Central Vermont Public Service Corporation; Notice of Authorization for Continued Project Operation, 22568 [2012-9016]

Download as PDF 22568 Federal Register / Vol. 77, No. 73 / Monday, April 16, 2012 / Notices Applicants: San Diego Gas & Electric Company. Description: Errata to SDGE Formula Appendix X to be effective 6/1/2012. Filed Date: 4/9/12. Accession Number: 20120409–5092. Comments Due: 5 p.m. ET 4/30/12. Docket Numbers: ER12–1461–000. Applicants: Florida Power Corporation. Description: Rate Schedule No. 200 of Florida Power Corporation to be effective 4/9/2012. Filed Date: 4/9/12. Accession Number: 20120409–5066. Comments Due: 5 p.m. ET 4/30/12. Take notice that the Commission received the following open access transmission tariff filings: Docket Numbers: OA07–53–008. Applicants: Carolina Power & Light Company, Florida Power Corporation. Description: Annual Penalty Revenues Refund Report of Florida Power Corporation et al. Filed Date: 4/9/12. Accession Number: 20120409–5051. Comments Due: 5 p.m. ET 4/30/12. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: April 9, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2012–9022 Filed 4–13–12; 8:45 am] BILLING CODE 6717–01–P emcdonald on DSK29S0YB1PROD with NOTICES DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2558–000] Central Vermont Public Service Corporation; Notice of Authorization for Continued Project Operation On August 1, 2011, the Central Vermont Public Service Corporation, VerDate Mar<15>2010 17:23 Apr 13, 2012 Jkt 226001 licensee for the Otter Creek Hydroelectric Project, filed an Application for a New License pursuant to the Federal Power Act (FPA) and the Commission’s regulations thereunder. The Otter Creek Hydroelectric Project is located on Otter Creek in Addison and Rutland counties, Vermont. The license for Project No. 2558 was issued for a period ending March 31, 2012. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the Commission, at the expiration of a license term, to issue from year-to-year an annual license to the then licensee under the terms and conditions of the prior license until a new license is issued, or the project is otherwise disposed of as provided in section 15 or any other applicable section of the FPA. If the project’s prior license waived the applicability of section 15 of the FPA, then, based on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth at 18 CFR 16.21(a), if the licensee of such project has filed an application for a subsequent license, the licensee may continue to operate the project in accordance with the terms and conditions of the license after the minor or minor part license expires, until the Commission acts on its application. If the licensee of such a project has not filed an application for a subsequent license, then it may be required, pursuant to 18 CFR 16.21(b), to continue project operations until the Commission issues someone else a license for the project or otherwise orders disposition of the project. If the project is subject to section 15 of the FPA, notice is hereby given that an annual license for Project No. 2558 is issued to the Central Vermont Public Service Corporation for a period effective April 1, 2012 through March 31, 2013, or until the issuance of a new license for the project or other disposition under the FPA, whichever comes first. If issuance of a new license (or other disposition) does not take place on or before March 31, 2013, notice is hereby given that, pursuant to 18 CFR 16.18(c), an annual license under section 15(a)(1) of the FPA is renewed automatically without further order or notice by the Commission, unless the Commission orders otherwise. If the project is not subject to section 15 of the FPA, notice is hereby given that the Central Vermont Public Service Corporation is authorized to continue operation of the Otter Creek Hydroelectric Project, until such time as the Commission acts on its application for a subsequent license. PO 00000 Frm 00012 Fmt 4703 Sfmt 4703 Dated: April 9, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–9016 Filed 4–13–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2615–000] Madison Paper Industries, FPL Energy Maine Hydro, LLC, Merimil Limited Partnership; Notice of Authorization for Continued Project Operation On March 29, 2007, the Madison Paper Industries, FPL Energy Maine Hydro, LLC, and Merimil Limited Partnership, licensees for the Brassua Hydroelectric Project, filed an Application for a New License pursuant to the Federal Power Act (FPA) and the Commission’s regulations thereunder. The Brassua Hydroelectric Project is located on the Moose River in Somerset County, Maine. The license for Project No. 2615 was issued for a period ending March 31, 2012. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the Commission, at the expiration of a license term, to issue from year-to-year an annual license to the then licensee under the terms and conditions of the prior license until a new license is issued, or the project is otherwise disposed of as provided in section 15 or any other applicable section of the FPA. If the project’s prior license waived the applicability of section 15 of the FPA, then, based on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), and as set forth at 18 CFR 16.21(a), if the licensee of such project has filed an application for a subsequent license, the licensee may continue to operate the project in accordance with the terms and conditions of the license after the minor or minor part license expires, until the Commission acts on its application. If the licensee of such a project has not filed an application for a subsequent license, then it may be required, pursuant to 18 CFR 16.21(b), to continue project operations until the Commission issues someone else a license for the project or otherwise orders disposition of the project. If the project is subject to section 15 of the FPA, notice is hereby given that an annual license for Project No. 2615 is issued to the Madison Paper Industries, FPL Energy Maine Hydro, LLC, and Merimil Limited Partnership for a period effective April 1, 2012 through March 31, 2013, or until the E:\FR\FM\16APN1.SGM 16APN1

Agencies

[Federal Register Volume 77, Number 73 (Monday, April 16, 2012)]
[Notices]
[Page 22568]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-9016]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2558-000]


Central Vermont Public Service Corporation; Notice of 
Authorization for Continued Project Operation

    On August 1, 2011, the Central Vermont Public Service Corporation, 
licensee for the Otter Creek Hydroelectric Project, filed an 
Application for a New License pursuant to the Federal Power Act (FPA) 
and the Commission's regulations thereunder. The Otter Creek 
Hydroelectric Project is located on Otter Creek in Addison and Rutland 
counties, Vermont.
    The license for Project No. 2558 was issued for a period ending 
March 31, 2012. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), 
requires the Commission, at the expiration of a license term, to issue 
from year-to-year an annual license to the then licensee under the 
terms and conditions of the prior license until a new license is 
issued, or the project is otherwise disposed of as provided in section 
15 or any other applicable section of the FPA. If the project's prior 
license waived the applicability of section 15 of the FPA, then, based 
on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c), 
and as set forth at 18 CFR 16.21(a), if the licensee of such project 
has filed an application for a subsequent license, the licensee may 
continue to operate the project in accordance with the terms and 
conditions of the license after the minor or minor part license 
expires, until the Commission acts on its application. If the licensee 
of such a project has not filed an application for a subsequent 
license, then it may be required, pursuant to 18 CFR 16.21(b), to 
continue project operations until the Commission issues someone else a 
license for the project or otherwise orders disposition of the project.
    If the project is subject to section 15 of the FPA, notice is 
hereby given that an annual license for Project No. 2558 is issued to 
the Central Vermont Public Service Corporation for a period effective 
April 1, 2012 through March 31, 2013, or until the issuance of a new 
license for the project or other disposition under the FPA, whichever 
comes first. If issuance of a new license (or other disposition) does 
not take place on or before March 31, 2013, notice is hereby given 
that, pursuant to 18 CFR 16.18(c), an annual license under section 
15(a)(1) of the FPA is renewed automatically without further order or 
notice by the Commission, unless the Commission orders otherwise. If 
the project is not subject to section 15 of the FPA, notice is hereby 
given that the Central Vermont Public Service Corporation is authorized 
to continue operation of the Otter Creek Hydroelectric Project, until 
such time as the Commission acts on its application for a subsequent 
license.

    Dated: April 9, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-9016 Filed 4-13-12; 8:45 am]
BILLING CODE 6717-01-P