Sunshine Act Meeting, 22772-22773 [2012-9275]
Download as PDF
22772
Federal Register / Vol. 77, No. 74 / Tuesday, April 17, 2012 / Notices
shelly.coles@ed.gov. Please include in
the subject line, the wording, ‘‘Public
Comment’’.
Records are kept of all Commission
proceedings and are available for public
inspection at the office of the White
House Initiative on Asian Americans
and Pacific Islanders, U.S. Department
of Education, 400 Maryland Avenue
SW. Washington, DC 20202, Monday–
Friday during the hours of 8:30 a.m. to
5 p.m.
Electronic Access to this Document:
You may view this document, as well as
all other documents of this Department
published in the Federal Register, in
text or Adobe Portable Document
Format (PDF) on the internet at the
following site: www.ed.gov/news/
fedregister/. To use PDF you
must have Adobe Acrobat Reader,
which is available free at this site. If you
have questions about using PDF, call the
U.S. Government Printing Office (GPO),
toll free at 1–866–512–1800; or in the
Washington, DC area at 202–512–0000.
Martha Kanter,
Under Secretary, U.S. Department of
Education.
[FR Doc. 2012–9153 Filed 4–16–12; 8:45 am]
BILLING CODE 4000–01–P
DEPARTMENT OF ENERGY
Environmental Management SiteSpecific Advisory Board
Office of Environmental
Management, Department of Energy.
ACTION: Notice of renewal.
AGENCY:
accordance with Title 41, Code of
Federal Regulations, Section 102–
3.65(a), and following consultation with
the Committee Management Secretariat,
General Services Administration, notice
is hereby given that the Environmental
Management Site-Specific Advisory
Board (EM SSAB) will be renewed for
a two-year period beginning April 11,
2012.
The Board provides advice and
recommendations to the Assistant
Secretary for Environmental
Management (EM) concerning issues
affecting the EM program at various
sites. These site-specific issues include
cleanup standards and environmental
restoration; waste management and
disposition; stabilization and
disposition of non-stockpile nuclear
materials; excess facilities; future land
use and long-term stewardship; risk
assessment and management; and cleanup science and technology activities.
Additionally, the renewal of the EM
SSAB has been determined to be
essential to the conduct of the
Department of Energy’s (DOE) mission
and to be in the public interest in
connection with the performance of
duties imposed on the DOE by law and
agreement. The Board will operate in
accordance with the provisions of the
Federal Advisory Committee Act, and
rules and regulations issued in
implementation of that Act.
Ms.
Catherine Alexander, Designated
Federal Officer, by telephone at (202)
586–7711.
FOR FURTHER INFORMATION CONTACT:
Pursuant to Section
14(a)(2)(A) of the Federal Advisory
Committee Act (Pub. L. 92–463), and in
SUMMARY:
Issued in Washington, DC, on April 11,
2012.
Carol A. Matthews,
Committee Management Officer.
[FR Doc. 2012–9180 Filed 4–16–12; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Sunshine Act Meeting
The following notice of meeting is
published pursuant to section 3(a) of the
government in the Sunshine Act (Pub.
L. 94–409), 5 U.S.C. 552b:
AGENCY HOLDING MEETING: Federal
Energy Regulatory Commission.
DATE AND TIME: April 19, 2012 10 a.m.
PLACE: Room 2C, 888 First Street NE.,
Washington, DC 20426.
STATUS: Open.
MATTERS TO BE CONSIDERED: Agenda
Note: Items listed on the agenda may be
deleted without further notice.
CONTACT PERSON FOR MORE INFORMATION:
Kimberly D. Bose, Secretary, Telephone
(202) 502–8400.
For a recorded message listing items
struck from or added to the meeting, call
(202) 502–8627.
This is a list of matters to be
considered by the Commission. It does
not include a listing of all documents
relevant to the items on the agenda. All
public documents, however, may be
viewed on line at the Commission’s
Web site at https://www.ferc.gov using
the eLibrary link, or may be examined
in the Commission’s Public Reference
Room.
980TH—MEETING; REGULAR MEETING
[April 19, 2012, 10 a.m.]
Item No.
Docket No.
Company
Administrative
A–1 ............................
A–2 ............................
A–3 ............................
AD02–1–000 .............
AD02–7–000 .............
AD06–3–000 .............
Agency Business Matters.
Customer Matters, Reliability, Security and Market Operations.
Market Update.
Electric
wreier-aviles on DSK5TPTVN1PROD with NOTICES
E–1 ............................
ER12–480–000 .........
E–2 ............................
E–3 ............................
E–4 ............................
ER09–1063–004 .......
AD12–14–000 ...........
AD11–11–000 ...........
RM11–17–000 ...........
E–5
E–6
E–7
E–8
RM05–5–020 .............
RM11–11–000 ...........
RM12–1–000 .............
RM11–18–000 ...........
............................
............................
............................
............................
VerDate Mar<15>2010
14:27 Apr 16, 2012
Jkt 226001
Midwest Independent Transmission System Operator, Inc. and Transmission Owners of the
Midwest Independent Transmission System Operator, Inc.
PJM Interconnection, L.L.C.
Open Access and Priority Rights on Interconnection Facilities.
Priority Rights to New Participant—Funded Transmission.
Enhancement of Electricity Market Surveillance and Analysis through Ongoing Electronic Delivery of Data from Regional Transmission Organizations and Independent System Operators.
Standards for Business Practices and Communication Protocols for Public Utilities.
Version 4 Critical Infrastructure Protection Reliability Standards.
Transmission Planning Reliability Standards.
Transmission Planning Reliability Standards.
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
E:\FR\FM\17APN1.SGM
17APN1
Federal Register / Vol. 77, No. 74 / Tuesday, April 17, 2012 / Notices
22773
980TH—MEETING; REGULAR MEETING—Continued
[April 19, 2012, 10 a.m.]
Item No.
Docket No.
E–9 ............................
E–10 ..........................
E–11 ..........................
RC08–5–001 .............
RC11–5–000 .............
ER09–187–000 .........
ER09–187–001.
ER10–160–000.
ER12–1155–000 .......
ER12–701–000 .........
ER12–701–001.
Omitted.
Omitted.
Omitted.
OA09–31–000 ...........
EL12–13–000 ............
E–12 ..........................
E–13 ..........................
E–14
E–15
E–16
E–17
E–18
..........................
..........................
..........................
..........................
..........................
Company
U.S. Department of Energy, Portsmouth/Paducah Project Office.
City of Holland, Michigan Board of Public Works.
Southern California Edison Company.
ISO New England, Inc. and New England Power Pool.
New York Independent System Operator, Inc.
Otter Tail Power Company.
PacifiCorp v. Utah Associated Municipal Power Systems.
Gas
G–1 ............................
G–2 ............................
RP10–1410–001 .......
RP10–1410–002.
RP10–1410–003.
RP11–1566–003 .......
RP11–1566–004.
RP11–1566–008.
RP11–1566–009.
RP11–1566–011.
RP11–2066–001.
Kern River Gas Transmission Company.
Tennessee Gas Pipeline Company, L.L.C.
Hydro
H–1 ............................
H–2 ............................
H–3 ............................
P–12632–004 ............
P–2299–076 ..............
P–2692–048 ..............
East Texas Electric Cooperative, Inc.
Turlock Irrigation District and Modesto Irrigation District.
Duke Energy Carolinas, LLC.
Certificates
C–1 ............................
C–2 ............................
C–3 ............................
C–4 ............................
C–5 ............................
C–6 ............................
CP11–539–000 .........
CP11–72–000 ...........
CP07–441–001 .........
CP07–442–001.
CP07–443–001.
CP07–444–001.
Omitted.
Omitted.
CP11–128–001 .........
wreier-aviles on DSK5TPTVN1PROD with NOTICES
Dated: April 12, 2012.
Kimberly D. Bose,
Secretary.
A free webcast of this event is
available through www.ferc.gov. Anyone
with Internet access who desires to view
this event can do so by navigating to
www.ferc.gov’s Calendar of Events and
locating this event in the Calendar. The
event will contain a link to its webcast.
The Capitol Connection provides
technical support for the free webcasts.
It also offers access to this event via
television in the DC area and via phone
bridge for a fee. If you have any
questions, visit
www.CapitolConnection.org or contact
Danelle Springer or David Reininger at
703–993–3100.
Immediately following the conclusion
of the Commission Meeting, a press
briefing will be held in the Commission
VerDate Mar<15>2010
14:27 Apr 16, 2012
Jkt 226001
ANR Pipeline Company.
Sabine Pass Liquefaction, LLC and Sabine Pass LNG, L.P.
Pacific Connector Gas Pipeline, LP
Jordan Cove Energy Project, L.P.
National Fuel Gas Supply Corporation.
Meeting Room. Members of the public
may view this briefing in the designated
overflow room. This statement is
intended to notify the public that the
press briefings that follow Commission
meetings may now be viewed remotely
at Commission headquarters, but will
not be telecast through the Capitol
Connection service.
DEPARTMENT OF ENERGY
[FR Doc. 2012–9275 Filed 4–13–12; 11:15 am]
Take notice that on March 19, 2012,
pursuant to the February 16, 2012 order
of the Federal Energy Regulatory
Commission in the above-captioned
proceeding Texas Eastern Transmission,
LP (Texas Eastern) submits its response
to show cause why it should not be
required to file revisions to its tariff
concerning reservation charge credits.
Any party desiring to file responses to
Texas Eastern’s March 19, 2012
submission must do so on or before 5
p.m. Eastern time on April 18, 2012.
BILLING CODE 6717–01–P
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
Federal Energy Regulatory
Commission
[ Docket No. RP12–318–001]
Texas Eastern Transmission, L.P.;
Notice of Response
E:\FR\FM\17APN1.SGM
17APN1
Agencies
[Federal Register Volume 77, Number 74 (Tuesday, April 17, 2012)]
[Notices]
[Pages 22772-22773]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-9275]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Sunshine Act Meeting
The following notice of meeting is published pursuant to section
3(a) of the government in the Sunshine Act (Pub. L. 94-409), 5 U.S.C.
552b:
Agency Holding Meeting: Federal Energy Regulatory Commission.
Date and Time: April 19, 2012 10 a.m.
Place: Room 2C, 888 First Street NE., Washington, DC 20426.
Status: Open.
Matters To Be Considered: Agenda
Note: Items listed on the agenda may be deleted without further
notice.
Contact Person For More Information: Kimberly D. Bose, Secretary,
Telephone (202) 502-8400.
For a recorded message listing items struck from or added to the
meeting, call (202) 502-8627.
This is a list of matters to be considered by the Commission. It
does not include a listing of all documents relevant to the items on
the agenda. All public documents, however, may be viewed on line at the
Commission's Web site at https://www.ferc.gov using the eLibrary link,
or may be examined in the Commission's Public Reference Room.
980th--Meeting; Regular Meeting
[April 19, 2012, 10 a.m.]
------------------------------------------------------------------------
Item No. Docket No. Company
------------------------------------------------------------------------
Administrative
------------------------------------------------------------------------
A-1........................ AD02-1-000................ Agency Business
Matters.
A-2........................ AD02-7-000................ Customer
Matters,
Reliability,
Security and
Market
Operations.
A-3........................ AD06-3-000................ Market Update.
------------------------------------------------------------------------
Electric
------------------------------------------------------------------------
E-1........................ ER12-480-000.............. Midwest
Independent
Transmission
System
Operator, Inc.
and
Transmission
Owners of the
Midwest
Independent
Transmission
System
Operator, Inc.
E-2........................ ER09-1063-004............. PJM
Interconnectio
n, L.L.C.
E-3........................ AD12-14-000............... Open Access and
Priority
Rights on
Interconnectio
n Facilities.
AD11-11-000............... Priority Rights
to New
Participant--F
unded
Transmission.
E-4........................ RM11-17-000............... Enhancement of
Electricity
Market
Surveillance
and Analysis
through
Ongoing
Electronic
Delivery of
Data from
Regional
Transmission
Organizations
and
Independent
System
Operators.
E-5........................ RM05-5-020................ Standards for
Business
Practices and
Communication
Protocols for
Public
Utilities.
E-6........................ RM11-11-000............... Version 4
Critical
Infrastructure
Protection
Reliability
Standards.
E-7........................ RM12-1-000................ Transmission
Planning
Reliability
Standards.
E-8........................ RM11-18-000............... Transmission
Planning
Reliability
Standards.
[[Page 22773]]
E-9........................ RC08-5-001................ U.S. Department
of Energy,
Portsmouth/
Paducah
Project
Office.
E-10....................... RC11-5-000................ City of
Holland,
Michigan Board
of Public
Works.
E-11....................... ER09-187-000.............. Southern
California
Edison
Company.
ER09-187-001.
ER10-160-000.
E-12....................... ER12-1155-000............. ISO New
England, Inc.
and New
England Power
Pool.
E-13....................... ER12-701-000.............. New York
Independent
System
Operator, Inc.
ER12-701-001.
E-14....................... Omitted.
E-15....................... Omitted.
E-16....................... Omitted.
E-17....................... OA09-31-000............... Otter Tail
Power Company.
E-18....................... EL12-13-000............... PacifiCorp v.
Utah
Associated
Municipal
Power Systems.
------------------------------------------------------------------------
Gas
------------------------------------------------------------------------
G-1........................ RP10-1410-001............. Kern River Gas
Transmission
Company.
RP10-1410-002.
RP10-1410-003.
G-2........................ RP11-1566-003............. Tennessee Gas
Pipeline
Company,
L.L.C.
RP11-1566-004.
RP11-1566-008.
RP11-1566-009.
RP11-1566-011.
RP11-2066-001.
------------------------------------------------------------------------
Hydro
------------------------------------------------------------------------
H-1........................ P-12632-004............... East Texas
Electric
Cooperative,
Inc.
H-2........................ P-2299-076................ Turlock
Irrigation
District and
Modesto
Irrigation
District.
H-3........................ P-2692-048................ Duke Energy
Carolinas,
LLC.
------------------------------------------------------------------------
Certificates
------------------------------------------------------------------------
C-1........................ CP11-539-000.............. ANR Pipeline
Company.
C-2........................ CP11-72-000............... Sabine Pass
Liquefaction,
LLC and Sabine
Pass LNG, L.P.
C-3........................ CP07-441-001.............. Pacific
Connector Gas
Pipeline, LP
CP07-442-001.
CP07-443-001.
CP07-444-001. Jordan Cove
Energy
Project, L.P.
C-4........................ Omitted.
C-5........................ Omitted.
C-6........................ CP11-128-001.............. National Fuel
Gas Supply
Corporation.
------------------------------------------------------------------------
Dated: April 12, 2012.
Kimberly D. Bose,
Secretary.
A free webcast of this event is available through www.ferc.gov.
Anyone with Internet access who desires to view this event can do so by
navigating to www.ferc.gov's Calendar of Events and locating this event
in the Calendar. The event will contain a link to its webcast. The
Capitol Connection provides technical support for the free webcasts. It
also offers access to this event via television in the DC area and via
phone bridge for a fee. If you have any questions, visit
www.CapitolConnection.org or contact Danelle Springer or David
Reininger at 703-993-3100.
Immediately following the conclusion of the Commission Meeting, a
press briefing will be held in the Commission Meeting Room. Members of
the public may view this briefing in the designated overflow room. This
statement is intended to notify the public that the press briefings
that follow Commission meetings may now be viewed remotely at
Commission headquarters, but will not be telecast through the Capitol
Connection service.
[FR Doc. 2012-9275 Filed 4-13-12; 11:15 am]
BILLING CODE 6717-01-P