683 to
Texla 39889 to be effective 5/2/2012.
Filed Date: 5/2/12.
Accession Number: 20120502–5064.
Comments Due: 5 p.m. ET 5/14/12.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
Filings in Existing Proceedings
Docket Numbers: RP12–498–001.
Applicants: CenterPoint Energy Gas
Transmission Company, LLC.
Description: CEGT LLC—Fuel
Tracker—Effective May 1, 2012—
Compliance Filing to be effective 5/1/
2012.
Filed Date: 5/1/12.
Accession Number: 20120501–5233.
Comments Due: 5 p.m. ET 5/14/12.
Docket Numbers: RP12–704–001.
Applicants: Gulf South Pipeline
Company, LP.
Description: Amendment to RP12–
704–000 to be effective 5/2/2012.
Filed Date: 5/2/12.
Accession Number: 20120502–5060.
Comments Due: 5 p.m. ET 5/14/12.
Docket Numbers: RP11–1435–002.
Applicants: Columbia Gulf
Transmission Company.
Description: Settlement Refund
Report to be effective N/A.
Filed Date: 5/2/12.
Accession Number: 20120502–5163.
Comments Due: 5 p.m. ET 5/14/12.
Any person desiring to protest in any
the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
and service can be found at: https://
www.ferc.gov/docs-filing/efiling/filingreq.pdf. For other information, call (866)
208–3676 (toll free). For TTY, call (202)
502–8659.
Dated: May 3, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–11276 Filed 5–9–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL12–62–000]
PPL Montana, LLC; Notice of Petition
for Declaratory Order
Take notice that on April 26, 2012,
pursuant to Rule 207 of the
E:\FR\FM\10MYN1.SGM
10MYN1
Agencies
[Federal Register Volume 77, Number 91 (Thursday, May 10, 2012)]
[Notices]
[Pages 27449-27450]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-11275]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings
Take notice that the Commission has received the following Natural
Gas Pipeline Rate and Refund Report filings:
Filings in Existing Proceedings
Docket Numbers: RP12-465-000.
Applicants: Equitrans, L.P.
Description: Equitrans, L.P. Response to FERC's March 30 Order
under RP12-465.
Filed Date: 4/19/12.
Accession Number: 20120419-5249.
Comments Due: 5 p.m. ET 5/9/12.
Docket Numbers: RP12-719-000.
Applicants: Columbia Gas Transmission, LLC.
Description: Negotiated Rate Service Agreement--NNE to be effective
5/4/2012.
Filed Date: 5/3/12.
Accession Number: 20120503-5052.
Comments Due: 5 p.m. ET 5/15/12.
Docket Numbers: RP12-720-000.
Applicants: CenterPoint Energy Gas Transmission Company, LLC.
Description: CEGT LLC--May 3, 2012 Negotiated Rate Filing to be
effective 5/3/2012.
Filed Date: 5/3/12.
Accession Number: 20120503-5094.
Comments Due: 5 p.m. ET 5/15/12.
Docket Numbers: RP12-721-000.
Applicants: Midwestern Gas Transmission Company.
Description: Non-Conforming Agreement Clean Up to be effective 6/4/
2012.
Filed Date: 5/4/12.
Accession Number: 20120504-5079.
Comments Due: 5 p.m. ET 5/16/12.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
[[Page 27450]]
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, and service can be found at:
https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other
information, call (866) 208-3676 (toll free). For TTY, call (202) 502-
8659.
Dated: May 4, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012-11275 Filed 5-9-12; 8:45 am]
BILLING CODE 6717-01-P