Notice Announcing Preliminary Permit Drawing, 24197 [2012-9661]
Download as PDF
rmajette on DSK2TPTVN1PROD with NOTICES
Federal Register / Vol. 77, No. 78 / Monday, April 23, 2012 / Notices
would follow the powerhouse access
road and drinking water tank road
alignment.
The estimated dependable capacity of
the project is 140 kW. The peak
installed capacity will primarily depend
on economics and the projected increase
in demand. AVEC has chosen to permit
the project with a peak capacity of 525
kW.
Applicant Contact: Brent Petrie;
Manager, Community Development and
Key Accounts; Alaska Village Electric
Cooperative; 4831 Eagle Street,
Anchorage, Alaska 99503–7497; (907)
565–5358 or email at bpetrie@avec.org.
FERC Contact: Carolyn Templeton;
(202) 502–8785 or
carolyn.templeton@ferc.gov.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at
https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13272) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: April 16, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–9656 Filed 4–20–12; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
15:11 Apr 20, 2012
Jkt 226001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice Announcing Preliminary Permit
Drawing
Mississippi 8
Hydro, LLC.
FFP Project 98,
LLC.
Project No. 13010–002.
Project No. 14272–000.
The Commission has received two
preliminary permit applications deemed
filed on September 1, 2011, at 8:30
a.m.,1 for proposed projects to be
located at the U.S. Army Corps of
Engineers’ Mississippi River Lock and
Dam No. 8 on the Mississippi River, in
Houston County, Minnesota, and
Vernon County, Wisconsin. The
applications were filed by Mississippi 8
Hydro, LLC for Project No. 13010 and
FFP Project 98, LLC for Project No.
14272.
On April 23, 2012, at 1 p.m. (Eastern
Time), the Secretary of the Commission,
or her designee, will conduct a random
drawing to determine the filing priority
of the applicants identified in this
notice. The Commission will select
among competing permit applications as
provided in section 4.37 of its
regulations.2 The priority established by
this drawing will be used to determine
which applicant, among those with
identical filing times, will be considered
to have the first-filed application.
The drawing is open to the public and
will be held in room 2C, the
Commission Meeting Room, located at
888 First Street NE., Washington, DC
20426. The Secretary will issue a
subsequent notice announcing the
results of the drawing.
Dated: April 16, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–9661 Filed 4–20–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP12–115–000]
Trunkline Gas Company, LLC; Notice
of Request Under Blanket
Authorization
Take notice that on April 5, 2012,
Trunkline Gas Company, LLC
1 Under the Commission’s Rules of Practice and
Procedure, any document received after regular
business hours is considered filed at 8:30 a.m. on
the next regular business day. 18 CFR
385.2001(a)(2)(2011).
2 18 CFR 4.37 (2011).
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
24197
(Trunkline), P.O. Box 4967, Houston,
Texas 77210–4967, filed in Docket No.
CP12–115–000, a Request for
Authorization Under Blanket Certificate
Prior Notice Procedures pursuant to
sections 157.205, 157.208(b), 157.213(b)
and 157.216(b)(2) of the Commission’s
Regulations under the Natural Gas Act
(NGA) as amended, for authorization to
abandon thirteen injection/withdrawal
(I/W) wells, convert three I/W wells to
observation wells and abandon two
compressor units, all located in West
and East Carroll Parishes, Louisiana, all
as more fully set forth in the application
which is on file with the Commission
and open to public inspection. The
filing may also be viewed on the Web
at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, please contact
FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or TTY, contact
(202) 502–8659.
Any questions concerning this
application may be directed to Stephen
Veatch, Senior Director of Certificates &
Tariffs, Trunkline Gas Company, LLC,
5051 Westheimer Road, Houston, Texas
77056; at telephone (713) 989–2024,
facsimile (713) 989–1158, or email:
stephen.veatch@sug.com.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to Section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to Section 7 of
the NGA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenter’s will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenter’s will not be
required to serve copies of filed
E:\FR\FM\23APN1.SGM
23APN1
Agencies
[Federal Register Volume 77, Number 78 (Monday, April 23, 2012)]
[Notices]
[Page 24197]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-9661]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice Announcing Preliminary Permit Drawing
Mississippi 8 Hydro, LLC.......... Project No. 13010-002.
FFP Project 98, LLC............... Project No. 14272-000.
The Commission has received two preliminary permit applications
deemed filed on September 1, 2011, at 8:30 a.m.,\1\ for proposed
projects to be located at the U.S. Army Corps of Engineers' Mississippi
River Lock and Dam No. 8 on the Mississippi River, in Houston County,
Minnesota, and Vernon County, Wisconsin. The applications were filed by
Mississippi 8 Hydro, LLC for Project No. 13010 and FFP Project 98, LLC
for Project No. 14272.
---------------------------------------------------------------------------
\1\ Under the Commission's Rules of Practice and Procedure, any
document received after regular business hours is considered filed
at 8:30 a.m. on the next regular business day. 18 CFR
385.2001(a)(2)(2011).
---------------------------------------------------------------------------
On April 23, 2012, at 1 p.m. (Eastern Time), the Secretary of the
Commission, or her designee, will conduct a random drawing to determine
the filing priority of the applicants identified in this notice. The
Commission will select among competing permit applications as provided
in section 4.37 of its regulations.\2\ The priority established by this
drawing will be used to determine which applicant, among those with
identical filing times, will be considered to have the first-filed
application.
---------------------------------------------------------------------------
\2\ 18 CFR 4.37 (2011).
---------------------------------------------------------------------------
The drawing is open to the public and will be held in room 2C, the
Commission Meeting Room, located at 888 First Street NE., Washington,
DC 20426. The Secretary will issue a subsequent notice announcing the
results of the drawing.
Dated: April 16, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-9661 Filed 4-20-12; 8:45 am]
BILLING CODE 6717-01-P