Madison Paper Industries, FPL Energy Maine Hydro, LLC, Merimil Limited Partnership; Notice of Authorization for Continued Project Operation, 22568-22569 [2012-9015]
Download as PDF
22568
Federal Register / Vol. 77, No. 73 / Monday, April 16, 2012 / Notices
Applicants: San Diego Gas & Electric
Company.
Description: Errata to SDGE Formula
Appendix X to be effective 6/1/2012.
Filed Date: 4/9/12.
Accession Number: 20120409–5092.
Comments Due: 5 p.m. ET 4/30/12.
Docket Numbers: ER12–1461–000.
Applicants: Florida Power
Corporation.
Description: Rate Schedule No. 200 of
Florida Power Corporation to be
effective 4/9/2012.
Filed Date: 4/9/12.
Accession Number: 20120409–5066.
Comments Due: 5 p.m. ET 4/30/12.
Take notice that the Commission
received the following open access
transmission tariff filings:
Docket Numbers: OA07–53–008.
Applicants: Carolina Power & Light
Company, Florida Power Corporation.
Description: Annual Penalty Revenues
Refund Report of Florida Power
Corporation et al.
Filed Date: 4/9/12.
Accession Number: 20120409–5051.
Comments Due: 5 p.m. ET 4/30/12.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: April 9, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–9022 Filed 4–13–12; 8:45 am]
BILLING CODE 6717–01–P
emcdonald on DSK29S0YB1PROD with NOTICES
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2558–000]
Central Vermont Public Service
Corporation; Notice of Authorization
for Continued Project Operation
On August 1, 2011, the Central
Vermont Public Service Corporation,
VerDate Mar<15>2010
17:23 Apr 13, 2012
Jkt 226001
licensee for the Otter Creek
Hydroelectric Project, filed an
Application for a New License pursuant
to the Federal Power Act (FPA) and the
Commission’s regulations thereunder.
The Otter Creek Hydroelectric Project is
located on Otter Creek in Addison and
Rutland counties, Vermont.
The license for Project No. 2558 was
issued for a period ending March 31,
2012. Section 15(a)(1) of the FPA, 16
U.S.C. 808(a)(1), requires the
Commission, at the expiration of a
license term, to issue from year-to-year
an annual license to the then licensee
under the terms and conditions of the
prior license until a new license is
issued, or the project is otherwise
disposed of as provided in section 15 or
any other applicable section of the FPA.
If the project’s prior license waived the
applicability of section 15 of the FPA,
then, based on section 9(b) of the
Administrative Procedure Act, 5 U.S.C.
558(c), and as set forth at 18 CFR
16.21(a), if the licensee of such project
has filed an application for a subsequent
license, the licensee may continue to
operate the project in accordance with
the terms and conditions of the license
after the minor or minor part license
expires, until the Commission acts on
its application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 2558
is issued to the Central Vermont Public
Service Corporation for a period
effective April 1, 2012 through March
31, 2013, or until the issuance of a new
license for the project or other
disposition under the FPA, whichever
comes first. If issuance of a new license
(or other disposition) does not take
place on or before March 31, 2013,
notice is hereby given that, pursuant to
18 CFR 16.18(c), an annual license
under section 15(a)(1) of the FPA is
renewed automatically without further
order or notice by the Commission,
unless the Commission orders
otherwise. If the project is not subject to
section 15 of the FPA, notice is hereby
given that the Central Vermont Public
Service Corporation is authorized to
continue operation of the Otter Creek
Hydroelectric Project, until such time as
the Commission acts on its application
for a subsequent license.
PO 00000
Frm 00012
Fmt 4703
Sfmt 4703
Dated: April 9, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–9016 Filed 4–13–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2615–000]
Madison Paper Industries, FPL Energy
Maine Hydro, LLC, Merimil Limited
Partnership; Notice of Authorization
for Continued Project Operation
On March 29, 2007, the Madison
Paper Industries, FPL Energy Maine
Hydro, LLC, and Merimil Limited
Partnership, licensees for the Brassua
Hydroelectric Project, filed an
Application for a New License pursuant
to the Federal Power Act (FPA) and the
Commission’s regulations thereunder.
The Brassua Hydroelectric Project is
located on the Moose River in Somerset
County, Maine.
The license for Project No. 2615 was
issued for a period ending March 31,
2012. Section 15(a)(1) of the FPA, 16
U.S.C. 808(a)(1), requires the
Commission, at the expiration of a
license term, to issue from year-to-year
an annual license to the then licensee
under the terms and conditions of the
prior license until a new license is
issued, or the project is otherwise
disposed of as provided in section 15 or
any other applicable section of the FPA.
If the project’s prior license waived the
applicability of section 15 of the FPA,
then, based on section 9(b) of the
Administrative Procedure Act, 5 U.S.C.
558(c), and as set forth at 18 CFR
16.21(a), if the licensee of such project
has filed an application for a subsequent
license, the licensee may continue to
operate the project in accordance with
the terms and conditions of the license
after the minor or minor part license
expires, until the Commission acts on
its application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 2615
is issued to the Madison Paper
Industries, FPL Energy Maine Hydro,
LLC, and Merimil Limited Partnership
for a period effective April 1, 2012
through March 31, 2013, or until the
E:\FR\FM\16APN1.SGM
16APN1
Federal Register / Vol. 77, No. 73 / Monday, April 16, 2012 / Notices
issuance of a new license for the project
or other disposition under the FPA,
whichever comes first. If issuance of a
new license (or other disposition) does
not take place on or before March 31,
2013, notice is hereby given that,
pursuant to 18 CFR 16.18(c), an annual
license under section 15(a)(1) of the
FPA is renewed automatically without
further order or notice by the
Commission, unless the Commission
orders otherwise. If the project is not
subject to section 15 of the FPA, notice
is hereby given that the Madison Paper
Industries, FPL Energy Maine Hydro,
LLC, and Merimil Limited Partnership
are authorized to continue operation of
the Brassua Hydroelectric Project, until
such time as the Commission acts on its
application for a subsequent license.
Dated: April 9, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–9015 Filed 4–13–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
date need not serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 7 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on Monday, April 16, 2012.
Dated: April 4, 2012.
Kimberly D. Bose,
Secretary.
Federal Energy Regulatory
Commission
[Docket No. PR12–20–000]
[FR Doc. 2012–9014 Filed 4–13–12; 8:45 am]
emcdonald on DSK29S0YB1PROD with NOTICES
NorthWestern Corporation; Notice of
Petition for Rate Approval
BILLING CODE 6717–01–P
Take notice that on April 2, 2012,
NorthWestern Corporation
(NorthWestern) filed a Rate Election
pursuant to 284.123(b)(1) of the
Commissions regulations and to revise
its Statement of Operating Conditions.
NorthWestern proposes to utilize rates
that are the same as those contained in
NorthWestern’s transportation rate
schedules for comparable intrastate
service on file with the South Dakota
Public Utilities Commission as more
fully detailed in the petition.
Any person desiring to participate in
this rate filing must file in accordance
with Rules 211 and 214 of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
date as indicated below. Anyone filing
an intervention or protest must serve a
copy of that document on the Applicant.
Anyone filing an intervention or protest
on or before the intervention or protest
DEPARTMENT OF ENERGY
VerDate Mar<15>2010
14:39 Apr 13, 2012
Jkt 226001
Western Area Power Administration
Interconnection of the Grande Prairie
Wind Farm, Holt County, NE
Western Area Power
Administration, Department of Energy.
ACTION: Notice of intent to prepare an
environmental impact statement and
conduct scoping meetings; Notice of
potential floodplain and wetlands
involvement.
AGENCY:
The Western Area Power
Administration (Western), an agency of
the Department of Energy (DOE),
intends to prepare an environmental
impact statement (EIS) on the proposed
interconnection of the Grande Prairie
Wind Farm (Project) in Holt County,
near the city of O’Neill, Nebraska.
Grande Prairie Wind, LLC (Grande
Prairie Wind), a majority-owned
subsidiary of Midwest Wind Energy,
LLC, has applied to Western to
interconnect their proposed wind
energy generation project to Western’s
power transmission system. Western’s
Federal action would be to execute an
interconnection agreement with Grande
Prairie Wind and make any necessary
SUMMARY:
PO 00000
Frm 00013
Fmt 4703
Sfmt 4703
22569
modifications to the transmission
system to accommodate the
interconnection at Grande Prairie
Wind’s expense. Western is issuing this
notice to inform the public and
interested parties about Western’s intent
to prepare an EIS, conduct a public
scoping process, and invite the public to
comment on the scope, proposed action,
alternatives, and other issues to be
addressed in the EIS.
Construction activities proposed by
Grande Prairie Wind may affect
floodplains and wetlands, so this Notice
of Intent (NOI) also serves as a notice of
proposed floodplain or wetland action
in accordance with DOE floodplain and
wetland environmental review
requirements.
The public scoping period begins
with the publication of this notice and
closes on May 16, 2012. To provide the
public an opportunity to review the
proposal and project information,
Western will hold one public meeting in
O’Neill, Nebraska. Western will
announce the date and location of the
public scoping meeting through local
news media, and posting on the Western
Web site at https://www.wapa.gov/ugp/
Environment/default.htm at least 15
days prior to the meeting. While
comments will be accepted at any time
during the EIS process, submission of
comments by the end of the scoping
comment period will ensure full
consideration in the Draft EIS.
ADDRESSES: Written comments on the
scope of the EIS should be addressed to
Mr. Matt Marsh, Western Area Power
Administration, P.O. Box 35800, 2900
4th Avenue, North, Billings, MT 59107,
fax (406) 255–2900 or email at
grandeprairie@wapa.gov.
DATES:
Mr.
Matt Marsh, Western Area Power
Administration, P.O. Box 35800, 2900
4th Avenue, North, Billings, MT 59107,
telephone (406) 255–2811, or email
grandeprairie@wapa.gov. For general
information on DOE’s National
Environmental Policy Act (NEPA)
review procedures or status of a NEPA
review, contact Ms. Carol M. Borgstrom,
Director, Office of NEPA Policy and
Compliance, GC–54, U.S. Department of
Energy, 1000 Independence Avenue
SW., Washington, DC 20585, telephone
(202) 586–4600 or (800) 472–2756, fax
(202) 586–7031.
SUPPLEMENTARY INFORMATION: Western,
an agency within DOE, markets Federal
hydroelectric power to preference
customers, as specified by law. These
customers include municipalities,
cooperatives, irrigation districts, Federal
and State agencies, and Native
FOR FURTHER INFORMATION CONTACT:
E:\FR\FM\16APN1.SGM
16APN1
Agencies
[Federal Register Volume 77, Number 73 (Monday, April 16, 2012)]
[Notices]
[Pages 22568-22569]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-9015]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2615-000]
Madison Paper Industries, FPL Energy Maine Hydro, LLC, Merimil
Limited Partnership; Notice of Authorization for Continued Project
Operation
On March 29, 2007, the Madison Paper Industries, FPL Energy Maine
Hydro, LLC, and Merimil Limited Partnership, licensees for the Brassua
Hydroelectric Project, filed an Application for a New License pursuant
to the Federal Power Act (FPA) and the Commission's regulations
thereunder. The Brassua Hydroelectric Project is located on the Moose
River in Somerset County, Maine.
The license for Project No. 2615 was issued for a period ending
March 31, 2012. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1),
requires the Commission, at the expiration of a license term, to issue
from year-to-year an annual license to the then licensee under the
terms and conditions of the prior license until a new license is
issued, or the project is otherwise disposed of as provided in section
15 or any other applicable section of the FPA. If the project's prior
license waived the applicability of section 15 of the FPA, then, based
on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c),
and as set forth at 18 CFR 16.21(a), if the licensee of such project
has filed an application for a subsequent license, the licensee may
continue to operate the project in accordance with the terms and
conditions of the license after the minor or minor part license
expires, until the Commission acts on its application. If the licensee
of such a project has not filed an application for a subsequent
license, then it may be required, pursuant to 18 CFR 16.21(b), to
continue project operations until the Commission issues someone else a
license for the project or otherwise orders disposition of the project.
If the project is subject to section 15 of the FPA, notice is
hereby given that an annual license for Project No. 2615 is issued to
the Madison Paper Industries, FPL Energy Maine Hydro, LLC, and Merimil
Limited Partnership for a period effective April 1, 2012 through March
31, 2013, or until the
[[Page 22569]]
issuance of a new license for the project or other disposition under
the FPA, whichever comes first. If issuance of a new license (or other
disposition) does not take place on or before March 31, 2013, notice is
hereby given that, pursuant to 18 CFR 16.18(c), an annual license under
section 15(a)(1) of the FPA is renewed automatically without further
order or notice by the Commission, unless the Commission orders
otherwise. If the project is not subject to section 15 of the FPA,
notice is hereby given that the Madison Paper Industries, FPL Energy
Maine Hydro, LLC, and Merimil Limited Partnership are authorized to
continue operation of the Brassua Hydroelectric Project, until such
time as the Commission acts on its application for a subsequent
license.
Dated: April 9, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-9015 Filed 4-13-12; 8:45 am]
BILLING CODE 6717-01-P