Carolina Gas Transmission Corporation; Notice of Request Under Blanket Authorization, 24198 [2012-9651]
Download as PDF
24198
Federal Register / Vol. 77, No. 78 / Monday, April 23, 2012 / Notices
documents on all other parties.
However, the non-party commentary,
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 7 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
Dated: April 16, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–9658 Filed 4–20–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP12–101–000]
Carolina Gas Transmission
Corporation; Notice of Request Under
Blanket Authorization
Take notice that on April 3, 2012
Carolina Gas Transmission Corporation
(Carolina Gas), 601 Old Taylor Road,
Cayce, South Carolina, 29033, filed in
the above Docket, a prior notice request
pursuant to sections 157.205, 157.208
and 157.210 of the Commission’s
regulations under the Natural Gas Act
(NGA), for authorization to replace
approximately 7.6 miles of Carolina Gas
existing Line 1 within the existing
easement in Aiken Country, South
Carolina, all as more fully set forth in
the application which is on file with the
Commission and open to public
inspection. The filing may also be
viewed on the web at https://www.ferc.
gov using the ‘‘eLibrary’’ link. Enter the
docket number excluding the last three
digits in the docket number field to
access the document. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or TTY, contact
(202) 502–8659.
Carolina Gas proposes to replace two
segments of the existing 16-inchdiameter natural gas pipeline Line 1 for
a total of 7.6 miles, within the existing
right of way. Carolina Gas states that the
estimated cost of the project is
$15,005,105.
Any questions concerning this
application may be directed to Randy D.
Traylor, Jr., Manager-System Planning,
Carolina Gas Transmission Corporation,
601 Old Taylor Road, Cayce, South
Carolina 29033 at (803) 217–2255, or by
email at dtraylor@scana.com.
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
Natural Gas Act (NGA) (18 CFR 157.205)
file a protest to the request. If no protest
is filed within the time allowed
therefore, the proposed activity shall be
deemed to be authorized effective the
day after the time allowed for protest. If
a protest is filed and not withdrawn
within 30 days after the time allowed
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (www.ferc.gov)
under the ‘‘e-Filing’’ link.
Dated: April 13, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–9651 Filed 4–20–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Revocation of Market-Based
Rate Authority and Termination of
Market-Based Rate Tariffs
rmajette on DSK2TPTVN1PROD with NOTICES
Docket Nos.
Aleph One, Inc. ......................................................................................................................................................................
Alpha Domestic Power Trading, LLC ....................................................................................................................................
American Power Exchange, Inc. ...........................................................................................................................................
CBA Endeavors, LLC .............................................................................................................................................................
Cesarie, Inc. ...........................................................................................................................................................................
Coburn Energy, LLC ..............................................................................................................................................................
Community Power & Utility ....................................................................................................................................................
Consulting Gasca & Associates, LLC ....................................................................................................................................
Eastland Power, LLC .............................................................................................................................................................
Ebersen, Inc. ..........................................................................................................................................................................
EnergyWindow, Inc. ...............................................................................................................................................................
Green Energy Partners, LLC .................................................................................................................................................
Innovative Technical Services, LLC ......................................................................................................................................
Inupiat Energy Marketing, LLC ..............................................................................................................................................
Kohler Co. ..............................................................................................................................................................................
KRK Energy ...........................................................................................................................................................................
Lafarge Midwest, Inc. .............................................................................................................................................................
Luna Energy Investments, LLC .............................................................................................................................................
Matched LLC ..........................................................................................................................................................................
Mid-Power Service Corporation .............................................................................................................................................
Olde Towne Energy Associates, LLC ....................................................................................................................................
P&T Power Company ............................................................................................................................................................
Quiet Light Trading, LLC .......................................................................................................................................................
Redwood Energy Marketing, LLC ..........................................................................................................................................
SF Phosphates Limited Company, LLC ................................................................................................................................
Sirius Investment Management, Inc. .....................................................................................................................................
Smart One Energy, LLC ........................................................................................................................................................
Tallgrass Energy Partners .....................................................................................................................................................
Telemagine, Inc. ....................................................................................................................................................................
VerDate Mar<15>2010
15:11 Apr 20, 2012
Jkt 226001
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
E:\FR\FM\23APN1.SGM
23APN1
ER04–686–000
ER08–14–000
ER94–1578–000
ER08–996–000
ER10–397–000
ER08–1523–000
ER10–1466–000
ER10–899–000
ER08–665–000
ER03–1330–000
ER04–584–000
ER08–1211–000
ER03–763–000
ER09–1748–000
ER95–1018–000
ER05–713–000
ER09–1146–000
ER08–859–000
ER10–719–000
ER97–4257–000
ER04–942–000
ER97–18–000
ER05–51–000
ER04–545–000
ER01–1121–000
ER05–71–000
ER10–2943–000
ER08–679–000
ER05–419–000
Agencies
[Federal Register Volume 77, Number 78 (Monday, April 23, 2012)]
[Notices]
[Page 24198]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-9651]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP12-101-000]
Carolina Gas Transmission Corporation; Notice of Request Under
Blanket Authorization
Take notice that on April 3, 2012 Carolina Gas Transmission
Corporation (Carolina Gas), 601 Old Taylor Road, Cayce, South Carolina,
29033, filed in the above Docket, a prior notice request pursuant to
sections 157.205, 157.208 and 157.210 of the Commission's regulations
under the Natural Gas Act (NGA), for authorization to replace
approximately 7.6 miles of Carolina Gas existing Line 1 within the
existing easement in Aiken Country, South Carolina, all as more fully
set forth in the application which is on file with the Commission and
open to public inspection. The filing may also be viewed on the web at
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number excluding the last three digits in the docket number field to
access the document. For assistance, please contact FERC Online Support
at FERCOnlineSupport@ferc.gov or toll free at (866) 208-3676, or TTY,
contact (202) 502-8659.
Carolina Gas proposes to replace two segments of the existing 16-
inch-diameter natural gas pipeline Line 1 for a total of 7.6 miles,
within the existing right of way. Carolina Gas states that the
estimated cost of the project is $15,005,105.
Any questions concerning this application may be directed to Randy
D. Traylor, Jr., Manager-System Planning, Carolina Gas Transmission
Corporation, 601 Old Taylor Road, Cayce, South Carolina 29033 at (803)
217-2255, or by email at dtraylor@scana.com.
Any person may, within 60 days after the issuance of the instant
notice by the Commission, file pursuant to Rule 214 of the Commission's
Procedural Rules (18 CFR 385.214) a motion to intervene or notice of
intervention. Any person filing to intervene or the Commission's staff
may, pursuant to section 157.205 of the Commission's Regulations under
the Natural Gas Act (NGA) (18 CFR 157.205) file a protest to the
request. If no protest is filed within the time allowed therefore, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for protest. If a protest is filed and not
withdrawn within 30 days after the time allowed for filing a protest,
the instant request shall be treated as an application for
authorization pursuant to section 7 of the NGA.
The Commission strongly encourages electronic filings of comments,
protests, and interventions via the internet in lieu of paper. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site (www.ferc.gov) under the ``e-Filing'' link.
Dated: April 13, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-9651 Filed 4-20-12; 8:45 am]