Whitestone Power and Communications; Notice Concluding Pre-Filing Process and Approving Process Plan and Schedule, 21977-21978 [2012-8819]

Download as PDF Federal Register / Vol. 77, No. 71 / Thursday, April 12, 2012 / Notices is contained in this system of records should address written inquiries to the Freedom of Information Act Office (DAN–1A/FOIA), Defense Intelligence Agency, 200 MacDill Boulevard, Washington, DC 20340–0001. The individual should provide their full name, current address, and telephone number.’’ RECORD ACCESS PROCEDURES: Delete entry and replace with ‘‘Individuals seeking access to information about themselves contained in this system should address written inquiries to the Freedom of Information Act Office (DAN–1A/FOIA), Defense Intelligence Agency, 200 MacDill Boulevard, Washington, DC 20340– 0001. The individual should provide their full name, current address, and telephone number.’’ Delete entry and replace with ‘‘DIA’s rules for accessing records, for contesting contents and appealing initial agency determinations are published in DIA Instruction 5400–001 Defense Intelligence Agency Privacy Program; 32 CFR part 319 or may be obtained from the system manager.’’ RECORD SOURCE CATEGORIES: Delete entry and replace with ‘‘Individuals, Agency officials, parent service and personnel records.’’ * * * * * [FR Doc. 2012–8835 Filed 4–11–12; 8:45 am] BILLING CODE 5001–06–P DEPARTMENT OF DEFENSE Department of the Army Army Science Board Summer Study Meeting Department of the Army, DoD. Notice of open meeting. AGENCY: Pursuant to the Federal Advisory Committee Act of 1972 (5 U.S.C., Appendix, as amended), the Sunshine in the Government Act of 1976 (U.S.C. 552b, as amended) and 41 Code of the Federal Regulations (CFR 102–3.140 through 160, the Department of the Army announces the following committee meeting: Name of Committee: Army Science Board (ASB). Date(s) of Meeting: May 3, 2012. mstockstill on DSK4VPTVN1PROD with NOTICES SUMMARY: Brenda S. Bowen, Army Federal Register Liaison Officer. [FR Doc. 2012–8828 Filed 4–11–12; 8:45 am] BILLING CODE 3710–08–P CONTESTING RECORD PROCEDURES: ACTION: Time(s) of Meeting: 11 a.m. to 12 p.m. Location: Capital Conference Center, 3601 Wilson BLVD, Arlington, VA 22201. Purpose: Hear the preliminary findings of the Strategic Directions for Army Science and Technology and vote on adoption. Proposed Agenda: Open Session, the ASB will hear preliminary findings of the Strategic Directions for Army Science & Technology study and vote on adoption. FOR FURTHER INFORMATION CONTACT: Non ASB attendee’s must contact Mr. Oscar Valent at 703–617–0316, Oscar.B.Valent.ctr@mail.mil before April 26, 2012 in order to attend. SUPPLEMENTARY INFORMATION: None. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13305–002] Whitestone Power and Communications; Notice Concluding Pre-Filing Process and Approving Process Plan and Schedule a. Type of Filing: Notice of Intent To File an Application for a Hydrokinetic Pilot Project License. b. Project No.: 13305–002. c. Date Filed: August 22, 2011. d. Submitted By: Whitestone Power and Communications (Whitestone). e. Name of Project: Microturbine Hydrokinetic River-In-Stream Energy Conversion Power Project. f. Location: On the Tanana River near Delta Junction, Alaska. The project would not occupy any federal lands. g. Filed Pursuant to: 18 CFR 5.3 and 5.5 of the Commission’s regulations. h. Applicant Contact: Steven M. Selvaggio, Whitestone Power and Communications, P.O. Box 1630, Delta Junction, Alaska 99737; (907) 895–4938. i. FERC Contact: Dianne Rodman; (202) 502–6077. j. Whitestone has filed with the Commission: (1) A notice of intent (NOI) to file an application for a pilot hydrokinetic hydropower project and a draft license application with monitoring plan; (2) a request for waiver of certain Integrated Licensing Process (ILP) regulations necessary for expedited processing of a license application for a hydrokinetic pilot project; (3) a proposed process plan and schedule; and (4) a request to be designated as the non-federal representative for section 7 of the Endangered Species Act (ESA) consultation and for section 106 consultation under the National Historic Preservation Act. k. A notice was issued on August 25, 2011, soliciting comments on the draft license application from agencies and stakeholders. Comments were filed by the Alaska Department of Fish and Game. l. Whitestone was designated as the non-federal representative for section 7 of the Endangered Species Act consultation and for section 106 consultation under the National Historic Preservation Act on January 21, 2011. m. The proposed Microturbine Hydrokinetic River-In-Stream Energy Conversion Power Project would consist of: (1) A 12-foot-wide, 16-foot-diameter Poncelet undershot water wheel; (2) a 34-foot-long, 19- to 24-foot-wide aluminum-frame floatation platform mounted on a 34-foot-long, 3.5-footdiameter high-density- polyethylene (HDPE) pontoon and a 34-foot-long, 3foot-diameter HDPE pontoon; (3) a 100kilowatt turbine/generator unit; (4) a 33foot-long, 3.5-foot-wide gangway from the shore to the floating pontoon; (5) three anchoring cables to secure the flotation platform to the shore, including a 30-foot-long primary safety tether, a 117-foot-long primary cable, and a 100-foot-long secondary cable; (6) an approximately 900-foot-long transmission cable from the floatation platform to an existing Golden Valley Electric Association distribution line; and (7) appurtenant facilities. The project is anticipated to operate from April until October, with an estimated annual generation of 200 megawatthours. n. The pre-filing process has been concluded and the requisite regulations have been waived such that the process and schedule indicated below can be implemented. o. Post-filing process schedule. The post-filing process will be conducted pursuant to the following schedule. Revisions to the schedule may be made as needed. Milestones Dates Final license application expected .............................................................................................................................................. Issue notice of acceptance and ready for environmental analysis and request for interventions ............................................. VerDate Mar<15>2010 16:27 Apr 11, 2012 Jkt 226001 PO 00000 Frm 00017 Fmt 4703 21977 Sfmt 4703 E:\FR\FM\12APN1.SGM 12APN1 April 17, 2012. May 2, 2012. 21978 Federal Register / Vol. 77, No. 71 / Thursday, April 12, 2012 / Notices Milestones Dates Recommendations, Conditions, Comments and Interventions due ............................................................................................ Issue notice of availability of environmental assessment ........................................................................................................... Comments due and 10(j) resolution, if needed .......................................................................................................................... p. Register online at https://ferc.gov/ esubscribenow.htm to be notified via email of new filing and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Dated: April 5, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–8819 Filed 4–11–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PR12–21–000] mstockstill on DSK4VPTVN1PROD with NOTICES MGTC, Inc.; Notice of Petition for Rate Approval Take notice that on April 4, 2012, MGTC, Inc. (MGTC) filed a Rate Election pursuant to 284.123(b)(1) of the Commission’s regulations and to revise its Statement of Operating Conditions. MGTC proposes to utilize rates that are the same as those contained in MGTC’s transportation rate schedules for comparable intrastate service on file with the Wyoming Public Service Commission as more fully detailed in the petition. Any person desiring to participate in this rate filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the date as indicated below. Anyone filing an intervention or protest must serve a copy of that document on the Applicant. Anyone filing an intervention or protest on or before the intervention or protest date need not serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically VerDate Mar<15>2010 16:27 Apr 11, 2012 Jkt 226001 should submit an original and 7 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on Monday, April 16, 2012. Dated: April 6, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–8815 Filed 4–11–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY [FR Doc. 2012–8816 Filed 4–11–12; 8:45 am] [Docket No. AD12–3–019] BILLING CODE 6717–01–P Review of Cost Submittals by Other Federal Agencies for Administering Part I of the Federal Power Act; Notice Requesting Questions and Comments on Fiscal Year 2011 Other Federal Agency Cost Submissions In its Order On Rehearing Consolidating Administrative Annual Charges Bill Appeals And Modifying Annual Charges Billing Procedures, 109 FERC ¶ 61,040 (2004) (October 8 Order) the Commission set forth an annual process for Other Federal Agencies (OFAs) to submit their costs related to Administering Part I of the Federal Power Act. Pursuant to the established process, the Director of the Financial Management Division, Office of the Executive Director, on October 19, 2011, issued a letter requesting the OFAs to submit their costs by January 17, 2012 using the OFA Cost Submission Form. Upon receipt of the agency submissions, the Commission posted the information in eLibrary, and issued, on February 29, 2012, a notice Frm 00018 Fmt 4703 Sfmt 4703 announcing the date for a technical conference to review the submitted costs. On March 22, 2012, the Commission held the technical conference. Technical conference transcripts, submitted cost forms, and detailed supporting documents are all available for review under Docket No. AD12–3. These documents are accessible on-line at https:// www.ferc.gov, using the ‘‘eLibrary’’ link and are available for review in the Commission’s Public Reference Room in Washington, DC. Interested parties may file specific questions and comments on the FY 2011 OFA cost submissions with the Commission under Docket No. AD12–3– 019, no later than May 5, 2012. Once filed, the Commission will forward the questions and comments to the OFAs for response. Anyone with questions pertaining to the technical conference or this notice should contact W. Doug Foster at (202) 502–6118 (via email at doug.foster@ferc.gov), or Fannie Kingsberry at (202) 502–6108 (via email at fannie.kingsberry@ferc.gov). Dated: April 5, 2012. Kimberly D. Bose, Secretary. Federal Energy Regulatory Commission PO 00000 June 1, 2012. July 31, 2012. August 30, 2012. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission’s staff may attend the following meeting. Their attendance is part of the Commission’s ongoing outreach efforts. Order No. 1000 Interregional Coordination Meeting April 12, 2012 8:30 a.m.–3 p.m. (local time). The above-referenced meeting will be held at: Renaissance Oklahoma City, 10 North Broadway Avenue, Oklahoma City, Oklahoma 73102. The above-referenced meeting is open to the public. E:\FR\FM\12APN1.SGM 12APN1

Agencies

[Federal Register Volume 77, Number 71 (Thursday, April 12, 2012)]
[Notices]
[Pages 21977-21978]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-8819]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13305-002]


 Whitestone Power and Communications; Notice Concluding Pre-
Filing Process and Approving Process Plan and Schedule

    a. Type of Filing: Notice of Intent To File an Application for a 
Hydrokinetic Pilot Project License.
    b. Project No.: 13305-002.
    c. Date Filed: August 22, 2011.
    d. Submitted By: Whitestone Power and Communications (Whitestone).
    e. Name of Project: Microturbine Hydrokinetic River-In-Stream 
Energy Conversion Power Project.
    f. Location: On the Tanana River near Delta Junction, Alaska. The 
project would not occupy any federal lands.
    g. Filed Pursuant to: 18 CFR 5.3 and 5.5 of the Commission's 
regulations.
    h. Applicant Contact: Steven M. Selvaggio, Whitestone Power and 
Communications, P.O. Box 1630, Delta Junction, Alaska 99737; (907) 895-
4938.
    i. FERC Contact: Dianne Rodman; (202) 502-6077.
    j. Whitestone has filed with the Commission: (1) A notice of intent 
(NOI) to file an application for a pilot hydrokinetic hydropower 
project and a draft license application with monitoring plan; (2) a 
request for waiver of certain Integrated Licensing Process (ILP) 
regulations necessary for expedited processing of a license application 
for a hydrokinetic pilot project; (3) a proposed process plan and 
schedule; and (4) a request to be designated as the non-federal 
representative for section 7 of the Endangered Species Act (ESA) 
consultation and for section 106 consultation under the National 
Historic Preservation Act.
    k. A notice was issued on August 25, 2011, soliciting comments on 
the draft license application from agencies and stakeholders. Comments 
were filed by the Alaska Department of Fish and Game.
    l. Whitestone was designated as the non-federal representative for 
section 7 of the Endangered Species Act consultation and for section 
106 consultation under the National Historic Preservation Act on 
January 21, 2011.
    m. The proposed Microturbine Hydrokinetic River-In-Stream Energy 
Conversion Power Project would consist of: (1) A 12-foot-wide, 16-foot-
diameter Poncelet undershot water wheel; (2) a 34-foot-long, 19- to 24-
foot-wide aluminum-frame floatation platform mounted on a 34-foot-long, 
3.5-foot-diameter high-density- polyethylene (HDPE) pontoon and a 34-
foot-long, 3-foot-diameter HDPE pontoon; (3) a 100-kilowatt turbine/
generator unit; (4) a 33-foot-long, 3.5-foot-wide gangway from the 
shore to the floating pontoon; (5) three anchoring cables to secure the 
flotation platform to the shore, including a 30-foot-long primary 
safety tether, a 117-foot-long primary cable, and a 100-foot-long 
secondary cable; (6) an approximately 900-foot-long transmission cable 
from the floatation platform to an existing Golden Valley Electric 
Association distribution line; and (7) appurtenant facilities. The 
project is anticipated to operate from April until October, with an 
estimated annual generation of 200 megawatt-hours.
    n. The pre-filing process has been concluded and the requisite 
regulations have been waived such that the process and schedule 
indicated below can be implemented.
    o. Post-filing process schedule. The post-filing process will be 
conducted pursuant to the following schedule. Revisions to the schedule 
may be made as needed.

------------------------------------------------------------------------
              Milestones                             Dates
------------------------------------------------------------------------
Final license application expected...  April 17, 2012.
Issue notice of acceptance and ready   May 2, 2012.
 for environmental analysis and
 request for interventions.

[[Page 21978]]

 
Recommendations, Conditions, Comments  June 1, 2012.
 and Interventions due.
Issue notice of availability of        July 31, 2012.
 environmental assessment.
Comments due and 10(j) resolution, if  August 30, 2012.
 needed.
------------------------------------------------------------------------

    p. Register online at https://ferc.gov/esubscribenow.htm to be 
notified via email of new filing and issuances related to this or other 
pending projects. For assistance, contact FERC Online Support.

    Dated: April 5, 2012.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2012-8819 Filed 4-11-12; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.