Environmental Impacts Statements; Notice of Availability, 25165-25166 [2012-10200]
Download as PDF
Federal Register / Vol. 77, No. 82 / Friday, April 27, 2012 / Notices
Plan. EPA Region 10 sent a letter to the
Alaska Department of Environmental
Conservation on April 2, 2012,
subsequent to the close of the comment
period stating EPA found the Eagle
River PM10 Limited Maintenance Plan to
be adequate for use in transportation
conformity.
Because limited maintenance plans
do not contain budgets, as provided in
40 CFR 93.109(l), the adequacy review
period for these maintenance plans
serves to allow the public to comment
on whether limited maintenance is
appropriate for these areas. As a result
of this adequacy finding, the
Municipality of Anchorage, Alaska
Department of Transportation & Public
Facilities, and the U.S. Department of
Transportation are no longer required to
conduct a regional emissions analysis
for conformity. However, other
conformity requirements still remain
such as consultation (40 CFR 93.112),
transportation control measures (40 CFR
93.113), and project level analysis (40
CFR 93.116).
Transportation conformity is required
by section 176(c) of the Clean Air Act.
EPA’s conformity rule requires
transportation plans, programs, and
projects to conform to SIPs and
establishes the criteria and procedures
for determining whether or not they do.
Conformity to a SIP means that
transportation activities will not
produce new air quality violations,
worsen existing violations, or delay
timely attainment of the national
ambient air quality standards.
The minimum criteria by which we
determine whether a SIP is adequate for
conformity purposes are specified at 40
CFR 93.118(e)(4). EPA’s analysis of how
the state’s submission satisfies these
criteria is found in the Technical
Support Document. EPA’s adequacy
review is separate from EPA’s SIP
completeness review and it also should
not be used to prejudge EPA’s ultimate
approval of the SIP. Even if we find the
SIP adequate for conformity purposes,
the SIP could later be disapproved.
mstockstill on DSK4VPTVN1PROD with NOTICES
Authority: 42 U.S.C. 7401–7671q.
Dated: April 16, 2012.
Dennis J. McLerran,
Regional Administrator, Region 10.
[FR Doc. 2012–10203 Filed 4–26–12; 8:45 am]
BILLING CODE 6560–50–P
VerDate Mar<15>2010
17:44 Apr 26, 2012
Jkt 226001
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–9002–7]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7146 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements filed 04/16/2012 through
04/20/2012 pursuant to 40 CFR
1506.9.
Notice: Section 309(a) of the Clean Air
Act requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EISs are available at: https://
www.epa.gov/compliance/nepa/
eisdata.html.
SUPPLEMENTARY INFORMATION: EPA is
seeking agencies to participate in its eNEPA electronic EIS submission pilot.
Participating agencies can fulfill all
requirements for EIS filing, eliminating
the need to submit paper copies to EPA
headquarters, by filing documents
online and providing feedback on the
process. To participate in the pilot,
register at: https://cdx.epa.gov.
EIS No. 20120113, Final EIS, BPA, OR,
Albany-Eugene 115 kilovolt No. 1
Transmission Line Rebuild Project,
Extending from Albany Substation to
the Alderwood Tap, Linn and Lane
Counties OR, Review Period Ends:
05/29/2012, Contact: Douglas F.
Corkran, 503–230–7646.
EIS No. 20120114, Final Supplement,
USN, CA, Hunters Point (Former)
Naval Shipyard Disposal and Reuse,
Supplement Information on the 2000
FEIS, Implementation, City of San
Francisco, San Francisco County, CA,
Review Period Ends: 05/29/2012,
Contact: Ronald Bochenek, 619–532–
0906.
EIS No. 20120115, Final EIS, USFS, AK,
Tonka Timber Sale Project, Proposed
Timber Harvesting, Petersburg Ranger
District, Tongass National Forest,
Petersburg, AK, Review Period Ends:
05/29/2012, Contact: Jason Anderson,
907–772–3871.
EIS No. 20120116, Final EIS, USFS, SD,
Vestal Project, Commercial and Noncommercial Vegetation Treatments
and Prescribed Burning to Reduce
Mountain Pine Beetle Risk and Fire
Hazard, Hell Canyon Ranger District,
Black Hills National Forest, Custer
County, SD, Review Period Ends:
05/29/2012, Contact: Lynn Kolund,
605–673–4853.
EIS No. 20120117, Draft EIS, BLM, WY,
Lost Creek In Situ Recovery Project,
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
25165
To Analyze the Site-Specific Impacts
Associated with the Plan of
Operations, Sweetwater County, WY,
Comment Period Ends: 06/11/2012,
Contact: John Russell, 307–328–4252.
EIS No. 20120118, Final EIS, FTA, CA,
California High-Speed Train (HST):
Merced to Fresno Section High-Speed
Train, Propose to Construct, Operate,
and Maintain an Electric-Powered
High-Speed Train (HST), Merced,
Madera, and Fresno Counties, CA,
Review Period Ends: 05/29/2012,
Contact: David Valenstein, 202–493–
6381.
EIS No. 20120119, Final EIS, NPS, IN,
Indiana Dunes National Lakeshore,
White-Tailed Deer Management Plan,
Implementation, Lake, Porter, LaPorte
Counties, IN, Review Period Ends:
05/29/2012, Contact: Randy Knutson,
219–395–1550.
EIS No. 20120120, Draft EIS, BLM, CO,
Mohave County Wind Farm Project,
Application for a Right-of-Way Grant
to Construct, Operate, Maintain and
Decommission a Wind Powered
Electrical Generation Facility, White
Hills, Mohave County, CO, Comment
Period Ends: 06/11/2012, Contact:
Jerry Crockford, 505–360–0473.
EIS No. 20120121, Final EIS, FHWA,
OR, Newberg Dundee Bypass Project,
Proposal to Build a Four Lane
Expressway and Reduce Congestion
on OR 99W, from OR 99W/OR/8 to
the top of Rex Hill, USACE 404/
Removal Fill Permits, Funding,
Yamhill and Washington Counties,
OR, Review Period Ends: 05/29/2012,
Contact: Michelle Eraut, 503–316–
2559.
EIS No. 20120122, Draft Supplement,
USACE, NM, Rio Grande Floodway
Flood Protection Plan, San Acacia to
Bosque Del Apache Unit, To Provide
Higher Levels of Flood Risk
Management to Floodplain
Communities from San Acacia
Diversion Dam Downstream to
Elephant Butte Lake, Socorro County,
NM, Comment Period Ends:
06/11/2012, Contact: Julie A. Alcon,
505–342–3281.
EIS No. 20120123, Final EIS, BLM, NV,
Phoenix Copper Leach Project,
Construction and Operation of a New
Copper Beneficiation Facility, Lander
County, NV, Review Period Ends:
05/29/2012, Contact: Dave Davis,
775–635–4000.
EIS No. 20120124, Final EIS, NPS, SD,
South Unit—Badlands National Park,
General Management Plan,
Implementation, SD, Review Period
Ends: 05/29/2012, Contact: Eric J.
Brunnemann, 605–433–5361 .
EIS No. 20120125, Final EIS, FTA, CA,
Hercules Intermodal Transit Center,
E:\FR\FM\27APN1.SGM
27APN1
25166
Federal Register / Vol. 77, No. 82 / Friday, April 27, 2012 / Notices
Construction To Improve Access to
Public Transit, Funding USACE
Section 404 Permit, Contra Costa
County, CA, Review Period Ends:
05/29/2012, Contact: Paul Page, 415–
744–2734.
EIS No. 20120126, Draft EIS, USFS, CO,
Black Mesa Vegetation Management
Project, Implementation, Divide
Ranger District, Rio Grande National
Forest, Hinsdale and Mineral
Counties, CO, Comment Period Ends:
06/11/2012, Contact: Thomas
Malecek, 719–657–3321.
EIS No. 20120127, Final EIS, USFS, CA,
Rubicon Trail Easement and Resource
Improvement Project, Construction
and Operation, Right-of-Way Grant,
Eldorado National Forest, Pacific
Ranger District, El Dorado County,
CA, Review Period Ends: 05/29/2012,
Contact: Laura Hierholzer, 530–642–
5187.
Amended Notices
EIS No. 20120047, Draft EIS, BIA, WA,
West Plains Casino and Mixed-Use
Development Project, Approval of
Gaming Development and
Management, Spokane Tribe of
Indians, Spokane County, WA,
Comment Period Ends: 05/16/2012,
Contact: Dr. B.J. Howerton, 503–231–
6749. Revision to FR Notice Published
03/02/2012; Lead Agency Re-opening
the Comment Period to end 05/16/
2012.
EIS No. 20120104, Draft EIS, NOAA, 00,
Amendment 5 to the Atlantic Herring
Fishery Management Plan,
Implementation, Comment Period
Ends: 06/04/2012, Contact: Daniel S.
Morris, 978–281–9250. Revision to FR
Notice Published 04/20/2012: Change
Agency Contact to Daniel S. Morris,
978–281–9250 and Correction to EIS
Title.
Dated: April 24, 2012.
Aimee Hessert,
DeputyDirector, NEPA Compliance Division,
Office of Federal Activities.
[FR Doc. 2012–10200 Filed 4–26–12; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
mstockstill on DSK4VPTVN1PROD with NOTICES
[EPA–R01–OW–2012–0201; FRL–9666–5]
EPA—New England Region I;
Massachusetts Marine Sanitation
Device Standard; Receipt of Petition
Environmental Protection
Agency (EPA).
ACTION: Notice—Receipt of petition.
AGENCY:
Notice is hereby given that a
petition has been received from the
SUMMARY:
VerDate Mar<15>2010
17:44 Apr 26, 2012
Jkt 226001
Commonwealth of Massachusetts
requesting a determination by the
Regional Administrator, U. S.
Environmental Protection Agency, that
adequate facilities for the safe and
sanitary removal and treatment of
sewage from all vessels are reasonably
available for the waters of Nantucket
and Vineyard Sounds and the Islands,
collectively termed the Southern Cape
Cod for the purpose of this notice.
DATES: Comments must be submitted by
May 29, 2012.
ADDRESSES: Submit your comments,
identified by Docket ID No. EPA–R01–
OW–2012–0201, by one of the following
methods: www.regulations.gov, Follow
the on-line instructions for submitting
comments.
• Email: rodney.ann@epa.gov.
• Fax: (617) 918–0538.
Mail and hand delivery: U.S.
Environmental Protection Agency—New
England Region, Five Post Office
Square, Suite 100, OEP06–1, Boston,
MA 02109–3912. Deliveries are only
accepted during the Regional Office’s
normal hours of operation (8 a.m.–
5 p.m., Monday through Friday,
excluding legal holidays), and special
arrangements should be made for
deliveries of boxed information.
Instructions: Direct your comments to
Docket ID No. EPA–R01–OW–2012–
0201. EPA’s policy is that all comments
received will be included in the public
docket without change and may be
made available online at
www.regulations.gov, including any
personal information provided, unless
the comment includes information
claimed to be Confidential Business
Information (CBI) or other information
whose disclosure is restricted by statute.
Do not submit information that you
consider to be CBI or otherwise
protected through www.regulations.gov,
or email. The www.regulations.gov Web
site is an ‘‘anonymous access’’ system,
which means EPA will not know your
identity or contact information unless
you provide it in the body of your
comment. If you send an email
comment directly to EPA without going
through www.regulations.gov your email
address will be automatically captured
and included as part of the comment
that is placed in the public docket and
made available on the Internet. If you
submit an electronic comment, EPA
recommends that you include your
name and other contact information in
the body of your comment and with any
disk or CD–ROM you submit. If EPA
cannot read your comment due to
technical difficulties and cannot contact
you for clarification, EPA may not be
able to consider your comment.
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
Electronic files should avoid the use of
special characters, any form of
encryption, and be free of any defects or
viruses.
Docket: All documents in the docket
are listed in the www.regulations.gov
index. Although listed in the index,
some information is not publicly
available, e.g., CBI or other information
whose disclosure is restricted by statute.
Certain other material, such as copyrighted material, will be publicly
available only in hard copy. Publicly
available docket materials are available
either electronically in
www.regulations.gov or in hard copy at
the U.S. Environmental Protection
Agency—New England Region, Five
Post Office Square, Suite 100, OEP06–
01, Boston, MA 02109–3912. Such
deliveries are only accepted during the
Regional Office’s normal hours of
operation, and special arrangements
should be made for deliveries of boxed
information. The Regional Office is
open from 8 a.m.–5 p.m., Monday
through Friday, excluding legal
holidays. The telephone number is (617)
918–1538.
Ann
Rodney, U.S. Environmental Protection
Agency—New England Region, Five
Post Office Square, Suite 100, OEP06–
01, Boston, MA 02109–3912. Telephone:
(617) 918–1538, Fax number: (617) 918–
0538; email address:
rodney.ann@epa.gov.
FOR FURTHER INFORMATION CONTACT:
Notice is
hereby given that a petition has been
received from the Commonwealth of
Massachusetts requesting a
determination by the Regional
Administrator, U.S. Environmental
Protection Agency, pursuant to Section
312(f)(3) of Public Law 92–500 as
amended by Public Law 95–217 and
Public Law 100–4, that adequate
facilities for the safe and sanitary
removal and treatment of sewage from
all vessels are reasonably available for
the Southern Cape Cod area.
The Southern Cape Cod No Discharge
Area will encompass the coastal waters
for the towns of Chilmark, West
Tisbury, Tisbury, Oak Bluffs,
Edgartown, Gosnold, Falmouth,
Mashpee, Barnstable, Yarmouth,
Dennis, Harwich, Chatham and
Nantucket.
The proposed boundaries of the No
Discharge Area for the Southern Cape
Cod waters are as follows:
The western-most contiguous area of
the NDA is bound by the Buzzards Bay
NDA and the Federal/State boundary
line:
SUPPLEMENTARY INFORMATION:
E:\FR\FM\27APN1.SGM
27APN1
Agencies
[Federal Register Volume 77, Number 82 (Friday, April 27, 2012)]
[Notices]
[Pages 25165-25166]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-10200]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-9002-7]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7146 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements filed 04/16/2012
through 04/20/2012 pursuant to 40 CFR 1506.9.
Notice: Section 309(a) of the Clean Air Act requires that EPA make
public its comments on EISs issued by other Federal agencies. EPA's
comment letters on EISs are available at: https://www.epa.gov/compliance/nepa/eisdata.html.
SUPPLEMENTARY INFORMATION: EPA is seeking agencies to participate in
its e-NEPA electronic EIS submission pilot. Participating agencies can
fulfill all requirements for EIS filing, eliminating the need to submit
paper copies to EPA headquarters, by filing documents online and
providing feedback on the process. To participate in the pilot,
register at: https://cdx.epa.gov.
EIS No. 20120113, Final EIS, BPA, OR, Albany-Eugene 115 kilovolt No. 1
Transmission Line Rebuild Project, Extending from Albany Substation to
the Alderwood Tap, Linn and Lane Counties OR, Review Period Ends: 05/
29/2012, Contact: Douglas F. Corkran, 503-230-7646.
EIS No. 20120114, Final Supplement, USN, CA, Hunters Point (Former)
Naval Shipyard Disposal and Reuse, Supplement Information on the 2000
FEIS, Implementation, City of San Francisco, San Francisco County, CA,
Review Period Ends: 05/29/2012, Contact: Ronald Bochenek, 619-532-0906.
EIS No. 20120115, Final EIS, USFS, AK, Tonka Timber Sale Project,
Proposed Timber Harvesting, Petersburg Ranger District, Tongass
National Forest, Petersburg, AK, Review Period Ends: 05/29/2012,
Contact: Jason Anderson, 907-772-3871.
EIS No. 20120116, Final EIS, USFS, SD, Vestal Project, Commercial and
Non-commercial Vegetation Treatments and Prescribed Burning to Reduce
Mountain Pine Beetle Risk and Fire Hazard, Hell Canyon Ranger District,
Black Hills National Forest, Custer County, SD, Review Period Ends: 05/
29/2012, Contact: Lynn Kolund, 605-673-4853.
EIS No. 20120117, Draft EIS, BLM, WY, Lost Creek In Situ Recovery
Project, To Analyze the Site-Specific Impacts Associated with the Plan
of Operations, Sweetwater County, WY, Comment Period Ends: 06/11/2012,
Contact: John Russell, 307-328-4252.
EIS No. 20120118, Final EIS, FTA, CA, California High-Speed Train
(HST): Merced to Fresno Section High-Speed Train, Propose to Construct,
Operate, and Maintain an Electric-Powered High-Speed Train (HST),
Merced, Madera, and Fresno Counties, CA, Review Period Ends: 05/29/
2012, Contact: David Valenstein, 202-493-6381.
EIS No. 20120119, Final EIS, NPS, IN, Indiana Dunes National Lakeshore,
White-Tailed Deer Management Plan, Implementation, Lake, Porter,
LaPorte Counties, IN, Review Period Ends: 05/29/2012, Contact: Randy
Knutson, 219-395-1550.
EIS No. 20120120, Draft EIS, BLM, CO, Mohave County Wind Farm Project,
Application for a Right-of-Way Grant to Construct, Operate, Maintain
and Decommission a Wind Powered Electrical Generation Facility, White
Hills, Mohave County, CO, Comment Period Ends: 06/11/2012, Contact:
Jerry Crockford, 505-360-0473.
EIS No. 20120121, Final EIS, FHWA, OR, Newberg Dundee Bypass Project,
Proposal to Build a Four Lane Expressway and Reduce Congestion on OR
99W, from OR 99W/OR/8 to the top of Rex Hill, USACE 404/Removal Fill
Permits, Funding, Yamhill and Washington Counties, OR, Review Period
Ends: 05/29/2012, Contact: Michelle Eraut, 503-316-2559.
EIS No. 20120122, Draft Supplement, USACE, NM, Rio Grande Floodway
Flood Protection Plan, San Acacia to Bosque Del Apache Unit, To Provide
Higher Levels of Flood Risk Management to Floodplain Communities from
San Acacia Diversion Dam Downstream to Elephant Butte Lake, Socorro
County, NM, Comment Period Ends: 06/11/2012, Contact: Julie A. Alcon,
505-342-3281.
EIS No. 20120123, Final EIS, BLM, NV, Phoenix Copper Leach Project,
Construction and Operation of a New Copper Beneficiation Facility,
Lander County, NV, Review Period Ends: 05/29/2012, Contact: Dave Davis,
775-635-4000.
EIS No. 20120124, Final EIS, NPS, SD, South Unit--Badlands National
Park, General Management Plan, Implementation, SD, Review Period Ends:
05/29/2012, Contact: Eric J. Brunnemann, 605-433-5361 .
EIS No. 20120125, Final EIS, FTA, CA, Hercules Intermodal Transit
Center,
[[Page 25166]]
Construction To Improve Access to Public Transit, Funding USACE Section
404 Permit, Contra Costa County, CA, Review Period Ends: 05/29/2012,
Contact: Paul Page, 415-744-2734.
EIS No. 20120126, Draft EIS, USFS, CO, Black Mesa Vegetation Management
Project, Implementation, Divide Ranger District, Rio Grande National
Forest, Hinsdale and Mineral Counties, CO, Comment Period Ends: 06/11/
2012, Contact: Thomas Malecek, 719-657-3321.
EIS No. 20120127, Final EIS, USFS, CA, Rubicon Trail Easement and
Resource Improvement Project, Construction and Operation, Right-of-Way
Grant, Eldorado National Forest, Pacific Ranger District, El Dorado
County, CA, Review Period Ends: 05/29/2012, Contact: Laura Hierholzer,
530-642-5187.
Amended Notices
EIS No. 20120047, Draft EIS, BIA, WA, West Plains Casino and Mixed-Use
Development Project, Approval of Gaming Development and Management,
Spokane Tribe of Indians, Spokane County, WA, Comment Period Ends: 05/
16/2012, Contact: Dr. B.J. Howerton, 503-231-6749. Revision to FR
Notice Published 03/02/2012; Lead Agency Re-opening the Comment Period
to end 05/16/2012.
EIS No. 20120104, Draft EIS, NOAA, 00, Amendment 5 to the Atlantic
Herring Fishery Management Plan, Implementation, Comment Period Ends:
06/04/2012, Contact: Daniel S. Morris, 978-281-9250. Revision to FR
Notice Published 04/20/2012: Change Agency Contact to Daniel S. Morris,
978-281-9250 and Correction to EIS Title.
Dated: April 24, 2012.
Aimee Hessert,
DeputyDirector, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 2012-10200 Filed 4-26-12; 8:45 am]
BILLING CODE 6560-50-P