Standards for Business Practices and Communication Protocols for Public Utilities, 24427-24433 [2012-9809]
Download as PDF
Federal Register / Vol. 77, No. 79 / Tuesday, April 24, 2012 / Proposed Rules
mstockstill on DSK4VPTVN1PROD with PROPOSALS
(i) Within the next 24 months after the
effective date of this AD, rework the rudder,
rudder trim-tab, elevators and elevators autotab surfaces by drilling additional drain
holes.
(ii) Within the next 24 months after the
effective date of this AD, inspect the ailerons
for the existence of required drain holes.
(iii) Before further flight after the
inspections required in paragraph (f)(3)(ii) of
this AD, if the required drain holes do not
exist, drill the drain holes.
(iv) Do the actions required in paragraph
(f)(3)(i) of this AD following Part II of the
Accomplishment Instructions in EMBRAER
Phenom Service Bulletin No. 505–57–0002,
dated February 13, 2012.
(v) Do the actions required in paragraphs
(f)(3)(ii) and (f)(3)(iii) of this AD following
Part II of the Accomplishment Instructions in
EMBRAER Phenom Service Bulletin No.
505–57–0004, dated February 16, 2012.
(4) Group 4 airplanes specified in
paragraph (c)(4) of this AD:
(i) Within the next 24 months after the
effective date of this AD, inspect the ailerons,
elevators, and rudder for the existence of
required drain holes.
(ii) Before further flight after the inspection
required in paragraph (f)(4)(i) of this AD, if
the required drain holes do not exist, drill the
drain holes.
(iii) Do the actions required in paragraphs
(f)(4)(i) and (f)(4)(ii) of this AD following Part
I of the Accomplishment Instructions in
EMBRAER Phenom Service Bulletin No.
505–57–0004, dated February 16, 2012.
(g) Other FAA AD Provisions
The following provisions also apply to this
AD:
(1) Alternative Methods of Compliance
(AMOCs): The Manager, Standards Office,
FAA, has the authority to approve AMOCs
for this AD, if requested using the procedures
found in 14 CFR 39.19. Send information to
ATTN: Jim Rutherford, Aerospace Engineer,
FAA, Small Airplane Directorate, 901 Locust,
Room 301, Kansas City, Missouri 64106;
telephone: (816) 329–4165; fax: (816) 329–
4090; email: jim.rutherford@faa.gov. Before
using any approved AMOC on any airplane
to which the AMOC applies, notify your
appropriate principal inspector (PI) in the
FAA Flight Standards District Office (FSDO),
or lacking a PI, your local FSDO.
(2) Airworthy Product: For any requirement
in this AD to obtain corrective actions from
a manufacturer or other source, use these
actions if they are FAA-approved. Corrective
actions are considered FAA-approved if they
are approved by the State of Design Authority
(or their delegated agent). You are required
to assure the product is airworthy before it
is returned to service.
(3) Reporting Requirements: For any
reporting requirement in this AD, a federal
agency may not conduct or sponsor, and a
person is not required to respond to, nor
shall a person be subject to a penalty for
failure to comply with a collection of
information subject to the requirements of
the Paperwork Reduction Act unless that
collection of information displays a current
valid OMB Control Number. The OMB
Control Number for this information
collection is 2120–0056. Public reporting for
this collection of information is estimated to
be approximately 5 minutes per response,
including the time for reviewing instructions,
completing and reviewing the collection of
information. All responses to this collection
of information are mandatory. Comments
concerning the accuracy of this burden and
suggestions for reducing the burden should
be directed to the FAA at: 800 Independence
Ave. SW., Washington, DC 20591, Attn:
Information Collection Clearance Officer,
AES–200.
(h) Related Information
ˆ
Refer to MCAI Agencia Nacional de
Aviacao Civil (ANAC) Brazilian
¸˜
Airworthiness Directive 2012–03–01, dated
March 20, 2012; EMBRAER Phenom Service
Bulletin No. 505–57–0002, dated February
13, 2012; EMBRAER Phenom Service
Bulletin No. 505–57–0003, dated November
16, 2011; and EMBRAER Phenom Service
Bulletin No. 505–57–0004, dated February
16, 2012, for related information. For service
information related to this AD, contact
Empresa Brasileira de Aeronautica S.A.
(EMBRAER), Phenom Maintenance Support,
´
˜
Av. Brigadeiro Faria Lima, 2170, Sao Jose dos
Campos—SP, CEP: 12227–901—P.O. Box
36/2, BRASIL; fax ++55 12 3927–2619; email
phenom.reliability@embraer.com.br; Internet:
https://www.embraer.com. You may review
copies of the referenced service information
at the FAA, Small Airplane Directorate, 901
Locust, Kansas City, Missouri 64106. For
information on the availability of this
material at the FAA, call (816) 329–4148.
Issued in Kansas City, Missouri, on April
18, 2012.
John Colomy,
Acting Manager, Small Airplane Directorate,
Aircraft Certification Service.
[FR Doc. 2012–9794 Filed 4–23–12; 8:45 am]
BILLING CODE 4910–13–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
18 CFR Part 38
[Docket No. RM05–5–020]
Standards for Business Practices and
Communication Protocols for Public
Utilities
Federal Energy Regulatory
Commission.
AGENCY:
ACTION:
24427
Notice of proposed rulemaking.
The Federal Energy
Regulatory Commission (Commission) is
proposing to amend its regulations to
incorporate by reference the business
practice standards adopted by the
Wholesale Electric Quadrant of the
North American Energy Standards
Board (NAESB) that pertain to the
measurement and verification of
demand response and energy efficiency
resources participating in organized
wholesale electricity markets. NAESB
adopted the measurement and
verification of demand response
standards in response to the
Commission’s findings in Order No.
676–F.
DATES: Comments are due June 25, 2012.
ADDRESSES: Comments, identified by
docket number RM05–5–020, may be
filed in the following ways:
• Electronic Filing through https://
www.ferc.gov. Documents created
electronically using word processing
software should be filed in native
applications or print-to-PDF format and
not in a scanned format.
• Mail/Hand Delivery: Those unable
to file electronically may mail or handdeliver comments to: Federal Energy
Regulatory Commission, Secretary of the
Commission, 888 First Street NE.,
Washington, DC 20426.
Instructions: For detailed instructions
on submitting comments and additional
information on the rulemaking process,
see the Comment Procedures Section of
this document.
These standards can be obtained from
NAESB at 801 Travis Street, Suite 1675,
Houston, TX 77002, telephone: (713)
356–0060, https://www.naesb.org, and
are available for viewing in the
Commission’s Public Reference Room.
FOR FURTHER INFORMATION CONTACT:
David Kathan (Technical Issues), Office
of Energy Policy and Innovation,
Federal Energy Regulatory
Commission, 888 First Street NE.,
Washington, DC 20426, (202) 502–
6404, david.kathan@ferc.gov;
Dennis Hough (Legal Issues), Office of
the General Counsel, Federal Energy
Regulatory Commission, 888 First
Street NE., Washington, DC 20426,
(202) 502–8631,
dennis.hough@ferc.gov.
SUMMARY:
SUPPLEMENTARY INFORMATION:
Table of Contents
Paragraph
Nos.
I. Background ............................................................................................................................................................................................
II. Discussion ............................................................................................................................................................................................
VerDate Mar<15>2010
17:33 Apr 23, 2012
Jkt 226001
PO 00000
Frm 00003
Fmt 4702
Sfmt 4702
E:\FR\FM\24APP1.SGM
24APP1
2
10
24428
Federal Register / Vol. 77, No. 79 / Tuesday, April 24, 2012 / Proposed Rules
Paragraph
Nos.
A. NAESB Phase II Demand Response M&V Standards .................................................................................................................
1. Description .............................................................................................................................................................................
2. Discussion ..............................................................................................................................................................................
B. NAESB Wholesale Energy Efficiency M&V Standards ...............................................................................................................
1. Description .............................................................................................................................................................................
2. Discussion ..............................................................................................................................................................................
III. Notice of Use of Voluntary Consensus Standards ............................................................................................................................
IV. Information Collection Statement ......................................................................................................................................................
V. Environmental Analysis ......................................................................................................................................................................
VI. Regulatory Flexibility Act Certification ............................................................................................................................................
VII. Comment Procedures ........................................................................................................................................................................
VIII. Document Availability .....................................................................................................................................................................
Notice of Proposed Rulemaking
(April 19, 2012)
1. In this Notice of Proposed
Rulemaking (NOPR), the Federal Energy
Regulatory Commission (Commission)
proposes to amend its regulations at 18
CFR 38.2 under the Federal Power Act 1
to incorporate by reference the business
practice standards adopted by the
Wholesale Electric Quadrant (WEQ) of
the North American Energy Standards
Board (NAESB) that pertain to the
measurement and verification of
demand response and energy efficiency
resources participating in organized
wholesale electricity markets.2
Adoption of these standards is intended
to improve the methods and procedures
used to accurately measure demand
response and energy efficiency resource
performance. Additionally, these
standards should help Regional
Transmission Organizations (RTO) and
Independent System Operators (ISO) to
properly credit demand response and
energy efficiency resources for their
services.3
I. Background
2. NAESB is a private consensus
standards developer that divides its
activities among four quadrants, each of
which is composed of members from all
1 16
U.S.C. 791a et seq. (2006).
Report, North American Energy Standards
Board, Measurement and Verification of Demand
Response Products, Docket No. RM05–5–020 (filed
May 3, 2011) (May 3 Report) (providing a status
update and description of the proposed standards).
In accordance with applicable copyright laws,
complete versions of the standards are available
from NAESB at 801 Travis Street, Suite 1675,
Houston, TX 77002, telephone: (713) 356–0060,
https://www.naesb.org, and are available for viewing
in the Commission’s Public Reference Room.
3 The Commission has also sought RTO and ISO
proposals regarding their measurement and
verification methodologies, including in Order No.
745, Demand Response Compensation in Organized
Wholesale Energy Markets, Order No. 745, 76 Fed.
Reg. 16,658 (Mar. 24, 2011), FERC Stats. & Regs.
¶ 31,322, at P 93–95 (2011), order on reh’g, Order
No. 745–A, 137 FERC ¶ 61,215, at P 123 (2011).
mstockstill on DSK4VPTVN1PROD with PROPOSALS
2 See
VerDate Mar<15>2010
17:33 Apr 23, 2012
Jkt 226001
segments of its respective industry.4
NAESB is an accredited standards
organization under the auspices of the
American National Standards Institute
(ANSI). NAESB’s procedures are
designed to ensure that all industry
members can have input into the
development of a standard, whether or
not they are members of NAESB, and
each wholesale electricity standard that
NAESB’s WEQ adopts is supported by a
consensus of the seven industry
segments: end users, distribution/load
serving entities, transmission,
generation, marketers/brokers,
independent grid operators/planners
and technology/services. Under the
WEQ process, for a standard to be
approved, it must receive a supermajority vote of 67 percent of the
members of the WEQ’s Executive
Committee, with support from at least
40 percent of each of the seven industry
segments.5 For final approval, 67
percent of the WEQ’s general
membership must ratify the standard.6
3. In 2006, the Commission issued
Order No. 676, a Final Rule that
incorporated by reference business
practice standards for the WEQ adopted
by NAESB applicable to public
utilities.7 Since 2006, the NAESB
consensus industry stakeholder process
has reviewed the NAESB business
practice standards for public utilities
with a view to creating a more efficient
marketplace and it has adopted
revisions that, in a number of instances,
the Commission has made mandatory by
4 The four quadrants are the wholesale and retail
electric quadrants and the wholesale and retail
natural gas quadrants.
5 Under NAESB’s procedures, interested persons
may attend and participate in NAESB committee
meetings and phone conferences, even if they are
not NAESB members.
6 See May 3 Report at 2.
7 See Standards for Business Practices and
Communication Protocols for Public Utilities, Order
No. 676, FERC Stats. & Regs. ¶ 31,216, (2006), reh’g
denied, Order No. 676–A, 116 FERC ¶ 61,255
(2006).
PO 00000
Frm 00004
Fmt 4702
Sfmt 4702
11
12
15
20
21
23
25
26
32
33
35
39
incorporating by reference into the
Commission’s regulations.8
4. NAESB began work on the
development of business practice
standards pertaining to the
measurement and verification of
demand response 9 products and
services in July 2007, when the NAESB
WEQ Demand Side Management—
Energy Efficiency (DSM–EE)
subcommittee began work on this issue.
This effort led to the adoption and
ratification by NAESB of initial
measurement and verification standards
early in 2009.
5. On April 17, 2009, NAESB filed a
report (April 2009 Report) informing the
Commission that it had adopted an
initial set of business practice standards
to categorize various demand response
products and services and to support
the measurement and verification of
these products and services in organized
wholesale electricity markets (Phase I
Demand Response M&V Standards).10
Key to obtaining consensus on the
initial set of standards was the
agreement to proceed with further work
on more detailed technical standards for
the measurement and verification of
demand response resources. The
NAESB report recognized that these
standards would need to be followed by
the development of more detailed
technical standards for the measurement
and verification of demand response
8 Standards for Business Practices and
Communication Protocols for Public Utilities, Order
No. 676–F, FERC Stats. & Regs. ¶ 31,309 (2010);
Order No. 676–E, FERC Stats. & Regs. ¶ 31,299
(2009); Order No. 676–D, 124 FERC ¶ 61,317 (2008),
Order No. 676–C, FERC Stats. & Regs. ¶ 31,274
(2008), Order No. 676–B, FERC Stats. & Regs.
¶ 31,246 (2007).
9 Demand response means a reduction in the
consumption of electric energy by customers from
their expected consumption in response to an
increase in the price of electric energy or to
incentive payments designed to induce lower
consumption of electric energy. 18 CFR 35.28(b)(4)
(2011).
10 Report, North American Energy Standards
Board, Measurement and Verification of Demand
Response Products, Docket No. RM05–5–017, at 2
(filed Apr. 17, 2009) (April 2009 Report).
E:\FR\FM\24APP1.SGM
24APP1
Federal Register / Vol. 77, No. 79 / Tuesday, April 24, 2012 / Proposed Rules
mstockstill on DSK4VPTVN1PROD with PROPOSALS
products and services in RTO and ISO
areas.
6. On April 15, 2010, the Commission
issued Order No. 676–F, incorporating
by reference 11 the Phase I Demand
Response M&V Standards 12 that
categorize various demand response
products and services and support the
measurement and verification of these
products and services in organized
wholesale electricity markets.13 The
Commission stated that ‘‘[w]hile
NAESB’s Phase I [Demand Response]
M&V Standards represent a good first
step, additional substantive standards
would appear beneficial in creating
transparent and consistent measurement
and verification of demand response
products and services in wholesale
electric markets.’’ 14 The Commission
also stated that ‘‘we expect Phase II will
address issues related to baseline
development * * *’’ 15 The
Commission anticipated that the
measurement and verification standards
needed to accomplish this goal would
be a focus of NAESB’s Phase II
measurement and verification standards
development efforts.16
7. NAESB subsequently initiated
specific plans to improve and adopt
additional technical standards and filed
a report 17 with the Commission on May
3, 2011 (May 3 Report) that informed
the Commission that NAESB had
adopted a revised set of standards
covering measurement and verification
(Phase II Demand Response M&V
Standards) and a new set of standards
covering energy efficiency,18 and
11 Incorporation by reference makes compliance
with these standards mandatory for public utilities
subject to Part 38 of the Commission’s regulations.
12 See Standards for Business Practices and
Communication Protocols for Public Utilities,
Notice of Proposed Rulemaking, FERC Stats. & Regs.
¶ 32,646 (2009) (2009 NOPR).
13 Standards for Business Practices and
Communication Protocols for Public Utilities, Order
No. 676–F, FERC Stats. & Regs. ¶ 31,309 (2010).
14 Order No. 676–F, FERC Stats. & Regs. ¶ 31,309
at P 32.
15 Id. P 37.
16 Id. P 32.
17 See supra n.2.
18 Energy efficiency:
[r]efers to programs that are aimed at reducing the
energy used by specific end-use devices and
systems, typically without affecting the services
provided. These programs reduce overall electricity
consumption (reported in megawatthours), often
without explicit consideration for the timing of
program-induced savings. Such savings are
generally achieved by substituting technologically
more advanced equipment to produce the same
level of end-use services (e.g. lighting, heating,
motor drive) with less electricity. Examples include
high-efficiency appliances, efficient lighting
programs, high-efficiency heating, ventilating and
air conditioning (HVAC) systems or control
modifications, efficient building design, advanced
electric motor drives, and heat recovery systems.
VerDate Mar<15>2010
17:33 Apr 23, 2012
Jkt 226001
explained its efforts to develop these
standards.
8. As discussed in more detail below,
the Phase II Demand Response M&V
Standards add more specifications to
the existing Phase I Demand Response
M&V Standards’ definitions and
business practice standards in the
following areas: meter data reporting
deadline, advanced notification,
telemetry interval, meter accuracy for
after-the-fact metering, meter data
reporting interval, and adjustment
window.19 During NAESB’s work on
Phase II, the WEQ DSM–EE Wholesale
Demand Response Work Group (WEQ
DR work group) discussed the level of
detail to be included in the standards,
with most participants agreeing that the
standards developed should not
‘‘duplicate efforts undertaken in the
ISO–RTO stakeholder process,’’ which
vetted the adopted programs
extensively.20 NAESB states that a
majority of the WEQ DR work group
agreed that ‘‘impacting the stakeholder
process would require guidance from
the FERC.’’ 21
9. In addition to demand response
standards, NAESB drafted, discussed,
and adopted business practice standards
for the measurement and verification of
energy efficiency in organized
wholesale electricity markets
(Wholesale Energy Efficiency M&V
Standards). NAESB reports that the
work took place between July 2009 and
December 2010, and was considered in
NAESB’s DSM–EE subcommittee
meetings and WEQ’s Executive
Committee meetings. The standards are
designed to create a standard method for
quantifying the energy reductions from
energy efficiency measures. The
Wholesale Energy Efficiency M&V
Standards include six new definitions
and 63 business practice standards.
Included are definitions for energy
efficiency baseline and demand
reduction value. The standards contain
criteria for the use of energy efficiency
products in organized wholesale
electricity markets, general
measurement and verification plan
requirements, and detailed criteria of
acceptable measurement and
verification methodologies. NAESB
U.S. Energy Information Administration Glossary,
https://www.eia.gov/tools/glossary/index.cfm?id=E
(last visited Feb. 24, 2012).
19 NAESB states that ‘‘advance notification’’
involves a communication to the demand response
resource made prior to when its services are
required. The ‘‘telemetry interval,’’ as described by
NAESB, is the period of time between submissions
of data. NAESB defines ‘‘adjustment window’’ as a
period of time used to calculate a baseline
adjustment.
20 May 3 Report at 1–2.
21 Id. at 1.
PO 00000
Frm 00005
Fmt 4702
Sfmt 4702
24429
states that the standards are built upon
PJM Interconnection, L.L.C. and ISO
New England Inc. manuals, the Federal
Energy Management Program (FEMP)
measurement and verification
standards,22 the International
Performance Measurement and
Verification Protocol (IPMVP),23 and
several state protocols.24
II. Discussion
10. The Commission proposes to
incorporate by reference into our
regulations both the Phase II Demand
Response M&V Standards and
associated terms, and the Wholesale
Energy Efficiency M&V Standards and
associated terms.
A. NAESB Phase II Demand Response
M&V Standards
11. The Commission proposes to
incorporate by reference into its
regulations the Phase II Demand
Response M&V Standards as a further
step toward transparency and
consistency in the methods RTOs and
ISOs use to measure and verify demand
response in their organized wholesale
electricity markets.25 Additionally, the
Commission seeks comment on the
Phase II Demand Response M&V
Standards and on certain aspects of
measurement and verification of
demand response more generally,
22 U.S. Department of Energy, FEMP, M&V
Guidelines: Measurement and Verification for
Federal Energy Projects, Version 3.0, April 2008,
https://www1.eere.energy.gov/femp/pdfs/
mv_guidelines.pdf.
23 Efficiency Valuation Organization, IPMVP
Public Library of Documents, https://www.evoworld.org/.
24 May 3 Report at 3.
25 We propose to incorporate by reference the
following standards collectively identified by
NAESB as 2010 Wholesale Electric Quadrant
Annual Plan Item 4(a) and 4(b): General—Section
015–1.0; Telemetry—Section 015–1.1; After-theFact Metering—Section 015–1.2; Performance
Evaluation—Section 015–1.3; General—Section
015–1.4; Telemetry—Section 015–1.5; After-theFact Metering—Section 015–1.6; Performance
Evaluation—Section 015–1.7; General—Section
015–1.8; Telemetry—Section 015–1.9; After-theFact Metering—Section 015–1.10; Performance
Evaluation—Section 015–1.11; General—Section
015–1.12; Telemetry—Section 015–1.13; After-theFact Metering—Section 015–1.14; Performance
Evaluation—Section 015–1.15; Baseline
Information—Section 015–1.16; Event
Information—Section 015–1.17; Special
Processing—Section 015–1.18; Baseline
Information—Section 015–1.19; Event
Information—Section 015–1.20; Special
Processing—Section 015–1.21; Baseline
Information—Section 015–1.22; Event
Information—Section 015–1.23; Special
Processing—Section 015–1.24; Baseline
Information—Section 015–1.25; Event
Information—Section 015–1.26; Special
Processing—Section 015–1.27; Baseline
Information—Section 015–1.28; Event
Information—Section 015–1.29; and Special
Processing—Section 015–1.30.
E:\FR\FM\24APP1.SGM
24APP1
24430
Federal Register / Vol. 77, No. 79 / Tuesday, April 24, 2012 / Proposed Rules
including the degree to which
standardization is important, the
appropriate degree of detail and
specificity that any such standards
should contain, and the appropriate
mechanism for achieving any necessary
improvements in this area.
mstockstill on DSK4VPTVN1PROD with PROPOSALS
1. Description
12. The Phase II Demand Response
M&V Standards build on the Phase I
Demand Response M&V Standards.
These new standards also include
updates to certain associated definitions
as well as some formatting and
organizational changes. The collective
set of Phase I and Phase II Demand
Response M&V Standards comprise two
parts: the first part establishes criteria
for the use of equipment, technology,
and procedures to quantify the demand
reduction value 26 of four product
categories,27 and the second part
includes business practice requirements
for five performance evaluation types.28
13. In the Phase II Demand Response
M&V Standards, NAESB consistently
replaced references to the ‘‘System
Operator’’ with the term ‘‘Governing
Documents’’ 29 throughout most of the
standards. Other changes include
adding a meter data reporting deadline
(103 days for the energy and capacity
product categories and 55 days for
reserve and regulation product
categories); specifying an advanced
notification of one day maximum to the
demand response resource that its
capacity product category will be
required; establishing a telemetry
interval of six seconds for the provider
of the regulation product category to
submit data to the system operator;
tightening the requirement for meter
accuracy for after-the-fact metering for
all four product categories; and defining
an adjustment window of four hours for
calculating baseline adjustments for the
26 NAESB defines ‘‘demand reduction value’’ as
the amount of a demand resource’s reduced
electricity usage.
27 The four product categories are energy service,
capacity service, reserve service, and regulation
service.
28 The five performance evaluation types are
maximum base load, meter before/meter after,
baseline type-I, baseline type-II, and metering
generator output.
29 ‘‘Governing Documents’’ are documents that
control or affect the interaction and relationship
between a system operator and other parties, for
example, applicable statutes and regulations, tariffs,
contracts, manuals, and other relevant procedures.
The DSM–EE subcommittee made this change to
remove system operator discretion and to more
accurately reflect that rules are developed by
markets not the system operator. See 2008 WEQ AP
Item 5(a) Recommendation to the NAESB WEQ
Executive Committee at 37 (Sept. 30, 2010)
(available at May 3 Report, Appendix B, Page 5,
https://www.naesb.org/pdf4/
dsmee_group3_093010reqcom_a1.doc).
VerDate Mar<15>2010
17:33 Apr 23, 2012
Jkt 226001
baseline type-I and baseline type-II
performance evaluation types.
14. As characterized by NAESB, the
set of business practice standards
represented by the combination of Phase
I and Phase II efforts ‘‘provide a
framework that may be used to develop
performance evaluation methodologies
for specific Demand Response services;
they do not specify detailed
characteristics of performance
evaluation methodologies.’’ 30 The
standards state that, should a conflict
arise between the business practice
standards and a System Operator’s
Governing Documents, the Governing
Documents would have precedence.31
2. Discussion
15. As noted above, when the
Commission approved the Phase I
Demand Response M&V Standards in
Order No. 676–F, it recognized that
‘‘additional substantive standards
would appear beneficial in creating
transparent and consistent measurement
and verification * * * in wholesale
electric markets.’’ 32 The Commission
agreed with commenters ‘‘that more
detailed measurement and verification
standards will reduce costs for
customers and market participants,
particularly those participating in
multiple markets’’ and that ‘‘demand
response providers that participate in
more than one RTO or ISO should not
have to incur the costs of developing
different business processes to adapt to
the differing RTO/ISO requirements,
increasing the cost and complexity of
their business.’’ 33 While the
Commission acknowledged that
NAESB’s efforts may not result in a
single performance evaluation method,
the Commission emphasized that
‘‘greater standardization of the
performance evaluation methods will
improve the accuracy of measuring and
verifying demand response performance
and may reduce costs.’’ 34
16. The 2009 NOPR noted that the key
to several NAESB participants’
willingness to accept the Phase I
Demand Response M&V Standards was
an agreement among participants to
include more specific technical
measurement and verification standards
in NAESB’s annual work plan and to
proceed with further work on more
detailed technical standards.35
Similarly, in its April 2009 Report,
30 2010 WEQ AP Item 4(a) and 4(b) Final Action
at 12 (ratified Mar. 21, 2011).
31 Id. at 10.
32 Order No. 676–F, FERC Stats. & Regs. ¶ 31,309
at P 32.
33 Id. P 33.
34 Id. P 34.
35 NOPR, FERC Stats. & Regs. ¶ 32,646 at P 6.
PO 00000
Frm 00006
Fmt 4702
Sfmt 4702
NAESB stressed that ‘‘more technical
standards would be needed to support
the standards provided in the
recommendation,’’ that ‘‘[a]ll WEQ
[Executive Committee] members agreed
to have a follow-up development effort
to provide additional technical context
to the standards,’’ and that ‘‘the DSM–
EE subcommittee [had already] begun
efforts to scope the development of
more detailed technical standards for
the measurement and verification of
demand response products and services
in ISO–RTO footprint areas.’’ 36
17. As noted above, NAESB
acknowledges that the resulting set of
business practice standards represented
by the combination of Phase I and Phase
II efforts set forth a generalized
performance evaluation methodology
that lacks specific provisions or detailed
requirements.37 The Commission invites
comments on the proposed Phase II
standards. Further, in light of the
Commission’s statements in Order No.
676–F regarding the importance of
consistency and specificity, we invite
comment as to whether the Phase II
Demand Response M&V Standards that
we propose to adopt herein are
sufficiently detailed to provide
transparent measurement and
verification among regions, and whether
greater detail or prescriptiveness would
be appropriate. We also seek comment
on the degree to which encouraging
greater consistency among markets and
regions would reduce costs for
customers and market participants or
otherwise facilitate participation by end
users in multiple markets.
18. To the extent that greater detail is
recommended, the Commission seeks
comment as to whether sufficient
experience in demand response is
available to identify best practices in the
area of measurement and verification,
particularly for performance evaluation
types such as baseline calculations.
Similarly, we seek comment about the
particular areas where enhancing such
detail or consistency would be most
useful. For example, are consistent
telemetry and metering requirements
more or less important than consistent
approaches to the determination of
baselines; would it be worthwhile to
address procedures for weather
adjustments; or are any other particular
aspects of measurement and verification
appropriate for further effort regarding
the addition of increased specificity and
more consistency across RTOs and
ISOs?
36 April
2009 Report at 2.
2010 WEQ AP Item 4(a) and 4(b) Final
Action at 12 (ratified Mar. 21, 2011).
37 See
E:\FR\FM\24APP1.SGM
24APP1
Federal Register / Vol. 77, No. 79 / Tuesday, April 24, 2012 / Proposed Rules
19. The Commission appreciates the
efforts of the WEQ thus far in
developing these standards. The
Commission also understands that
various participants in the NAESB
process expressed concern that the
NAESB process should not duplicate
efforts undertaken in the stakeholder
processes of the RTOs and ISOs, which
vetted their individual programs
extensively.38 As a result, many of the
standards defer to the existing
Governing Documents of the RTOs and
ISOs. The Commission seeks comment
on whether further development of
more substantive measurement and
verification standards broadly
applicable to RTOs and ISOs are
required and, if so, whether a NAESB or
a Commission-led, or other process
should carry out the task. If commenters
prefer the NAESB process, we request
comment on the best relationship
framework between NAESB and the
RTO and ISO stakeholder processes to
facilitate the formulation of standards.
B. NAESB Wholesale Energy Efficiency
M&V Standards
20. The Commission proposes to
incorporate by reference into our
regulations the Wholesale Energy
Efficiency M&V Standards.39 These
business practice standards provide
criteria for energy efficiency resources
participating in organized wholesale
electricity markets, general
requirements for the structure of a
measurement and verification plan, and
detailed criteria for acceptable
measurement and verification
methodologies. The standards
incorporate documentation and
reporting requirements applicable to
installed energy efficiency measures.
The standards also consider technical
requirements such as identification of
energy efficiency baseline conditions,
statistical significance requirements for
measurement methodologies requiring
statistical estimation techniques, and
38 See
May 3 Report at 1.
propose to incorporate by reference the
following standards collectively identified by
NAESB as 2010 Wholesale Electric Quadrant
Annual Plan Item 4(d): Energy Efficiency Resource
Use Criteria in Wholesale Markets—Section 021–
3.1; General Measurement and Verification Plan
Requirements—Section 021–3.2; Post Installation
M&V Report Components—Section 021–3.3;
Performance Reporting—Section 021–3.4; M&V
Supporting Documents—Section 021–3.5; M&V
Methodologies—Section 021–3.6; Energy Efficiency
Baseline Conditions—Section 021–3.7; Statistical
Significance—Section 021–3.8; Nominated Energy
Efficiency Value Calculations/Demand Reduction
Value Calculations—Section 021–3.9; Measurement
and Monitoring—Section 021–3.10; Measurement
Equipment Specifications—Section 021–3.11; and
Data Validation—Section 021–3.12.
mstockstill on DSK4VPTVN1PROD with PROPOSALS
39 We
VerDate Mar<15>2010
17:33 Apr 23, 2012
Jkt 226001
technical requirements for measurement
equipment.
1. Description
21. The purpose of these business
practice standards is to establish a
standard method for quantifying the
energy reductions associated with
energy efficiency measures such as
lighting, appliances, industrial process
improvements, and building
management. NAESB describes the
Wholesale Energy Efficiency M&V
Standards as an initial set of standards
for the participation of energy efficiency
products in organized wholesale
electricity markets.
22. NAESB adopted its Wholesale
Energy Efficiency M&V Standards under
its consensus procedures. The
consensus process developed by NAESB
requires the organization to be fully
aware of the positions of each of
NAESB’s six wholesale electric
segments (i.e., end users, distribution/
load serving entities, transmission,
generation, marketers/brokers, and
independent grid operators/planners).
2. Discussion
23. The Commission preliminarily
finds that the Wholesale Energy
Efficiency M&V Standards provide
substantive detail to assure more
effective evaluation of the performance
of energy efficiency products and
services. The standards provide the
means for demonstrating consistent and
reliable evidence of reductions in
electricity usage attributable to energy
efficiency resources that qualify to
participate in organized wholesale
electricity markets. The NAESB
standards are intended to provide for
proper measurement and verification of
energy efficiency resources so that the
resources may be compensated in
accordance with how well they perform,
and how performance continues as
equipment or systems age. The
standards should also help to ensure
that energy efficiency resources and
other electricity resources are treated
comparably.
24. The Commission appreciates the
detail provided within the Wholesale
Energy Efficiency M&V Standards. The
standards provide four measurement
and verification methodologies
(Sections 021–3.6.1.1–021–3.6.1.4), as
well as a mechanism by which energy
efficiency resource providers may
propose, and RTOs and ISOs may
consider, alternative measurement and
verification methodologies (Section
021–3.6.2). The Commission recognizes
that the establishment of baseline
performance data and monitoring of
post-installation performance of energy
PO 00000
Frm 00007
Fmt 4702
Sfmt 4702
24431
efficiency measures is conducted by
directly measuring and monitoring
system loads, or extrapolating from a
selection of available measurement
variables. The standards contain 15
technical requirements for all
measurement equipment devices used
by energy efficiency resource providers
(Sections 021–3.11.1–021–3.11.15).
Specifically, the 15 technical
requirements provide standards for
interval meters that record electricity
usage data as well as for the
measurement or monitoring of ‘‘proxy
variables’’ that do not directly measure
electricity consumption. The technical
requirements for proxy variable
measurement include detailed accuracy
and precision requirements. The
standards also contain five statistical
requirements intended to ensure
accuracy for the measurement
methodologies requiring statistical
estimation techniques (Sections 021–
3.8.2–021–3.8.6). The Commission
invites comment on the proposed
standards.
III. Notice of Use of Voluntary
Consensus Standards
25. Office of Management and Budget
Circular A–119 (section 11) (Feb. 10,
1998) provides that federal agencies
should publish a request for comment in
a NOPR when the agency is seeking to
issue or revise a regulation proposing to
adopt a voluntary consensus standard or
a government-unique standard. In this
NOPR, the Commission is proposing to
incorporate by reference voluntary
consensus standards developed by the
NAESB WEQ.
IV. Information Collection Statement
26. The collections of information
contained in this proposed rule have
been submitted to the Office of
Management and Budget (OMB) for
review under section 3507(d) of the
Paperwork Reduction Act of 1995, 44
U.S.C. 3507(d). The Commission solicits
comments on the Commission’s need for
this information, whether the
information will have practical utility,
the accuracy of the provided burden
estimates, ways to enhance the quality,
utility, and clarity of the information to
be collected, and any suggested methods
for minimizing respondents’ burden,
including the use of automated
information techniques. Respondents
subject to the filing requirements of this
rule will not be penalized for failing to
respond to these collections of
information unless the collections of
information display a valid OMB
control number.
27. The following burden estimate is
based on the projected costs for the
E:\FR\FM\24APP1.SGM
24APP1
24432
Federal Register / Vol. 77, No. 79 / Tuesday, April 24, 2012 / Proposed Rules
industry to implement revisions to the
WEQ Standards currently incorporated
by reference into the Commission’s
regulations at 18 CFR 38.2 and to
implement the new standards adopted
by NAESB that we propose here to
incorporate by reference.
Number of
respondents
Number of
responses per
respondent
Hours per
response
Total number
of hours
(A)
(B)
(C)
(A) × (B) × (C)
Total for FERC–516 ...................
Total for FERC–717 ...................
FERC–516 40 ....................................
FERC–717 41 ....................................
FERC–516 ........................................
FERC–717 ........................................
...........................................................
...........................................................
6
6
6
6
........................
........................
1
1
1
1
........................
........................
4
9
6
12
........................
........................
24
54
36
72
78
108
Total One-Time Burden .............
...........................................................
........................
........................
........................
186
FERC Collection No.
Demand Response Standards ..........
Energy Efficiency Standards .............
Total Annual Hours for Collection:
(Reporting and Recordkeeping, (if
appropriate)) = 186 hours.
Information Collection Costs: The
Commission seeks comments on the
costs to comply with these
requirements. It has projected the
average annualized cost for all
respondents to be the following: 42
FERC–516
FERC–717
$1,416
N/A
2,124
N/A
1,416
2,124
$3,186
N/A
4,248
N/A
43 3,186
44 4,248
All Standards Total Annualized Costs ..............................................................................................................
mstockstill on DSK4VPTVN1PROD with PROPOSALS
Demand Response Standards Annualized Capital/Startup Costs ..........................................................................
Demand Response Standards Annualized Costs (Operations & Maintenance) ....................................................
Energy Efficiency Standards Annualized Capital/Startup Costs .............................................................................
Energy Efficiency Standards Annualized Costs (Operations & Maintenance) .......................................................
Demand Response Standards Total Annualized Costs ..........................................................................................
Energy Efficiency Standards Total Annualized Costs .............................................................................................
3,540
7,434
28. OMB regulations require OMB to
approve certain information collection
requirements imposed by agency rule.
The Commission is submitting
notification of this proposed rule to
OMB. These information collections are
mandatory requirements.
Title: Standards for Business Practices
and Communication Protocols for
Public Utilities (formerly Open Access
Same Time Information System) (FERC–
717); Electric Rate Schedule Filings
(FERC–516).
Action: Proposed collection.
OMB Control No.: 1902–0096 (FERC–
516); 1902–0173 (FERC–717).
Respondents for This Rulemaking:
RTOs and ISOs.
Frequency of Responses: One-time
implementation (business procedures,
capital/start-up).
Necessity of the Information: This
proposed rule, if implemented, will
help to standardize the methods and
procedures used by RTOs and ISOs to
accurately measure demand response
and energy efficiency resource
performance, thereby improving an
RTO’s or ISO’s capability to detect anticompetitive or manipulative behavior.
Additionally, this proposed rule will
help RTOs and ISOs to properly credit
demand response and energy efficiency
resources for their efforts.
29. Internal Review: The Commission
has reviewed the business practice
standards proposed in this NOPR and
has made a preliminary determination
that these standards are necessary to
maintain consistency and help increase
the effectiveness of RTO and ISO rules
pertaining to measurement and
verification of demand response and
energy efficiency resource practices.
The Commission has assured itself, by
means of its internal review, that there
is specific, objective support for the
burden estimate associated with the
information requirements.
30. Interested persons may obtain
information on the reporting
requirements by contacting the Federal
Energy Regulatory Commission, Office
of the Executive Director, 888 First
Street NE., Washington, DC 20426
[Attention: Ellen Brown, email:
DataClearance@ferc.gov, phone: (202)
502–8663, fax: (202) 273–0873].
31. Comments concerning the
information collections proposed in this
NOPR and the associated burden
estimates, should be sent to the
Commission in this docket and may also
be sent to the Office of Management and
Budge, Office of Information and
Regulatory Affairs, Washington, DC
20503 [Attention: Desk Officer for the
Federal Energy Regulatory
Commission]. For security reasons,
comments should be sent by email to
OMB at the following email address:
oira_submission@omb.eop.gov. Please
reference FERC–xxx and the docket
number of this proposed rulemaking
(Docket No. RM05–5–020) in your
submission.
40 ‘‘FERC–516’’ is the Commission’s identifier
that corresponds to OMB control no. 1902–0096
which identifies the information collection
associated with Electric Rate Schedules and Tariff
Filings.
41 ‘‘FERC–717’’ is the Commission’s identifier
that corresponds to OMB control no. 1902–0173
which identifies the information collection
associated with Standards for Business Practices
and Communication Protocols for Public Utilities.
42 The Total Annual Cost for information
collection is $10,974. This number is reached by
multiplying the total hours to prepare responses
(186) by an hourly wage estimate of $59 (a
composite estimate of wages plus benefits that
includes legal, technical and support staff rates.
Based on data from the Bureau of Labor Statistics
at https://bls.gov/oes/current/naics3_221000.htm
and https://www.bls.gov/news.release/ecec.nr0.htm).
(78 hours for demand response standards + 108
hours for energy efficiency standards) × $59/hour =
$10,974.
43 We note that 24 hours at $59/hour = $1,416 and
54 hours at $59/hour = $3,186.
44 We note that 36 hours at $59/hour = $2,124 and
72 hours at $59/hour = $4,248.
VerDate Mar<15>2010
17:33 Apr 23, 2012
Jkt 226001
PO 00000
Frm 00008
Fmt 4702
Sfmt 4702
E:\FR\FM\24APP1.SGM
24APP1
Federal Register / Vol. 77, No. 79 / Tuesday, April 24, 2012 / Proposed Rules
V. Environmental Analysis
32. The Commission is required to
prepare an Environmental Assessment
or an Environmental Impact Statement
for any action that may have a
significant adverse effect on the human
environment.45 The Commission has
categorically excluded certain actions
from these requirements as not having a
significant effect on the human
environment.46 The actions proposed to
be taken here fall within categorical
exclusions in the Commission’s
regulations for rules that are corrective,
clarifying, or procedural, for
information gathering, analysis, and
dissemination, and for sales, exchange,
and transportation of electric power that
requires no construction of facilities.47
Therefore an environmental review is
unnecessary and has not been prepared
in this rulemaking.
mstockstill on DSK4VPTVN1PROD with PROPOSALS
VI. Regulatory Flexibility Act
Certification
33. The Regulatory Flexibility Act of
1980 (RFA) 48 generally requires an
administrative agency to perform an
analysis of rulemakings that will have a
significant economic impact on a
substantial number of small entities.
The RFA mandates consideration of
regulatory alternatives that accomplish
the stated objectives of a proposed
rulemaking while minimizing any
significant economic impact on a
substantial number of small entities.
The Small Business Administration
(SBA) develops the numerical definition
of a small business.49 The SBA has
established a size standard for electric
utilities, stating that a firm is small if,
including its affiliates, it is primarily
engaged in the transmission, generation,
and/or distribution of electric energy for
sale and its total electric output for the
preceding fiscal year did not exceed
four million megawatt hours.50
34. The regulations proposed here
impose requirements only on RTOs and
ISOs, which are not small businesses.
Moreover, these requirements are
designed to benefit all customers,
including small businesses.
Accordingly, the Commission hereby
certifies, pursuant to section 605(b) of
the RFA,51 that the regulations proposed
herein will not have a significant
45 Regulations
Implementing the National
Environmental Policy Act, Order No. 486, 52 FR
47897 (Dec. 17, 1987), FERC Stats. & Regs.
Regulations Preambles 1986–1990 ¶ 30,783 (1987).
46 18 CFR 380.4.
47 See 18 CFR 380.4(a)(2)(ii), 380.4(a)(5), and
380.4(a)(27).
48 5 U.S.C. 601–612.
49 13 CFR 121.101.
50 13 CFR 121.201, Sector 22 Utilities n.1.
51 5 U.S.C. 605(b).
VerDate Mar<15>2010
17:33 Apr 23, 2012
Jkt 226001
economic impact on a substantial
number of small entities.
VII. Comment Procedures
35. The Commission invites interested
persons to submit comments on the
matters and issues proposed in this
notice to be adopted, including any
related matters or alternative proposals
that commenters may wish to discuss.
Comments are due June 25, 2012.
Comments must refer to Docket No.
RM05–5–020, and must include the
commenter’s name, the organization
they represent, if applicable, and their
address in their comments.
36. The Commission encourages
comments to be filed electronically via
the eFiling link on the Commission’s
Web site at https://www.ferc.gov. The
Commission accepts most standard
word processing formats. Documents
created electronically using word
processing software should be filed in
native applications or print-to-PDF
format and not in a scanned format.
Commenters filing electronically do not
need to make a paper filing.
37. Commenters that are not able to
file comments electronically must send
an original of their comments to:
Federal Energy Regulatory Commission,
Secretary of the Commission, 888 First
Street NE., Washington, DC 20426.
38. All comments will be placed in
the Commission’s public files and may
be viewed, printed, or downloaded
remotely as described in the Document
Availability section below. Commenters
on this proposal are not required to
serve copies of their comments on other
commenters.
VIII. Document Availability
39. In addition to publishing the full
text of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the Internet through the
Commission’s Home Page (https://
www.ferc.gov) and in the Commission’s
Public Reference Room during normal
business hours (8:30 a.m. to 5 p.m.
Eastern time) at 888 First Street NE.,
Room 2A, Washington DC 20426.
40. From the Commission’s Home
Page on the Internet, this information is
available on eLibrary. The full text of
this document is available on eLibrary
in PDF and Microsoft Word format for
viewing, printing, and/or downloading.
To access this document in eLibrary,
type the docket number excluding the
last three digits of this document in the
docket number field.
41. User assistance is available for
eLibrary and the Commission’s Web site
during normal business hours from the
PO 00000
Frm 00009
Fmt 4702
Sfmt 4702
24433
Commission’s Online Support at 202–
502–6652 (toll free at 1–866–208–3676)
or email at ferconlinesupport@ferc.gov,
or the Public Reference Room at (202)
502–8371, TTY (202) 502–8659. Email
the Public Reference Room at
public.referenceroom@ferc.gov.
List of Subjects in 18 CFR Part 38
Conflicts of interests, Electric power
plants, Electric utilities, Incorporation
by reference, Reporting and
recordkeeping requirements.
By direction of the Commission.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
In consideration of the foregoing, the
Commission proposes to amend Part 38,
Chapter I, Title 18, Code of Federal
Regulations, as follows.
PART 38—BUSINESS PRACTICE
STANDARDS AND COMMUNICATION
PROTOCOLS FOR PUBLIC UTILITIES
1. The authority citation for part 38
continues to read as follows:
Authority: 16 U.S.C. 791–825r, 2601–2645;
31 U.S.C. 9701; 42 U.S.C. 7101–7352.
2. Section 38.2 is amended by revising
paragraph (a)(12) and adding paragraph
(a)(13) to read as follows:
§ 38.2 Incorporation by reference of
North American Energy Standards
Board Wholesale Electric Quadrant
standards.
(a) * * *
(12) Business Practices for
Measurement and Verification of
Wholesale Electricity Demand Response
(WEQ–015, 2010 Annual Plan Items 4(a)
and 4(b), March 21, 2011).
(13) Business Practice Standards for
Measurement and Verification of Energy
Efficiency Products (WEQ–021, 2010
Annual Plan Item 4(d), May 13, 2011).
*
*
*
*
*
[FR Doc. 2012–9809 Filed 4–23–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 100
[Docket No. USCG–2012–0201]
RIN 1625–AA08
Special Local Regulations; ODBA
Draggin on the Waccamaw, Atlantic
Intracoastal Waterway, Bucksport, SC
Coast Guard, DHS.
Notice of proposed rulemaking.
AGENCY:
ACTION:
E:\FR\FM\24APP1.SGM
24APP1
Agencies
[Federal Register Volume 77, Number 79 (Tuesday, April 24, 2012)]
[Proposed Rules]
[Pages 24427-24433]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-9809]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
18 CFR Part 38
[Docket No. RM05-5-020]
Standards for Business Practices and Communication Protocols for
Public Utilities
AGENCY: Federal Energy Regulatory Commission.
ACTION: Notice of proposed rulemaking.
-----------------------------------------------------------------------
SUMMARY: The Federal Energy Regulatory Commission (Commission) is
proposing to amend its regulations to incorporate by reference the
business practice standards adopted by the Wholesale Electric Quadrant
of the North American Energy Standards Board (NAESB) that pertain to
the measurement and verification of demand response and energy
efficiency resources participating in organized wholesale electricity
markets. NAESB adopted the measurement and verification of demand
response standards in response to the Commission's findings in Order
No. 676-F.
DATES: Comments are due June 25, 2012.
ADDRESSES: Comments, identified by docket number RM05-5-020, may be
filed in the following ways:
Electronic Filing through https://www.ferc.gov. Documents
created electronically using word processing software should be filed
in native applications or print-to-PDF format and not in a scanned
format.
Mail/Hand Delivery: Those unable to file electronically
may mail or hand-deliver comments to: Federal Energy Regulatory
Commission, Secretary of the Commission, 888 First Street NE.,
Washington, DC 20426.
Instructions: For detailed instructions on submitting comments and
additional information on the rulemaking process, see the Comment
Procedures Section of this document.
These standards can be obtained from NAESB at 801 Travis Street,
Suite 1675, Houston, TX 77002, telephone: (713) 356-0060, https://www.naesb.org, and are available for viewing in the Commission's Public
Reference Room.
FOR FURTHER INFORMATION CONTACT:
David Kathan (Technical Issues), Office of Energy Policy and
Innovation, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426, (202) 502-6404, david.kathan@ferc.gov;
Dennis Hough (Legal Issues), Office of the General Counsel, Federal
Energy Regulatory Commission, 888 First Street NE., Washington, DC
20426, (202) 502-8631, dennis.hough@ferc.gov.
SUPPLEMENTARY INFORMATION:
Table of Contents
Paragraph
Nos.
I. Background............................................... 2
II. Discussion.............................................. 10
[[Page 24428]]
A. NAESB Phase II Demand Response M&V Standards......... 11
1. Description...................................... 12
2. Discussion....................................... 15
B. NAESB Wholesale Energy Efficiency M&V Standards...... 20
1. Description...................................... 21
2. Discussion....................................... 23
III. Notice of Use of Voluntary Consensus Standards......... 25
IV. Information Collection Statement........................ 26
V. Environmental Analysis................................... 32
VI. Regulatory Flexibility Act Certification................ 33
VII. Comment Procedures..................................... 35
VIII. Document Availability................................. 39
Notice of Proposed Rulemaking
(April 19, 2012)
1. In this Notice of Proposed Rulemaking (NOPR), the Federal Energy
Regulatory Commission (Commission) proposes to amend its regulations at
18 CFR 38.2 under the Federal Power Act \1\ to incorporate by reference
the business practice standards adopted by the Wholesale Electric
Quadrant (WEQ) of the North American Energy Standards Board (NAESB)
that pertain to the measurement and verification of demand response and
energy efficiency resources participating in organized wholesale
electricity markets.\2\ Adoption of these standards is intended to
improve the methods and procedures used to accurately measure demand
response and energy efficiency resource performance. Additionally,
these standards should help Regional Transmission Organizations (RTO)
and Independent System Operators (ISO) to properly credit demand
response and energy efficiency resources for their services.\3\
---------------------------------------------------------------------------
\1\ 16 U.S.C. 791a et seq. (2006).
\2\ See Report, North American Energy Standards Board,
Measurement and Verification of Demand Response Products, Docket No.
RM05-5-020 (filed May 3, 2011) (May 3 Report) (providing a status
update and description of the proposed standards). In accordance
with applicable copyright laws, complete versions of the standards
are available from NAESB at 801 Travis Street, Suite 1675, Houston,
TX 77002, telephone: (713) 356-0060, https://www.naesb.org, and are
available for viewing in the Commission's Public Reference Room.
\3\ The Commission has also sought RTO and ISO proposals
regarding their measurement and verification methodologies,
including in Order No. 745, Demand Response Compensation in
Organized Wholesale Energy Markets, Order No. 745, 76 Fed. Reg.
16,658 (Mar. 24, 2011), FERC Stats. & Regs. ] 31,322, at P 93-95
(2011), order on reh'g, Order No. 745-A, 137 FERC ] 61,215, at P 123
(2011).
---------------------------------------------------------------------------
I. Background
2. NAESB is a private consensus standards developer that divides
its activities among four quadrants, each of which is composed of
members from all segments of its respective industry.\4\ NAESB is an
accredited standards organization under the auspices of the American
National Standards Institute (ANSI). NAESB's procedures are designed to
ensure that all industry members can have input into the development of
a standard, whether or not they are members of NAESB, and each
wholesale electricity standard that NAESB's WEQ adopts is supported by
a consensus of the seven industry segments: end users, distribution/
load serving entities, transmission, generation, marketers/brokers,
independent grid operators/planners and technology/services. Under the
WEQ process, for a standard to be approved, it must receive a super-
majority vote of 67 percent of the members of the WEQ's Executive
Committee, with support from at least 40 percent of each of the seven
industry segments.\5\ For final approval, 67 percent of the WEQ's
general membership must ratify the standard.\6\
---------------------------------------------------------------------------
\4\ The four quadrants are the wholesale and retail electric
quadrants and the wholesale and retail natural gas quadrants.
\5\ Under NAESB's procedures, interested persons may attend and
participate in NAESB committee meetings and phone conferences, even
if they are not NAESB members.
\6\ See May 3 Report at 2.
---------------------------------------------------------------------------
3. In 2006, the Commission issued Order No. 676, a Final Rule that
incorporated by reference business practice standards for the WEQ
adopted by NAESB applicable to public utilities.\7\ Since 2006, the
NAESB consensus industry stakeholder process has reviewed the NAESB
business practice standards for public utilities with a view to
creating a more efficient marketplace and it has adopted revisions
that, in a number of instances, the Commission has made mandatory by
incorporating by reference into the Commission's regulations.\8\
---------------------------------------------------------------------------
\7\ See Standards for Business Practices and Communication
Protocols for Public Utilities, Order No. 676, FERC Stats. & Regs. ]
31,216, (2006), reh'g denied, Order No. 676-A, 116 FERC ] 61,255
(2006).
\8\ Standards for Business Practices and Communication Protocols
for Public Utilities, Order No. 676-F, FERC Stats. & Regs. ] 31,309
(2010); Order No. 676-E, FERC Stats. & Regs. ] 31,299 (2009); Order
No. 676-D, 124 FERC ] 61,317 (2008), Order No. 676-C, FERC Stats. &
Regs. ] 31,274 (2008), Order No. 676-B, FERC Stats. & Regs. ] 31,246
(2007).
---------------------------------------------------------------------------
4. NAESB began work on the development of business practice
standards pertaining to the measurement and verification of demand
response \9\ products and services in July 2007, when the NAESB WEQ
Demand Side Management--Energy Efficiency (DSM-EE) subcommittee began
work on this issue. This effort led to the adoption and ratification by
NAESB of initial measurement and verification standards early in 2009.
---------------------------------------------------------------------------
\9\ Demand response means a reduction in the consumption of
electric energy by customers from their expected consumption in
response to an increase in the price of electric energy or to
incentive payments designed to induce lower consumption of electric
energy. 18 CFR 35.28(b)(4) (2011).
---------------------------------------------------------------------------
5. On April 17, 2009, NAESB filed a report (April 2009 Report)
informing the Commission that it had adopted an initial set of business
practice standards to categorize various demand response products and
services and to support the measurement and verification of these
products and services in organized wholesale electricity markets (Phase
I Demand Response M&V Standards).\10\ Key to obtaining consensus on the
initial set of standards was the agreement to proceed with further work
on more detailed technical standards for the measurement and
verification of demand response resources. The NAESB report recognized
that these standards would need to be followed by the development of
more detailed technical standards for the measurement and verification
of demand response
[[Page 24429]]
products and services in RTO and ISO areas.
---------------------------------------------------------------------------
\10\ Report, North American Energy Standards Board, Measurement
and Verification of Demand Response Products, Docket No. RM05-5-017,
at 2 (filed Apr. 17, 2009) (April 2009 Report).
---------------------------------------------------------------------------
6. On April 15, 2010, the Commission issued Order No. 676-F,
incorporating by reference \11\ the Phase I Demand Response M&V
Standards \12\ that categorize various demand response products and
services and support the measurement and verification of these products
and services in organized wholesale electricity markets.\13\ The
Commission stated that ``[w]hile NAESB's Phase I [Demand Response] M&V
Standards represent a good first step, additional substantive standards
would appear beneficial in creating transparent and consistent
measurement and verification of demand response products and services
in wholesale electric markets.'' \14\ The Commission also stated that
``we expect Phase II will address issues related to baseline
development * * *'' \15\ The Commission anticipated that the
measurement and verification standards needed to accomplish this goal
would be a focus of NAESB's Phase II measurement and verification
standards development efforts.\16\
---------------------------------------------------------------------------
\11\ Incorporation by reference makes compliance with these
standards mandatory for public utilities subject to Part 38 of the
Commission's regulations.
\12\ See Standards for Business Practices and Communication
Protocols for Public Utilities, Notice of Proposed Rulemaking, FERC
Stats. & Regs. ] 32,646 (2009) (2009 NOPR).
\13\ Standards for Business Practices and Communication
Protocols for Public Utilities, Order No. 676-F, FERC Stats. & Regs.
] 31,309 (2010).
\14\ Order No. 676-F, FERC Stats. & Regs. ] 31,309 at P 32.
\15\ Id. P 37.
\16\ Id. P 32.
---------------------------------------------------------------------------
7. NAESB subsequently initiated specific plans to improve and adopt
additional technical standards and filed a report \17\ with the
Commission on May 3, 2011 (May 3 Report) that informed the Commission
that NAESB had adopted a revised set of standards covering measurement
and verification (Phase II Demand Response M&V Standards) and a new set
of standards covering energy efficiency,\18\ and explained its efforts
to develop these standards.
---------------------------------------------------------------------------
\17\ See supra n.2.
\18\ Energy efficiency:
[r]efers to programs that are aimed at reducing the energy used
by specific end-use devices and systems, typically without affecting
the services provided. These programs reduce overall electricity
consumption (reported in megawatthours), often without explicit
consideration for the timing of program-induced savings. Such
savings are generally achieved by substituting technologically more
advanced equipment to produce the same level of end-use services
(e.g. lighting, heating, motor drive) with less electricity.
Examples include high-efficiency appliances, efficient lighting
programs, high-efficiency heating, ventilating and air conditioning
(HVAC) systems or control modifications, efficient building design,
advanced electric motor drives, and heat recovery systems.
U.S. Energy Information Administration Glossary, https://www.eia.gov/tools/glossary/index.cfm?id=E (last visited Feb. 24,
2012).
---------------------------------------------------------------------------
8. As discussed in more detail below, the Phase II Demand Response
M&V Standards add more specifications to the existing Phase I Demand
Response M&V Standards' definitions and business practice standards in
the following areas: meter data reporting deadline, advanced
notification, telemetry interval, meter accuracy for after-the-fact
metering, meter data reporting interval, and adjustment window.\19\
During NAESB's work on Phase II, the WEQ DSM-EE Wholesale Demand
Response Work Group (WEQ DR work group) discussed the level of detail
to be included in the standards, with most participants agreeing that
the standards developed should not ``duplicate efforts undertaken in
the ISO-RTO stakeholder process,'' which vetted the adopted programs
extensively.\20\ NAESB states that a majority of the WEQ DR work group
agreed that ``impacting the stakeholder process would require guidance
from the FERC.'' \21\
---------------------------------------------------------------------------
\19\ NAESB states that ``advance notification'' involves a
communication to the demand response resource made prior to when its
services are required. The ``telemetry interval,'' as described by
NAESB, is the period of time between submissions of data. NAESB
defines ``adjustment window'' as a period of time used to calculate
a baseline adjustment.
\20\ May 3 Report at 1-2.
\21\ Id. at 1.
---------------------------------------------------------------------------
9. In addition to demand response standards, NAESB drafted,
discussed, and adopted business practice standards for the measurement
and verification of energy efficiency in organized wholesale
electricity markets (Wholesale Energy Efficiency M&V Standards). NAESB
reports that the work took place between July 2009 and December 2010,
and was considered in NAESB's DSM-EE subcommittee meetings and WEQ's
Executive Committee meetings. The standards are designed to create a
standard method for quantifying the energy reductions from energy
efficiency measures. The Wholesale Energy Efficiency M&V Standards
include six new definitions and 63 business practice standards.
Included are definitions for energy efficiency baseline and demand
reduction value. The standards contain criteria for the use of energy
efficiency products in organized wholesale electricity markets, general
measurement and verification plan requirements, and detailed criteria
of acceptable measurement and verification methodologies. NAESB states
that the standards are built upon PJM Interconnection, L.L.C. and ISO
New England Inc. manuals, the Federal Energy Management Program (FEMP)
measurement and verification standards,\22\ the International
Performance Measurement and Verification Protocol (IPMVP),\23\ and
several state protocols.\24\
---------------------------------------------------------------------------
\22\ U.S. Department of Energy, FEMP, M&V Guidelines:
Measurement and Verification for Federal Energy Projects, Version
3.0, April 2008, https://www1.eere.energy.gov/femp/pdfs/mv_guidelines.pdf.
\23\ Efficiency Valuation Organization, IPMVP Public Library of
Documents, https://www.evo-world.org/.
\24\ May 3 Report at 3.
---------------------------------------------------------------------------
II. Discussion
10. The Commission proposes to incorporate by reference into our
regulations both the Phase II Demand Response M&V Standards and
associated terms, and the Wholesale Energy Efficiency M&V Standards and
associated terms.
A. NAESB Phase II Demand Response M&V Standards
11. The Commission proposes to incorporate by reference into its
regulations the Phase II Demand Response M&V Standards as a further
step toward transparency and consistency in the methods RTOs and ISOs
use to measure and verify demand response in their organized wholesale
electricity markets.\25\ Additionally, the Commission seeks comment on
the Phase II Demand Response M&V Standards and on certain aspects of
measurement and verification of demand response more generally,
[[Page 24430]]
including the degree to which standardization is important, the
appropriate degree of detail and specificity that any such standards
should contain, and the appropriate mechanism for achieving any
necessary improvements in this area.
---------------------------------------------------------------------------
\25\ We propose to incorporate by reference the following
standards collectively identified by NAESB as 2010 Wholesale
Electric Quadrant Annual Plan Item 4(a) and 4(b): General--Section
015-1.0; Telemetry--Section 015-1.1; After-the-Fact Metering--
Section 015-1.2; Performance Evaluation--Section 015-1.3; General--
Section 015-1.4; Telemetry--Section 015-1.5; After-the-Fact
Metering--Section 015-1.6; Performance Evaluation--Section 015-1.7;
General--Section 015-1.8; Telemetry--Section 015-1.9; After-the-Fact
Metering--Section 015-1.10; Performance Evaluation--Section 015-
1.11; General--Section 015-1.12; Telemetry--Section 015-1.13; After-
the-Fact Metering--Section 015-1.14; Performance Evaluation--Section
015-1.15; Baseline Information--Section 015-1.16; Event
Information--Section 015-1.17; Special Processing--Section 015-1.18;
Baseline Information--Section 015-1.19; Event Information--Section
015-1.20; Special Processing--Section 015-1.21; Baseline
Information--Section 015-1.22; Event Information--Section 015-1.23;
Special Processing--Section 015-1.24; Baseline Information--Section
015-1.25; Event Information--Section 015-1.26; Special Processing--
Section 015-1.27; Baseline Information--Section 015-1.28; Event
Information--Section 015-1.29; and Special Processing--Section 015-
1.30.
---------------------------------------------------------------------------
1. Description
12. The Phase II Demand Response M&V Standards build on the Phase I
Demand Response M&V Standards. These new standards also include updates
to certain associated definitions as well as some formatting and
organizational changes. The collective set of Phase I and Phase II
Demand Response M&V Standards comprise two parts: the first part
establishes criteria for the use of equipment, technology, and
procedures to quantify the demand reduction value \26\ of four product
categories,\27\ and the second part includes business practice
requirements for five performance evaluation types.\28\
---------------------------------------------------------------------------
\26\ NAESB defines ``demand reduction value'' as the amount of a
demand resource's reduced electricity usage.
\27\ The four product categories are energy service, capacity
service, reserve service, and regulation service.
\28\ The five performance evaluation types are maximum base
load, meter before/meter after, baseline type-I, baseline type-II,
and metering generator output.
---------------------------------------------------------------------------
13. In the Phase II Demand Response M&V Standards, NAESB
consistently replaced references to the ``System Operator'' with the
term ``Governing Documents'' \29\ throughout most of the standards.
Other changes include adding a meter data reporting deadline (103 days
for the energy and capacity product categories and 55 days for reserve
and regulation product categories); specifying an advanced notification
of one day maximum to the demand response resource that its capacity
product category will be required; establishing a telemetry interval of
six seconds for the provider of the regulation product category to
submit data to the system operator; tightening the requirement for
meter accuracy for after-the-fact metering for all four product
categories; and defining an adjustment window of four hours for
calculating baseline adjustments for the baseline type-I and baseline
type-II performance evaluation types.
---------------------------------------------------------------------------
\29\ ``Governing Documents'' are documents that control or
affect the interaction and relationship between a system operator
and other parties, for example, applicable statutes and regulations,
tariffs, contracts, manuals, and other relevant procedures. The DSM-
EE subcommittee made this change to remove system operator
discretion and to more accurately reflect that rules are developed
by markets not the system operator. See 2008 WEQ AP Item 5(a)
Recommendation to the NAESB WEQ Executive Committee at 37 (Sept. 30,
2010) (available at May 3 Report, Appendix B, Page 5, https://www.naesb.org/pdf4/dsmee_group3_093010reqcom_a1.doc).
---------------------------------------------------------------------------
14. As characterized by NAESB, the set of business practice
standards represented by the combination of Phase I and Phase II
efforts ``provide a framework that may be used to develop performance
evaluation methodologies for specific Demand Response services; they do
not specify detailed characteristics of performance evaluation
methodologies.'' \30\ The standards state that, should a conflict arise
between the business practice standards and a System Operator's
Governing Documents, the Governing Documents would have precedence.\31\
---------------------------------------------------------------------------
\30\ 2010 WEQ AP Item 4(a) and 4(b) Final Action at 12 (ratified
Mar. 21, 2011).
\31\ Id. at 10.
---------------------------------------------------------------------------
2. Discussion
15. As noted above, when the Commission approved the Phase I Demand
Response M&V Standards in Order No. 676-F, it recognized that
``additional substantive standards would appear beneficial in creating
transparent and consistent measurement and verification * * * in
wholesale electric markets.'' \32\ The Commission agreed with
commenters ``that more detailed measurement and verification standards
will reduce costs for customers and market participants, particularly
those participating in multiple markets'' and that ``demand response
providers that participate in more than one RTO or ISO should not have
to incur the costs of developing different business processes to adapt
to the differing RTO/ISO requirements, increasing the cost and
complexity of their business.'' \33\ While the Commission acknowledged
that NAESB's efforts may not result in a single performance evaluation
method, the Commission emphasized that ``greater standardization of the
performance evaluation methods will improve the accuracy of measuring
and verifying demand response performance and may reduce costs.'' \34\
---------------------------------------------------------------------------
\32\ Order No. 676-F, FERC Stats. & Regs. ] 31,309 at P 32.
\33\ Id. P 33.
\34\ Id. P 34.
---------------------------------------------------------------------------
16. The 2009 NOPR noted that the key to several NAESB participants'
willingness to accept the Phase I Demand Response M&V Standards was an
agreement among participants to include more specific technical
measurement and verification standards in NAESB's annual work plan and
to proceed with further work on more detailed technical standards.\35\
Similarly, in its April 2009 Report, NAESB stressed that ``more
technical standards would be needed to support the standards provided
in the recommendation,'' that ``[a]ll WEQ [Executive Committee] members
agreed to have a follow-up development effort to provide additional
technical context to the standards,'' and that ``the DSM-EE
subcommittee [had already] begun efforts to scope the development of
more detailed technical standards for the measurement and verification
of demand response products and services in ISO-RTO footprint areas.''
\36\
---------------------------------------------------------------------------
\35\ NOPR, FERC Stats. & Regs. ] 32,646 at P 6.
\36\ April 2009 Report at 2.
---------------------------------------------------------------------------
17. As noted above, NAESB acknowledges that the resulting set of
business practice standards represented by the combination of Phase I
and Phase II efforts set forth a generalized performance evaluation
methodology that lacks specific provisions or detailed
requirements.\37\ The Commission invites comments on the proposed Phase
II standards. Further, in light of the Commission's statements in Order
No. 676-F regarding the importance of consistency and specificity, we
invite comment as to whether the Phase II Demand Response M&V Standards
that we propose to adopt herein are sufficiently detailed to provide
transparent measurement and verification among regions, and whether
greater detail or prescriptiveness would be appropriate. We also seek
comment on the degree to which encouraging greater consistency among
markets and regions would reduce costs for customers and market
participants or otherwise facilitate participation by end users in
multiple markets.
---------------------------------------------------------------------------
\37\ See 2010 WEQ AP Item 4(a) and 4(b) Final Action at 12
(ratified Mar. 21, 2011).
---------------------------------------------------------------------------
18. To the extent that greater detail is recommended, the
Commission seeks comment as to whether sufficient experience in demand
response is available to identify best practices in the area of
measurement and verification, particularly for performance evaluation
types such as baseline calculations. Similarly, we seek comment about
the particular areas where enhancing such detail or consistency would
be most useful. For example, are consistent telemetry and metering
requirements more or less important than consistent approaches to the
determination of baselines; would it be worthwhile to address
procedures for weather adjustments; or are any other particular aspects
of measurement and verification appropriate for further effort
regarding the addition of increased specificity and more consistency
across RTOs and ISOs?
[[Page 24431]]
19. The Commission appreciates the efforts of the WEQ thus far in
developing these standards. The Commission also understands that
various participants in the NAESB process expressed concern that the
NAESB process should not duplicate efforts undertaken in the
stakeholder processes of the RTOs and ISOs, which vetted their
individual programs extensively.\38\ As a result, many of the standards
defer to the existing Governing Documents of the RTOs and ISOs. The
Commission seeks comment on whether further development of more
substantive measurement and verification standards broadly applicable
to RTOs and ISOs are required and, if so, whether a NAESB or a
Commission-led, or other process should carry out the task. If
commenters prefer the NAESB process, we request comment on the best
relationship framework between NAESB and the RTO and ISO stakeholder
processes to facilitate the formulation of standards.
---------------------------------------------------------------------------
\38\ See May 3 Report at 1.
---------------------------------------------------------------------------
B. NAESB Wholesale Energy Efficiency M&V Standards
20. The Commission proposes to incorporate by reference into our
regulations the Wholesale Energy Efficiency M&V Standards.\39\ These
business practice standards provide criteria for energy efficiency
resources participating in organized wholesale electricity markets,
general requirements for the structure of a measurement and
verification plan, and detailed criteria for acceptable measurement and
verification methodologies. The standards incorporate documentation and
reporting requirements applicable to installed energy efficiency
measures. The standards also consider technical requirements such as
identification of energy efficiency baseline conditions, statistical
significance requirements for measurement methodologies requiring
statistical estimation techniques, and technical requirements for
measurement equipment.
---------------------------------------------------------------------------
\39\ We propose to incorporate by reference the following
standards collectively identified by NAESB as 2010 Wholesale
Electric Quadrant Annual Plan Item 4(d): Energy Efficiency Resource
Use Criteria in Wholesale Markets--Section 021-3.1; General
Measurement and Verification Plan Requirements--Section 021-3.2;
Post Installation M&V Report Components--Section 021-3.3;
Performance Reporting--Section 021-3.4; M&V Supporting Documents--
Section 021-3.5; M&V Methodologies--Section 021-3.6; Energy
Efficiency Baseline Conditions--Section 021-3.7; Statistical
Significance--Section 021-3.8; Nominated Energy Efficiency Value
Calculations/Demand Reduction Value Calculations--Section 021-3.9;
Measurement and Monitoring--Section 021-3.10; Measurement Equipment
Specifications--Section 021-3.11; and Data Validation--Section 021-
3.12.
---------------------------------------------------------------------------
1. Description
21. The purpose of these business practice standards is to
establish a standard method for quantifying the energy reductions
associated with energy efficiency measures such as lighting,
appliances, industrial process improvements, and building management.
NAESB describes the Wholesale Energy Efficiency M&V Standards as an
initial set of standards for the participation of energy efficiency
products in organized wholesale electricity markets.
22. NAESB adopted its Wholesale Energy Efficiency M&V Standards
under its consensus procedures. The consensus process developed by
NAESB requires the organization to be fully aware of the positions of
each of NAESB's six wholesale electric segments (i.e., end users,
distribution/load serving entities, transmission, generation,
marketers/brokers, and independent grid operators/planners).
2. Discussion
23. The Commission preliminarily finds that the Wholesale Energy
Efficiency M&V Standards provide substantive detail to assure more
effective evaluation of the performance of energy efficiency products
and services. The standards provide the means for demonstrating
consistent and reliable evidence of reductions in electricity usage
attributable to energy efficiency resources that qualify to participate
in organized wholesale electricity markets. The NAESB standards are
intended to provide for proper measurement and verification of energy
efficiency resources so that the resources may be compensated in
accordance with how well they perform, and how performance continues as
equipment or systems age. The standards should also help to ensure that
energy efficiency resources and other electricity resources are treated
comparably.
24. The Commission appreciates the detail provided within the
Wholesale Energy Efficiency M&V Standards. The standards provide four
measurement and verification methodologies (Sections 021-3.6.1.1-021-
3.6.1.4), as well as a mechanism by which energy efficiency resource
providers may propose, and RTOs and ISOs may consider, alternative
measurement and verification methodologies (Section 021-3.6.2). The
Commission recognizes that the establishment of baseline performance
data and monitoring of post-installation performance of energy
efficiency measures is conducted by directly measuring and monitoring
system loads, or extrapolating from a selection of available
measurement variables. The standards contain 15 technical requirements
for all measurement equipment devices used by energy efficiency
resource providers (Sections 021-3.11.1-021-3.11.15). Specifically, the
15 technical requirements provide standards for interval meters that
record electricity usage data as well as for the measurement or
monitoring of ``proxy variables'' that do not directly measure
electricity consumption. The technical requirements for proxy variable
measurement include detailed accuracy and precision requirements. The
standards also contain five statistical requirements intended to ensure
accuracy for the measurement methodologies requiring statistical
estimation techniques (Sections 021-3.8.2-021-3.8.6). The Commission
invites comment on the proposed standards.
III. Notice of Use of Voluntary Consensus Standards
25. Office of Management and Budget Circular A-119 (section 11)
(Feb. 10, 1998) provides that federal agencies should publish a request
for comment in a NOPR when the agency is seeking to issue or revise a
regulation proposing to adopt a voluntary consensus standard or a
government-unique standard. In this NOPR, the Commission is proposing
to incorporate by reference voluntary consensus standards developed by
the NAESB WEQ.
IV. Information Collection Statement
26. The collections of information contained in this proposed rule
have been submitted to the Office of Management and Budget (OMB) for
review under section 3507(d) of the Paperwork Reduction Act of 1995, 44
U.S.C. 3507(d). The Commission solicits comments on the Commission's
need for this information, whether the information will have practical
utility, the accuracy of the provided burden estimates, ways to enhance
the quality, utility, and clarity of the information to be collected,
and any suggested methods for minimizing respondents' burden, including
the use of automated information techniques. Respondents subject to the
filing requirements of this rule will not be penalized for failing to
respond to these collections of information unless the collections of
information display a valid OMB control number.
27. The following burden estimate is based on the projected costs
for the
[[Page 24432]]
industry to implement revisions to the WEQ Standards currently
incorporated by reference into the Commission's regulations at 18 CFR
38.2 and to implement the new standards adopted by NAESB that we
propose here to incorporate by reference.
----------------------------------------------------------------------------------------------------------------
Number of
FERC Collection Number of responses per Hours per Total number
No. respondents respondent response of hours
(A) (B) (C) (A) x (B) x
(C)
----------------------------------------------------------------------------------------------------------------
Demand Response Standards..... FERC-516 \40\... 6 1 4 24
FERC-717 \41\... 6 1 9 54
Energy Efficiency Standards... FERC-516........ 6 1 6 36
FERC-717........ 6 1 12 72
Total for FERC-516........ ................ .............. .............. .............. 78
Total for FERC-717........ ................ .............. .............. .............. 108
---------------------------------------------------------------
Total One-Time Burden..... ................ .............. .............. .............. 186
----------------------------------------------------------------------------------------------------------------
Total Annual Hours for Collection: (Reporting and Recordkeeping,
(if appropriate)) = 186 hours.
---------------------------------------------------------------------------
\40\ ``FERC-516'' is the Commission's identifier that
corresponds to OMB control no. 1902-0096 which identifies the
information collection associated with Electric Rate Schedules and
Tariff Filings.
\41\ ``FERC-717'' is the Commission's identifier that
corresponds to OMB control no. 1902-0173 which identifies the
information collection associated with Standards for Business
Practices and Communication Protocols for Public Utilities.
---------------------------------------------------------------------------
Information Collection Costs: The Commission seeks comments on the
costs to comply with these requirements. It has projected the average
annualized cost for all respondents to be the following: \42\
---------------------------------------------------------------------------
\42\ The Total Annual Cost for information collection is
$10,974. This number is reached by multiplying the total hours to
prepare responses (186) by an hourly wage estimate of $59 (a
composite estimate of wages plus benefits that includes legal,
technical and support staff rates. Based on data from the Bureau of
Labor Statistics at https://bls.gov/oes/current/naics3_221000.htm
and https://www.bls.gov/news.release/ecec.nr0.htm). (78 hours for
demand response standards + 108 hours for energy efficiency
standards) x $59/hour = $10,974.
\43\ We note that 24 hours at $59/hour = $1,416 and 54 hours at
$59/hour = $3,186.
\44\ We note that 36 hours at $59/hour = $2,124 and 72 hours at
$59/hour = $4,248.
------------------------------------------------------------------------
FERC-516 FERC-717
------------------------------------------------------------------------
Demand Response Standards Annualized $1,416 $3,186
Capital/Startup Costs..................
Demand Response Standards Annualized N/A N/A
Costs (Operations & Maintenance).......
Energy Efficiency Standards Annualized 2,124 4,248
Capital/Startup Costs..................
Energy Efficiency Standards Annualized N/A N/A
Costs (Operations & Maintenance).......
Demand Response Standards Total 1,416 \43\ 3,186
Annualized Costs.......................
Energy Efficiency Standards Total 2,124 \44\ 4,248
Annualized Costs.......................
-------------------------------
All Standards Total Annualized Costs 3,540 7,434
------------------------------------------------------------------------
28. OMB regulations require OMB to approve certain information
collection requirements imposed by agency rule. The Commission is
submitting notification of this proposed rule to OMB. These information
collections are mandatory requirements.
Title: Standards for Business Practices and Communication Protocols
for Public Utilities (formerly Open Access Same Time Information
System) (FERC-717); Electric Rate Schedule Filings (FERC-516).
Action: Proposed collection.
OMB Control No.: 1902-0096 (FERC-516); 1902-0173 (FERC-717).
Respondents for This Rulemaking: RTOs and ISOs.
Frequency of Responses: One-time implementation (business
procedures, capital/start-up).
Necessity of the Information: This proposed rule, if implemented,
will help to standardize the methods and procedures used by RTOs and
ISOs to accurately measure demand response and energy efficiency
resource performance, thereby improving an RTO's or ISO's capability to
detect anti-competitive or manipulative behavior. Additionally, this
proposed rule will help RTOs and ISOs to properly credit demand
response and energy efficiency resources for their efforts.
29. Internal Review: The Commission has reviewed the business
practice standards proposed in this NOPR and has made a preliminary
determination that these standards are necessary to maintain
consistency and help increase the effectiveness of RTO and ISO rules
pertaining to measurement and verification of demand response and
energy efficiency resource practices. The Commission has assured
itself, by means of its internal review, that there is specific,
objective support for the burden estimate associated with the
information requirements.
30. Interested persons may obtain information on the reporting
requirements by contacting the Federal Energy Regulatory Commission,
Office of the Executive Director, 888 First Street NE., Washington, DC
20426 [Attention: Ellen Brown, email: DataClearance@ferc.gov, phone:
(202) 502-8663, fax: (202) 273-0873].
31. Comments concerning the information collections proposed in
this NOPR and the associated burden estimates, should be sent to the
Commission in this docket and may also be sent to the Office of
Management and Budge, Office of Information and Regulatory Affairs,
Washington, DC 20503 [Attention: Desk Officer for the Federal Energy
Regulatory Commission]. For security reasons, comments should be sent
by email to OMB at the following email address: oira_submission@omb.eop.gov. Please reference FERC-xxx and the docket number
of this proposed rulemaking (Docket No. RM05-5-020) in your submission.
[[Page 24433]]
V. Environmental Analysis
32. The Commission is required to prepare an Environmental
Assessment or an Environmental Impact Statement for any action that may
have a significant adverse effect on the human environment.\45\ The
Commission has categorically excluded certain actions from these
requirements as not having a significant effect on the human
environment.\46\ The actions proposed to be taken here fall within
categorical exclusions in the Commission's regulations for rules that
are corrective, clarifying, or procedural, for information gathering,
analysis, and dissemination, and for sales, exchange, and
transportation of electric power that requires no construction of
facilities.\47\ Therefore an environmental review is unnecessary and
has not been prepared in this rulemaking.
---------------------------------------------------------------------------
\45\ Regulations Implementing the National Environmental Policy
Act, Order No. 486, 52 FR 47897 (Dec. 17, 1987), FERC Stats. & Regs.
Regulations Preambles 1986-1990 ] 30,783 (1987).
\46\ 18 CFR 380.4.
\47\ See 18 CFR 380.4(a)(2)(ii), 380.4(a)(5), and 380.4(a)(27).
---------------------------------------------------------------------------
VI. Regulatory Flexibility Act Certification
33. The Regulatory Flexibility Act of 1980 (RFA) \48\ generally
requires an administrative agency to perform an analysis of rulemakings
that will have a significant economic impact on a substantial number of
small entities. The RFA mandates consideration of regulatory
alternatives that accomplish the stated objectives of a proposed
rulemaking while minimizing any significant economic impact on a
substantial number of small entities. The Small Business Administration
(SBA) develops the numerical definition of a small business.\49\ The
SBA has established a size standard for electric utilities, stating
that a firm is small if, including its affiliates, it is primarily
engaged in the transmission, generation, and/or distribution of
electric energy for sale and its total electric output for the
preceding fiscal year did not exceed four million megawatt hours.\50\
---------------------------------------------------------------------------
\48\ 5 U.S.C. 601-612.
\49\ 13 CFR 121.101.
\50\ 13 CFR 121.201, Sector 22 Utilities n.1.
---------------------------------------------------------------------------
34. The regulations proposed here impose requirements only on RTOs
and ISOs, which are not small businesses. Moreover, these requirements
are designed to benefit all customers, including small businesses.
Accordingly, the Commission hereby certifies, pursuant to section
605(b) of the RFA,\51\ that the regulations proposed herein will not
have a significant economic impact on a substantial number of small
entities.
---------------------------------------------------------------------------
\51\ 5 U.S.C. 605(b).
---------------------------------------------------------------------------
VII. Comment Procedures
35. The Commission invites interested persons to submit comments on
the matters and issues proposed in this notice to be adopted, including
any related matters or alternative proposals that commenters may wish
to discuss. Comments are due June 25, 2012. Comments must refer to
Docket No. RM05-5-020, and must include the commenter's name, the
organization they represent, if applicable, and their address in their
comments.
36. The Commission encourages comments to be filed electronically
via the eFiling link on the Commission's Web site at https://www.ferc.gov. The Commission accepts most standard word processing
formats. Documents created electronically using word processing
software should be filed in native applications or print-to-PDF format
and not in a scanned format. Commenters filing electronically do not
need to make a paper filing.
37. Commenters that are not able to file comments electronically
must send an original of their comments to: Federal Energy Regulatory
Commission, Secretary of the Commission, 888 First Street NE.,
Washington, DC 20426.
38. All comments will be placed in the Commission's public files
and may be viewed, printed, or downloaded remotely as described in the
Document Availability section below. Commenters on this proposal are
not required to serve copies of their comments on other commenters.
VIII. Document Availability
39. In addition to publishing the full text of this document in the
Federal Register, the Commission provides all interested persons an
opportunity to view and/or print the contents of this document via the
Internet through the Commission's Home Page (https://www.ferc.gov) and
in the Commission's Public Reference Room during normal business hours
(8:30 a.m. to 5 p.m. Eastern time) at 888 First Street NE., Room 2A,
Washington DC 20426.
40. From the Commission's Home Page on the Internet, this
information is available on eLibrary. The full text of this document is
available on eLibrary in PDF and Microsoft Word format for viewing,
printing, and/or downloading. To access this document in eLibrary, type
the docket number excluding the last three digits of this document in
the docket number field.
41. User assistance is available for eLibrary and the Commission's
Web site during normal business hours from the Commission's Online
Support at 202-502-6652 (toll free at 1-866-208-3676) or email at
ferconlinesupport@ferc.gov, or the Public Reference Room at (202) 502-
8371, TTY (202) 502-8659. Email the Public Reference Room at
public.referenceroom@ferc.gov.
List of Subjects in 18 CFR Part 38
Conflicts of interests, Electric power plants, Electric utilities,
Incorporation by reference, Reporting and recordkeeping requirements.
By direction of the Commission.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
In consideration of the foregoing, the Commission proposes to amend
Part 38, Chapter I, Title 18, Code of Federal Regulations, as follows.
PART 38--BUSINESS PRACTICE STANDARDS AND COMMUNICATION PROTOCOLS
FOR PUBLIC UTILITIES
1. The authority citation for part 38 continues to read as follows:
Authority: 16 U.S.C. 791-825r, 2601-2645; 31 U.S.C. 9701; 42
U.S.C. 7101-7352.
2. Section 38.2 is amended by revising paragraph (a)(12) and adding
paragraph (a)(13) to read as follows:
Sec. 38.2 Incorporation by reference of North American Energy
Standards Board Wholesale Electric Quadrant standards.
(a) * * *
(12) Business Practices for Measurement and Verification of
Wholesale Electricity Demand Response (WEQ-015, 2010 Annual Plan Items
4(a) and 4(b), March 21, 2011).
(13) Business Practice Standards for Measurement and Verification
of Energy Efficiency Products (WEQ-021, 2010 Annual Plan Item 4(d), May
13, 2011).
* * * * *
[FR Doc. 2012-9809 Filed 4-23-12; 8:45 am]
BILLING CODE 6717-01-P