Combined Notice of Filings #2, 22567-22568 [2012-9022]
Download as PDF
emcdonald on DSK29S0YB1PROD with NOTICES
Federal Register / Vol. 77, No. 73 / Monday, April 16, 2012 / Notices
Accession Number: 20120405–5190.
Comments Due: 5 p.m. ET 4/26/12.
Docket Numbers: ER11–3949–004.
Applicants: New York Independent
System Operator, Inc.
Description: New York Independent
System Operator, Inc. submits tariff
filing per 35: NYISO Compliance
filing—Verification of MP Risk Mgmt
Policies and Procedures to be effective
6/30/2012.
Filed Date: 4/5/12.
Accession Number: 20120405–5146.
Comments Due: 5 p.m. ET 4/26/12.
Docket Numbers: ER12–30–000.
Applicants: BlueStar Energy Services
Inc.
Description: BlueStar Energy Services
Inc. submits tariff filing per: Change in
Status to be effective N/A.
Filed Date: 4/5/12.
Accession Number: 20120405–5176.
Comments Due: 5 p.m. ET 4/26/12.
Docket Numbers: ER12–1223–001.
Applicants: Wildcat Wind, LLC.
Description: Supplement to
Application for Market-Based Rate
Authorization to be effective 5/1/2012.
Filed Date: 4/5/12.
Accession Number: 20120405–5136.
Comments Due: 5 p.m. ET 4/26/12.
Docket Numbers: ER12–1450–000.
Applicants: Union Electric Company.
Description: Union Electric Company
submits Notice of Cancellation of
Wholesale Distribution Agreement with
Owensville, Missouri.
Filed Date: 4/5/12.
Accession Number: 20120405–5131.
Comments Due: 5 p.m. ET 4/26/12.
Docket Numbers: ER12–1451–000.
Applicants: Entergy Arkansas, Inc.
Description: Entergy Arkansas, Inc.
submits tariff filing per 35.13(a)(2)(iii:
Brazos NITSA NOA Filing to be
effective 6/1/2012.
Filed Date: 4/5/12.
Accession Number: 20120405–5144.
Comments Due: 5 p.m. ET 4/26/12.
Docket Numbers: ER12–1452–000.
Applicants: Bangor Hydro Electric
Company.
Description: Bangor Hydro Electric
Company submits tariff filing per
35.13(a)(2)(iii: Filing of an Amended
Interconnection Agreement to be
effective 4/4/2012.
Filed Date: 4/5/12.
Accession Number: 20120405–5145.
Comments Due: 5 p.m. ET 4/26/12.
Docket Numbers: ER12–1453–000.
Applicants: ISO New England Inc.,
Fitchburg Gas and Electric Light
Company.
Description: FG&E Request for
Updated Depreciation Rates to be
effective 6/1/2012.
VerDate Mar<15>2010
14:39 Apr 13, 2012
Jkt 226001
Filed Date: 4/6/12.
Accession Number: 20120406–5055.
Comments Due: 5 p.m. ET 4/27/12.
Docket Numbers: ER12–1454–000.
Applicants: PJM Interconnection,
L.L.C.
Description: Original Service
Agreement No. 3265; Queue No. X1–042
to be effective 3/2/2012.
Filed Date: 4/6/12.
Accession Number: 20120406–5071.
Comments Due: 5 p.m. ET 4/27/12.
Docket Numbers: ER12–1455–000.
Applicants: ISO New England Inc.
Description: Revisions to FCM Rules
Related to Inf. Publication to be effective
6/5/2012.
Filed Date: 4/6/12.
Accession Number: 20120406–5072.
Comments Due: 5 p.m. ET 4/27/12.
Docket Numbers: ER12–1456–000.
Applicants: Black Hills Power, Inc.
Description: BH Power, Inc., JOATT
Replacement Sections to be effective
8/1/2011.
Filed Date: 4/6/12.
Accession Number: 20120406–5089.
Comments Due: 5 p.m. ET 4/27/12.
Docket Numbers: ER12–1457–000.
Applicants: Southern California
Edison Company.
Description: Unexecuted GIA and
Service Agreement with San Gorgonio
Farms, Inc. to be effective 3/23/2012.
Filed Date: 4/6/12.
Accession Number: 20120406–5097.
Comments Due: 5 p.m. ET 4/27/12.
Docket Numbers: ER12–1458–000.
Applicants: Southern California
Edison Company.
Description: Amended SGIA WDAT
SCE–CSDLAC for Puente Hills Project to
be effective 4/7/2012.
Filed Date: 4/6/12.
Accession Number: 20120406–5107.
Comments Due: 5 p.m. ET 4/27/12.
Docket Numbers: ER12–1459–000.
Applicants: Midwest Independent
Transmission System Operator, Inc.
Description: 04–06–2012 Attachment
L Revisions to be effective 5/7/2012.
Filed Date: 4/6/12.
Accession Number: 20120406–5124.
Comments Due: 5 p.m. ET 4/27/12.
Docket Numbers: ER12–1460–000.
Applicants: Southwest Power Pool,
Inc.
Description: 2404 Oklahoma Gas and
Electric Company Interconnection
Agreement to be effective 6/1/2012.
Filed Date: 4/6/12.
Accession Number: 20120406–5129.
Comments Due: 5 p.m. ET 4/27/12.
Take notice that the Commission
received the following electric securities
filings:
Docket Numbers: ES12–30–000.
PO 00000
Frm 00011
Fmt 4703
Sfmt 4703
22567
Applicants: Citizens Sunrise
Transmission LLC.
Description: Application for
Authorization of Issuance of Long-Term
Debt Securities under FPA Section 204
and Request for Expedited
Consideration of Citizens Sunrise
Transmission LLC.
Filed Date: 4/5/12.
Accession Number: 20120405–5188.
Comments Due: 5 p.m. ET 4/26/12.
Docket Numbers: ES12–31–000.
Applicants: American Transmission
Company LLC, ATC Management Inc.
Description: Application under
Section 204 of The Federal Power Act
for Authorization to Issue Securities of
American Transmission Company LLC.
Filed Date: 4/6/12.
Accession Number: 20120406–5082.
Comments Due: 5 p.m. ET 4/27/12.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 9, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–9023 Filed 4–13–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER12–677–001.
Applicants: ITC Midwest LLC.
Description: Compliance Filing—ITC
Midwest, Storm Lake, and IPL Joint Use
Agreement to be effective 2/21/2012.
Filed Date: 4/9/12.
Accession Number: 20120409–5070.
Comments Due: 5 p.m. ET 4/30/12.
Docket Numbers: ER12–1417–001.
E:\FR\FM\16APN1.SGM
16APN1
22568
Federal Register / Vol. 77, No. 73 / Monday, April 16, 2012 / Notices
Applicants: San Diego Gas & Electric
Company.
Description: Errata to SDGE Formula
Appendix X to be effective 6/1/2012.
Filed Date: 4/9/12.
Accession Number: 20120409–5092.
Comments Due: 5 p.m. ET 4/30/12.
Docket Numbers: ER12–1461–000.
Applicants: Florida Power
Corporation.
Description: Rate Schedule No. 200 of
Florida Power Corporation to be
effective 4/9/2012.
Filed Date: 4/9/12.
Accession Number: 20120409–5066.
Comments Due: 5 p.m. ET 4/30/12.
Take notice that the Commission
received the following open access
transmission tariff filings:
Docket Numbers: OA07–53–008.
Applicants: Carolina Power & Light
Company, Florida Power Corporation.
Description: Annual Penalty Revenues
Refund Report of Florida Power
Corporation et al.
Filed Date: 4/9/12.
Accession Number: 20120409–5051.
Comments Due: 5 p.m. ET 4/30/12.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 9, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–9022 Filed 4–13–12; 8:45 am]
BILLING CODE 6717–01–P
emcdonald on DSK29S0YB1PROD with NOTICES
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2558–000]
Central Vermont Public Service
Corporation; Notice of Authorization
for Continued Project Operation
On August 1, 2011, the Central
Vermont Public Service Corporation,
VerDate Mar<15>2010
17:23 Apr 13, 2012
Jkt 226001
licensee for the Otter Creek
Hydroelectric Project, filed an
Application for a New License pursuant
to the Federal Power Act (FPA) and the
Commission’s regulations thereunder.
The Otter Creek Hydroelectric Project is
located on Otter Creek in Addison and
Rutland counties, Vermont.
The license for Project No. 2558 was
issued for a period ending March 31,
2012. Section 15(a)(1) of the FPA, 16
U.S.C. 808(a)(1), requires the
Commission, at the expiration of a
license term, to issue from year-to-year
an annual license to the then licensee
under the terms and conditions of the
prior license until a new license is
issued, or the project is otherwise
disposed of as provided in section 15 or
any other applicable section of the FPA.
If the project’s prior license waived the
applicability of section 15 of the FPA,
then, based on section 9(b) of the
Administrative Procedure Act, 5 U.S.C.
558(c), and as set forth at 18 CFR
16.21(a), if the licensee of such project
has filed an application for a subsequent
license, the licensee may continue to
operate the project in accordance with
the terms and conditions of the license
after the minor or minor part license
expires, until the Commission acts on
its application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 2558
is issued to the Central Vermont Public
Service Corporation for a period
effective April 1, 2012 through March
31, 2013, or until the issuance of a new
license for the project or other
disposition under the FPA, whichever
comes first. If issuance of a new license
(or other disposition) does not take
place on or before March 31, 2013,
notice is hereby given that, pursuant to
18 CFR 16.18(c), an annual license
under section 15(a)(1) of the FPA is
renewed automatically without further
order or notice by the Commission,
unless the Commission orders
otherwise. If the project is not subject to
section 15 of the FPA, notice is hereby
given that the Central Vermont Public
Service Corporation is authorized to
continue operation of the Otter Creek
Hydroelectric Project, until such time as
the Commission acts on its application
for a subsequent license.
PO 00000
Frm 00012
Fmt 4703
Sfmt 4703
Dated: April 9, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–9016 Filed 4–13–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2615–000]
Madison Paper Industries, FPL Energy
Maine Hydro, LLC, Merimil Limited
Partnership; Notice of Authorization
for Continued Project Operation
On March 29, 2007, the Madison
Paper Industries, FPL Energy Maine
Hydro, LLC, and Merimil Limited
Partnership, licensees for the Brassua
Hydroelectric Project, filed an
Application for a New License pursuant
to the Federal Power Act (FPA) and the
Commission’s regulations thereunder.
The Brassua Hydroelectric Project is
located on the Moose River in Somerset
County, Maine.
The license for Project No. 2615 was
issued for a period ending March 31,
2012. Section 15(a)(1) of the FPA, 16
U.S.C. 808(a)(1), requires the
Commission, at the expiration of a
license term, to issue from year-to-year
an annual license to the then licensee
under the terms and conditions of the
prior license until a new license is
issued, or the project is otherwise
disposed of as provided in section 15 or
any other applicable section of the FPA.
If the project’s prior license waived the
applicability of section 15 of the FPA,
then, based on section 9(b) of the
Administrative Procedure Act, 5 U.S.C.
558(c), and as set forth at 18 CFR
16.21(a), if the licensee of such project
has filed an application for a subsequent
license, the licensee may continue to
operate the project in accordance with
the terms and conditions of the license
after the minor or minor part license
expires, until the Commission acts on
its application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 2615
is issued to the Madison Paper
Industries, FPL Energy Maine Hydro,
LLC, and Merimil Limited Partnership
for a period effective April 1, 2012
through March 31, 2013, or until the
E:\FR\FM\16APN1.SGM
16APN1
Agencies
[Federal Register Volume 77, Number 73 (Monday, April 16, 2012)]
[Notices]
[Pages 22567-22568]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-9022]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings 2
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER12-677-001.
Applicants: ITC Midwest LLC.
Description: Compliance Filing--ITC Midwest, Storm Lake, and IPL
Joint Use Agreement to be effective 2/21/2012.
Filed Date: 4/9/12.
Accession Number: 20120409-5070.
Comments Due: 5 p.m. ET 4/30/12.
Docket Numbers: ER12-1417-001.
[[Page 22568]]
Applicants: San Diego Gas & Electric Company.
Description: Errata to SDGE Formula Appendix X to be effective 6/1/
2012.
Filed Date: 4/9/12.
Accession Number: 20120409-5092.
Comments Due: 5 p.m. ET 4/30/12.
Docket Numbers: ER12-1461-000.
Applicants: Florida Power Corporation.
Description: Rate Schedule No. 200 of Florida Power Corporation to
be effective 4/9/2012.
Filed Date: 4/9/12.
Accession Number: 20120409-5066.
Comments Due: 5 p.m. ET 4/30/12.
Take notice that the Commission received the following open access
transmission tariff filings:
Docket Numbers: OA07-53-008.
Applicants: Carolina Power & Light Company, Florida Power
Corporation.
Description: Annual Penalty Revenues Refund Report of Florida Power
Corporation et al.
Filed Date: 4/9/12.
Accession Number: 20120409-5051.
Comments Due: 5 p.m. ET 4/30/12.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: April 9, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012-9022 Filed 4-13-12; 8:45 am]
BILLING CODE 6717-01-P