Meeting Related to the Transmission Planning Activities of the Southwest Power Pool, Inc.; Notice of Commission Staff Attendance, 24950 [2012-10061]
Download as PDF
24950
Federal Register / Vol. 77, No. 81 / Thursday, April 26, 2012 / Notices
reactive power resources, including
synchronous and asynchronous
generation resources, transmission
resources and energy storage resources;
the design options for and cost of
installing reactive power equipment at
the time of interconnection as well as
retrofitting a resource with reactive
power equipment; other means by
which reactive power is currently
secured such as through self-supply;
and how a technology that is capable of
providing reactive power but may not be
subject to the generation
interconnection process (e.g., FACTs)
would be analyzed. The staff and
participants discussed information on
methods used to determine the reactive
power requirements for a transmission
system and how system impact and
system planning studies take into
account changes in technologies
connected to the system.
Persons wishing to comment on these
issues should submit written comments
to the Commission no later than May 21,
2012.
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Midwest Independent Transmission,
System Operator, Inc.; Supplemental
Notice of Technical Conference
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Meeting Related to the Transmission
Planning Activities of the Southwest
Power Pool, Inc.; Notice of
Commission Staff Attendance
The Federal Energy Regulatory
Commission hereby gives notice that
members of the Commission’s staff may
attend the following meeting related to
the transmission planning activities of
the Southwest Power Pool, Inc. (SPP):
tkelley on DSK3SPTVN1PROD with NOTICES
[FR Doc. 2012–10061 Filed 4–25–12; 8:45 am]
[Docket Nos. ER12–678–000; ER12–679–
000]
[FR Doc. 2012–10062 Filed 4–25–12; 8:45 am]
Strategic Planning Committee Task
Force on Order 1000
April 25, 2012.
9 a.m.–3 p.m. Local Time.
The above-referenced meeting will be
held at: OG&E Offices, 321 N. Harvey
Avenue, Oklahoma City, OK 73101.
The above-referenced meeting is open
to stakeholders.
Further information may be found at
www.spp.org.
The discussions at the meetings
described above may address matters at
issue in the following proceedings:
Docket No. ER09–35–001, Tallgrass
Transmission, LLC.
Docket No. ER09–36–001, Prairie Wind
Transmission, LLC.
17:51 Apr 25, 2012
Dated: April 20, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
Federal Energy Regulatory
Commission
Dated: April 20, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
VerDate Mar<15>2010
Docket No. ER09–548–001, ITC Great
Plains, LLC.
Docket No. ER11–4105–000, Southwest
Power Pool, Inc.
Docket No. EL11–34–001, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER11–3967–002, Southwest
Power Pool, Inc.
Docket No. ER11–3967–003, Southwest
Power Pool, Inc.
Docket No. ER12–1179–000, Southwest
Power Pool, Inc.
For more information, contact
Luciano Lima, Office of Energy Markets
Regulation, Federal Energy Regulatory
Commission at (202) 502–6210 or
luciano.lima@ferc.gov.
Jkt 226001
As announced in the Notice of
Technical Conference issued on April 4,
2012, and as required in the
Commission’s March 30, 2012 order in
these dockets,1 there will be a technical
conference in these proceedings on May
15, 2012 at the Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC, Room 3M–2A&B.
The technical conference will be led by
staff, and will be open for the public to
attend. Attendees may register in
advance at the following Web page:
https://www.ferc.gov/whats-new/
registration/midwest-independent-5–15–
12-form.asp. Advance registration is not
required, but is encouraged. Parties
attending in person should still allow
time to pass through building security
procedures before the 9:00 a.m. start
time of the conference.
The conference will not be webcast,
but will be accessible via telephone.
Parties wishing to participate by phone
should fill out the registration form and
check the box indicating that they wish
to participate by conference call, and do
so no later than 5:00 p.m. (Eastern Time)
on Wednesday, May 9. Parties selecting
this option will receive a confirmation
1 Midwest Independent Transmission System
Operator, Inc., 138 FERC ¶ 61,235 (2012).
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
email containing a dial-in number and
a password before the conference. To
the extent possible, individuals calling
from the same location share a single
telephone line.
FERC conferences are accessible
under section 508 of the Rehabilitation
Act of 1973. For accessibility
accommodations please send an email
to accessibility@ferc.gov or call toll free
866–208–3372 (voice) or 202–208–1659
(TTY), or send a FAX to 202–208–2106
with the required accommodations.
For further information regarding this
conference, contact Stephen Pointer at
stephen.pointer@ferc.gov or 202–502–
8761, Adam Pollock at
adam.pollock@ferc.gov or 202–502–
8458, or Katherine Waldbauer at
katherine.waldbauer@ferc.gov or 202–
502–8232.
I. Questions to be Addressed Prior to
Technical Conference. The Midwest
Independent Transmission System
Operator, Inc. (MISO) and/or Potomac
Economics, Inc., MISO’s Independent
Market Monitor (IMM), are requested to
file written responses to each of the
questions below by Thursday, May 10,
2012, so that the responses may be
discussed at the technical conferences.
1. Provide monthly information (from
2009 forward) on how many units were
committed for VLR and the percentage
of those units that were committed on
transmission lines of less than 100 kV.
Provide information on where in the
MISO region these VLR units were
committed. Does MISO expect VLR
commitments in the future, and if so,
where? Please explain.
2. How many VLR units (from 2009
forward) were economically dispatched?
3. With regard to the IMM’s testimony
in Docket No. ER12–678 at ¶ 15–22,2 for
the period from January 2010 to
September 2011:
a. Were VLR units economically
dispatched during any of these hours?
Provide data on the number of hours
VLR units were economically
dispatched.
b. Did these units have headroom? If
so, how many MWs?
4. MISO states that ‘‘[i]n principle,
voltage issues would be modeled using
thermal constraints as a proxy in the
commitment and dispatch’’ 3 and ‘‘[i]n
fact, these commitments are made per
operating procedures and guidelines
regardless of expected or actual
deviation volumes.’’ 4
a. Please provide the Operating
Procedures and guidelines.
2 Docket No. ER12–678–000 Filing, Tab E,
Affidavit of David B. Patton.
3 Analysis of Market Results at 1.
4 Id. at 8.
E:\FR\FM\26APN1.SGM
26APN1
Agencies
[Federal Register Volume 77, Number 81 (Thursday, April 26, 2012)]
[Notices]
[Page 24950]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-10061]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Meeting Related to the Transmission Planning Activities of the
Southwest Power Pool, Inc.; Notice of Commission Staff Attendance
The Federal Energy Regulatory Commission hereby gives notice that
members of the Commission's staff may attend the following meeting
related to the transmission planning activities of the Southwest Power
Pool, Inc. (SPP):
Strategic Planning Committee Task Force on Order 1000
April 25, 2012.
9 a.m.-3 p.m. Local Time.
The above-referenced meeting will be held at: OG&E Offices, 321 N.
Harvey Avenue, Oklahoma City, OK 73101.
The above-referenced meeting is open to stakeholders.
Further information may be found at www.spp.org.
The discussions at the meetings described above may address matters
at issue in the following proceedings:
Docket No. ER09-35-001, Tallgrass Transmission, LLC.
Docket No. ER09-36-001, Prairie Wind Transmission, LLC.
Docket No. ER09-548-001, ITC Great Plains, LLC.
Docket No. ER11-4105-000, Southwest Power Pool, Inc.
Docket No. EL11-34-001, Midwest Independent Transmission System
Operator, Inc.
Docket No. ER11-3967-002, Southwest Power Pool, Inc.
Docket No. ER11-3967-003, Southwest Power Pool, Inc.
Docket No. ER12-1179-000, Southwest Power Pool, Inc.
For more information, contact Luciano Lima, Office of Energy
Markets Regulation, Federal Energy Regulatory Commission at (202) 502-
6210 or luciano.lima@ferc.gov.
Dated: April 20, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012-10061 Filed 4-25-12; 8:45 am]
BILLING CODE 6717-01-P