Download as PDF Federal Register / Vol. 77, No. 82 / Friday, April 27, 2012 / Notices Plan. EPA Region 10 sent a letter to the Alaska Department of Environmental Conservation on April 2, 2012, subsequent to the close of the comment period stating EPA found the Eagle River PM10 Limited Maintenance Plan to be adequate for use in transportation conformity. Because limited maintenance plans do not contain budgets, as provided in 40 CFR 93.109(l), the adequacy review period for these maintenance plans serves to allow the public to comment on whether limited maintenance is appropriate for these areas. As a result of this adequacy finding, the Municipality of Anchorage, Alaska Department of Transportation & Public Facilities, and the U.S. Department of Transportation are no longer required to conduct a regional emissions analysis for conformity. However, other conformity requirements still remain such as consultation (40 CFR 93.112), transportation control measures (40 CFR 93.113), and project level analysis (40 CFR 93.116). Transportation conformity is required by section 176(c) of the Clean Air Act. EPA’s conformity rule requires transportation plans, programs, and projects to conform to SIPs and establishes the criteria and procedures for determining whether or not they do. Conformity to a SIP means that transportation activities will not produce new air quality violations, worsen existing violations, or delay timely attainment of the national ambient air quality standards. The minimum criteria by which we determine whether a SIP is adequate for conformity purposes are specified at 40 CFR 93.118(e)(4). EPA’s analysis of how the state’s submission satisfies these criteria is found in the Technical Support Document. EPA’s adequacy review is separate from EPA’s SIP completeness review and it also should not be used to prejudge EPA’s ultimate approval of the SIP. Even if we find the SIP adequate for conformity purposes, the SIP could later be disapproved. mstockstill on DSK4VPTVN1PROD with NOTICES Authority: 42 U.S.C. 7401–7671q. Dated: April 16, 2012. Dennis J. McLerran, Regional Administrator, Region 10. [FR Doc. 2012–10203 Filed 4–26–12; 8:45 am] BILLING CODE 6560–50–P VerDate Mar<15>2010 17:44 Apr 26, 2012 Jkt 226001 ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–9002–7] Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–7146 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements filed 04/16/2012 through 04/20/2012 pursuant to 40 CFR 1506.9. Notice: Section 309(a) of the Clean Air Act requires that EPA make public its comments on EISs issued by other Federal agencies. EPA’s comment letters on EISs are available at: https:// www.epa.gov/compliance/nepa/ eisdata.html. SUPPLEMENTARY INFORMATION: EPA is seeking agencies to participate in its eNEPA electronic EIS submission pilot. Participating agencies can fulfill all requirements for EIS filing, eliminating the need to submit paper copies to EPA headquarters, by filing documents online and providing feedback on the process. To participate in the pilot, register at: https://cdx.epa.gov. EIS No. 20120113, Final EIS, BPA, OR, Albany-Eugene 115 kilovolt No. 1 Transmission Line Rebuild Project, Extending from Albany Substation to the Alderwood Tap, Linn and Lane Counties OR, Review Period Ends: 05/29/2012, Contact: Douglas F. Corkran, 503–230–7646. EIS No. 20120114, Final Supplement, USN, CA, Hunters Point (Former) Naval Shipyard Disposal and Reuse, Supplement Information on the 2000 FEIS, Implementation, City of San Francisco, San Francisco County, CA, Review Period Ends: 05/29/2012, Contact: Ronald Bochenek, 619–532– 0906. EIS No. 20120115, Final EIS, USFS, AK, Tonka Timber Sale Project, Proposed Timber Harvesting, Petersburg Ranger District, Tongass National Forest, Petersburg, AK, Review Period Ends: 05/29/2012, Contact: Jason Anderson, 907–772–3871. EIS No. 20120116, Final EIS, USFS, SD, Vestal Project, Commercial and Noncommercial Vegetation Treatments and Prescribed Burning to Reduce Mountain Pine Beetle Risk and Fire Hazard, Hell Canyon Ranger District, Black Hills National Forest, Custer County, SD, Review Period Ends: 05/29/2012, Contact: Lynn Kolund, 605–673–4853. EIS No. 20120117, Draft EIS, BLM, WY, Lost Creek In Situ Recovery Project, PO 00000 Frm 00045 Fmt 4703 Sfmt 4703 25165 To Analyze the Site-Specific Impacts Associated with the Plan of Operations, Sweetwater County, WY, Comment Period Ends: 06/11/2012, Contact: John Russell, 307–328–4252. EIS No. 20120118, Final EIS, FTA, CA, California High-Speed Train (HST): Merced to Fresno Section High-Speed Train, Propose to Construct, Operate, and Maintain an Electric-Powered High-Speed Train (HST), Merced, Madera, and Fresno Counties, CA, Review Period Ends: 05/29/2012, Contact: David Valenstein, 202–493– 6381. EIS No. 20120119, Final EIS, NPS, IN, Indiana Dunes National Lakeshore, White-Tailed Deer Management Plan, Implementation, Lake, Porter, LaPorte Counties, IN, Review Period Ends: 05/29/2012, Contact: Randy Knutson, 219–395–1550. EIS No. 20120120, Draft EIS, BLM, CO, Mohave County Wind Farm Project, Application for a Right-of-Way Grant to Construct, Operate, Maintain and Decommission a Wind Powered Electrical Generation Facility, White Hills, Mohave County, CO, Comment Period Ends: 06/11/2012, Contact: Jerry Crockford, 505–360–0473. EIS No. 20120121, Final EIS, FHWA, OR, Newberg Dundee Bypass Project, Proposal to Build a Four Lane Expressway and Reduce Congestion on OR 99W, from OR 99W/OR/8 to the top of Rex Hill, USACE 404/ Removal Fill Permits, Funding, Yamhill and Washington Counties, OR, Review Period Ends: 05/29/2012, Contact: Michelle Eraut, 503–316– 2559. EIS No. 20120122, Draft Supplement, USACE, NM, Rio Grande Floodway Flood Protection Plan, San Acacia to Bosque Del Apache Unit, To Provide Higher Levels of Flood Risk Management to Floodplain Communities from San Acacia Diversion Dam Downstream to Elephant Butte Lake, Socorro County, NM, Comment Period Ends: 06/11/2012, Contact: Julie A. Alcon, 505–342–3281. EIS No. 20120123, Final EIS, BLM, NV, Phoenix Copper Leach Project, Construction and Operation of a New Copper Beneficiation Facility, Lander County, NV, Review Period Ends: 05/29/2012, Contact: Dave Davis, 775–635–4000. EIS No. 20120124, Final EIS, NPS, SD, South Unit—Badlands National Park, General Management Plan, Implementation, SD, Review Period Ends: 05/29/2012, Contact: Eric J. Brunnemann, 605–433–5361 . EIS No. 20120125, Final EIS, FTA, CA, Hercules Intermodal Transit Center, E:\FR\FM\27APN1.SGM 27APN1 25166 Federal Register / Vol. 77, No. 82 / Friday, April 27, 2012 / Notices Construction To Improve Access to Public Transit, Funding USACE Section 404 Permit, Contra Costa County, CA, Review Period Ends: 05/29/2012, Contact: Paul Page, 415– 744–2734. EIS No. 20120126, Draft EIS, USFS, CO, Black Mesa Vegetation Management Project, Implementation, Divide Ranger District, Rio Grande National Forest, Hinsdale and Mineral Counties, CO, Comment Period Ends: 06/11/2012, Contact: Thomas Malecek, 719–657–3321. EIS No. 20120127, Final EIS, USFS, CA, Rubicon Trail Easement and Resource Improvement Project, Construction and Operation, Right-of-Way Grant, Eldorado National Forest, Pacific Ranger District, El Dorado County, CA, Review Period Ends: 05/29/2012, Contact: Laura Hierholzer, 530–642– 5187. Amended Notices EIS No. 20120047, Draft EIS, BIA, WA, West Plains Casino and Mixed-Use Development Project, Approval of Gaming Development and Management, Spokane Tribe of Indians, Spokane County, WA, Comment Period Ends: 05/16/2012, Contact: Dr. B.J. Howerton, 503–231– 6749. Revision to FR Notice Published 03/02/2012; Lead Agency Re-opening the Comment Period to end 05/16/ 2012. EIS No. 20120104, Draft EIS, NOAA, 00, Amendment 5 to the Atlantic Herring Fishery Management Plan, Implementation, Comment Period Ends: 06/04/2012, Contact: Daniel S. Morris, 978–281–9250. Revision to FR Notice Published 04/20/2012: Change Agency Contact to Daniel S. Morris, 978–281–9250 and Correction to EIS Title. Dated: April 24, 2012. Aimee Hessert, DeputyDirector, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 2012–10200 Filed 4–26–12; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY mstockstill on DSK4VPTVN1PROD with NOTICES [EPA–R01–OW–2012–0201; FRL–9666–5] EPA—New England Region I; Massachusetts Marine Sanitation Device Standard; Receipt of Petition Environmental Protection Agency (EPA). ACTION: Notice—Receipt of petition. AGENCY: Notice is hereby given that a petition has been received from the SUMMARY: VerDate Mar<15>2010 17:44 Apr 26, 2012 Jkt 226001 Commonwealth of Massachusetts requesting a determination by the Regional Administrator, U. S. Environmental Protection Agency, that adequate facilities for the safe and sanitary removal and treatment of sewage from all vessels are reasonably available for the waters of Nantucket and Vineyard Sounds and the Islands, collectively termed the Southern Cape Cod for the purpose of this notice. DATES: Comments must be submitted by May 29, 2012. ADDRESSES: Submit your comments, identified by Docket ID No. EPA–R01– OW–2012–0201, by one of the following methods: www.regulations.gov, Follow the on-line instructions for submitting comments. • Email: rodney.ann@epa.gov. • Fax: (617) 918–0538. Mail and hand delivery: U.S. Environmental Protection Agency—New England Region, Five Post Office Square, Suite 100, OEP06–1, Boston, MA 02109–3912. Deliveries are only accepted during the Regional Office’s normal hours of operation (8 a.m.– 5 p.m., Monday through Friday, excluding legal holidays), and special arrangements should be made for deliveries of boxed information. Instructions: Direct your comments to Docket ID No. EPA–R01–OW–2012– 0201. EPA’s policy is that all comments received will be included in the public docket without change and may be made available online at www.regulations.gov, including any personal information provided, unless the comment includes information claimed to be Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. Do not submit information that you consider to be CBI or otherwise protected through www.regulations.gov, or email. The www.regulations.gov Web site is an ‘‘anonymous access’’ system, which means EPA will not know your identity or contact information unless you provide it in the body of your comment. If you send an email comment directly to EPA without going through www.regulations.gov your email address will be automatically captured and included as part of the comment that is placed in the public docket and made available on the Internet. If you submit an electronic comment, EPA recommends that you include your name and other contact information in the body of your comment and with any disk or CD–ROM you submit. If EPA cannot read your comment due to technical difficulties and cannot contact you for clarification, EPA may not be able to consider your comment. PO 00000 Frm 00046 Fmt 4703 Sfmt 4703 Electronic files should avoid the use of special characters, any form of encryption, and be free of any defects or viruses. Docket: All documents in the docket are listed in the www.regulations.gov index. Although listed in the index, some information is not publicly available, e.g., CBI or other information whose disclosure is restricted by statute. Certain other material, such as copyrighted material, will be publicly available only in hard copy. Publicly available docket materials are available either electronically in www.regulations.gov or in hard copy at the U.S. Environmental Protection Agency—New England Region, Five Post Office Square, Suite 100, OEP06– 01, Boston, MA 02109–3912. Such deliveries are only accepted during the Regional Office’s normal hours of operation, and special arrangements should be made for deliveries of boxed information. The Regional Office is open from 8 a.m.–5 p.m., Monday through Friday, excluding legal holidays. The telephone number is (617) 918–1538. Ann Rodney, U.S. Environmental Protection Agency—New England Region, Five Post Office Square, Suite 100, OEP06– 01, Boston, MA 02109–3912. Telephone: (617) 918–1538, Fax number: (617) 918– 0538; email address: rodney.ann@epa.gov. FOR FURTHER INFORMATION CONTACT: Notice is hereby given that a petition has been received from the Commonwealth of Massachusetts requesting a determination by the Regional Administrator, U.S. Environmental Protection Agency, pursuant to Section 312(f)(3) of Public Law 92–500 as amended by Public Law 95–217 and Public Law 100–4, that adequate facilities for the safe and sanitary removal and treatment of sewage from all vessels are reasonably available for the Southern Cape Cod area. The Southern Cape Cod No Discharge Area will encompass the coastal waters for the towns of Chilmark, West Tisbury, Tisbury, Oak Bluffs, Edgartown, Gosnold, Falmouth, Mashpee, Barnstable, Yarmouth, Dennis, Harwich, Chatham and Nantucket. The proposed boundaries of the No Discharge Area for the Southern Cape Cod waters are as follows: The western-most contiguous area of the NDA is bound by the Buzzards Bay NDA and the Federal/State boundary line: SUPPLEMENTARY INFORMATION: E:\FR\FM\27APN1.SGM 27APN1

Agencies

[Federal Register Volume 77, Number 82 (Friday, April 27, 2012)]
[Notices]
[Pages 25165-25166]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-10200]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-9002-7]


Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7146 or https://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements filed 04/16/2012 
through 04/20/2012 pursuant to 40 CFR 1506.9.

    Notice: Section 309(a) of the Clean Air Act requires that EPA make 
public its comments on EISs issued by other Federal agencies. EPA's 
comment letters on EISs are available at: https://www.epa.gov/compliance/nepa/eisdata.html.

SUPPLEMENTARY INFORMATION: EPA is seeking agencies to participate in 
its e-NEPA electronic EIS submission pilot. Participating agencies can 
fulfill all requirements for EIS filing, eliminating the need to submit 
paper copies to EPA headquarters, by filing documents online and 
providing feedback on the process. To participate in the pilot, 
register at: https://cdx.epa.gov.

EIS No. 20120113, Final EIS, BPA, OR, Albany-Eugene 115 kilovolt No. 1 
Transmission Line Rebuild Project, Extending from Albany Substation to 
the Alderwood Tap, Linn and Lane Counties OR, Review Period Ends: 05/
29/2012, Contact: Douglas F. Corkran, 503-230-7646.
EIS No. 20120114, Final Supplement, USN, CA, Hunters Point (Former) 
Naval Shipyard Disposal and Reuse, Supplement Information on the 2000 
FEIS, Implementation, City of San Francisco, San Francisco County, CA, 
Review Period Ends: 05/29/2012, Contact: Ronald Bochenek, 619-532-0906.
EIS No. 20120115, Final EIS, USFS, AK, Tonka Timber Sale Project, 
Proposed Timber Harvesting, Petersburg Ranger District, Tongass 
National Forest, Petersburg, AK, Review Period Ends: 05/29/2012, 
Contact: Jason Anderson, 907-772-3871.
EIS No. 20120116, Final EIS, USFS, SD, Vestal Project, Commercial and 
Non-commercial Vegetation Treatments and Prescribed Burning to Reduce 
Mountain Pine Beetle Risk and Fire Hazard, Hell Canyon Ranger District, 
Black Hills National Forest, Custer County, SD, Review Period Ends: 05/
29/2012, Contact: Lynn Kolund, 605-673-4853.
EIS No. 20120117, Draft EIS, BLM, WY, Lost Creek In Situ Recovery 
Project, To Analyze the Site-Specific Impacts Associated with the Plan 
of Operations, Sweetwater County, WY, Comment Period Ends: 06/11/2012, 
Contact: John Russell, 307-328-4252.
EIS No. 20120118, Final EIS, FTA, CA, California High-Speed Train 
(HST): Merced to Fresno Section High-Speed Train, Propose to Construct, 
Operate, and Maintain an Electric-Powered High-Speed Train (HST), 
Merced, Madera, and Fresno Counties, CA, Review Period Ends: 05/29/
2012, Contact: David Valenstein, 202-493-6381.
EIS No. 20120119, Final EIS, NPS, IN, Indiana Dunes National Lakeshore, 
White-Tailed Deer Management Plan, Implementation, Lake, Porter, 
LaPorte Counties, IN, Review Period Ends: 05/29/2012, Contact: Randy 
Knutson, 219-395-1550.
EIS No. 20120120, Draft EIS, BLM, CO, Mohave County Wind Farm Project, 
Application for a Right-of-Way Grant to Construct, Operate, Maintain 
and Decommission a Wind Powered Electrical Generation Facility, White 
Hills, Mohave County, CO, Comment Period Ends: 06/11/2012, Contact: 
Jerry Crockford, 505-360-0473.
EIS No. 20120121, Final EIS, FHWA, OR, Newberg Dundee Bypass Project, 
Proposal to Build a Four Lane Expressway and Reduce Congestion on OR 
99W, from OR 99W/OR/8 to the top of Rex Hill, USACE 404/Removal Fill 
Permits, Funding, Yamhill and Washington Counties, OR, Review Period 
Ends: 05/29/2012, Contact: Michelle Eraut, 503-316-2559.
EIS No. 20120122, Draft Supplement, USACE, NM, Rio Grande Floodway 
Flood Protection Plan, San Acacia to Bosque Del Apache Unit, To Provide 
Higher Levels of Flood Risk Management to Floodplain Communities from 
San Acacia Diversion Dam Downstream to Elephant Butte Lake, Socorro 
County, NM, Comment Period Ends: 06/11/2012, Contact: Julie A. Alcon, 
505-342-3281.
EIS No. 20120123, Final EIS, BLM, NV, Phoenix Copper Leach Project, 
Construction and Operation of a New Copper Beneficiation Facility, 
Lander County, NV, Review Period Ends: 05/29/2012, Contact: Dave Davis, 
775-635-4000.
EIS No. 20120124, Final EIS, NPS, SD, South Unit--Badlands National 
Park, General Management Plan, Implementation, SD, Review Period Ends: 
05/29/2012, Contact: Eric J. Brunnemann, 605-433-5361 .
EIS No. 20120125, Final EIS, FTA, CA, Hercules Intermodal Transit 
Center,

[[Page 25166]]

Construction To Improve Access to Public Transit, Funding USACE Section 
404 Permit, Contra Costa County, CA, Review Period Ends: 05/29/2012, 
Contact: Paul Page, 415-744-2734.
EIS No. 20120126, Draft EIS, USFS, CO, Black Mesa Vegetation Management 
Project, Implementation, Divide Ranger District, Rio Grande National 
Forest, Hinsdale and Mineral Counties, CO, Comment Period Ends: 06/11/
2012, Contact: Thomas Malecek, 719-657-3321.
EIS No. 20120127, Final EIS, USFS, CA, Rubicon Trail Easement and 
Resource Improvement Project, Construction and Operation, Right-of-Way 
Grant, Eldorado National Forest, Pacific Ranger District, El Dorado 
County, CA, Review Period Ends: 05/29/2012, Contact: Laura Hierholzer, 
530-642-5187.

Amended Notices

EIS No. 20120047, Draft EIS, BIA, WA, West Plains Casino and Mixed-Use 
Development Project, Approval of Gaming Development and Management, 
Spokane Tribe of Indians, Spokane County, WA, Comment Period Ends: 05/
16/2012, Contact: Dr. B.J. Howerton, 503-231-6749. Revision to FR 
Notice Published 03/02/2012; Lead Agency Re-opening the Comment Period 
to end 05/16/2012.
EIS No. 20120104, Draft EIS, NOAA, 00, Amendment 5 to the Atlantic 
Herring Fishery Management Plan, Implementation, Comment Period Ends: 
06/04/2012, Contact: Daniel S. Morris, 978-281-9250. Revision to FR 
Notice Published 04/20/2012: Change Agency Contact to Daniel S. Morris, 
978-281-9250 and Correction to EIS Title.

    Dated: April 24, 2012.
Aimee Hessert,
DeputyDirector, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 2012-10200 Filed 4-26-12; 8:45 am]