21. Project Sponsor and Facility:
Williams Production Appalachia, LLC
(Middle Branch Wyalusing Creek),
Forest Lake Township, Susquehanna
County, Pa. Surface water withdrawal of
up to 0.750 mgd.
22. Project Sponsor and Facility:
Williams Production Appalachia, LLC
(Snake Creek–2), Franklin Township,
Susquehanna County, Pa. Surface water
withdrawal of up to 0.999 mgd.
23. Project Sponsor and Facility:
Williams Production Appalachia, LLC
(Susquehanna River), Great Bend
Township, Susquehanna County, Pa.
Commission-initiated modification to
project features and conditions of the
surface water withdrawal approval
(Docket No. 20090303), making a
correction and reducing the approved
surface water withdrawal amount from
3.00 mgd to 1.00 mgd.
24. Project Sponsor and Facility:
Williams Production Appalachia, LLC
(Susquehanna River–2), Great Bend
Township, Susquehanna County, Pa.
Surface water withdrawal of up to 2.000
mgd.
Authority: Pub. L. 91–575, 84 Stat. 1509
et seq., 18 CFR parts 806, 807, and 808.
Dated: March 23, 2012.
Thomas W. Beauduy,
Deputy Executive Director.
[FR Doc. 2012–7552 Filed 3–28–12; 8:45 am]
BILLING CODE 7040–01–P
SUSQUEHANNA RIVER BASIN
COMMISSION
Actions Taken at March 15, 2012,
Meeting
Susquehanna River Basin
Commission.
ACTION: Notice.
AGENCY:
As part of its regular business
meeting held on March 15, 2012, in
Harrisburg, Pennsylvania, the
Commission took the following actions:
(1) Reconsidered certain actions taken at
its December 15, 2011, public hearing;
(2) upon reconsideration, approved or
denied the applications of certain water
resources projects, originally considered
at the December 15, 2011, public
hearing; (3) rescinded approval for one
additional water resources project; (4)
approved, tabled or denied the
applications of certain additional water
resources projects; and (5) took
additional actions as set forth in the
Supplementary Information below.
DATES: March 15, 2012.
ADDRESSES: Susquehanna River Basin
Commission, 1721 N. Front Street,
Harrisburg, PA 17102–2391.
mstockstill on DSK4VPTVN1PROD with NOTICES
SUMMARY:
VerDate Mar<15>2010
17:14 Mar 28, 2012
Jkt 226001
FOR FURTHER INFORMATION CONTACT:
Richard A. Cairo, General Counsel,
telephone: (717) 238–0423, ext. 306; fax:
(717) 238–2436; email: rcairo@srbc.net.
Regular mail inquiries may be sent to
the above address. See also Commission
Web site at www.srbc.net.
SUPPLEMENTARY INFORMATION: In
addition to its related actions on
projects identified in the summary
above and the listings below, the
following items were also presented or
acted on at the business meeting: (1)
Adoption of a resolution encouraging
the use of lesser quality waters; (2)
approval for expenditures for the
Susquehanna River Flow Management
Project; (3) adoption of an investment
policy statement and amendments of the
By-Laws; (4) approval of a partial waiver
of the fee for transfer of approvals to
SWEPI, LP; (5) adoption of the revised
operating budget and a capital budget
for FY–2013; (6) approval for staff to
release a draft Low Flow Protection
Policy for public review and comment;
(7) ratification of a settlement agreement
with C&N Dining; and (8) ratification of
grants/contracts. The Commission also
took the following specific actions:
Project Applications Originally
Considered at the December 15, 2011,
Public Hearing, Approved
Upon reconsideration, the
Commission approved the following
project applications originally acted
upon at the December 15, 2011, public
hearing:
1. Project Sponsor: Bioenergy
International, LLC. Project Facility:
Bionol Clearfield, LLC, Clearfield
Borough, Clearfield County, Pa.
Modification to conditions of the
surface water withdrawal approval
(Docket No. 20070904).
2. Project Sponsor: Borough of
Ephrata. Project Facility: Ephrata Area
Joint Authority, Ephrata Borough,
Lancaster County, Pa. Modification to
conditions of the groundwater
withdrawal approval (Docket No.
20110902).
3. Project Sponsor and Facility:
Carrizo (Marcellus), LLC (Mosquito
Creek–2), Karthaus Township,
Clearfield County, Pa. Surface water
withdrawal of up to 2.160 mgd.
4. Project Sponsor and Facility:
Central New York Oil and Gas
Company, LLC (Susquehanna River),
Wilmot Township, Bradford County, Pa.
Surface water withdrawal of up to 0.540
mgd.
5. Project Sponsor and Facility:
Central New York Oil and Gas
Company, LLC, Wilmot Township,
Bradford County, Pa. Consumptive
water use of up to 0.105 mgd.
PO 00000
Frm 00056
Fmt 4703
Sfmt 4703
6. Project Sponsor and Facility:
Chesapeake Appalachia, LLC
(Susquehanna River—Babcock), Ulster
Township, Bradford County, Pa. Surface
water withdrawal of up to 3.000 mgd.
7. Project Sponsor and Facility:
Chesapeake Appalachia, LLC
(Susquehanna River—Elmglade),
Wilmot Township, Bradford County, Pa.
Surface water withdrawal of up to 2.016
mgd.
8. Project Sponsor and Facility:
Chesapeake Appalachia, LLC (Towanda
Creek—Sechrist), Canton Township,
Bradford County, Pa. Surface water
withdrawal of up to 0.504 mgd.
9. Project Sponsor: Clark Trucking,
LLC. Project Facility: Northeast Division
(Lycoming Creek), Lewis Township,
Lycoming County, Pa. Surface water
withdrawal of up to 0.500 mgd.
10. Project Sponsor: Clark Trucking,
LLC. Project Facility: Northeast Division
(Muncy Creek), Muncy Creek Township,
Lycoming County, Pa. Surface water
withdrawal of up to 0.700 mgd.
11. Project Sponsor and Facility:
Dunn Lake LLC (Dunn Pond), Ararat
Township, Susquehanna County, Pa.
Surface water withdrawal of up to 0.999
mgd.
12. Project Sponsor and Facility:
EXCO Resources (PA), LLC (Muncy
Creek—McClintock), Penn Township,
Lycoming County, Pa. Surface water
withdrawal of up to 1.500 mgd.
13. Project Sponsor: Glenn O.
Hawbaker, Inc. Project Facility: Greens
Landing Aggregate Plant, Athens
Township, Bradford County, Pa. Surface
water withdrawal of up to 0.249 mgd.
14. Project Sponsor: Glenn O.
Hawbaker, Inc. Project Facility: Greens
Landing Aggregate Plant, Athens
Township, Bradford County, Pa.
Consumptive water use of up to 0.249
mgd.
15. Project Sponsor: Hazleton Creek
Properties, LLC. Project Facility:
Hazleton Mine Reclamation, Hazleton
City, Luzerne County, Pa. Modification
to increase groundwater withdrawal by
an additional 0.145 mgd, for a total of
0.200 mgd (30-day average) (Docket No.
20110307).
16. Project Sponsor and Facility:
Keystone Clearwater Solutions, LLC
(Babb Creek), Morris Township, Tioga
County, Pa. Surface water withdrawal of
up to 0.950 mgd.
17. Project Sponsor and Facility:
Sugar Hollow Trout Park and Hatchery,
Eaton Township, Wyoming County, Pa.
Modification to project features and
conditions of the groundwater
withdrawal approval (Docket No.
20100913).
18. Project Sponsor and Facility:
Sugar Hollow Water Services, LLC
E:\FR\FM\29MRN1.SGM
29MRN1
Federal Register / Vol. 77, No. 61 / Thursday, March 29, 2012 / Notices
mstockstill on DSK4VPTVN1PROD with NOTICES
(Susquehanna River—Chellis), Eaton
Township, Wyoming County, Pa.
Surface water withdrawal of up to 1.500
mgd.
19. Project Sponsor: The Municipal
Authority of the Borough of Berlin.
Project Facility: Berlin Borough
Municipal Authority, Allegheny
Township, Somerset County, Pa.
Modification to conditions of the
groundwater withdrawal approval
(Docket No. 19980702).
20. Project Sponsor and Facility:
Walker Township Water Association,
Walker Township, Centre County, Pa.
Modification to increase the total
groundwater system withdrawal limit
from 0.523 mgd to 0.753 mgd (30-day
average) (Docket No. 20070905).
21. Project Sponsor and Facility:
Williams Production Appalachia, LLC
(Middle Branch Wyalusing Creek),
Forest Lake Township, Susquehanna
County, Pa. Surface water withdrawal of
up to 0.750 mgd.
22. Project Sponsor and Facility:
Williams Production Appalachia, LLC
(Snake Creek–2), Franklin Township,
Susquehanna County, Pa. Surface water
withdrawal of up to 0.999 mgd.
23. Project Sponsor and Facility:
Williams Production Appalachia, LLC
(Susquehanna River), Great Bend
Township, Susquehanna County, Pa.
Commission-initiated modification to
project features and conditions of the
surface water withdrawal approval
(Docket No. 20090303), making a
correction and reducing the approved
surface water withdrawal amount from
3.00 mgd to 1.00 mgd.
24. Project Sponsor and Facility:
Williams Production Appalachia, LLC
(Susquehanna River–2), Great Bend
Township, Susquehanna County, Pa.
Surface water withdrawal of up to 2.000
mgd.
Project Application Originally
Considered at the December 15, 2011,
Public Hearing, Denied
Upon reconsideration, the
Commission denied the following
project application originally acted
upon at the December 15, 2011, public
hearing:
1. Project Sponsor: Anadarko E&P
Company LP. Project Facility: Sproul
State Forest—Council Run, Snow Shoe
Township, Centre County, Pa.
Application for groundwater
withdrawal of up to 0.715 mgd (30-day
average) from Well PW–11.
Rescission of Project Approval
The Commission rescinded approval
for the following project:
1. Project Sponsor and Facility: Texas
Eastern Transmission LP (Susquehanna
VerDate Mar<15>2010
17:14 Mar 28, 2012
Jkt 226001
River) (Docket No. 20110314), East
Donegal Township, Lancaster County,
Pa.
Project Applications Approved
The Commission approved the
following project applications:
1. Project Sponsor and Facility:
Anadarko E&P Company LP (Lycoming
Creek), Lewis Township, Lycoming
County, Pa. Surface water withdrawal of
up to 1.340 mgd (peak day).
2. Project Sponsor and Facility: Aqua
Infrastructure, LLC (West Branch
Susquehanna River), Piatt Township,
Lycoming County, Pa. Surface water
withdrawal of up to 3.000 mgd (peak
day).
3. Project Sponsor and Facility: Black
Bear Waters, LLC (Lycoming Creek),
Lewis Township, Lycoming County, Pa.
Surface water withdrawal of up to 0.400
mgd (peak day).
4. Project Sponsor and Facility:
Blossburg Municipal Authority, Bloss
Township, Tioga County, Pa.
Groundwater withdrawal of up to 0.396
mgd (30-day average) from Route 15
Well.
5. Project Sponsor and Facility: Buck
Ridge Stone, LLC (Salt Lick Creek), New
Milford Township, Susquehanna
County, Pa. Modification to increase
surface water withdrawal by an
additional 0.637 mgd, for a total of 0.720
mgd (peak day) (Docket No. 20100905).
6. Project Sponsor and Facility: Cabot
Oil & Gas Corporation (Susquehanna
River), Susquehanna Depot Borough,
Susquehanna County, Pa. Modification
to increase surface water withdrawal by
an additional 0.780 mgd, for a total of
1.500 mgd (peak day) (Docket No.
20080908).
7. Project Sponsor and Facility: Cabot
Oil & Gas Corporation (Susquehanna
River), Great Bend Township,
Susquehanna County, Pa. Modification
to increase surface water withdrawal by
an additional 1.280 mgd, for a total of
2.000 mgd (peak day) (Docket No.
20080905).
8. Project Sponsor and Facility:
Carrizo (Marcellus), LLC (Middle
Branch Wyalusing Creek), Forest Lake
Township, Susquehanna County, Pa.
Modification to conditions of the
surface water withdrawal approval
(Docket No. 20110604).
9. Project Sponsor and Facility:
Carrizo (Marcellus), LLC (Moshannon
Creek), Decatur Township, Clearfield
County, Pa. Surface water withdrawal of
up to 2.590 mgd (peak day).
10. Project Sponsor and Facility:
Carrizo (Marcellus), LLC (Unnamed
Tributary of Middle Branch Wyalusing
Creek), Forest Lake Township,
Susquehanna County, Pa. Modification
PO 00000
Frm 00057
Fmt 4703
Sfmt 4703
19053
to conditions of the surface water
withdrawal approval (Docket No.
20110605).
11. Project Sponsor and Facility: EQT
Production Company (Bennett Branch
Power), Jay Township, Elk County, Pa.
Surface water withdrawal of up to 2.500
mgd (peak day).
12. Project Sponsor and Facility: EQT
Production Company (Wilson Creek),
Duncan Township, Tioga County, Pa.
Surface water withdrawal of up to 0.740
mgd (peak day).
13. Project Sponsor: IBM Corporation.
Project Facility: Endicott Facility,
Village of Endicott, Broome County,
N.Y. Modification to increase total
groundwater system withdrawal by an
additional 0.499 mgd, for a total of 1.509
mgd (30-day average) (Docket No.
20090329).
14. Project Sponsor and Facility:
Keystone Landfill, Inc., Dunmore
Borough, Lackawanna County, Pa.
Modification to increase groundwater
withdrawal by an additional 0.150 mgd,
for a total of 0.160 mgd (30-day average)
(Docket No. 20080611).
15. Project Sponsor and Facility:
Keystone Landfill, Inc., Dunmore
Borough, Lackawanna County, Pa.
Modification to increase consumptive
water use by an additional 0.260 mgd,
for a total of up to 0.360 mgd (30-day
average) (Docket No. 20080611).
16. Project Sponsor: Pine Creek
Municipal Authority. Project Facility:
Wastewater Treatment Plant, Pine Creek
Township, Clinton County, Pa.
Withdrawal of treated wastewater
effluent of up to 0.999 mgd.
17. Project Sponsor and Facility:
Roaring Spring Water–Division of
Roaring Spring Blank Book (Roaring
Spring), Roaring Spring Borough, Blair
County, Pa. Surface water withdrawal of
up to 0.302 mgd (peak day).
18. Project Sponsor and Facility:
Roaring Spring Water–Division of
Roaring Spring Blank Book, Roaring
Spring Borough, Blair County, Pa.
Consumptive water use of up to 0.255
mgd (30-day average).
19. Project Sponsor and Facility:
Southwestern Energy Production
Company (Blockhouse Creek), Jackson
Township, Lycoming County, Pa.
Surface water withdrawal of up to 0.999
mgd (peak day).
20. Project Sponsor and Facility:
Southwestern Energy Production
Company (Susquehanna River), Oakland
Township, Susquehanna County, Pa.
Surface water withdrawal of up to 3.000
mgd (peak day).
21. Project Sponsor and Facility:
Southwestern Energy Production
Company (Tunkhannock Creek), Lenox
Township, Susquehanna County, Pa.
E:\FR\FM\29MRN1.SGM
29MRN1
19054
Federal Register / Vol. 77, No. 61 / Thursday, March 29, 2012 / Notices
mstockstill on DSK4VPTVN1PROD with NOTICES
Surface water withdrawal of up to 1.500
mgd (peak day).
22. Project Sponsor and Facility:
SWEPI LP (Cowanesque River—
Egleston), Nelson Township, Tioga
County, Pa. Modification to increase
surface water withdrawal by an
additional 0.267 mgd, for a total of 0.534
mgd (peak day) (Docket No. 20100604).
Project Applications Tabled
The following project applications
were tabled by the Commission:
1. Project Sponsor and Facility: Aqua
Resources, Inc. (Susquehanna River),
Athens Township, Bradford County, Pa.
Application for surface water
withdrawal of up to 0.900 mgd (peak
day).
2. Project Sponsor and Facility:
Empire Kosher Poultry, Inc., Walker
Township, Juniata County, Pa.
Modification to increase total
groundwater system withdrawal by an
additional 0.499 mgd, for a total of 1.269
mgd (30-day average) (Docket No.
20030809).
3. Project Sponsor and Facility: Jo Jo
Oil Company, Inc. (Tunkhannock
Creek), Tunkhannock Township,
Wyoming County, Pa. Application for
surface water withdrawal of up to 0.999
mgd (peak day).
4. Project Sponsor and Facility:
Northwestern Lancaster County
Authority, Penn Township, Lancaster
County, Pa. Application for
groundwater withdrawal of up to 0.324
mgd (30-day average) from Well 2.
5. Project Sponsor and Facility:
Northwestern Lancaster County
Authority, Penn Township, Lancaster
County, Pa. Application for
groundwater withdrawal of up to 1.000
mgd (30-day average) from Well 3.
6. Project Sponsor and Facility:
Southwestern Energy Production
Company (East Branch Tunkhannock
Creek), Lenox Township, Susquehanna
County, Pa. Application for surface
water withdrawal of up to 1.500 mgd
(peak day).
7. Project Sponsor: Viking Energy of
Northumberland, LLC. Project Facility:
Power Plant, Point Township,
Northumberland County, Pa.
Application for consumptive water use
of up to 0.387 mgd (30-day average).
8. Project Sponsor: Viking Energy of
Northumberland, LLC. Project Facility:
Power Plant, Point Township,
Northumberland County, Pa.
Application for groundwater
withdrawal of up to 0.172 mgd from
Well 1, and a total system withdrawal
limit of up to 0.391 mgd (30-day
average).
9. Project Sponsor: Viking Energy of
Northumberland, LLC. Project Facility:
VerDate Mar<15>2010
17:14 Mar 28, 2012
Jkt 226001
Power Plant, Point Township,
Northumberland County, Pa.
Application for groundwater
withdrawal of up to 0.172 mgd from
Well 2, and a total system withdrawal
limit of up to 0.391 mgd (30-day
average).
10. Project Sponsor: Viking Energy of
Northumberland, LLC. Project Facility:
Power Plant, Point Township,
Northumberland County, Pa.
Application for groundwater
withdrawal of up to 0.172 mgd from
Well 4, and a total system withdrawal
limit of up to 0.391 mgd (30-day
average).
Project Applications Denied
The following project applications
were denied by the Commission:
1. Project Sponsor and Facility:
Stanley S. Karp Sr. (Tunkhannock
Creek), Nicholson Township, Wyoming
County, Pa. Application for surface
water withdrawal of up to 0.510 mgd
(peak day).
2. Project Sponsor and Facility: Water
Treatment Solutions, LLC (South
Mountain Lake), Woodward Township,
Lycoming County, Pa. Application for
surface water withdrawal of up to 0.499
mgd (peak day).
Authority: Pub. L. 91–575, 84 Stat. 1509 et
seq., 18 CFR parts 806, 807, and 808.
Dated: March 23, 2012.
Thomas W. Beauduy,
Deputy Executive Director.
[FR Doc. 2012–7528 Filed 3–28–12; 8:45 am]
BILLING CODE 7040–01–P
DEPARTMENT OF TRANSPORTATION
Federal Railroad Administration
[Docket No. FRA–2000–7257; Notice No. 68]
Railroad Safety Advisory Committee;
Notice of Meeting
Federal Railroad
Administration (FRA), Department of
Transportation (DOT).
ACTION: Announcement of Railroad
Safety Advisory Committee (RSAC)
meeting.
AGENCY:
FRA announces the fortysixth meeting of the RSAC, a Federal
Advisory Committee that develops
railroad safety regulations through a
consensus process. The RSAC meeting
topics will include opening remarks
from the FRA Administrator, and status
reports will be provided by the Track
Safety Standards, Critical Incident, Dark
Territory, Fatigue Management, Risk
Reduction, Electronic Device
Distraction, and Passenger Safety
SUMMARY:
PO 00000
Frm 00058
Fmt 4703
Sfmt 9990
Working Groups. This agenda is subject
to change, including the possible
addition of further proposed tasks under
the Rail Safety Improvement Act of
2008.
The meeting of the RSAC is
scheduled to commence at 9:30 a.m. on
Thursday, April 26, 2012, and will
adjourn by 4:30 p.m.
DATES:
The RSAC meeting will be
held at the National Housing Center,
1201 15th Street NW., Washington, DC
20005. The meeting is open to the
public on a first-come, first-served basis,
and is accessible to individuals with
disabilities. Sign and oral interpretation
can be made available if requested 10
calendar days before the meeting.
ADDRESSES:
Mr.
Larry Woolverton, RSAC Administrative
Officer/Coordinator, FRA, 1200 New
Jersey Avenue SE., Mailstop 25,
Washington, DC 20590, (202) 493–6212;
or Mr. Robert C. Lauby, Deputy
Associate Administrator for Regulatory
and Legislative Operations, FRA, 1200
New Jersey Avenue SE., Mailstop 25,
Washington, DC 20590, (202) 493–6404.
FOR FURTHER INFORMATION CONTACT:
Pursuant
to Section 10(a)(2) of the Federal
Advisory Committee Act (Pub. L. 92–
463), FRA is giving notice of a meeting
of the RSAC. The RSAC was established
to provide advice and recommendations
to FRA on railroad safety matters. The
RSAC is composed of 54 voting
representatives from 31 member
organizations, representing various rail
industry perspectives. In addition, there
are non-voting advisory representatives
from the agencies with railroad safety
regulatory responsibility in Canada and
Mexico, the National Transportation
Safety Board, and the Federal Transit
Administration. The diversity of the
Committee ensures the requisite range
of views and expertise necessary to
discharge its responsibilities. See the
RSAC Web site for details on prior
RSAC activities and pending tasks at:
https://rsac.fra.dot.gov/. Please refer to
the notice published in the Federal
Register on March 11, 1996 (61 FR
9740), for additional information about
the RSAC.
SUPPLEMENTARY INFORMATION:
Issued in Washington, DC, on March 22,
2012.
Robert C. Lauby,
Deputy Associate Administrator for
Regulatory and Legislative Operations.
[FR Doc. 2012–7492 Filed 3–28–12; 8:45 am]
BILLING CODE 4910–06–P
E:\FR\FM\29MRN1.SGM
29MRN1
Agencies
[Federal Register Volume 77, Number 61 (Thursday, March 29, 2012)]
[Notices]
[Pages 19052-19054]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-7528]
-----------------------------------------------------------------------
SUSQUEHANNA RIVER BASIN COMMISSION
Actions Taken at March 15, 2012, Meeting
AGENCY: Susquehanna River Basin Commission.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: As part of its regular business meeting held on March 15,
2012, in Harrisburg, Pennsylvania, the Commission took the following
actions: (1) Reconsidered certain actions taken at its December 15,
2011, public hearing; (2) upon reconsideration, approved or denied the
applications of certain water resources projects, originally considered
at the December 15, 2011, public hearing; (3) rescinded approval for
one additional water resources project; (4) approved, tabled or denied
the applications of certain additional water resources projects; and
(5) took additional actions as set forth in the Supplementary
Information below.
DATES: March 15, 2012.
ADDRESSES: Susquehanna River Basin Commission, 1721 N. Front Street,
Harrisburg, PA 17102-2391.
FOR FURTHER INFORMATION CONTACT: Richard A. Cairo, General Counsel,
telephone: (717) 238-0423, ext. 306; fax: (717) 238-2436; email:
rcairo@srbc.net. Regular mail inquiries may be sent to the above
address. See also Commission Web site at www.srbc.net.
SUPPLEMENTARY INFORMATION: In addition to its related actions on
projects identified in the summary above and the listings below, the
following items were also presented or acted on at the business
meeting: (1) Adoption of a resolution encouraging the use of lesser
quality waters; (2) approval for expenditures for the Susquehanna River
Flow Management Project; (3) adoption of an investment policy statement
and amendments of the By-Laws; (4) approval of a partial waiver of the
fee for transfer of approvals to SWEPI, LP; (5) adoption of the revised
operating budget and a capital budget for FY-2013; (6) approval for
staff to release a draft Low Flow Protection Policy for public review
and comment; (7) ratification of a settlement agreement with C&N
Dining; and (8) ratification of grants/contracts. The Commission also
took the following specific actions:
Project Applications Originally Considered at the December 15, 2011,
Public Hearing, Approved
Upon reconsideration, the Commission approved the following project
applications originally acted upon at the December 15, 2011, public
hearing:
1. Project Sponsor: Bioenergy International, LLC. Project Facility:
Bionol Clearfield, LLC, Clearfield Borough, Clearfield County, Pa.
Modification to conditions of the surface water withdrawal approval
(Docket No. 20070904).
2. Project Sponsor: Borough of Ephrata. Project Facility: Ephrata
Area Joint Authority, Ephrata Borough, Lancaster County, Pa.
Modification to conditions of the groundwater withdrawal approval
(Docket No. 20110902).
3. Project Sponsor and Facility: Carrizo (Marcellus), LLC (Mosquito
Creek-2), Karthaus Township, Clearfield County, Pa. Surface water
withdrawal of up to 2.160 mgd.
4. Project Sponsor and Facility: Central New York Oil and Gas
Company, LLC (Susquehanna River), Wilmot Township, Bradford County, Pa.
Surface water withdrawal of up to 0.540 mgd.
5. Project Sponsor and Facility: Central New York Oil and Gas
Company, LLC, Wilmot Township, Bradford County, Pa. Consumptive water
use of up to 0.105 mgd.
6. Project Sponsor and Facility: Chesapeake Appalachia, LLC
(Susquehanna River--Babcock), Ulster Township, Bradford County, Pa.
Surface water withdrawal of up to 3.000 mgd.
7. Project Sponsor and Facility: Chesapeake Appalachia, LLC
(Susquehanna River--Elmglade), Wilmot Township, Bradford County, Pa.
Surface water withdrawal of up to 2.016 mgd.
8. Project Sponsor and Facility: Chesapeake Appalachia, LLC
(Towanda Creek--Sechrist), Canton Township, Bradford County, Pa.
Surface water withdrawal of up to 0.504 mgd.
9. Project Sponsor: Clark Trucking, LLC. Project Facility:
Northeast Division (Lycoming Creek), Lewis Township, Lycoming County,
Pa. Surface water withdrawal of up to 0.500 mgd.
10. Project Sponsor: Clark Trucking, LLC. Project Facility:
Northeast Division (Muncy Creek), Muncy Creek Township, Lycoming
County, Pa. Surface water withdrawal of up to 0.700 mgd.
11. Project Sponsor and Facility: Dunn Lake LLC (Dunn Pond), Ararat
Township, Susquehanna County, Pa. Surface water withdrawal of up to
0.999 mgd.
12. Project Sponsor and Facility: EXCO Resources (PA), LLC (Muncy
Creek--McClintock), Penn Township, Lycoming County, Pa. Surface water
withdrawal of up to 1.500 mgd.
13. Project Sponsor: Glenn O. Hawbaker, Inc. Project Facility:
Greens Landing Aggregate Plant, Athens Township, Bradford County, Pa.
Surface water withdrawal of up to 0.249 mgd.
14. Project Sponsor: Glenn O. Hawbaker, Inc. Project Facility:
Greens Landing Aggregate Plant, Athens Township, Bradford County, Pa.
Consumptive water use of up to 0.249 mgd.
15. Project Sponsor: Hazleton Creek Properties, LLC. Project
Facility: Hazleton Mine Reclamation, Hazleton City, Luzerne County, Pa.
Modification to increase groundwater withdrawal by an additional 0.145
mgd, for a total of 0.200 mgd (30-day average) (Docket No. 20110307).
16. Project Sponsor and Facility: Keystone Clearwater Solutions,
LLC (Babb Creek), Morris Township, Tioga County, Pa. Surface water
withdrawal of up to 0.950 mgd.
17. Project Sponsor and Facility: Sugar Hollow Trout Park and
Hatchery, Eaton Township, Wyoming County, Pa. Modification to project
features and conditions of the groundwater withdrawal approval (Docket
No. 20100913).
18. Project Sponsor and Facility: Sugar Hollow Water Services, LLC
[[Page 19053]]
(Susquehanna River--Chellis), Eaton Township, Wyoming County, Pa.
Surface water withdrawal of up to 1.500 mgd.
19. Project Sponsor: The Municipal Authority of the Borough of
Berlin. Project Facility: Berlin Borough Municipal Authority, Allegheny
Township, Somerset County, Pa. Modification to conditions of the
groundwater withdrawal approval (Docket No. 19980702).
20. Project Sponsor and Facility: Walker Township Water
Association, Walker Township, Centre County, Pa. Modification to
increase the total groundwater system withdrawal limit from 0.523 mgd
to 0.753 mgd (30-day average) (Docket No. 20070905).
21. Project Sponsor and Facility: Williams Production Appalachia,
LLC (Middle Branch Wyalusing Creek), Forest Lake Township, Susquehanna
County, Pa. Surface water withdrawal of up to 0.750 mgd.
22. Project Sponsor and Facility: Williams Production Appalachia,
LLC (Snake Creek-2), Franklin Township, Susquehanna County, Pa. Surface
water withdrawal of up to 0.999 mgd.
23. Project Sponsor and Facility: Williams Production Appalachia,
LLC (Susquehanna River), Great Bend Township, Susquehanna County, Pa.
Commission-initiated modification to project features and conditions of
the surface water withdrawal approval (Docket No. 20090303), making a
correction and reducing the approved surface water withdrawal amount
from 3.00 mgd to 1.00 mgd.
24. Project Sponsor and Facility: Williams Production Appalachia,
LLC (Susquehanna River-2), Great Bend Township, Susquehanna County, Pa.
Surface water withdrawal of up to 2.000 mgd.
Project Application Originally Considered at the December 15, 2011,
Public Hearing, Denied
Upon reconsideration, the Commission denied the following project
application originally acted upon at the December 15, 2011, public
hearing:
1. Project Sponsor: Anadarko E&P Company LP. Project Facility:
Sproul State Forest--Council Run, Snow Shoe Township, Centre County,
Pa. Application for groundwater withdrawal of up to 0.715 mgd (30-day
average) from Well PW-11.
Rescission of Project Approval
The Commission rescinded approval for the following project:
1. Project Sponsor and Facility: Texas Eastern Transmission LP
(Susquehanna River) (Docket No. 20110314), East Donegal Township,
Lancaster County, Pa.
Project Applications Approved
The Commission approved the following project applications:
1. Project Sponsor and Facility: Anadarko E&P Company LP (Lycoming
Creek), Lewis Township, Lycoming County, Pa. Surface water withdrawal
of up to 1.340 mgd (peak day).
2. Project Sponsor and Facility: Aqua Infrastructure, LLC (West
Branch Susquehanna River), Piatt Township, Lycoming County, Pa. Surface
water withdrawal of up to 3.000 mgd (peak day).
3. Project Sponsor and Facility: Black Bear Waters, LLC (Lycoming
Creek), Lewis Township, Lycoming County, Pa. Surface water withdrawal
of up to 0.400 mgd (peak day).
4. Project Sponsor and Facility: Blossburg Municipal Authority,
Bloss Township, Tioga County, Pa. Groundwater withdrawal of up to 0.396
mgd (30-day average) from Route 15 Well.
5. Project Sponsor and Facility: Buck Ridge Stone, LLC (Salt Lick
Creek), New Milford Township, Susquehanna County, Pa. Modification to
increase surface water withdrawal by an additional 0.637 mgd, for a
total of 0.720 mgd (peak day) (Docket No. 20100905).
6. Project Sponsor and Facility: Cabot Oil & Gas Corporation
(Susquehanna River), Susquehanna Depot Borough, Susquehanna County, Pa.
Modification to increase surface water withdrawal by an additional
0.780 mgd, for a total of 1.500 mgd (peak day) (Docket No. 20080908).
7. Project Sponsor and Facility: Cabot Oil & Gas Corporation
(Susquehanna River), Great Bend Township, Susquehanna County, Pa.
Modification to increase surface water withdrawal by an additional
1.280 mgd, for a total of 2.000 mgd (peak day) (Docket No. 20080905).
8. Project Sponsor and Facility: Carrizo (Marcellus), LLC (Middle
Branch Wyalusing Creek), Forest Lake Township, Susquehanna County, Pa.
Modification to conditions of the surface water withdrawal approval
(Docket No. 20110604).
9. Project Sponsor and Facility: Carrizo (Marcellus), LLC
(Moshannon Creek), Decatur Township, Clearfield County, Pa. Surface
water withdrawal of up to 2.590 mgd (peak day).
10. Project Sponsor and Facility: Carrizo (Marcellus), LLC (Unnamed
Tributary of Middle Branch Wyalusing Creek), Forest Lake Township,
Susquehanna County, Pa. Modification to conditions of the surface water
withdrawal approval (Docket No. 20110605).
11. Project Sponsor and Facility: EQT Production Company (Bennett
Branch Power), Jay Township, Elk County, Pa. Surface water withdrawal
of up to 2.500 mgd (peak day).
12. Project Sponsor and Facility: EQT Production Company (Wilson
Creek), Duncan Township, Tioga County, Pa. Surface water withdrawal of
up to 0.740 mgd (peak day).
13. Project Sponsor: IBM Corporation. Project Facility: Endicott
Facility, Village of Endicott, Broome County, N.Y. Modification to
increase total groundwater system withdrawal by an additional 0.499
mgd, for a total of 1.509 mgd (30-day average) (Docket No. 20090329).
14. Project Sponsor and Facility: Keystone Landfill, Inc., Dunmore
Borough, Lackawanna County, Pa. Modification to increase groundwater
withdrawal by an additional 0.150 mgd, for a total of 0.160 mgd (30-day
average) (Docket No. 20080611).
15. Project Sponsor and Facility: Keystone Landfill, Inc., Dunmore
Borough, Lackawanna County, Pa. Modification to increase consumptive
water use by an additional 0.260 mgd, for a total of up to 0.360 mgd
(30-day average) (Docket No. 20080611).
16. Project Sponsor: Pine Creek Municipal Authority. Project
Facility: Wastewater Treatment Plant, Pine Creek Township, Clinton
County, Pa. Withdrawal of treated wastewater effluent of up to 0.999
mgd.
17. Project Sponsor and Facility: Roaring Spring Water-Division of
Roaring Spring Blank Book (Roaring Spring), Roaring Spring Borough,
Blair County, Pa. Surface water withdrawal of up to 0.302 mgd (peak
day).
18. Project Sponsor and Facility: Roaring Spring Water-Division of
Roaring Spring Blank Book, Roaring Spring Borough, Blair County, Pa.
Consumptive water use of up to 0.255 mgd (30-day average).
19. Project Sponsor and Facility: Southwestern Energy Production
Company (Blockhouse Creek), Jackson Township, Lycoming County, Pa.
Surface water withdrawal of up to 0.999 mgd (peak day).
20. Project Sponsor and Facility: Southwestern Energy Production
Company (Susquehanna River), Oakland Township, Susquehanna County, Pa.
Surface water withdrawal of up to 3.000 mgd (peak day).
21. Project Sponsor and Facility: Southwestern Energy Production
Company (Tunkhannock Creek), Lenox Township, Susquehanna County, Pa.
[[Page 19054]]
Surface water withdrawal of up to 1.500 mgd (peak day).
22. Project Sponsor and Facility: SWEPI LP (Cowanesque River--
Egleston), Nelson Township, Tioga County, Pa. Modification to increase
surface water withdrawal by an additional 0.267 mgd, for a total of
0.534 mgd (peak day) (Docket No. 20100604).
Project Applications Tabled
The following project applications were tabled by the Commission:
1. Project Sponsor and Facility: Aqua Resources, Inc. (Susquehanna
River), Athens Township, Bradford County, Pa. Application for surface
water withdrawal of up to 0.900 mgd (peak day).
2. Project Sponsor and Facility: Empire Kosher Poultry, Inc.,
Walker Township, Juniata County, Pa. Modification to increase total
groundwater system withdrawal by an additional 0.499 mgd, for a total
of 1.269 mgd (30-day average) (Docket No. 20030809).
3. Project Sponsor and Facility: Jo Jo Oil Company, Inc.
(Tunkhannock Creek), Tunkhannock Township, Wyoming County, Pa.
Application for surface water withdrawal of up to 0.999 mgd (peak day).
4. Project Sponsor and Facility: Northwestern Lancaster County
Authority, Penn Township, Lancaster County, Pa. Application for
groundwater withdrawal of up to 0.324 mgd (30-day average) from Well 2.
5. Project Sponsor and Facility: Northwestern Lancaster County
Authority, Penn Township, Lancaster County, Pa. Application for
groundwater withdrawal of up to 1.000 mgd (30-day average) from Well 3.
6. Project Sponsor and Facility: Southwestern Energy Production
Company (East Branch Tunkhannock Creek), Lenox Township, Susquehanna
County, Pa. Application for surface water withdrawal of up to 1.500 mgd
(peak day).
7. Project Sponsor: Viking Energy of Northumberland, LLC. Project
Facility: Power Plant, Point Township, Northumberland County, Pa.
Application for consumptive water use of up to 0.387 mgd (30-day
average).
8. Project Sponsor: Viking Energy of Northumberland, LLC. Project
Facility: Power Plant, Point Township, Northumberland County, Pa.
Application for groundwater withdrawal of up to 0.172 mgd from Well 1,
and a total system withdrawal limit of up to 0.391 mgd (30-day
average).
9. Project Sponsor: Viking Energy of Northumberland, LLC. Project
Facility: Power Plant, Point Township, Northumberland County, Pa.
Application for groundwater withdrawal of up to 0.172 mgd from Well 2,
and a total system withdrawal limit of up to 0.391 mgd (30-day
average).
10. Project Sponsor: Viking Energy of Northumberland, LLC. Project
Facility: Power Plant, Point Township, Northumberland County, Pa.
Application for groundwater withdrawal of up to 0.172 mgd from Well 4,
and a total system withdrawal limit of up to 0.391 mgd (30-day
average).
Project Applications Denied
The following project applications were denied by the Commission:
1. Project Sponsor and Facility: Stanley S. Karp Sr. (Tunkhannock
Creek), Nicholson Township, Wyoming County, Pa. Application for surface
water withdrawal of up to 0.510 mgd (peak day).
2. Project Sponsor and Facility: Water Treatment Solutions, LLC
(South Mountain Lake), Woodward Township, Lycoming County, Pa.
Application for surface water withdrawal of up to 0.499 mgd (peak day).
Authority: Pub. L. 91-575, 84 Stat. 1509 et seq., 18 CFR parts
806, 807, and 808.
Dated: March 23, 2012.
Thomas W. Beauduy,
Deputy Executive Director.
[FR Doc. 2012-7528 Filed 3-28-12; 8:45 am]