Environmental Impacts Statements; Notice of Availability, 23713 [2012-9584]
Download as PDF
Federal Register / Vol. 77, No. 77 / Friday, April 20, 2012 / Notices
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–9002–6]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7146 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 04/09/2012 through 04/13/2012
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act
requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EISs are available at: https://
www.epa.gov/compliance/nepa/
eisdata.html.
EPA is
seeking agencies to participate in its eNEPA Electronic EIS Submission Pilot.
Participating agencies can fulfill all
requirements for EIS filing, eliminating
the need to submit paper copies to EPA
headquarters, by filing documents
online and providing feedback on the
process. To get more information on
participating in the pilot, please contact
Justin Wright (wright.justin@epa.gov) or
Dawn Roberts (roberts.dawn@epa.gov).
EIS No. 20120103, Final EIS, USACE,
00, Savannah Harbor Expansion
Project, Navigation Improvements to
the Federal Navigation Channel,
Chatham County, GA and Jasper
County, SC, Review Period Ends:
05/21/2012, Contact: William Bailey
912–652–5781.
EIS No. 20120104, Draft EIS, NOAA,
ME, Amendment 5 to the Atlantic
Herring Fishery Management Plan,
Implementation of Management
Measures to Adjust the Fishery
Management Program for Federally
Managed Atlantic Herring Fishery,
Gulf of Maine, Comment Period Ends:
06/04/2012, Contact: Paul Howard
978–465–3316.
EIS No. 20120105, Final EIS, USFS, CA,
Kirkwood Meadows Power Line
Reliability Project, Proposal to
Construct and Operate 34.5 kilovolt
Power Line, Eldorado National Forest,
Amador, Eldorado, and Alpine
Counties, CA, Review Period Ends:
05/21/2012, Contact: Susan A.
Rodman 530–621–5298.
EIS No. 20120106, Draft EIS, NOAA, 00,
Amendment 14 to the Atlantic
Mackerel, Squid, and Butterfish
Fishery Management Plan,
Implementation, Comment Period
tkelley on DSK3SPTVN1PROD with NOTICES
SUPPLEMENTARY INFORMATION:
VerDate Mar<15>2010
18:17 Apr 19, 2012
Jkt 226001
Ends: 06/04/2012, Contact: Daniel S.
Morris 978–281–9250.
EIS No. 20120107, Final EIS, BLM, OR,
John Day Basin Resource Management
Plan, To Provide Direction for
Managing Public Lands in Central and
Eastern Oregon, Prineville District,
Grant, Wheeler, Gilliam, Wasco,
Sherman, Umatilla, Jefferson and
Morrow Counties, OR, Review Period
Ends: 05/21/2012, Contact: Monte
Kuk 541–416–6700.
EIS No. 20120108, Draft EIS, BLM, CA,
Ocotillo Sol Project, Proposed 100acre Solar Photovoltaic Generation
Facility, Possible Issuance of a Rightof-Way Grant, Imperial County, CA,
Comment Period Ends: 07/18/2012,
Contact: Noel Ludwig 760–833–7104.
EIS No. 20120109, Draft EIS, FHWA,
OR, Salem River Crossing Project,
Proposes to Build a Modified or New
Crossing of the Willamette River in
Salem, Funding, USACE Section 10
and 404 Permits, Marion and Polk
Counties, OR, Comment Period Ends:
06/18/2012, Contact: Cindy Callahan
503–399–5749.
EIS No. 20120110, Final EIS, USFWS,
CA, Sears Point Wetland and
Watershed Restoration Project, To
Restore Tidal Wetlands and
Rehabilitate Diked Wetlands, Sonoma
County, CA, Review Period Ends:
05/21/2012, Contact: Don Brubaker
707–769–4200.
EIS No. 20120111, Draft EIS, USFS, AZ,
Kaibab National Forest Land and
Resource Management Plan,
Implementation, Coconino, Yavapai,
and Mojave Counties, AZ, Comment
Period Ends: 07/18/2012, Contact:
Ariel Leonard 928–635–8200.
EIS No. 20120112, Draft EIS, USFS, AK,
Greens Creek Mine Tailings Disposal
Facility Expansion, USACE Section
404 Permit, Admiralty National
Monument, Tongass National Forest,
Juneau, AK, Comment Period Ends:
06/04/2012, Contact: Sarah
Samuelson 907–789–6202.
Amended Notices
EIS No. 20120091, Second Draft
Supplement, BLM, AK, National
Petroleum Reserve—Alaska (NPR–A)
Integrated Activity Plan, To
Determine Appropriate Management
BLM-Administrated Lands in the
NPR–A, North Slope Borough, AK,
Comment Period Ends: 05/29/2012,
Contact: Jim Ducker 907–271–3130.
Revision to FR Notice Published 3/30/
2012; Correction to Document Status
from Second Draft Supplemental to
Draft and Change Comment Period from
05/29/2012 to 06/01/2012.
EIS No. 20120098, Draft EIS, USAF, 00,
F–35A Operational Basing, Beddown
PO 00000
Frm 00056
Fmt 4703
Sfmt 4703
23713
and Operation of F–35A Aircraft for
the Combat Air Forces at One or More
Locations throughout the Contiguous
U.S. from 2015 through 2020,
Comment Period Ends: 06/01/2012,
Contact: Nicholas Germanos 757–
764–5994.
Revision to FR Notice Published 4/13/
2012; Change Comment Period Ends
from 06/04/2012 to 06/01/2012.
Dated: April 17, 2012.
Cliff Rader,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 2012–9584 Filed 4–19–12; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPP–2012–0176; FRL–9343–9]
Pesticides; Final Guidance on Material
Safety Data Sheets as Pesticide
Labeling; Request for Comment on
Paperwork Burden
Environmental Protection
Agency (EPA).
ACTION: Notice of availability.
AGENCY:
The Agency is announcing
the availability of a Pesticide
Registration Notice (PR Notice) entitled
‘‘Pesticide Registration (PR) Notice
2012–1: Material Safety Data Sheets as
Pesticide Labeling.’’ This PR Notice was
issued by the Agency on April 9, 2012.
PR Notices are issued by the Office of
Pesticide Programs (OPP) to inform
pesticide registrants and other
interested persons about important
policies, procedures, and registration
related decisions, and serve to provide
guidance to pesticide registrants and
OPP personnel. This particular PR
Notice provides guidance to the
registrant concerning the relationship
between EPA-approved labels for
pesticides registered under the Federal
Insecticide, Fungicide, and Rodenticide
Act (FIFRA), and the Material Safety
Data Sheet (MSDS, also referred to as
Safety Data Sheet or SDS), required by
the Occupational Safety and Health
Administration (OSHA). It explains how
registrants can ensure their FIFRA
labeling and SDS’s comply with both
agencies’ requirements. In addition,
EPA is hereby soliciting public
comment on the information collection
activities and related burden estimates
associated with the guidance provided
in PR Notice 2012–1.
DATES: Comments on the Agency’s
information collection activities and
related burden estimates must be
received on or before June 19, 2012.
SUMMARY:
E:\FR\FM\20APN1.SGM
20APN1
Agencies
[Federal Register Volume 77, Number 77 (Friday, April 20, 2012)]
[Notices]
[Page 23713]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-9584]
[[Page 23713]]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-9002-6]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7146 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 04/09/2012 through 04/13/2012
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act requires that EPA make public
its comments on EISs issued by other Federal agencies. EPA's comment
letters on EISs are available at: https://www.epa.gov/compliance/nepa/eisdata.html.
SUPPLEMENTARY INFORMATION: EPA is seeking agencies to participate in
its e-NEPA Electronic EIS Submission Pilot. Participating agencies can
fulfill all requirements for EIS filing, eliminating the need to submit
paper copies to EPA headquarters, by filing documents online and
providing feedback on the process. To get more information on
participating in the pilot, please contact Justin Wright
(wright.justin@epa.gov) or Dawn Roberts (roberts.dawn@epa.gov).
EIS No. 20120103, Final EIS, USACE, 00, Savannah Harbor Expansion
Project, Navigation Improvements to the Federal Navigation Channel,
Chatham County, GA and Jasper County, SC, Review Period Ends: 05/21/
2012, Contact: William Bailey 912-652-5781.
EIS No. 20120104, Draft EIS, NOAA, ME, Amendment 5 to the Atlantic
Herring Fishery Management Plan, Implementation of Management Measures
to Adjust the Fishery Management Program for Federally Managed Atlantic
Herring Fishery, Gulf of Maine, Comment Period Ends: 06/04/2012,
Contact: Paul Howard 978-465-3316.
EIS No. 20120105, Final EIS, USFS, CA, Kirkwood Meadows Power Line
Reliability Project, Proposal to Construct and Operate 34.5 kilovolt
Power Line, Eldorado National Forest, Amador, Eldorado, and Alpine
Counties, CA, Review Period Ends: 05/21/2012, Contact: Susan A. Rodman
530-621-5298.
EIS No. 20120106, Draft EIS, NOAA, 00, Amendment 14 to the Atlantic
Mackerel, Squid, and Butterfish Fishery Management Plan,
Implementation, Comment Period Ends: 06/04/2012, Contact: Daniel S.
Morris 978-281-9250.
EIS No. 20120107, Final EIS, BLM, OR, John Day Basin Resource
Management Plan, To Provide Direction for Managing Public Lands in
Central and Eastern Oregon, Prineville District, Grant, Wheeler,
Gilliam, Wasco, Sherman, Umatilla, Jefferson and Morrow Counties, OR,
Review Period Ends: 05/21/2012, Contact: Monte Kuk 541-416-6700.
EIS No. 20120108, Draft EIS, BLM, CA, Ocotillo Sol Project, Proposed
100- acre Solar Photovoltaic Generation Facility, Possible Issuance of
a Right-of-Way Grant, Imperial County, CA, Comment Period Ends: 07/18/
2012, Contact: Noel Ludwig 760-833-7104.
EIS No. 20120109, Draft EIS, FHWA, OR, Salem River Crossing Project,
Proposes to Build a Modified or New Crossing of the Willamette River in
Salem, Funding, USACE Section 10 and 404 Permits, Marion and Polk
Counties, OR, Comment Period Ends: 06/18/2012, Contact: Cindy Callahan
503-399-5749.
EIS No. 20120110, Final EIS, USFWS, CA, Sears Point Wetland and
Watershed Restoration Project, To Restore Tidal Wetlands and
Rehabilitate Diked Wetlands, Sonoma County, CA, Review Period Ends: 05/
21/2012, Contact: Don Brubaker 707-769-4200.
EIS No. 20120111, Draft EIS, USFS, AZ, Kaibab National Forest Land and
Resource Management Plan, Implementation, Coconino, Yavapai, and Mojave
Counties, AZ, Comment Period Ends: 07/18/2012, Contact: Ariel Leonard
928-635-8200.
EIS No. 20120112, Draft EIS, USFS, AK, Greens Creek Mine Tailings
Disposal Facility Expansion, USACE Section 404 Permit, Admiralty
National Monument, Tongass National Forest, Juneau, AK, Comment Period
Ends: 06/04/2012, Contact: Sarah Samuelson 907-789-6202.
Amended Notices
EIS No. 20120091, Second Draft Supplement, BLM, AK, National Petroleum
Reserve--Alaska (NPR-A) Integrated Activity Plan, To Determine
Appropriate Management BLM-Administrated Lands in the NPR-A, North
Slope Borough, AK, Comment Period Ends: 05/29/2012, Contact: Jim Ducker
907-271-3130.
Revision to FR Notice Published 3/30/2012; Correction to Document
Status from Second Draft Supplemental to Draft and Change Comment
Period from 05/29/2012 to 06/01/2012.
EIS No. 20120098, Draft EIS, USAF, 00, F-35A Operational Basing,
Beddown and Operation of F-35A Aircraft for the Combat Air Forces at
One or More Locations throughout the Contiguous U.S. from 2015 through
2020, Comment Period Ends: 06/01/2012, Contact: Nicholas Germanos 757-
764-5994.
Revision to FR Notice Published 4/13/2012; Change Comment Period
Ends from 06/04/2012 to 06/01/2012.
Dated: April 17, 2012.
Cliff Rader,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 2012-9584 Filed 4-19-12; 8:45 am]
BILLING CODE 6560-50-P