Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment Request; Part 70 State Operating Permit Program (Renewal) and Part 71 Federal Operating Permit Program (Renewal), 24702-24703 [2012-9896]
Download as PDF
pmangrum on DSK3VPTVN1PROD with NOTICES
24702
Federal Register / Vol. 77, No. 80 / Wednesday, April 25, 2012 / Notices
regulations are finalized and the initial,
rule-specific, ICRs are due to expire.
Burden Statement: The annual public
reporting and recordkeeping burden for
this collection of information is
estimated to average 0.45 hours per
response. Burden means the total time,
effort or financial resources expended
by persons to generate, maintain, retain,
or disclose or provide information to or
for a Federal agency. This includes the
time needed to review instructions;
develop, acquire, install, and utilize
technology and systems for the purposes
of collecting, validating, and verifying
information, processing and
maintaining information, and disclosing
and providing information; adjust the
existing ways to comply with any
previously applicable instructions and
requirements which have subsequently
changed; train personnel to be able to
respond to a collection of information;
search data sources; complete and
review the collection of information;
and transmit or otherwise disclose the
information.
The ICR provides a detailed
explanation of the Agency’s estimate,
which is only briefly summarized here:
Respondents/Affected Entities:
Owners/operators of public water
systems, commercial air carriers, state
primacy agencies.
Estimated Number of Respondents:
153,083.
Frequency of Response: Varies by
requirement (i.e., on occasion, monthly,
quarterly, semi-annually, annually,
biennially, and every 3, 6, and 9 years)
Estimated Total Annual Hour Burden:
12,920,667.
Estimated Total Annual Cost:
$589,403,000, includes $135,346,345
operating and maintenance and capital
costs.
Changes in the Estimates: There is an
increase of 2,250,751 hours in the total
estimated burden currently identified in
the OMB Inventory of Approved ICR
Burdens. The changes in burden consist
of program adjustments for activities
that were carried forward from existing
ICRs to this Microbial Rules ICR
renewal. Changes in calculated burden
are a result of updating relevant baseline
information for each rule with the most
current and accurate information on
activity compliance.
John Moses,
Director, Collection Strategies Division.
[FR Doc. 2012–9897 Filed 4–24–12; 8:45 am]
BILLING CODE 6560–50–P
VerDate Mar<15>2010
15:14 Apr 24, 2012
Jkt 226001
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OAR–2004–0015 and EPA–HQ–
OAR–2004–0016; FRL 9514–8]
Agency Information Collection
Activities; Submission to OMB for
Review and Approval; Comment
Request; Part 70 State Operating
Permit Program (Renewal) and Part 71
Federal Operating Permit Program
(Renewal)
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
In compliance with the
Paperwork Reduction Act (PRA) (44
U.S.C. 3501 et seq.), this document
announces that two Information
Collection Requests (ICRs) have been
forwarded to the Office of Management
and Budget (OMB) for review and
approval. This is a request to renew two
existing approved collections. The ICRs,
which are abstracted below, describe the
nature of the two information
collections and the estimated burdens
and costs.
DATES: Additional comments may be
submitted on or before May 25, 2012.
ADDRESSES: Submit your comments,
referencing Docket ID No. EPA–HQ–
OAR–2004–0015 (for the Part 70 state
program) or Docket ID No. EPA–HQ–
OAR–2004–0016 (for the Part 71 federal
program), to (1) the EPA online using
www.regulations.gov (our preferred
method), by email at a-and-rdocket@epa.gov or by mail to: Air and
Radiation Docket and Information
Center, Mailcode: 28221T,
Environmental Protection Agency, 1200
Pennsylvania Ave. NW., Washington,
DC 20460, and (2) the OMB by mail to:
Office of Information and Regulatory
Affairs, Office of Management and
Budget (OMB), Attention: Desk Officer
for EPA, 725 17th Street NW.,
Washington, DC 20503.
FOR FURTHER INFORMATION CONTACT: Mr.
Jeff Herring, Air Quality Policy Division,
Office of Air Quality Planning and
Standards, (C504–05), Environmental
Protection Agency, Research Triangle
Park, North Carolina 27711; telephone
number: (919) 541–3195; fax number:
(919) 541–5509; email address:
herring.jeff@epa.gov.
SUPPLEMENTARY INFORMATION: The EPA
has submitted the following ICRs to the
OMB for review and approval according
to the procedures prescribed in 5 CFR
1320.12. On December 14, 2011 (76 FR
77820), the EPA sought comments on
the two ICRs pursuant to 5 CFR
1320.8(d). The EPA received no
SUMMARY:
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
comments. Any additional comments on
the two ICRs should be submitted to the
EPA and the OMB within 30 days of this
notice.
The EPA has established a public
docket for the Part 70 ICR renewal
under Docket ID No. EPA–HQ–OAR–
2004–0015 and a public docket for the
Part 71 ICR renewal under Docket ID
No. EPA–HQ–OAR–2004–0016, which
are available at www.regulations.gov.
Use the EPA’s electronic docket and
comment system at
www.regulations.gov, to submit or view
public comments.
Title: Part 70 State Operating Permit
Program (Renewal) and Part 71 Federal
Operating Permit Program (Renewal).
ICR numbers: For the Part 70
regulations, EPA ICR No. 1587.12 and
OMB Control No. 2060–0243. For the
Part 71 regulations, EPA ICR No.
1713.10 and OMB Control No. 2060–
0336.
ICR Status: The two ICRs are both
scheduled to expire on April 30, 2012.
Under OMB regulations, the Agency
may continue to conduct or sponsor the
collection of information while this
submission is pending at the OMB. An
agency may not conduct or sponsor, and
a person is not required to respond to,
a collection of information, unless it
displays a currently valid OMB control
number.
Abstract: Title V of the Clean Air Act
(Act) requires states to develop and
implement a program for issuing
operating permits to all sources that fall
under any Act definition of ‘‘major’’ and
certain other non-major sources that are
subject to federal air quality regulations.
The Act further requires the EPA to
develop regulations that establish the
minimum requirements for those state
operating permits programs, to oversee
implementation of the state programs,
and to operate a federal operating
permits program in areas not subject to
an approved state program. The EPA
regulations setting forth requirements
for the state operating permit program
are at 40 CFR part 70, and the EPA
regulations setting forth the
requirements for the federal (EPA)
operating permit program are at 40 CFR
part 71. The part 70 program is designed
to be implemented primarily by state
and local permitting authorities in all
areas where they have juridiction. The
part 71 program is designed to be
implemented primarily by the EPA in
all areas where state and local agencies
do not have jurisdiction, such as Indian
country and offshore beyond states’
seaward boundaries. The EPA may also
delegate authority to implement the part
71 program on its behalf to a state, local
or tribal agency if the agency requests
E:\FR\FM\25APN1.SGM
25APN1
24703
Federal Register / Vol. 77, No. 80 / Wednesday, April 25, 2012 / Notices
delegation and makes certain showings
regarding its authority and ability to
implement the program. One such
delegate agency for the part 71 program
exists at present.
In order to receive an operating
permit for a major or other source
subject to either of the permitting
programs, the applicant must conduct
the necessary research, perform the
appropriate analyses and prepare the
permit application with documentation
to demonstrate that its facility meets all
applicable statutory and regulatory
requirements. Specific activities and
requirements are listed and described in
the Supporting Statements for the two
ICRs.
State and local agencies under part 70
and the EPA (or a delegate agency)
under part 71 review permit
applications, provide for public review
of proposed permits, issue permits
based on consideration of all technical
factors and public input, and review
information submittals required of
sources during the term of the permit.
Also, under part 70, the EPA reviews
certain actions of the state and local
agencies and provides oversight of the
programs to ensure that they are being
adequately implemented and enforced.
Under part 71, the EPA reviews certain
actions and performs oversight for any
delegate agency, consistent with the
terms of a delegation agreement.
Consequently, information prepared and
submitted by sources is essential for
sources to receive permits, and for
federal, state, local and tribal permitting
agencies to adequately review the
permit applications and thereby
properly administer and manage the
program.
Since the previous renewal of this
ICR, the EPA has promulgated two
changes to the part 70 and 71
regulations: the Flexible Air Permits
rule and the Greenhouse Gas (GHG)
Tailoring rule. The first rule provides a
mechanism for sources to establish
provisions in their operating permits
that result in fewer permit revisions
necessary during the term of the permit;
the second establishes levels where
GHG emissions trigger permitting
requirements. The information
collection requirements for these
regulatory revisions were approved by
the OMB after the approval of the 2007
ICR renewals, and those approved
changes are included and updated in
these ICR renewals. Also, the previous
part 71 ICR renewal identifed the EPA
as the sole permitting authority, while
this part 71 renewal identifies the EPA
and one delegate agency, the Navaho
Nation, as permitting authorities (the
EPA continues to serve as a permitting
authority in all areas, while the delegate
agency serves as a permitting authority
in a limited portion of Indian country).
Burden Statement: Burden means the
total time, effort or financial resources
expended by persons to generate,
maintain, retain or disclose or provide
information to or for a federal agency.
This includes the time needed to review
instructions; develop, acquire, install
and utilize technology and systems for
the purposes of collecting, validating
and verifying information, processing
and maintaining information and
disclosing and providing information;
adjust the existing ways to comply with
any previously applicable instructions
and requirements which have
subsequently changed; train personnel
to be able to respond to a collection of
information; search data sources;
complete and review the collection of
information; and transmit or otherwise
disclose the information.
The annual public reporting and
recordkeeping burden for the collection
of information under parts 70 and 71 is
broken down as follows:
Type of permit action
Part 70
Number of Sources ..................................................................................................................................................
Burden Hours per Response:
Sources .............................................................................................................................................................
Permitting Authority ..........................................................................................................................................
Total Annual Burden Hours:
Sources .............................................................................................................................................................
Permitting Authority ..........................................................................................................................................
Part 71
15,940
174
250
84
209
90
3,977,316
1,336,370
36,375
1,254 a
pmangrum on DSK3VPTVN1PROD with NOTICES
Any minor discrepencies are due to rounding.
a Only delegate agency burden is shown for part 71.
Respondents/Affected Entities:
Industrial plants (sources); state, local
and tribal permitting authorities.
Estimated Number of Respondents:
For part 70 there are 15,940 sources and
112 state and local permitting
authorities. For part 71 there are 174
industry sources and 1 tribal delegate
permitting authority. (The EPA serves as
a permitting authority but, as a federal
agency, is not a respondent.)
Estimated Total Annual Hour Burden:
For part 70, the total annual burden for
sources and state and local permitting
authorities is 5,313,686 hours. For part
71, the total annual burden for sources
and the one delegate agency (tribal) is
37,629 hours.
Estimated Total Annual Cost: For part
70, the total annual cost for sources and
state and local permitting authorities is
$322,734,860. For part 71, the total
annual cost for sources and the one
VerDate Mar<15>2010
15:14 Apr 24, 2012
Jkt 226001
delegate agency (tribal) is $2,393,171. In
both cases, all costs are labor costs;
there are no capital, startup or operating
and maintenance costs.
Changes in the Estimates: Since the
last renewal of the part 70 ICR (in 2007),
there is an decrease of about 199,000
hours (or nearly a 5 percent decrease) of
annual respondent burden. This change
is primarily due to an updated estimate
of the number of permits expected.
Since the last renewal of the part 71
ICR (in 2007), there is an increase of
over 10,000 hours of total annual
respondent burden (about a 38 percent
increase). This is primarily due to an
updated estimate of the number of
permits expected.
John Moses,
Director, Collection Strategies Division.
[FR Doc. 2012–9896 Filed 4–24–12; 8:45 am]
BILLING CODE 6560–50–P
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OECA–2012–0034; FRL–9515–9]
Agency Information Collection
Activities; Submission to OMB for
Review and Approval; Comment
Request; National Emission Standards
for Hazardous Air Pollutants (NESHAP)
for Nine Metal Fabrication and
Finishing Area Sources
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
In compliance with the
Paperwork Reduction Act (44 U.S.C.
3501 et seq.), this document announces
that an Information Collection Request
(ICR) has been forwarded to the Office
of Management and Budget (OMB) for
review and approval. This is a request
SUMMARY:
E:\FR\FM\25APN1.SGM
25APN1
Agencies
[Federal Register Volume 77, Number 80 (Wednesday, April 25, 2012)]
[Notices]
[Pages 24702-24703]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-9896]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[EPA-HQ-OAR-2004-0015 and EPA-HQ-OAR-2004-0016; FRL 9514-8]
Agency Information Collection Activities; Submission to OMB for
Review and Approval; Comment Request; Part 70 State Operating Permit
Program (Renewal) and Part 71 Federal Operating Permit Program
(Renewal)
AGENCY: Environmental Protection Agency (EPA).
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: In compliance with the Paperwork Reduction Act (PRA) (44
U.S.C. 3501 et seq.), this document announces that two Information
Collection Requests (ICRs) have been forwarded to the Office of
Management and Budget (OMB) for review and approval. This is a request
to renew two existing approved collections. The ICRs, which are
abstracted below, describe the nature of the two information
collections and the estimated burdens and costs.
DATES: Additional comments may be submitted on or before May 25, 2012.
ADDRESSES: Submit your comments, referencing Docket ID No. EPA-HQ-OAR-
2004-0015 (for the Part 70 state program) or Docket ID No. EPA-HQ-OAR-
2004-0016 (for the Part 71 federal program), to (1) the EPA online
using www.regulations.gov (our preferred method), by email at a-and-r-docket@epa.gov or by mail to: Air and Radiation Docket and Information
Center, Mailcode: 28221T, Environmental Protection Agency, 1200
Pennsylvania Ave. NW., Washington, DC 20460, and (2) the OMB by mail
to: Office of Information and Regulatory Affairs, Office of Management
and Budget (OMB), Attention: Desk Officer for EPA, 725 17th Street NW.,
Washington, DC 20503.
FOR FURTHER INFORMATION CONTACT: Mr. Jeff Herring, Air Quality Policy
Division, Office of Air Quality Planning and Standards, (C504-05),
Environmental Protection Agency, Research Triangle Park, North Carolina
27711; telephone number: (919) 541-3195; fax number: (919) 541-5509;
email address: herring.jeff@epa.gov.
SUPPLEMENTARY INFORMATION: The EPA has submitted the following ICRs to
the OMB for review and approval according to the procedures prescribed
in 5 CFR 1320.12. On December 14, 2011 (76 FR 77820), the EPA sought
comments on the two ICRs pursuant to 5 CFR 1320.8(d). The EPA received
no comments. Any additional comments on the two ICRs should be
submitted to the EPA and the OMB within 30 days of this notice.
The EPA has established a public docket for the Part 70 ICR renewal
under Docket ID No. EPA-HQ-OAR-2004-0015 and a public docket for the
Part 71 ICR renewal under Docket ID No. EPA-HQ-OAR-2004-0016, which are
available at www.regulations.gov. Use the EPA's electronic docket and
comment system at www.regulations.gov, to submit or view public
comments.
Title: Part 70 State Operating Permit Program (Renewal) and Part 71
Federal Operating Permit Program (Renewal).
ICR numbers: For the Part 70 regulations, EPA ICR No. 1587.12 and
OMB Control No. 2060-0243. For the Part 71 regulations, EPA ICR No.
1713.10 and OMB Control No. 2060-0336.
ICR Status: The two ICRs are both scheduled to expire on April 30,
2012. Under OMB regulations, the Agency may continue to conduct or
sponsor the collection of information while this submission is pending
at the OMB. An agency may not conduct or sponsor, and a person is not
required to respond to, a collection of information, unless it displays
a currently valid OMB control number.
Abstract: Title V of the Clean Air Act (Act) requires states to
develop and implement a program for issuing operating permits to all
sources that fall under any Act definition of ``major'' and certain
other non-major sources that are subject to federal air quality
regulations. The Act further requires the EPA to develop regulations
that establish the minimum requirements for those state operating
permits programs, to oversee implementation of the state programs, and
to operate a federal operating permits program in areas not subject to
an approved state program. The EPA regulations setting forth
requirements for the state operating permit program are at 40 CFR part
70, and the EPA regulations setting forth the requirements for the
federal (EPA) operating permit program are at 40 CFR part 71. The part
70 program is designed to be implemented primarily by state and local
permitting authorities in all areas where they have juridiction. The
part 71 program is designed to be implemented primarily by the EPA in
all areas where state and local agencies do not have jurisdiction, such
as Indian country and offshore beyond states' seaward boundaries. The
EPA may also delegate authority to implement the part 71 program on its
behalf to a state, local or tribal agency if the agency requests
[[Page 24703]]
delegation and makes certain showings regarding its authority and
ability to implement the program. One such delegate agency for the part
71 program exists at present.
In order to receive an operating permit for a major or other source
subject to either of the permitting programs, the applicant must
conduct the necessary research, perform the appropriate analyses and
prepare the permit application with documentation to demonstrate that
its facility meets all applicable statutory and regulatory
requirements. Specific activities and requirements are listed and
described in the Supporting Statements for the two ICRs.
State and local agencies under part 70 and the EPA (or a delegate
agency) under part 71 review permit applications, provide for public
review of proposed permits, issue permits based on consideration of all
technical factors and public input, and review information submittals
required of sources during the term of the permit. Also, under part 70,
the EPA reviews certain actions of the state and local agencies and
provides oversight of the programs to ensure that they are being
adequately implemented and enforced. Under part 71, the EPA reviews
certain actions and performs oversight for any delegate agency,
consistent with the terms of a delegation agreement. Consequently,
information prepared and submitted by sources is essential for sources
to receive permits, and for federal, state, local and tribal permitting
agencies to adequately review the permit applications and thereby
properly administer and manage the program.
Since the previous renewal of this ICR, the EPA has promulgated two
changes to the part 70 and 71 regulations: the Flexible Air Permits
rule and the Greenhouse Gas (GHG) Tailoring rule. The first rule
provides a mechanism for sources to establish provisions in their
operating permits that result in fewer permit revisions necessary
during the term of the permit; the second establishes levels where GHG
emissions trigger permitting requirements. The information collection
requirements for these regulatory revisions were approved by the OMB
after the approval of the 2007 ICR renewals, and those approved changes
are included and updated in these ICR renewals. Also, the previous part
71 ICR renewal identifed the EPA as the sole permitting authority,
while this part 71 renewal identifies the EPA and one delegate agency,
the Navaho Nation, as permitting authorities (the EPA continues to
serve as a permitting authority in all areas, while the delegate agency
serves as a permitting authority in a limited portion of Indian
country).
Burden Statement: Burden means the total time, effort or financial
resources expended by persons to generate, maintain, retain or disclose
or provide information to or for a federal agency. This includes the
time needed to review instructions; develop, acquire, install and
utilize technology and systems for the purposes of collecting,
validating and verifying information, processing and maintaining
information and disclosing and providing information; adjust the
existing ways to comply with any previously applicable instructions and
requirements which have subsequently changed; train personnel to be
able to respond to a collection of information; search data sources;
complete and review the collection of information; and transmit or
otherwise disclose the information.
The annual public reporting and recordkeeping burden for the
collection of information under parts 70 and 71 is broken down as
follows:
------------------------------------------------------------------------
Type of permit action Part 70 Part 71
------------------------------------------------------------------------
Number of Sources....................... 15,940 174
Burden Hours per Response:
Sources............................. 250 209
Permitting Authority................ 84 90
Total Annual Burden Hours:
Sources............................. 3,977,316 36,375
Permitting Authority................ 1,336,370 1,254 \a\
------------------------------------------------------------------------
Any minor discrepencies are due to rounding.
\a\ Only delegate agency burden is shown for part 71.
Respondents/Affected Entities: Industrial plants (sources); state,
local and tribal permitting authorities.
Estimated Number of Respondents: For part 70 there are 15,940
sources and 112 state and local permitting authorities. For part 71
there are 174 industry sources and 1 tribal delegate permitting
authority. (The EPA serves as a permitting authority but, as a federal
agency, is not a respondent.)
Estimated Total Annual Hour Burden: For part 70, the total annual
burden for sources and state and local permitting authorities is
5,313,686 hours. For part 71, the total annual burden for sources and
the one delegate agency (tribal) is 37,629 hours.
Estimated Total Annual Cost: For part 70, the total annual cost for
sources and state and local permitting authorities is $322,734,860. For
part 71, the total annual cost for sources and the one delegate agency
(tribal) is $2,393,171. In both cases, all costs are labor costs; there
are no capital, startup or operating and maintenance costs.
Changes in the Estimates: Since the last renewal of the part 70 ICR
(in 2007), there is an decrease of about 199,000 hours (or nearly a 5
percent decrease) of annual respondent burden. This change is primarily
due to an updated estimate of the number of permits expected.
Since the last renewal of the part 71 ICR (in 2007), there is an
increase of over 10,000 hours of total annual respondent burden (about
a 38 percent increase). This is primarily due to an updated estimate of
the number of permits expected.
John Moses,
Director, Collection Strategies Division.
[FR Doc. 2012-9896 Filed 4-24-12; 8:45 am]
BILLING CODE 6560-50-P