Uranium Enrichment Fuel Cycle Facility Inspection Reports Regarding Louisiana Energy Services LLC, National Enrichment Facility, Eunice, NM, Prior to the Commencement of Operations, 18272-18273 [2012-7310]
Download as PDF
18272
Federal Register / Vol. 77, No. 59 / Tuesday, March 27, 2012 / Notices
Development Branch, Division of
Engineering, Office of Nuclear
Regulatory Research, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001, telephone: 301–251–
7489; email: Mekonen.Bayssie@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Introduction
The NRC is issuing a revision to an
existing guide in the NRC’s ‘‘Regulatory
Guide’’ series. This series was
developed to describe and make
available to the public information such
as methods that are acceptable to the
NRC staff for implementing specific
parts of the agency’s regulations,
techniques that the staff uses in
evaluating specific problems or
postulated accidents, and data that the
staff needs in its review of applications
for permits and licenses.
Revision 2 of RG 4.11 was issued with
a temporary identification as Draft
Regulatory Guide, DG–4016. This guide
focuses on terrestrial analyses for
licensing new nuclear power stations
under Title 10 of the Code of Federal
Regulations (10 CFR) part 52, ‘‘Licenses,
Certifications, and Approvals for
Nuclear Power Plants’’ and power
reactors under 10 CFR Part 50,
‘‘Domestic Licensing of Production and
Utilization Facilities’’ and this guide is
also useful in identifying the more
limited studies and analyses needed for
nuclear reactor operating license
renewal under 10 CFR part 54,
‘‘Requirements for Renewal of Operating
Licenses for Nuclear Power Plants,’’ and
portions may also be relevant to nuclear
reactor decommissioning.
II. Further Information
mstockstill on DSK4VPTVN1PROD with NOTICES
DG–4016, was published in the
Federal Register on August 12, 2011 (76
FR 50274) for a 60-day public comment
period. The public comment period
closed on October 14, 2011. No public
comments were received.
Dated at Rockville, Maryland, this 16th day
of March, 2012.
For the Nuclear Regulatory Commission.
Richard A. Jervey,
Acting Chief, Regulatory Guide Development
Branch, Division of Engineering, Office of
Nuclear Regulatory Research.
[FR Doc. 2012–7313 Filed 3–26–12; 8:45 am]
BILLING CODE 7590–01–P
VerDate Mar<15>2010
17:14 Mar 26, 2012
Jkt 226001
NUCLEAR REGULATORY
COMMISSION
[Docket No. 70–3103; NRC–2010–0264]
Uranium Enrichment Fuel Cycle
Facility Inspection Reports Regarding
Louisiana Energy Services LLC,
National Enrichment Facility, Eunice,
NM, Prior to the Commencement of
Operations
Nuclear Regulatory
Commission.
ACTION: Notice of availability.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) staff has conducted
inspections of the Louisiana Energy
Services (LES), LLC, National
enrichment Facility in Eunice, New
Mexico, and has verified that cascades
number 1.5, 1.6, 1.7, 1.8, 2.1, and 2.4 as
well as autoclave one of the facility have
been constructed in accordance with the
requirements of the approved license.
The NRC staff has prepared inspection
reports documenting its findings in
accordance with the requirements of the
NRC Inspection Manual.
ADDRESSES: Please refer to Docket ID
NRC–2010–0264 when contacting the
NRC about the availability of
information regarding this document.
You may access information related to
this document, which the NRC
possesses and is publicly-available,
using the following methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2010–0264. Address
questions about NRC dockets to Carol
Gallagher; telephone: 301–492–3668;
email: Carol.Gallagher@nrc.gov.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may access publiclyavailable documents online in the NRC
Library at https://www.nrc.gov/readingrm/adams.html. To begin the search,
select ‘‘ADAMS Public Documents’’ and
then select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov. In
addition, for the convenience of the
reader, the ADAMS accession numbers
are provided in a table in the section of
this notice entitled, Availability of
Inspection Reports.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT:
Michael Raddatz, Office of Nuclear
SUMMARY:
PO 00000
Frm 00071
Fmt 4703
Sfmt 4703
Material Safety and Safeguards, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001; telephone:
(301) 492–3108; email:
Michael.Raddatz@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Discussion
The NRC staff has conducted
inspections of the Louisiana Energy
Services (LES), LLC, National
enrichment Facility in Eunice, New
Mexico, and has verified that cascades
number 1.5, 1.6, 1.7, 1.8, 2.1, and 2.4 as
well as autoclave one of the facility have
been constructed in accordance with the
requirements of the approved license.
The NRC staff has prepared inspection
reports documenting its findings in
accordance with the requirements of the
NRC Inspection Manual. As a result of
these inspections, on November 15,
2011, the Commission authorized the
licensee to start operation of cascade
number 1.5. On December 2, 2011, the
Commission authorized the licensee to
start operation of Autoclave one. On
December 21, 2011, the Commission
authorized the licensee to start
operation of cascade number 1.6. On
January 23, 2012, the Commission
authorized the licensee to start
operation of cascade number 1.7.
Finally, on March 1, 2012, the
Commission authorized the licensee to
start operations of cascades numbered
1.8, 2.1, and 2.4.
The publication of this Notice
satisfies the requirements of Title 10 of
the Code of Federal Regulations (10
CFR) 70.32 (k) and Section 193(c) of the
Atomic Energy Act of 1954, as amended.
The introduction of uranium
hexafluoride into any module of the
National Enrichment Facility is not
permitted until the Commission
completes an operational readiness and
management measures verification
review to verify that management
measures that ensure compliance with
the performance requirements of 10 CFR
70.61 have been implemented and
confirms that the facility has been
constructed in accordance with the
license and will be operated safely.
Subsequent operational readiness and
management measures verification
reviews will continue throughout the
various phases of plant construction
and, upon completion of these
subsequent phases, additional notices
will be posted to verify that the phase
in question has been constructed in
accordance with the license and to
acknowledge licensee readiness for
operations.
E:\FR\FM\27MRN1.SGM
27MRN1
Federal Register / Vol. 77, No. 59 / Tuesday, March 27, 2012 / Notices
II. Availability of Inspection Reports
inspection reports prepared by the NRC
staff. For information on how to access
The following table provides the
ADAMS accession numbers for the
.....................................................................
.....................................................................
.....................................................................
.....................................................................
.....................................................................
.....................................................................
.....................................................................
.....................................................................
.....................................................................
.....................................................................
.....................................................................
.....................................................................
.....................................................................
.....................................................................
.....................................................................
.....................................................................
.....................................................................
.....................................................................
.....................................................................
.....................................................................
.....................................................................
.....................................................................
.....................................................................
.....................................................................
.....................................................................
Dated at Rockville, Maryland, this 9th day
of March 2012.
For the U.S. Nuclear Regulatory
Commission.
Brian W. Smith,
Chief, Uranium Enrichment Branch, Division
of Fuel Cycle Safety and Safeguards, Office
of Nuclear Material Safety and Safeguards.
[FR Doc. 2012–7310 Filed 3–26–12; 8:45 am]
BILLING CODE 7590–01–P
PEACE CORPS
Submission for OMB Review; Request
for Comments
30-Day notice and request for
comments.
ACTION:
The Peace Corps will be
submitting the following information
collection request to the Office of
Management and Budget (OMB) for
review and approval. The purpose of
this notice is to allow 30 days for public
comment in the Federal Register
preceding submission to OMB. We are
conducting this process in accordance
with the Paperwork Reduction Act of
1995 (44 U.S.C. chapter 35).
DATES: Comments must be submitted on
or before April 26, 2012.
ADDRESSES: Interested persons are
invited to submit comments regarding
this proposal. Comments should refer to
the proposal by name/or OMB approval
mstockstill on DSK4VPTVN1PROD with NOTICES
SUMMARY:
VerDate Mar<15>2010
18:24 Mar 26, 2012
Jkt 226001
ADAMS, see the ADDRESSES section of
this document.
Date
ADAMS
Accession No.
....................................................................................................
January 25, 2012 .......................................................................
December 8, 2011 .....................................................................
December 16, 2011 ...................................................................
October 28, 2011 .......................................................................
June 15, 2011 ............................................................................
April 29, 2011 .............................................................................
July 21, 2010 .............................................................................
March 31, 2010 ..........................................................................
March 26, 2010 ..........................................................................
December 17, 2009 ...................................................................
October 8, 2009 .........................................................................
September 30, 2009 ..................................................................
June 26, 2009 ............................................................................
March 26, 2009 ..........................................................................
March 20, 2009 ..........................................................................
December 19, 2008 ...................................................................
October 30, 2008 .......................................................................
July 10, 2008 .............................................................................
April 24, 2008 .............................................................................
March 7, 2008 ............................................................................
November 2, 2007 .....................................................................
August 16, 2007 .........................................................................
May 24, 2007 .............................................................................
January 19, 2007 .......................................................................
Pending
ML12025A286
ML11342A131
ML11353A102
ML11301A218
ML111660886
ML111190268
ML102020385
ML100900329
ML100850424
ML093511013
ML092820188
ML092730612
ML091770643
ML090850669
ML090790642
ML083540709
ML083040618
ML081930118
ML081160345
ML080670475
ML073060571
ML072280647
ML071440430
ML070190661
Inspection Report Nos.
70–3103/2012–002
70–3103/2011–013
70–3103/2011–009
70–3103/2011–007
70–3103/2011–004
70–3103/2011–008
70–3103/2011–002
70–3103/2010–012
70–3103/2010–007
70–3103/2010–005
70–3103/2009–004
70–3103/2009–006
70–3103/2009–003
70–3103/2009–002
70–3103/2009–001
70–3103/2008–006
70–3103/2008–004
70–3103/2008–003
70–3103/2008–002
70–3103/2008–001
70–3103/2007–004
70–3103/2007–003
70–3103/2007–002
70–3103/2007–001
70–3103/2006–001
18273
number and should be sent via email to:
oira_submission@omb.eop.gov or fax to:
202–395–3086. Attention: Desk Officer
for Peace Corps.
FOR FURTHER INFORMATION CONTACT:
Denora Miller, FOIA Officer, Peace
Corps, 1111 20th Street NW.,
Washington, DC 20526, (202) 692–1236,
or email at pcfr@peacecorps.gov. Copies
of available documents submitted to
OMB may be obtained from Denora
Miller at address listed above.
SUPPLEMENTARY INFORMATION: The Peace
Corps Act states that ‘‘[t]he President
may enroll in the Peace Corps for
service abroad qualified citizens and
nationals of the United States (referred
to in this Act as ‘‘volunteers’’). The
terms and conditions of the enrollment
* * * of volunteers shall be exclusively
those set forth in this Act and those
consistent therewith which the
President may prescribe * * *’’ 22
U.S.C. 2504(a). Eligibility requirements
for the Peace Corps have been
prescribed in 22 CFR part 305. Among
those eligibility requirements is one
relating to medical status. An Applicant
‘‘must, with reasonable accommodation,
have the physical and mental capacity
required of a Volunteer to perform the
essential functions of the Peace Corps
Volunteer assignment for which he or
she is otherwise eligible and be able to
complete an agreed upon tour of service,
ordinarily two years, without undue
PO 00000
Frm 00072
Fmt 4703
Sfmt 4703
disruption due to health problems.’’ 22
CFR 305.2(c). All applicants for service
must undergo a physical examination
and a dental evaluation prior to
Volunteer service to determine if they
meet this medical status eligibility
requirement. In addition, under 22
U.S.C. 2504(e), the Peace Corps provides
medical care to Volunteers during their
service and the information collected
will also be used in connection with
medical care and treatment during
Peace Corps service for applicants who
become Volunteers. Finally, the
information collected may serve as a
point of reference for any potential
future Volunteer worker’s compensation
claims.
Volunteers serve in 67 developing
countries where western-style
healthcare is often not available.
Volunteers are placed in remote
locations where they may suffer
hardship because they have no access to
running water and/or electricity. They
also may be placed in locations with
extreme environmental conditions
related to cold, heat or high altitude and
they may be exposed to diseases not
generally found in the U.S. Volunteers
may be placed many hours from the
Peace Corps medical office and not have
easy access to any health care provider.
Therefore, a thorough review of an
Applicant’s past medical history is an
E:\FR\FM\27MRN1.SGM
27MRN1
Agencies
[Federal Register Volume 77, Number 59 (Tuesday, March 27, 2012)]
[Notices]
[Pages 18272-18273]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-7310]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 70-3103; NRC-2010-0264]
Uranium Enrichment Fuel Cycle Facility Inspection Reports
Regarding Louisiana Energy Services LLC, National Enrichment Facility,
Eunice, NM, Prior to the Commencement of Operations
AGENCY: Nuclear Regulatory Commission.
ACTION: Notice of availability.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) staff has
conducted inspections of the Louisiana Energy Services (LES), LLC,
National enrichment Facility in Eunice, New Mexico, and has verified
that cascades number 1.5, 1.6, 1.7, 1.8, 2.1, and 2.4 as well as
autoclave one of the facility have been constructed in accordance with
the requirements of the approved license. The NRC staff has prepared
inspection reports documenting its findings in accordance with the
requirements of the NRC Inspection Manual.
ADDRESSES: Please refer to Docket ID NRC-2010-0264 when contacting the
NRC about the availability of information regarding this document. You
may access information related to this document, which the NRC
possesses and is publicly-available, using the following methods:
Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2010-0264. Address
questions about NRC dockets to Carol Gallagher; telephone: 301-492-
3668; email: Carol.Gallagher@nrc.gov.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may access publicly-available documents online in the NRC
Library at https://www.nrc.gov/reading-rm/adams.html. To begin the
search, select ``ADAMS Public Documents'' and then select ``Begin Web-
based ADAMS Search.'' For problems with ADAMS, please contact the NRC's
Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-
4737, or by email to pdr.resource@nrc.gov. In addition, for the
convenience of the reader, the ADAMS accession numbers are provided in
a table in the section of this notice entitled, Availability of
Inspection Reports.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT: Michael Raddatz, Office of Nuclear
Material Safety and Safeguards, U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001; telephone: (301) 492-3108; email:
Michael.Raddatz@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Discussion
The NRC staff has conducted inspections of the Louisiana Energy
Services (LES), LLC, National enrichment Facility in Eunice, New
Mexico, and has verified that cascades number 1.5, 1.6, 1.7, 1.8, 2.1,
and 2.4 as well as autoclave one of the facility have been constructed
in accordance with the requirements of the approved license. The NRC
staff has prepared inspection reports documenting its findings in
accordance with the requirements of the NRC Inspection Manual. As a
result of these inspections, on November 15, 2011, the Commission
authorized the licensee to start operation of cascade number 1.5. On
December 2, 2011, the Commission authorized the licensee to start
operation of Autoclave one. On December 21, 2011, the Commission
authorized the licensee to start operation of cascade number 1.6. On
January 23, 2012, the Commission authorized the licensee to start
operation of cascade number 1.7. Finally, on March 1, 2012, the
Commission authorized the licensee to start operations of cascades
numbered 1.8, 2.1, and 2.4.
The publication of this Notice satisfies the requirements of Title
10 of the Code of Federal Regulations (10 CFR) 70.32 (k) and Section
193(c) of the Atomic Energy Act of 1954, as amended.
The introduction of uranium hexafluoride into any module of the
National Enrichment Facility is not permitted until the Commission
completes an operational readiness and management measures verification
review to verify that management measures that ensure compliance with
the performance requirements of 10 CFR 70.61 have been implemented and
confirms that the facility has been constructed in accordance with the
license and will be operated safely. Subsequent operational readiness
and management measures verification reviews will continue throughout
the various phases of plant construction and, upon completion of these
subsequent phases, additional notices will be posted to verify that the
phase in question has been constructed in accordance with the license
and to acknowledge licensee readiness for operations.
[[Page 18273]]
II. Availability of Inspection Reports
The following table provides the ADAMS accession numbers for the
inspection reports prepared by the NRC staff. For information on how to
access ADAMS, see the ADDRESSES section of this document.
------------------------------------------------------------------------
ADAMS Accession
Inspection Report Nos. Date No.
------------------------------------------------------------------------
70-3103/2012-002............. ..................... Pending
70-3103/2011-013............. January 25, 2012..... ML12025A286
70-3103/2011-009............. December 8, 2011..... ML11342A131
70-3103/2011-007............. December 16, 2011.... ML11353A102
70-3103/2011-004............. October 28, 2011..... ML11301A218
70-3103/2011-008............. June 15, 2011........ ML111660886
70-3103/2011-002............. April 29, 2011....... ML111190268
70-3103/2010-012............. July 21, 2010........ ML102020385
70-3103/2010-007............. March 31, 2010....... ML100900329
70-3103/2010-005............. March 26, 2010....... ML100850424
70-3103/2009-004............. December 17, 2009.... ML093511013
70-3103/2009-006............. October 8, 2009...... ML092820188
70-3103/2009-003............. September 30, 2009... ML092730612
70-3103/2009-002............. June 26, 2009........ ML091770643
70-3103/2009-001............. March 26, 2009....... ML090850669
70-3103/2008-006............. March 20, 2009....... ML090790642
70-3103/2008-004............. December 19, 2008.... ML083540709
70-3103/2008-003............. October 30, 2008..... ML083040618
70-3103/2008-002............. July 10, 2008........ ML081930118
70-3103/2008-001............. April 24, 2008....... ML081160345
70-3103/2007-004............. March 7, 2008........ ML080670475
70-3103/2007-003............. November 2, 2007..... ML073060571
70-3103/2007-002............. August 16, 2007...... ML072280647
70-3103/2007-001............. May 24, 2007......... ML071440430
70-3103/2006-001............. January 19, 2007..... ML070190661
------------------------------------------------------------------------
Dated at Rockville, Maryland, this 9th day of March 2012.
For the U.S. Nuclear Regulatory Commission.
Brian W. Smith,
Chief, Uranium Enrichment Branch, Division of Fuel Cycle Safety and
Safeguards, Office of Nuclear Material Safety and Safeguards.
[FR Doc. 2012-7310 Filed 3-26-12; 8:45 am]
BILLING CODE 7590-01-P