Fairlawn Hydroelectric Company, LLC; Notice of Availability of Final Environmental Assessment, 26537-26538 [2012-10780]
Download as PDF
Federal Register / Vol. 77, No. 87 / Friday, May 4, 2012 / Notices
Filings in Existing Proceedings
Docket Numbers: RP12–88–002.
Applicants: National Fuel Gas Supply
Corporation.
Description: RP12–88 Interim
Settlement Rates to be effective 5/1/
2012.
Filed Date: 4/24/12.
Accession Number: 20120424–5109.
Comments Due: 5 p.m. ET 5/7/12.
Docket Numbers: RP12–624–001.
Applicants: Texas Eastern
Transmission, LP.
Description: Texas Eastern
Transmission, LP submits tariff filing
per 154.205(b): TETLP 2012 Tariff Map
Filing Amendment to be effective 5/21/
2012.
Filed Date: 4/26/12.
Accession Number: 20120426–5114.
Comments Due: 5 p.m. ET 5/8/12.
Any person desiring to protest in any
of the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
and service can be found at: https://
www.ferc.gov/docs-filing/efiling/filingreq.pdf. For other information, call (866)
208–3676 (toll free). For TTY, call (202)
502–8659.
Dated: April 26, 2012 .
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–10774 Filed 5–3–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
erowe on DSK2VPTVN1PROD with NOTICES
Notice of Commissioners and Staff
Attendance at FERC Leadership
Development Program Graduation/
Induction Ceremony
The Federal Energy Regulatory
Commission (FERC or Commission)
hereby gives notice that members of the
Commission and/or Commission staff
may attend the following event:
FERC Leadership Development Program
Graduation/Induction Ceremony: 888
First Street NE., Washington, DC
20426.
May 8, 2012 (10:00 a.m.–11:00 a.m.).
The event will introduce and
welcome 17 employees selected for the
VerDate Mar<15>2010
15:20 May 03, 2012
Jkt 226001
2012 Leadership Development Program
and graduate 15 employees from the
2011 program.
Dated: April 30, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–10786 Filed 5–3–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL12–61–000]
City of Alexandria, LA, Louisiana
Energy and Power Authority, Lafayette
Utilities System v. Cleco Power, LLC;
Notice of Complaint
Take notice that on April 25, 2012,
pursuant to sections 206, 306 and 309
of the Federal Power Act, 16 U.S.C.
824e, 825e, and 825h and Rule 206 of
the Rules of Practice and Procedure of
the Federal Energy Regulatory
Commission (Commission), 18 CFR
385.206, City of Alexandria, Louisiana,
Louisiana Energy and Power Authority,
and Lafayette Utilities System
(Complainants) filed a formal complaint
against Cleco Power, LLC (Respondent)
requesting that the Commission institute
an investigation under Section 206 of
the Federal Power Act and establish a
refund effective date while the
Commission evaluates the justness and
reasonableness of Respondent’s
transmission rates, particularly those set
forth in the ongoing, related proceedings
initiated by Respondent under Section
205 of the Federal Power Act in Docket
Nos. ER12–1378–000 and ER12–1379–
000. Complainants also request that the
Commission consolidate the instant
proceeding with the ongoing
proceedings in Docket Nos. ER12–1378–
000 and ER12–1379–000.
Complainants certify that copies of
the complaint were served on the
contacts for Respondent as listed on the
Commission’s list of Corporate Officials.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
PO 00000
Frm 00051
Fmt 4703
Sfmt 4703
26537
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on May 15, 2012.
Dated: April 26, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–10787 Filed 5–3–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12715–003]
Fairlawn Hydroelectric Company, LLC;
Notice of Availability of Final
Environmental Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s regulations, 18 CFR part
380, the Office of Energy Projects has
reviewed the application for an original
license for the proposed 14,000-kilowatt
(kW) Jennings Randolph Hydroelectric
Project located on the North Branch
Potomac River in Garrett County,
Maryland and Mineral County, West
Virginia, at the U.S. Army Corps of
Engineers’ (Corps) Jennings Randolph
Dam and has prepared a final
environmental assessment (EA) in
cooperation with the U.S. Army Corps
of Engineers. In the final EA,
Commission staff analyzes the potential
environmental effects of licensing the
project and concludes that issuing a
license for the construction and
operation of the project, with
E:\FR\FM\04MYN1.SGM
04MYN1
26538
Federal Register / Vol. 77, No. 87 / Friday, May 4, 2012 / Notices
appropriate environmental measures,
would not constitute a major federal
action significantly affecting the quality
of the human environment.
A copy of the final EA is on file with
the Commission and is available for
public inspection. The final EA may
also be viewed on the Commission’s
Web site at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY, (202)
502–8659.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
For further information contact
Allyson Conner at (202) 502–6082.
Dated: April 30, 2012.
Kimberly D. Bose,
Secretary.
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on May 17, 2012.
Dated: April 26, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–10780 Filed 5–3–12; 8:45 am]
BILLING CODE 6717–01–P
[FR Doc. 2012–10788 Filed 5–3–12; 8:45 am]
DEPARTMENT OF ENERGY
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
[Docket No. ID–6627–001]
Federal Energy Regulatory
Commission
erowe on DSK2VPTVN1PROD with NOTICES
Vigue, Peter A.; Notice of Filing
Take notice that on April 26, 2012,
Peter A. Vigue submitted for filing, a
supplement to the application for
authority to hold interlocking positions
filed on March 6, 2012, pursuant to
section 305(b) of the Federal Power Act,
16 U.S.C. 825d(b) (2011) and section
45.8 of Federal Energy Regulatory
Commission’s (Commission) Rules of
Practice and Procedure, 18 CFR 45.8
(2011).
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
VerDate Mar<15>2010
15:20 May 03, 2012
Jkt 226001
[Docket No. RP12–123–000]
ANR Storage Company; Notice of
Informal Settlement Conference
Take notice that an informal
settlement conference will be convened
in this proceeding commencing at 10:00
a.m. on May 3, 2012 at the offices of the
Federal Energy Regulatory Commission,
888 First Street NE. Washington, DC
20426, for the purpose of exploring the
possible settlement of the abovereferenced dockets.
Any party, as defined by 18 CFR
385.102(c), or any participant as defined
by 18 CFR 385.102(b), is invited to
attend. A person wishing to become a
party must move to intervene and
receive intervenor status pursuant to the
Commission’s regulations (18 CFR
385.214).
For additional information, please
contact Marc Gary Denkinger, 202–502–
8662, marc.denkinger@ferc.gov, or
Lorna J. Hadlock, 202–502–8737,
lorna.hadlock@ferc.gov.
PO 00000
Frm 00052
Fmt 4703
Sfmt 4703
Dated: April 30, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–10782 Filed 5–3–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER12–1626–000]
Topaz Solar Farms LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of Topaz
Solar Farms LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
Part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR Part 34, of
future issuances of securities and
assumptions of liability, is May 17,
2012.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
E:\FR\FM\04MYN1.SGM
04MYN1
Agencies
[Federal Register Volume 77, Number 87 (Friday, May 4, 2012)]
[Notices]
[Pages 26537-26538]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-10780]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12715-003]
Fairlawn Hydroelectric Company, LLC; Notice of Availability of
Final Environmental Assessment
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's regulations, 18 CFR part
380, the Office of Energy Projects has reviewed the application for an
original license for the proposed 14,000-kilowatt (kW) Jennings
Randolph Hydroelectric Project located on the North Branch Potomac
River in Garrett County, Maryland and Mineral County, West Virginia, at
the U.S. Army Corps of Engineers' (Corps) Jennings Randolph Dam and has
prepared a final environmental assessment (EA) in cooperation with the
U.S. Army Corps of Engineers. In the final EA, Commission staff
analyzes the potential environmental effects of licensing the project
and concludes that issuing a license for the construction and operation
of the project, with
[[Page 26538]]
appropriate environmental measures, would not constitute a major
federal action significantly affecting the quality of the human
environment.
A copy of the final EA is on file with the Commission and is
available for public inspection. The final EA may also be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at (866)
208-3676, or for TTY, (202) 502-8659.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
For further information contact Allyson Conner at (202) 502-6082.
Dated: April 30, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-10780 Filed 5-3-12; 8:45 am]
BILLING CODE 6717-01-P