Petition for Waiver of Compliance, 26358-26359 [2012-10706]
Download as PDF
26358
Federal Register / Vol. 77, No. 86 / Thursday, May 3, 2012 / Notices
should notify FRA, in writing, before
the end of the comment period and
specify the basis for their request.
All communications concerning these
proceedings should identify the
appropriate docket number and may be
submitted by any of the following
methods:
• Web site: https://
www.regulations.gov. Follow the online
instructions for submitting comments.
• Fax: (202) 493-2251.
• Mail: Docket Operations Facility,
U.S. Department of Transportation, 1200
New Jersey Avenue SE., W12–140,
Washington, DC 20590.
• Hand Delivery: 1200 New Jersey
Avenue SE., Room W12–140,
Washington, DC 20590, between 9 a.m.
and 5 p.m., Monday through Friday,
except Federal Holidays.
Communications received by June 18,
2012 will be considered by FRA before
final action is taken. Comments received
after that date will be considered as far
as practicable.
Anyone is able to search the
electronic form of any written
communications and comments
received into any of our dockets by the
name of the individual submitting the
comment (or signing the comment, if
submitted on behalf of an association,
business, labor union, etc.). You may
review DOT’s complete Privacy Act
Statement in the Federal Register
published on April 11, 2000 (Volume
65, Number 70; Pages 19477–78), or
online at https://www.dot.gov/
privacy.html.
Issued in Washington, DC, on April 26,
2012.
Ron Hynes,
Acting Deputy Associate Administrator for
Regulatory and Legislative Operations.
[FR Doc. 2012–10703 Filed 5–2–12; 8:45 am]
BILLING CODE 4910–06–P
DEPARTMENT OF TRANSPORTATION
Federal Railroad Administration
[Docket Number FRA–2010–0028]
wreier-aviles on DSK7SPTVN1PROD with NOTICES
Petition for Waiver of Compliance
In accordance with Part 211 of Title
49 Code of Federal Regulations (CFR),
this document provides the public
notice that by a document dated
February 16, 2012, CSX Transportation,
Inc. (CSX) has petitioned the Federal
Railroad Administration (FRA) for a
waiver of compliance from certain
provisions of the Federal railroad safety
regulations contained at 49 CFR part
236. FRA assigned the petition to
Docket Number FRA–2010–0028.
VerDate Mar<15>2010
15:32 May 02, 2012
Jkt 226001
Pursuant to the requirements of 49
CFR Section 236.1035, Field testing
requirements, CSX has submitted the
Interoperable Electronic Train
Management System® (I–ETMS)
Positive Train Control (PTC) Test
Waiver Request, Version 1.0, dated
February 16, 2012, along with
associated required documents for
request of relief from select parts of
Subparts A–G. In conjunction with
those requests, CSX test waiver includes
requests for relief from regulations other
than that contained in Subparts A–G.
I–ETMS is a vital overlay system as
defined in 49 CFR part 236, subpart I,
Section 236.1015(e)(2) and fully
described in the CSX I–ETMS PTC
Development Plan found in Appendix
A, and for which FRA Type Approval,
FRA–TA–2011–02, was issued on
August 26, 2011.
The I–ETMS system is designed to
support different railroads and their
individual methods of operation, and is
intended to be implementable across a
broad spectrum of railroads without
significant modification. This design
approach supports interoperability
across railroads, as I–ETMS equipped
locomotives apply consistent warning
and enforcement functionality
regardless of trackage ownership.
CSX seeks a waiver of compliance
from certain parts of 49 CFR (Parts 216,
Special Notice and Emergency Order
Procedures: Railroad Track, Locomotive
and Equipment; Part 217, Railroad
Operating Rules; Part 218, Railroad
Operating Practices; Part 229, Railroad
Locomotive Safety Standards; Part 233,
Signal Systems Reporting Requirements;
Part 235, Instructions Governing
Applications for Approval of a
Discontinuance or Material
Modification of a Signal System or
Relief from the Requirements of Part
236; and Part 240, Qualification and
Certification of Locomotive Engineers),
under Section 211.51 (Tests), to allow
them to test I–ETMS on nonrevenue
trains on the Aberdeen Subdivision
(between Raleigh and Hamlet, NC) from
Southern Junction (Milepost (MP) South
156.8) to Marston (MP South 241.6), and
on the Wilmington Subdivision
(between Hamlet and Wilmington, NC)
from NE East Junction (MP Southeast
254.1) to end of main track (MP
Southeast 354.0).
The following sections include the
waiver request and justification:
• Section 216.13, Special notice for
repairs—locomotive. A waiver is
requested for I–ETMS-equipped
locomotives to the extent that nonoperation of I–ETMS equipment
installed on board, whether through
malfunction or deactivation, shall not be
PO 00000
Frm 00118
Fmt 4703
Sfmt 4703
construed as an unsafe condition
requiring special notice for repairs. A
waiver is also sought for non-I–ETMSequipped locomotives operating in I–
ETMS territory to the extent that the
absence of I–ETMS equipment on board
shall not be construed as an unsafe
condition requiring special notice for
repairs.
Justification: With or without I–ETMS
equipment operating on board the
controlling locomotive, a train remains
subject to existing operating rules. I–
ETMS tests require flexibility in
installing, removing, turning on, and
turning off the equipment.
• Section 217.9, Program of
operational tests and inspections—
recordkeeping. A waiver is requested
exempting operation of I–ETMS
equipment and procedures from the
requirements for operational tests and
inspections, and associated
recordkeeping.
Justification: During the I–ETMS test
phase, procedures for using I–ETMS
equipment and functions will be refined
and modified. Until such procedures are
defined in the PTC Safety Plan (PTCSP)
and associated documentation, they
cannot be addressed in CSX Operating
Rules. I–ETMS is expected to have
minimal impact on existing operating
rules due to its nature of overlay to
existing methods of operation.
• Section 217.11, Program of
instruction on operating rules;
recordkeeping; electronic
recordkeeping. A waiver is requested
exempting I–ETMS testing and its
equipment and procedures from the
requirements for instruction and
recordkeeping.
Justification: During the I–ETMS test
phase, procedures for using I–ETMS
equipment and functions will be refined
and modified. Until such procedures are
defined in the PTCSP and associated
documentation, they cannot be
addressed in CSX Operating Rules. I–
ETMS is expected to have minimal
impact on existing operating rules due
to its nature of overlay to existing
methods of operation.
• Part 218, Subpart D—Prohibition
Against Tampering With Safety Devices.
A waiver is requested exempting
onboard I–ETMS equipment from the
requirements of Sections 218.51, 218.53,
218.55, 218.57, 218.59, and 218.61 to
the extent that I–ETMS equipment on
board a locomotive shall not be
considered a ‘‘safety device’’ subject to
the provisions of this subpart at any
time during the test and demonstration
phase.
Justification: I–ETMS tests and
demonstrations require flexibility in
E:\FR\FM\03MYN1.SGM
03MYN1
wreier-aviles on DSK7SPTVN1PROD with NOTICES
Federal Register / Vol. 77, No. 86 / Thursday, May 3, 2012 / Notices
installing, removing, turning on, and
turning off the onboard equipment.
• Section 229.7, Prohibited acts. A
waiver is requested for both I–ETMSequipped and non-I–ETMS-equipped
locomotives operating in the I–ETMS
test territory during the test period.
Justification: Non-operation of I–
ETMS equipment installed on board a
locomotive, whether through
malfunction or deactivation, shall not be
construed as an unsafe condition subject
to this section. Additionally, in the
absence of I–ETMS equipment on board,
non-I–ETMS-equipped locomotives
operating in I–ETMS territory shall not
be construed as an unsafe condition
subject to this regulation. The I–ETMS
test program requires flexibility in
installing, removing, turning on, and
turning off the onboard equipment.
Whether I–ETMS equipment on board a
locomotive is functioning, the train
remains subject to the safety provisions
of the existing method of operation.
• Section 229.135, Event recorders. A
waiver is requested to the extent that I–
ETMS equipment on board a locomotive
shall not be considered an ‘‘event
recorder,’’ subject to the provisions of
this section, during the test phase.
Justification: I–ETMS equipment by
design will operate intermittently
during the test phase. The data
accumulated by the onboard I–ETMS
equipment will be used to develop and
refine I–ETMS functions. Such data can
be expected to contain anomalies that
do not reflect true operating conditions
but, by analysis, will contribute to
achieving necessary objectives in the I–
ETMS design.
• Section 233.9, Annual reports. A
waiver is requested exempting I–ETMS
operations in the test phase from the
reporting requirements of this section.
Justification: CSX recognizes that a
revenue service I–ETMS system is
subject to the provisions of this section;
however, imposition of these
requirements during the test and
demonstration phase would be an
unnecessary paperwork burden. PTC
testing should not affect the final
inventory of the CSX signal system,
which will be included in the Signal
System Five-Year Report.
• Section 235.5, Changes requiring
filing of application. A waiver is
requested exempting I–ETMS from the
requirements of this section during the
test phase.
Justification: I–ETMS tests require
flexibility in installing, removing,
VerDate Mar<15>2010
15:32 May 02, 2012
Jkt 226001
modifying, turning on, and turning off
the I–ETMS equipment.
• Section 240.127, Criteria for
examining skill performance. A waiver
is requested exempting I–ETMS from
the testing requirements for
qualification and certification of
locomotive engineers during the test
phase.
Justification: Criteria and procedures
for engineer performance evaluation as
related to I–ETMS do not yet exist; they
will be identified and defined during
the I–ETMS test phase and included in
the PTCSP.
• Section 240.129, Criteria for
monitoring operational performance of
certified engineers. A waiver is
requested exempting I–ETMS from the
performance monitoring procedures
during the I–ETMS test phase.
Justification: Criteria and procedures
for I–ETMS monitoring the performance
of engineers using I–ETMS do not yet
exist; they will be identified and
defined during the I–ETMS test phase
and included in the PTCSP.
In addition, CSX is requesting a
waiver of compliance from certain
sections of 49 CFR Part 236 (Rules,
Standards, and Instructions Governing
the Installation, Inspection,
Maintenance, and Repair of Signal and
Train Control Systems, Devices, and
Appliances) for information only, and
on which FRA is not receiving
comments. Those sections are: 236.11,
Adjustment, repair, or replacement of
component; 236.15, Timetable
instructions; 236.23, Aspects and
indications; 236.76, Tagging of wires
and interference of wires or tags with
signal apparatus; 236.101, Purpose of
inspection and tests; removal from
service of relay or device failing to meet
test requirements; 236.109, Time
releases, timing relays and timing
devices; 236.110, Results of tests;
236.501, Forestalling device and speed
control; 236.552, Insulation resistance;
requirement; 236.566, Locomotive of
each train operating in train stop, train
control or cab signal territory; equipped;
236.567, Restrictions imposed when
device fails and/or is cut out en route;
236.586, Daily or after trip test; 236.587,
Departure test; and 236.588, Periodic
test.
A copy of the petition, as well as any
written communications concerning the
petition, is available for review online at
www.regulations.gov and in person at
the U.S. Department of Transportation’s
(DOT) Docket Operations Facility, 1200
PO 00000
Frm 00119
Fmt 4703
Sfmt 9990
26359
New Jersey Avenue SE., W12–140,
Washington, DC 20590. The Docket
Operations Facility is open from 9 a.m.
to 5 p.m., Monday through Friday,
except Federal Holidays.
Interested parties are invited to
participate in these proceedings by
submitting written views, data, or
comments. FRA does not anticipate
scheduling a public hearing in
connection with these proceedings since
the facts do not appear to warrant a
hearing. If any interested party desires
an opportunity for oral comment, they
should notify FRA, in writing, before
the end of the comment period and
specify the basis for their request.
All communications concerning these
proceedings should identify the
appropriate docket number and may be
submitted by any of the following
methods:
• Web site: https://
www.regulations.gov. Follow the online
instructions for submitting comments.
• Fax: 202–493–2251.
• Mail: Docket Operations Facility,
U.S. Department of Transportation, 1200
New Jersey Avenue SE., W12–140,
Washington, DC 20590.
• Hand Delivery: 1200 New Jersey
Avenue SE., Room W12–140,
Washington, DC 20590, between 9 a.m.
and 5 p.m., Monday through Friday,
except Federal Holidays.
Communications received by June 18,
2012 will be considered by FRA before
final action is taken. Comments received
after that date will be considered as far
as practicable.
Anyone is able to search the
electronic form of any written
communications and comments
received into any of our dockets by the
name of the individual submitting the
comment (or signing the comment, if
submitted on behalf of an association,
business, labor union, etc.). You may
review DOT’s complete Privacy Act
Statement in the Federal Register
published on April 11, 2000 (Volume
65, Number 70; Pages 19477–78), or
online at https://www.dot.gov/
privacy.html.
Issued in Washington, DC, on April 26,
2012.
Ron Hynes,
Acting Deputy Associate Administrator for
Regulatory and Legislative Operations.
[FR Doc. 2012–10706 Filed 5–2–12; 8:45 am]
BILLING CODE 4910–06–P
E:\FR\FM\03MYN1.SGM
03MYN1
Agencies
[Federal Register Volume 77, Number 86 (Thursday, May 3, 2012)]
[Notices]
[Pages 26358-26359]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-10706]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Railroad Administration
[Docket Number FRA-2010-0028]
Petition for Waiver of Compliance
In accordance with Part 211 of Title 49 Code of Federal Regulations
(CFR), this document provides the public notice that by a document
dated February 16, 2012, CSX Transportation, Inc. (CSX) has petitioned
the Federal Railroad Administration (FRA) for a waiver of compliance
from certain provisions of the Federal railroad safety regulations
contained at 49 CFR part 236. FRA assigned the petition to Docket
Number FRA-2010-0028.
Pursuant to the requirements of 49 CFR Section 236.1035, Field
testing requirements, CSX has submitted the Interoperable Electronic
Train Management System[supreg] (I-ETMS) Positive Train Control (PTC)
Test Waiver Request, Version 1.0, dated February 16, 2012, along with
associated required documents for request of relief from select parts
of Subparts A-G. In conjunction with those requests, CSX test waiver
includes requests for relief from regulations other than that contained
in Subparts A-G.
I-ETMS is a vital overlay system as defined in 49 CFR part 236,
subpart I, Section 236.1015(e)(2) and fully described in the CSX I-ETMS
PTC Development Plan found in Appendix A, and for which FRA Type
Approval, FRA-TA-2011-02, was issued on August 26, 2011.
The I-ETMS system is designed to support different railroads and
their individual methods of operation, and is intended to be
implementable across a broad spectrum of railroads without significant
modification. This design approach supports interoperability across
railroads, as I-ETMS equipped locomotives apply consistent warning and
enforcement functionality regardless of trackage ownership.
CSX seeks a waiver of compliance from certain parts of 49 CFR
(Parts 216, Special Notice and Emergency Order Procedures: Railroad
Track, Locomotive and Equipment; Part 217, Railroad Operating Rules;
Part 218, Railroad Operating Practices; Part 229, Railroad Locomotive
Safety Standards; Part 233, Signal Systems Reporting Requirements; Part
235, Instructions Governing Applications for Approval of a
Discontinuance or Material Modification of a Signal System or Relief
from the Requirements of Part 236; and Part 240, Qualification and
Certification of Locomotive Engineers), under Section 211.51 (Tests),
to allow them to test I-ETMS on nonrevenue trains on the Aberdeen
Subdivision (between Raleigh and Hamlet, NC) from Southern Junction
(Milepost (MP) South 156.8) to Marston (MP South 241.6), and on the
Wilmington Subdivision (between Hamlet and Wilmington, NC) from NE East
Junction (MP Southeast 254.1) to end of main track (MP Southeast
354.0).
The following sections include the waiver request and
justification:
Section 216.13, Special notice for repairs--locomotive. A
waiver is requested for I-ETMS-equipped locomotives to the extent that
non-operation of I-ETMS equipment installed on board, whether through
malfunction or deactivation, shall not be construed as an unsafe
condition requiring special notice for repairs. A waiver is also sought
for non-I-ETMS-equipped locomotives operating in I-ETMS territory to
the extent that the absence of I-ETMS equipment on board shall not be
construed as an unsafe condition requiring special notice for repairs.
Justification: With or without I-ETMS equipment operating on board
the controlling locomotive, a train remains subject to existing
operating rules. I-ETMS tests require flexibility in installing,
removing, turning on, and turning off the equipment.
Section 217.9, Program of operational tests and
inspections--recordkeeping. A waiver is requested exempting operation
of I-ETMS equipment and procedures from the requirements for
operational tests and inspections, and associated recordkeeping.
Justification: During the I-ETMS test phase, procedures for using
I-ETMS equipment and functions will be refined and modified. Until such
procedures are defined in the PTC Safety Plan (PTCSP) and associated
documentation, they cannot be addressed in CSX Operating Rules. I-ETMS
is expected to have minimal impact on existing operating rules due to
its nature of overlay to existing methods of operation.
Section 217.11, Program of instruction on operating rules;
recordkeeping; electronic recordkeeping. A waiver is requested
exempting I-ETMS testing and its equipment and procedures from the
requirements for instruction and recordkeeping.
Justification: During the I-ETMS test phase, procedures for using
I-ETMS equipment and functions will be refined and modified. Until such
procedures are defined in the PTCSP and associated documentation, they
cannot be addressed in CSX Operating Rules. I-ETMS is expected to have
minimal impact on existing operating rules due to its nature of overlay
to existing methods of operation.
Part 218, Subpart D--Prohibition Against Tampering With
Safety Devices. A waiver is requested exempting onboard I-ETMS
equipment from the requirements of Sections 218.51, 218.53, 218.55,
218.57, 218.59, and 218.61 to the extent that I-ETMS equipment on board
a locomotive shall not be considered a ``safety device'' subject to the
provisions of this subpart at any time during the test and
demonstration phase.
Justification: I-ETMS tests and demonstrations require flexibility
in
[[Page 26359]]
installing, removing, turning on, and turning off the onboard
equipment.
Section 229.7, Prohibited acts. A waiver is requested for
both I-ETMS-equipped and non-I-ETMS-equipped locomotives operating in
the I-ETMS test territory during the test period.
Justification: Non-operation of I-ETMS equipment installed on board
a locomotive, whether through malfunction or deactivation, shall not be
construed as an unsafe condition subject to this section. Additionally,
in the absence of I-ETMS equipment on board, non-I-ETMS-equipped
locomotives operating in I-ETMS territory shall not be construed as an
unsafe condition subject to this regulation. The I-ETMS test program
requires flexibility in installing, removing, turning on, and turning
off the onboard equipment. Whether I-ETMS equipment on board a
locomotive is functioning, the train remains subject to the safety
provisions of the existing method of operation.
Section 229.135, Event recorders. A waiver is requested to
the extent that I-ETMS equipment on board a locomotive shall not be
considered an ``event recorder,'' subject to the provisions of this
section, during the test phase.
Justification: I-ETMS equipment by design will operate
intermittently during the test phase. The data accumulated by the
onboard I-ETMS equipment will be used to develop and refine I-ETMS
functions. Such data can be expected to contain anomalies that do not
reflect true operating conditions but, by analysis, will contribute to
achieving necessary objectives in the I-ETMS design.
Section 233.9, Annual reports. A waiver is requested
exempting I-ETMS operations in the test phase from the reporting
requirements of this section.
Justification: CSX recognizes that a revenue service I-ETMS system
is subject to the provisions of this section; however, imposition of
these requirements during the test and demonstration phase would be an
unnecessary paperwork burden. PTC testing should not affect the final
inventory of the CSX signal system, which will be included in the
Signal System Five-Year Report.
Section 235.5, Changes requiring filing of application. A
waiver is requested exempting I-ETMS from the requirements of this
section during the test phase.
Justification: I-ETMS tests require flexibility in installing,
removing, modifying, turning on, and turning off the I-ETMS equipment.
Section 240.127, Criteria for examining skill performance.
A waiver is requested exempting I-ETMS from the testing requirements
for qualification and certification of locomotive engineers during the
test phase.
Justification: Criteria and procedures for engineer performance
evaluation as related to I-ETMS do not yet exist; they will be
identified and defined during the I-ETMS test phase and included in the
PTCSP.
Section 240.129, Criteria for monitoring operational
performance of certified engineers. A waiver is requested exempting I-
ETMS from the performance monitoring procedures during the I-ETMS test
phase.
Justification: Criteria and procedures for I-ETMS monitoring the
performance of engineers using I-ETMS do not yet exist; they will be
identified and defined during the I-ETMS test phase and included in the
PTCSP.
In addition, CSX is requesting a waiver of compliance from certain
sections of 49 CFR Part 236 (Rules, Standards, and Instructions
Governing the Installation, Inspection, Maintenance, and Repair of
Signal and Train Control Systems, Devices, and Appliances) for
information only, and on which FRA is not receiving comments. Those
sections are: 236.11, Adjustment, repair, or replacement of component;
236.15, Timetable instructions; 236.23, Aspects and indications;
236.76, Tagging of wires and interference of wires or tags with signal
apparatus; 236.101, Purpose of inspection and tests; removal from
service of relay or device failing to meet test requirements; 236.109,
Time releases, timing relays and timing devices; 236.110, Results of
tests; 236.501, Forestalling device and speed control; 236.552,
Insulation resistance; requirement; 236.566, Locomotive of each train
operating in train stop, train control or cab signal territory;
equipped; 236.567, Restrictions imposed when device fails and/or is cut
out en route; 236.586, Daily or after trip test; 236.587, Departure
test; and 236.588, Periodic test.
A copy of the petition, as well as any written communications
concerning the petition, is available for review online at
www.regulations.gov and in person at the U.S. Department of
Transportation's (DOT) Docket Operations Facility, 1200 New Jersey
Avenue SE., W12-140, Washington, DC 20590. The Docket Operations
Facility is open from 9 a.m. to 5 p.m., Monday through Friday, except
Federal Holidays.
Interested parties are invited to participate in these proceedings
by submitting written views, data, or comments. FRA does not anticipate
scheduling a public hearing in connection with these proceedings since
the facts do not appear to warrant a hearing. If any interested party
desires an opportunity for oral comment, they should notify FRA, in
writing, before the end of the comment period and specify the basis for
their request.
All communications concerning these proceedings should identify the
appropriate docket number and may be submitted by any of the following
methods:
Web site: https://www.regulations.gov. Follow the online
instructions for submitting comments.
Fax: 202-493-2251.
Mail: Docket Operations Facility, U.S. Department of
Transportation, 1200 New Jersey Avenue SE., W12-140, Washington, DC
20590.
Hand Delivery: 1200 New Jersey Avenue SE., Room W12-140,
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday,
except Federal Holidays.
Communications received by June 18, 2012 will be considered by FRA
before final action is taken. Comments received after that date will be
considered as far as practicable.
Anyone is able to search the electronic form of any written
communications and comments received into any of our dockets by the
name of the individual submitting the comment (or signing the comment,
if submitted on behalf of an association, business, labor union, etc.).
You may review DOT's complete Privacy Act Statement in the Federal
Register published on April 11, 2000 (Volume 65, Number 70; Pages
19477-78), or online at https://www.dot.gov/privacy.html.
Issued in Washington, DC, on April 26, 2012.
Ron Hynes,
Acting Deputy Associate Administrator for Regulatory and Legislative
Operations.
[FR Doc. 2012-10706 Filed 5-2-12; 8:45 am]
BILLING CODE 4910-06-P