Environmental Impacts Statements; Notice of Availability, 19281-19282 [2012-7690]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 77, No. 62 / Friday, March 30, 2012 / Notices
calculations, and how good is the
available data?
Æ What methods can be used to
determine reserve zones?
(2) Optimal transmission switching:
D Simple optimal DC transmission
switching appears to represent a
potentially solvable technical problem
using existing computational resources
if transmission operators optimize only
a small number of transmission switch
positions. It is less clear whether
transmission switching model
formulations that include realistic
representations of reliability
requirements are solvable. What is the
performance of these more complex
model formulations?
D What additional computational
impediments, if any, exist to
implementing optimal transmission
switching over a small number of
switches while maintaining reliability?
D What steps toward optimal
transmission switching might be taken
over the next 5 to 10 years?
(3) AC optimal power flow modeling:
D What is the current state of
computational capability with respect to
dependably solving AC optimal power
flow problems, including analysis of
power system reliability?
D Discussions during previous
conferences have centered on concerns
that current system data quality might
not allow for an AC optimal power flow
model to be properly formulated and
solved. What are the specific data
concerns, and what needs to be done to
address them?
D What steps toward use of AC
optimal power flow modeling might be
taken over the next 5 to 10 years?
(4) Adaptive and dynamic
transmission ratings:
D Previous presentations examined
the use of post-contingency analysis
when determining transmission ratings,
including consideration of availability
of ramping capability. How can (or
have) adaptive transmission ratings
been implemented?
D Previous presentations also
examined how transmission ratings
might be updated in real time in
response to ambient conditions. How
have such dynamic transmission ratings
been implemented?
D What are the data or computational
challenges associated with
implementing adaptive or dynamic
transmission ratings?
While the topics suggested above are
largely forward-looking, we also
encourage proposals for presentations
on best practices and other analyses of
current operations with respect to these
and related topics.
VerDate Mar<15>2010
19:11 Mar 29, 2012
Jkt 226001
The technical conference will be held
in the Commission Meeting Room at the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426. All interested participants are
invited to attend, and participants with
ideas for relevant presentations are
invited to nominate themselves to speak
at the conference.
Speaker nominations must be
submitted on or before April 27, 2012
through the Commission’s Web site 2 by
providing the proposed speaker’s
contact information along with a title,
abstract, and list of contributing authors
for the proposed presentation. Proposed
presentations should be closely related
to the topics discussed above. Speakers
and presentations will be selected to
ensure relevant topics and to
accommodate time constraints.
Although registration is not required
for general attendance by U.S. citizens,
we encourage those planning to attend
the conference to register through the
Commission’s Web site.3 We will
provide printed nametags for those who
register on or before June 20, 2012.
Due to new security procedures, we
strongly encourage attendees who are
not citizens of the United States to
register for the conference by June 1,
2012, in order to avoid any delay
associated with being processed by
FERC security.
Following the conferences, a
comment date will be set for the filing
of post-conference comments.
There is an ‘‘eSubscription’’ link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
866 208–3676 (toll free). For TTY, call
202 502–8659.
A free webcast of this event will be
available through the FERC Web site.
Webcast viewers will not be able to
participate during the technical
conference. Anyone with Internet access
interested in viewing the webcast of this
conference can do so by navigating to
Calendar of Events at www.ferc.gov. The
events will contain a link to the
webcast. The Capitol Connection
provides technical support for the
webcasts and offers the option of
listening to the conferences via phonebridge for a fee. If you have any
questions, visit
2 The speaker nomination form is located at
https://www.ferc.gov/whats-new/registration/realmarket-6-25-12-speaker-form.asp.
3 The registration form is located at https://
www.ferc.gov/whats-new/registration/real-market-625-12-form.asp.
PO 00000
Frm 00105
Fmt 4703
Sfmt 4703
19281
www.CapitolConnection.org or call (703)
993–3100.
FERC conferences are accessible
under section 508 of the Rehabilitation
Act of 1973. For accessibility
accommodations please send an email
to accessibility@ferc.gov or call toll free
(866) 208–3372 (voice) or (202) 502–
8659 (TTY), or send a fax to (202) 208–
2106 with the required
accommodations.
For further information about these
conferences, please contact:
Sarah McKinley (Logistical
Information), Office of External
Affairs, (202) 502–8004,
Sarah.McKinley@ferc.gov.
Brian Bak (Technical Information),
Office of Energy Policy and
Innovation, (202) 502–6574,
Brian.Bak@ferc.gov.
Dated: March 26, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–7643 Filed 3–29–12; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–9002–3]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7146 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 03/19/2012 Through 03/23/2012
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act
requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EISs are available at: https://
www.epa.gov/compliance/nepa/
eisdata.html.
EIS No. 20120080, Revised Final EIS,
USACE, FL, Central and Southern
Florida Project, Broward County
Water Preserve Areas, Updates
Resulting from Policy Changes that
occurred since 2007 Civil Works
Board Approval, South Florida Water
Management District (SFWMD),
Comprehensive Everglades
Restoration Plan, (CERP), Broward
County, FL, Review Period Ends: 04/
30/2012, Contact: Angela E. Dunn
904–232–2108.
EIS No. 20120081, Draft EIS, USFWS,
AK, Izembek National Wildlife Refuge
Land Exchange/Road Corridor,
E:\FR\FM\30MRN1.SGM
30MRN1
mstockstill on DSK4VPTVN1PROD with NOTICES
19282
Federal Register / Vol. 77, No. 62 / Friday, March 30, 2012 / Notices
Proposed Land Exchange for the
Purpose of Construction of a Road
between Communities of King Cove
and Cold Bay, USACE Section 10 and
404 Permits, AK, Comment Period
Ends: 05/18/2012, Contact: Stephanie
Brady 907–786–3357.
EIS No. 20120082, Final EIS, USFS, OR,
Snow Basin Vegetation Management
Project, Proposal to Implementing
Commercial Harvest of Timber, Post
Harvest Non-commercial Thinning,
Whitman Ranger District, WallowaWhitman Forest, Baker County, OR,
Review Period Ends: 04/30/2012,
Contact: Dea Nelson 541–523–6391.
EIS No. 20120083, Final Supplement,
BLM, NV, Upper Las Vegas Wash
Conservation Transfer Area (CTA),
Propose to Establish a Final
Boundary, Implementation, Clark
County, NV, Review Period Ends: 04/
30/2012, Contact: Gayle Marrs-Smith
702–515–5156.
EIS No. 20120084, Final EIS, USFS, FL,
City of Tallahassee Southwestern
Transmission Line Project, Proposes
to Construct, Operate and Maintain a
New Overhead 230-kilovolt (kV),
Electric Transmission Line, SpecialUse-Permit (SUP), Apalachicola
National Forest (ANF), Leon County,
FL, Review Period Ends: 04/30/2012,
Contact: Harold Shenk 850–926–3561.
EIS No. 20120085, Final EIS, USN, WA,
Trident Support Facilities Explosives
Handling Wharf (EHW–2), New
Information, Construction and
Operating, Naval Base Kitsap Bangor,
Silverdale, WA, Review Period Ends:
04/30/2012, Contact: Christine
Stevenson 360–396–0080.
EIS No. 20120086, Draft EIS, DOE, CO,
Granby Pumping Plant Switchyard—
Windy Gap Substation Transmission
Line Rebuild, To Replace Existing
Transmission Line with Double
Circuit Transmission, Grand County,
CO, Comment Period Ends: 05/29/
2012, Contact: Jim Hartman 720–962–
7255.
EIS No. 20120087, Draft EIS, USFS, OR,
Eden Ridge Timber Sales,
Implementation, Powers Ranger
District, Rogue River-Siskiyou
National Forest, Coos County, OR,
Comment Period Ends: 05/14/2012,
Contact: Wesley Crum 541–439–6200.
EIS No. 20120088, Second Draft EIS
(Tiering), FHWA, IL, TIER 2—Elgin
O’Hare—West Bypass, Extending the
Planning Period from 2030 to 2040,
Federal Approvals and Funding, Cook
and DuPage Counties, IL, Comment
Period Ends: 05/14/2012, Contact:
Norman Stoner 217–492–4600.
The U.S. Department of
Transportation’s Federal Highway
VerDate Mar<15>2010
19:11 Mar 29, 2012
Jkt 226001
Administration and the Federal
Aviation Administration are Joint Lead
agencies for this project.
EIS No. 20120089, Final EIS, USFS, CA,
Greys Mountain Ecological
Restoration Project, Proposed Forest
Management Treatments to Reduce
Fire Hazard and Restore Forest
Health, Sierra National Forest, Bass
Lake Ranger District, Madera and
Mariposa Counties, CA, Review Period
Ends: 04/30/2012, Contact: Burt
Stalter 559–887–2218 ext. 3208.
EIS No. 20120090, Draft EIS, USAF, AK,
Modernization and Enhancement of
Ranges, Airspace, and Training Areas
in the Joint Pacific Alaska Range
Complex, AK, Comment Period Ends:
06/07/2012, Contact: Mark Peterson
808–449–1078.
The U.S. Army and the U.S. Air Force
are Joint Lead agencies for this project.
EIS No. 20120091, Second Draft
Supplement, BLM, AK, National
Petroleum Reserve -Alaska (NPR–A)
Integrated Activity Plan, To
Determine Appropriate Management
for BLM–Administrated Lands in the
NPR–A, North Slope Borough, AK,
Comment Period Ends: 05/29/2012,
Contact: Jim Ducker 907–271–3130.
EIS No. 20120092, Final EIS, USACE,
LA, Louisiana Coastal Area Barataria
Basin Barrier Shoreline Restoration,
To Restore the Barrier Shoreline
Ecosystem and Significantly Reduce
the Loss of Estuarine and Freshwater
Wetlands, Caminada Headland in
Lafourche and Jefferson Parishes and
Shell Islands in Plaquemines Parish,
LA, Review Period Ends: 04/30/2012,
Contact: Dr. William P. Klein, Jr. 504–
862–2540.
Amended Notices
EIS No. 20110440, Revised Draft EIS,
USFS, ID, Idaho Panhandle National
Forests, Land Management Plan,
Revises the 1987 Forest Plan,
Implementation, Boundary, Bonner,
Kootenai, Benewah, and Shoshone
Counties, ID and Pend Oreille County,
WA, Comment Period Ends: 05/07/
2012, Contact: Mary Farnsworth 208–
765–7223. Revision to FR Notice
Published 01/13/2012; Extending
Comment Period from 04/4/2012 to
05/07/2012.
EIS No. 20110441, Revised Draft EIS,
USFS, MT, Kootenai National Forest
Land Management Plan, Revises the
1987 Forest Plan, Implementation,
Lincoln, Sanders, Flathead Counties,
MT and Bonner and Boundary
Counties, ID, Comment Period Ends:
04/04/2012, Contact: Paul Bradford
406–293–6211.
PO 00000
Frm 00106
Fmt 4703
Sfmt 4703
Revision to FR Notice Published 01/
06/2012; Extending Comment Period
from 04/04/2012 to 05/07/2012.
EIS No. 20120028, Draft EIS, USACE,
CA, Clearwater Program, To Meet the
Wastewater Management Needs of the
Joint Outfall System (JOS) Through
the Year 2050, Near San Pedro,
Section 404 Permit, Los Angeles
County, CA, Comment Period Ends:
04/10/2012, Contact: Dr. Aaron O.
Allen 805–585–2148.
Revision to FR Notice Published
2/10/2012; Comment Period Ends 04/
10/2012.
Dated: March 27, 2012.
Cliff Rader,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 2012–7690 Filed 3–29–12; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–9650–8]
Draft NPDES General Permit for
Discharges From the Oil and Gas
Extraction Point Source Category to
Coastal Waters in Texas (TXG330000)
Environmental Protection
Agency (EPA).
ACTION: Proposal of NPDES General
Permit Renewal.
AGENCY:
EPA Region 6 today proposes
a National Pollutant Discharge
Elimination System (NPDES) general
permit regulating discharges from oil
and gas wells in the Coastal Subcategory
in Texas and in the Stripper
Subcategory which discharge into
coastal waters in Texas.
DATES: Comments must be received by
May 14, 2012.
ADDRESSES: Comments should be sent
to: Ms. Diane Smith (6WQ–NP), U.S.
Environmental Protection Agency,
Region 6, 1445 Ross Avenue, Dallas,
Texas 75202–2733.
Comments may also be submitted via
EMAIL to the following address:
smith.diane@epa.gov.
SUMMARY:
Public Meeting/Public Hearing
Information
A public meeting and a public hearing
on the proposed permit will be held at
the times and place below. The meeting
will include a presentation on the
proposed permit followed by the
opportunity for questions and answers.
The public hearing will be held in
accordance with the requirements of 40
CFR 124.12. At the public hearing, any
person may submit oral or written
E:\FR\FM\30MRN1.SGM
30MRN1
Agencies
[Federal Register Volume 77, Number 62 (Friday, March 30, 2012)]
[Notices]
[Pages 19281-19282]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-7690]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-9002-3]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7146 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 03/19/2012 Through 03/23/2012
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act requires that EPA make public
its comments on EISs issued by other Federal agencies. EPA's comment
letters on EISs are available at: https://www.epa.gov/compliance/nepa/eisdata.html.
EIS No. 20120080, Revised Final EIS, USACE, FL, Central and Southern
Florida Project, Broward County Water Preserve Areas, Updates Resulting
from Policy Changes that occurred since 2007 Civil Works Board
Approval, South Florida Water Management District (SFWMD),
Comprehensive Everglades Restoration Plan, (CERP), Broward County, FL,
Review Period Ends: 04/30/2012, Contact: Angela E. Dunn 904-232-2108.
EIS No. 20120081, Draft EIS, USFWS, AK, Izembek National Wildlife
Refuge Land Exchange/Road Corridor,
[[Page 19282]]
Proposed Land Exchange for the Purpose of Construction of a Road
between Communities of King Cove and Cold Bay, USACE Section 10 and 404
Permits, AK, Comment Period Ends: 05/18/2012, Contact: Stephanie Brady
907-786-3357.
EIS No. 20120082, Final EIS, USFS, OR, Snow Basin Vegetation Management
Project, Proposal to Implementing Commercial Harvest of Timber, Post
Harvest Non-commercial Thinning, Whitman Ranger District, Wallowa-
Whitman Forest, Baker County, OR, Review Period Ends: 04/30/2012,
Contact: Dea Nelson 541-523-6391.
EIS No. 20120083, Final Supplement, BLM, NV, Upper Las Vegas Wash
Conservation Transfer Area (CTA), Propose to Establish a Final
Boundary, Implementation, Clark County, NV, Review Period Ends: 04/30/
2012, Contact: Gayle Marrs-Smith 702-515-5156.
EIS No. 20120084, Final EIS, USFS, FL, City of Tallahassee Southwestern
Transmission Line Project, Proposes to Construct, Operate and Maintain
a New Overhead 230-kilovolt (kV), Electric Transmission Line, Special-
Use-Permit (SUP), Apalachicola National Forest (ANF), Leon County, FL,
Review Period Ends: 04/30/2012, Contact: Harold Shenk 850-926-3561.
EIS No. 20120085, Final EIS, USN, WA, Trident Support Facilities
Explosives Handling Wharf (EHW-2), New Information, Construction and
Operating, Naval Base Kitsap Bangor, Silverdale, WA, Review Period
Ends: 04/30/2012, Contact: Christine Stevenson 360-396-0080.
EIS No. 20120086, Draft EIS, DOE, CO, Granby Pumping Plant Switchyard--
Windy Gap Substation Transmission Line Rebuild, To Replace Existing
Transmission Line with Double Circuit Transmission, Grand County, CO,
Comment Period Ends: 05/29/2012, Contact: Jim Hartman 720-962-7255.
EIS No. 20120087, Draft EIS, USFS, OR, Eden Ridge Timber Sales,
Implementation, Powers Ranger District, Rogue River-Siskiyou National
Forest, Coos County, OR, Comment Period Ends: 05/14/2012, Contact:
Wesley Crum 541-439-6200.
EIS No. 20120088, Second Draft EIS (Tiering), FHWA, IL, TIER 2--Elgin
O'Hare--West Bypass, Extending the Planning Period from 2030 to 2040,
Federal Approvals and Funding, Cook and DuPage Counties, IL, Comment
Period Ends: 05/14/2012, Contact: Norman Stoner 217-492-4600.
The U.S. Department of Transportation's Federal Highway
Administration and the Federal Aviation Administration are Joint Lead
agencies for this project.
EIS No. 20120089, Final EIS, USFS, CA, Greys Mountain Ecological
Restoration Project, Proposed Forest Management Treatments to Reduce
Fire Hazard and Restore Forest Health, Sierra National Forest, Bass
Lake Ranger District, Madera and Mariposa Counties, CA, Review Period
Ends: 04/30/2012, Contact: Burt Stalter 559-887-2218 ext. 3208.
EIS No. 20120090, Draft EIS, USAF, AK, Modernization and Enhancement of
Ranges, Airspace, and Training Areas in the Joint Pacific Alaska Range
Complex, AK, Comment Period Ends: 06/07/2012, Contact: Mark Peterson
808-449-1078.
The U.S. Army and the U.S. Air Force are Joint Lead agencies for
this project.
EIS No. 20120091, Second Draft Supplement, BLM, AK, National Petroleum
Reserve -Alaska (NPR-A) Integrated Activity Plan, To Determine
Appropriate Management for BLM-Administrated Lands in the NPR-A, North
Slope Borough, AK, Comment Period Ends: 05/29/2012, Contact: Jim Ducker
907-271-3130.
EIS No. 20120092, Final EIS, USACE, LA, Louisiana Coastal Area
Barataria Basin Barrier Shoreline Restoration, To Restore the Barrier
Shoreline Ecosystem and Significantly Reduce the Loss of Estuarine and
Freshwater Wetlands, Caminada Headland in Lafourche and Jefferson
Parishes and Shell Islands in Plaquemines Parish, LA, Review Period
Ends: 04/30/2012, Contact: Dr. William P. Klein, Jr. 504-862-2540.
Amended Notices
EIS No. 20110440, Revised Draft EIS, USFS, ID, Idaho Panhandle National
Forests, Land Management Plan, Revises the 1987 Forest Plan,
Implementation, Boundary, Bonner, Kootenai, Benewah, and Shoshone
Counties, ID and Pend Oreille County, WA, Comment Period Ends: 05/07/
2012, Contact: Mary Farnsworth 208-765-7223. Revision to FR Notice
Published 01/13/2012; Extending Comment Period from 04/4/2012 to 05/07/
2012.
EIS No. 20110441, Revised Draft EIS, USFS, MT, Kootenai National Forest
Land Management Plan, Revises the 1987 Forest Plan, Implementation,
Lincoln, Sanders, Flathead Counties, MT and Bonner and Boundary
Counties, ID, Comment Period Ends: 04/04/2012, Contact: Paul Bradford
406-293-6211.
Revision to FR Notice Published 01/06/2012; Extending Comment
Period from 04/04/2012 to 05/07/2012.
EIS No. 20120028, Draft EIS, USACE, CA, Clearwater Program, To Meet the
Wastewater Management Needs of the Joint Outfall System (JOS) Through
the Year 2050, Near San Pedro, Section 404 Permit, Los Angeles County,
CA, Comment Period Ends: 04/10/2012, Contact: Dr. Aaron O. Allen 805-
585-2148.
Revision to FR Notice Published 2/10/2012; Comment Period Ends 04/
10/2012.
Dated: March 27, 2012.
Cliff Rader,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 2012-7690 Filed 3-29-12; 8:45 am]
BILLING CODE 6560-50-P