Notice of Commission Staff Attendance, 21978-21979 [2012-8817]
Download as PDF
21978
Federal Register / Vol. 77, No. 71 / Thursday, April 12, 2012 / Notices
Milestones
Dates
Recommendations, Conditions, Comments and Interventions due ............................................................................................
Issue notice of availability of environmental assessment ...........................................................................................................
Comments due and 10(j) resolution, if needed ..........................................................................................................................
p. Register online at https://ferc.gov/
esubscribenow.htm to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: April 5, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–8819 Filed 4–11–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. PR12–21–000]
mstockstill on DSK4VPTVN1PROD with NOTICES
MGTC, Inc.; Notice of Petition for Rate
Approval
Take notice that on April 4, 2012,
MGTC, Inc. (MGTC) filed a Rate
Election pursuant to 284.123(b)(1) of the
Commission’s regulations and to revise
its Statement of Operating Conditions.
MGTC proposes to utilize rates that are
the same as those contained in MGTC’s
transportation rate schedules for
comparable intrastate service on file
with the Wyoming Public Service
Commission as more fully detailed in
the petition.
Any person desiring to participate in
this rate filing must file in accordance
with Rules 211 and 214 of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.211 and
385.214). Protests will be considered by
the Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
date as indicated below. Anyone filing
an intervention or protest must serve a
copy of that document on the Applicant.
Anyone filing an intervention or protest
on or before the intervention or protest
date need not serve motions to intervene
or protests on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
VerDate Mar<15>2010
16:27 Apr 11, 2012
Jkt 226001
should submit an original and 7 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on Monday, April 16, 2012.
Dated: April 6, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–8815 Filed 4–11–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
[FR Doc. 2012–8816 Filed 4–11–12; 8:45 am]
[Docket No. AD12–3–019]
BILLING CODE 6717–01–P
Review of Cost Submittals by Other
Federal Agencies for Administering
Part I of the Federal Power Act; Notice
Requesting Questions and Comments
on Fiscal Year 2011 Other Federal
Agency Cost Submissions
In its Order On Rehearing
Consolidating Administrative Annual
Charges Bill Appeals And Modifying
Annual Charges Billing Procedures, 109
FERC ¶ 61,040 (2004) (October 8 Order)
the Commission set forth an annual
process for Other Federal Agencies
(OFAs) to submit their costs related to
Administering Part I of the Federal
Power Act. Pursuant to the established
process, the Director of the Financial
Management Division, Office of the
Executive Director, on October 19, 2011,
issued a letter requesting the OFAs to
submit their costs by January 17, 2012
using the OFA Cost Submission Form.
Upon receipt of the agency
submissions, the Commission posted
the information in eLibrary, and issued,
on February 29, 2012, a notice
Frm 00018
Fmt 4703
Sfmt 4703
announcing the date for a technical
conference to review the submitted
costs. On March 22, 2012, the
Commission held the technical
conference. Technical conference
transcripts, submitted cost forms, and
detailed supporting documents are all
available for review under Docket No.
AD12–3. These documents are
accessible on-line at https://
www.ferc.gov, using the ‘‘eLibrary’’ link
and are available for review in the
Commission’s Public Reference Room in
Washington, DC.
Interested parties may file specific
questions and comments on the FY 2011
OFA cost submissions with the
Commission under Docket No. AD12–3–
019, no later than May 5, 2012. Once
filed, the Commission will forward the
questions and comments to the OFAs
for response.
Anyone with questions pertaining to
the technical conference or this notice
should contact W. Doug Foster at (202)
502–6118 (via email at
doug.foster@ferc.gov), or Fannie
Kingsberry at (202) 502–6108 (via email
at fannie.kingsberry@ferc.gov).
Dated: April 5, 2012.
Kimberly D. Bose,
Secretary.
Federal Energy Regulatory
Commission
PO 00000
June 1, 2012.
July 31, 2012.
August 30, 2012.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commission Staff
Attendance
The Federal Energy Regulatory
Commission (Commission) hereby gives
notice that members of the
Commission’s staff may attend the
following meeting. Their attendance is
part of the Commission’s ongoing
outreach efforts.
Order No. 1000 Interregional
Coordination Meeting
April 12, 2012
8:30 a.m.–3 p.m. (local time).
The above-referenced meeting will be
held at: Renaissance Oklahoma City, 10
North Broadway Avenue, Oklahoma
City, Oklahoma 73102.
The above-referenced meeting is open
to the public.
E:\FR\FM\12APN1.SGM
12APN1
Federal Register / Vol. 77, No. 71 / Thursday, April 12, 2012 / Notices
Further information may be found at
www.misoenergy.org or www.spp.org.
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
No.
No.
No.
No.
No.
No.
No.
No.
No.
EL12–24 ................................
EL12–28 ................................
ER12–1357 ............................
ER12–715 ..............................
ER12–480 ..............................
ER12–309 ..............................
ER11–1844 ............................
EL11–56 ................................
EL11–30 ................................
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
Docket
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
OA08–53 ...............................
ER09–35 ................................
ER09–36 ................................
ER09–548 ..............................
ER11–4105 ............................
EL11–34 ................................
ER11–3967 ............................
ER11–3967 ............................
ER12–1179 ............................
OA07–32 ...............................
EL00–66 ................................
EL01–88 ................................
EL07–52 ................................
EL08–51 ................................
EL08–60 ................................
EL09–43 ................................
EL09–50 ................................
EL09–61 ................................
EL10–55 ................................
EL10–65 ................................
EL11–34 ................................
ER05–1065 ............................
ER07–682 ..............................
ER07–956 ..............................
ER08–1056 ............................
ER09–833 ..............................
ER09–1224 ............................
ER10–794 ..............................
ER10–1350 ............................
ER10–1676 ............................
ER10–2001 ............................
ER10–3357 ............................
ER11–2131 ............................
ER11–2132 ............................
ER11–2133 ............................
ER11–2134 ............................
ER11–2135 ............................
ER11–2136 ............................
ER11–3156 ............................
ER11–3657 ............................
ER12–480 ..............................
mstockstill on DSK4VPTVN1PROD with NOTICES
The discussions at the meeting
described above may address matters at
issue in the following proceedings:
Pioneer Transmission LLC.
Xcel Energy.
Louisville Gas and Electric Company.
Midwest Independent Transmission System Operator, Inc.
Midwest Independent Transmission System Operator, Inc.
Midwest Independent Transmission System Operator, Inc.
Midwest Independent Transmission System Operator, Inc.
FirstEnergy Service Company.
E.ON Climate & Renewables North America, LLC v. Midwest Independent Transmission System
Operator, Inc.
Midwest Independent Transmission System Operator, Inc.
Tallgrass Transmission, LLC.
Prairie Wind Transmission, LLC.
ITC Great Plains, LLC.
Southwest Power Pool, Inc.
Midwest Independent Transmission System Operator, Inc.
Southwest Power Pool, Inc.
Southwest Power Pool, Inc.
Southwest Power Pool, Inc.
Entergy Services, Inc.
Louisiana Public Service Commission v. Entergy Services, Inc.
Louisiana Public Service Commission v. Entergy Services, Inc.
Louisiana Public Service Commission v. Entergy Services, Inc.
Louisiana Public Service Commission v. Entergy Services, Inc.
Ameren Services Co. v. Entergy Services, Inc.
Arkansas Public Service Commission v. Entergy Services, Inc.
Louisiana Public Service Commission v. Entergy Services, Inc.
Louisiana Public Service Commission v. Entergy Services, Inc.
Louisiana Public Service Commission v. Entergy Services, Inc.
Louisiana Public Service Commission v. Entergy Services, Inc.
Midwest Independent System Transmission Operator, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Entergy Services, Inc.
Entergy Arkansas, Inc.
Entergy Arkansas, Inc.
Entergy Arkansas, Inc.
Entergy Gulf States, Louisiana, LLC
Entergy Gulf States, Louisiana, LLC
Entergy Mississippi, Inc.
Entergy New Orleans, Inc.
Entergy Texas, Inc.
Entergy Arkansas, Inc.
Entergy Arkansas, Inc.
Midwest Independent Transmission System Operator, Inc.
For more information, contact Zeny
Magos, Office of Energy Markets
Regulation, Federal Energy Regulatory
Commission at (202) 502–8244 or
zeny.magos@ferc.gov.
Dated: April 5, 2012.
Kimberly D. Bose,
Secretary.
attend the meeting noted below. Their
attendance is part of the Commission’s
ongoing outreach efforts.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of FERC Staff Attendance at the
Entergy Regional State Committee
Working Group and Stakeholder
Meeting
[FR Doc. 2012–8817 Filed 4–11–12; 8:45 am]
The Federal Energy Regulatory
Commission (Commission) hereby gives
notice that members of its staff may
BILLING CODE 6717–01–P
Docket No. OA07–32 ...............................
Docket No. EL00–66 ................................
Docket No. EL01–88 ................................
VerDate Mar<15>2010
16:27 Apr 11, 2012
Jkt 226001
21979
Entergy Regional State Committee
Working Group and Stakeholder
Meeting
April 17, 2012 (9 a.m.–3 p.m.)
This meeting will be held at the Pan
American Life Center, 601 Poydras
Street, New Orleans, LA 70130.
The discussions may address matters
at issue in the following proceedings:
Entergy Services, Inc.
Louisiana Public Service Commission v. Entergy Services, Inc.
Louisiana Public Service Commission v. Entergy Services, Inc.
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
E:\FR\FM\12APN1.SGM
12APN1
Agencies
[Federal Register Volume 77, Number 71 (Thursday, April 12, 2012)]
[Notices]
[Pages 21978-21979]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-8817]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Commission Staff Attendance
The Federal Energy Regulatory Commission (Commission) hereby gives
notice that members of the Commission's staff may attend the following
meeting. Their attendance is part of the Commission's ongoing outreach
efforts.
Order No. 1000 Interregional Coordination Meeting
April 12, 2012
8:30 a.m.-3 p.m. (local time).
The above-referenced meeting will be held at: Renaissance Oklahoma
City, 10 North Broadway Avenue, Oklahoma City, Oklahoma 73102.
The above-referenced meeting is open to the public.
[[Page 21979]]
Further information may be found at www.misoenergy.org or
www.spp.org.
The discussions at the meeting described above may address matters
at issue in the following proceedings:
Docket No. EL12-24................................ Pioneer Transmission
LLC.
Docket No. EL12-28................................ Xcel Energy.
Docket No. ER12-1357.............................. Louisville Gas and
Electric Company.
Docket No. ER12-715............................... Midwest Independent
Transmission System
Operator, Inc.
Docket No. ER12-480............................... Midwest Independent
Transmission System
Operator, Inc.
Docket No. ER12-309............................... Midwest Independent
Transmission System
Operator, Inc.
Docket No. ER11-1844.............................. Midwest Independent
Transmission System
Operator, Inc.
Docket No. EL11-56................................ FirstEnergy Service
Company.
Docket No. EL11-30................................ E.ON Climate &
Renewables North
America, LLC v.
Midwest Independent
Transmission System
Operator, Inc.
Docket No. OA08-53................................ Midwest Independent
Transmission System
Operator, Inc.
Docket No. ER09-35................................ Tallgrass
Transmission, LLC.
Docket No. ER09-36................................ Prairie Wind
Transmission, LLC.
Docket No. ER09-548............................... ITC Great Plains,
LLC.
Docket No. ER11-4105.............................. Southwest Power
Pool, Inc.
Docket No. EL11-34................................ Midwest Independent
Transmission System
Operator, Inc.
Docket No. ER11-3967.............................. Southwest Power
Pool, Inc.
Docket No. ER11-3967.............................. Southwest Power
Pool, Inc.
Docket No. ER12-1179.............................. Southwest Power
Pool, Inc.
Docket No. OA07-32................................ Entergy Services,
Inc.
Docket No. EL00-66................................ Louisiana Public
Service Commission
v. Entergy
Services, Inc.
Docket No. EL01-88................................ Louisiana Public
Service Commission
v. Entergy
Services, Inc.
Docket No. EL07-52................................ Louisiana Public
Service Commission
v. Entergy
Services, Inc.
Docket No. EL08-51................................ Louisiana Public
Service Commission
v. Entergy
Services, Inc.
Docket No. EL08-60................................ Ameren Services Co.
v. Entergy
Services, Inc.
Docket No. EL09-43................................ Arkansas Public
Service Commission
v. Entergy
Services, Inc.
Docket No. EL09-50................................ Louisiana Public
Service Commission
v. Entergy
Services, Inc.
Docket No. EL09-61................................ Louisiana Public
Service Commission
v. Entergy
Services, Inc.
Docket No. EL10-55................................ Louisiana Public
Service Commission
v. Entergy
Services, Inc.
Docket No. EL10-65................................ Louisiana Public
Service Commission
v. Entergy
Services, Inc.
Docket No. EL11-34................................ Midwest Independent
System Transmission
Operator, Inc.
Docket No. ER05-1065.............................. Entergy Services,
Inc.
Docket No. ER07-682............................... Entergy Services,
Inc.
Docket No. ER07-956............................... Entergy Services,
Inc.
Docket No. ER08-1056.............................. Entergy Services,
Inc.
Docket No. ER09-833............................... Entergy Services,
Inc.
Docket No. ER09-1224.............................. Entergy Services,
Inc.
Docket No. ER10-794............................... Entergy Services,
Inc.
Docket No. ER10-1350.............................. Entergy Services,
Inc.
Docket No. ER10-1676.............................. Entergy Services,
Inc.
Docket No. ER10-2001.............................. Entergy Arkansas,
Inc.
Docket No. ER10-3357.............................. Entergy Arkansas,
Inc.
Docket No. ER11-2131.............................. Entergy Arkansas,
Inc.
Docket No. ER11-2132.............................. Entergy Gulf States,
Louisiana, LLC
Docket No. ER11-2133.............................. Entergy Gulf States,
Louisiana, LLC
Docket No. ER11-2134.............................. Entergy Mississippi,
Inc.
Docket No. ER11-2135.............................. Entergy New Orleans,
Inc.
Docket No. ER11-2136.............................. Entergy Texas, Inc.
Docket No. ER11-3156.............................. Entergy Arkansas,
Inc.
Docket No. ER11-3657.............................. Entergy Arkansas,
Inc.
Docket No. ER12-480............................... Midwest Independent
Transmission System
Operator, Inc.
For more information, contact Zeny Magos, Office of Energy Markets
Regulation, Federal Energy Regulatory Commission at (202) 502-8244 or
zeny.magos@ferc.gov.
Dated: April 5, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-8817 Filed 4-11-12; 8:45 am]
BILLING CODE 6717-01-P