Cimarron Windpower II, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 23476-23477 [2012-9385]
Download as PDF
23476
Federal Register / Vol. 77, No. 76 / Thursday, April 19, 2012 / Notices
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: April 12, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–9382 Filed 4–18–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Dated: April 12, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[Docket No. ER12–1472–000]
mstockstill on DSK4VPTVN1PROD with NOTICES
Conch Energy Trading, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
[FR Doc. 2012–9388 Filed 4–18–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
This is a supplemental notice in the
above-referenced proceeding of Conch
Energy Trading, LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is May 2, 2012.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
VerDate Mar<15>2010
17:10 Apr 18, 2012
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Jkt 226001
Federal Energy Regulatory
Commission
[Docket No. ER12–1470–000]
Energia Sierra Juarez U.S., LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of Energia
Sierra Juarez U.S., LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is May 2, 2012.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: April 12, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–9387 Filed 4–18–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER12–1504–000]
Cimarron Windpower II, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of
Cimarron Windpower II, LLC’s
application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
E:\FR\FM\19APN1.SGM
19APN1
Federal Register / Vol. 77, No. 76 / Thursday, April 19, 2012 / Notices
future issuances of securities and
assumptions of liability, is May 2, 2012.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: April 12, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–9385 Filed 4–18–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13135–003]
mstockstill on DSK4VPTVN1PROD with NOTICES
City of Watervliet; Notice of Intent To
File License Application, Filing of PreApplication Document, and Approving
Use of the Traditional Licensing
Process
a. Type of Filing: Notice of Intent to
File License Application and Request to
Use the Traditional Licensing Process.
b. Project No.: 13135–003.
c. Date Filed: February 27, 2012.
d. Submitted By: City of Watervliet.
e. Name of Project: Delta
Hydroelectric Project.
f. Location: On the Mohawk River, in
Oneida County, New York. No federal
lands are occupied by the project works
or located within the project boundary.
VerDate Mar<15>2010
17:10 Apr 18, 2012
Jkt 226001
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Potential Applicant Contact: Mr.
Mark Gleason, General Manager, City of
Watervliet, City Hall, Watervliet, NY
12189 (518) 270–3800 x 122.
i. FERC Contact: Brandi Sangunett at
(202) 502–8393; or email at
brandi.sangunett@ferc.gov.
j. The City of Watervliet filed its
request to use the Traditional Licensing
Process on February 27, 2012. The City
of Watervliet provided public notice of
its request on February 29, 2012. In a
letter dated April 12, 2012, the Director
of the Division of Hydropower
Licensing approved the City of
Watervliet’s request to use the
Traditional Licensing Process.
k. With this notice, we are initiating
informal consultation with: (a) The U.S.
Fish and Wildlife Service under section
7 of the Endangered Species Act and the
joint agency regulations thereunder at
50 CFR, Part 402; (b) NOAA Fisheries
under section 305(b) of the MagnusonStevens Fishery Conservation and
Management Act and implementing
regulations at 50 CFR 600.920; and (c)
the New York State Historic
Preservation Officer, as required by
section 106, National Historical
Preservation Act, and the implementing
regulations of the Advisory Council on
Historic Preservation at 36 CFR 800.2.
l. The City of Watervliet filed a PreApplication Document (PAD; including
a proposed process plan and schedule)
with the Commission, pursuant to 18
CFR 5.6 of the Commission’s
regulations.
m. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCONlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in paragraph h.
n. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: April 12, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–9368 Filed 4–18–12; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
23477
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14366–000]
City of New York; Notice of Preliminary
Permit Application Accepted for Filing
and Soliciting Comments, Motions To
Intervene, and Competing Applications
On March 1, 2012, the City of New
York filed an application, pursuant to
section 4(f) of the Federal Power Act,
proposing to study the feasibility of the
West of Hudson Hydroelectric Project,
which comprises two development
sites, Pepacton located on the East
Branch of the Delaware River and
Neversink located on the Neversink
River. The Pepacton Development
would be located in Delaware County,
New York, and the Neversink
Development would be located in
Sullivan County, New York.
The proposed West of Hudson
Hydroelectric Project would consist of
the following developments:
Pepacton Development:
(1) An existing 2,450-foot-long, 204foot-high earthen Downsville Dam; (2)
an existing reservoir having a surface
area of 5,560 acres and a storage
capacity of 441,000 acre-feet and normal
water surface elevation of 1,280 feet
mean sea level; (3) a proposed
powerhouse containing one new
generating unit having an installed
capacity of 1.7-megawatts; (4) a
proposed 80-foot-long, 12.5-kilovolt
transmission line; and (5) appurtenant
facilities. The proposed Pepacton
Development would have an average
annual generation of 9.235-gigawatthours.
Neversink Development:
(1) An existing 2,800-foot-long, 195foot-high earthen Neversink Dam; (2) an
existing reservoir having a surface area
of 1,478 acres and a storage capacity of
112,000 acre-feet and normal water
surface elevation of 1,440 feet mean sea
level; (3) a proposed powerhouse
containing one new generating unit
having an installed capacity of 0.9megawatt; (4) a proposed 760-foot-long,
12.5-kilovolt transmission line; and (5)
appurtenant facilities. The proposed
Neversink Development would have an
average annual generation of 5.457gigawatt-hours.
Applicant Contact: Mr. Kevin M.
Lang, Esq., Couch White, LLP, 540
Broadway, P. O. Box 22222, Albany, NY
12201–2222, phone (518) 426–4600.
FERC Contact: Timothy Looney;
phone: (202) 502–6096.
E:\FR\FM\19APN1.SGM
19APN1
Agencies
[Federal Register Volume 77, Number 76 (Thursday, April 19, 2012)]
[Notices]
[Pages 23476-23477]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-9385]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER12-1504-000]
Cimarron Windpower II, LLC; Supplemental Notice That Initial
Market-Based Rate Filing Includes Request for Blanket Section 204
Authorization
This is a supplemental notice in the above-referenced proceeding of
Cimarron Windpower II, LLC's application for market-based rate
authority, with an accompanying rate tariff, noting that such
application includes a request for blanket authorization, under 18 CFR
part 34, of future issuances of securities and assumptions of
liability.
Any person desiring to intervene or to protest should file with the
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426, in accordance with Rules 211 and 214 of the Commission's
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone
filing a motion to intervene or protest must serve a copy of that
document on the Applicant.
Notice is hereby given that the deadline for filing protests with
regard to the applicant's request for blanket authorization, under 18
CFR part 34, of
[[Page 23477]]
future issuances of securities and assumptions of liability, is May 2,
2012.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
14 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426.
The filings in the above-referenced proceeding are accessible in
the Commission's eLibrary system by clicking on the appropriate link in
the above list. They are also available for review in the Commission's
Public Reference Room in Washington, DC. There is an eSubscription link
on the web site that enables subscribers to receive email notification
when a document is added to a subscribed docket(s). For assistance with
any FERC Online service, please email FERCOnlineSupport@ferc.gov. or
call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Dated: April 12, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012-9385 Filed 4-18-12; 8:45 am]
BILLING CODE 6717-01-P