Public Utility District No. 1 of Snohomish County, WA; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments, 17466-17467 [2012-7150]
Download as PDF
tkelley on DSK3SPTVN1PROD with NOTICES
17466
Federal Register / Vol. 77, No. 58 / Monday, March 26, 2012 / Notices
inspection and maintenance of the weir.
The proposed action requires that
Georgia Power Company move the
existing project boundary downstream
by 200 feet to accommodate the
structure and the proposed safety
signage, as well as a new positive boat
barrier. With the installation of the
tailrace weir, Georgia Power Company is
not proposing to change current project
operations, so all flows would remain
the same as currently authorized by the
license for the Middle Chattahoochee
Project. During construction of the
tailrace weir, Georgia Power Company
will, for a short period, divert flows over
the North Highlands spillway, not
through the powerhouse.
l. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number (P–2177–090) excluding the last
three digits in the docket number field
to access the document. For assistance,
contact FERC Online Support. A copy is
also available for inspection and
reproduction at the address in item h
above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
Any filings must bear in all capital
letters the title ‘‘COMMENTS,’’
‘‘PROTEST,’’ or ‘‘MOTION TO
INTERVENE,’’ as applicable, and the
Project Number of the particular
application to which the filing refers. A
copy of any motion to intervene must
also be served upon each representative
of the Applicant specified in the
particular application.
VerDate Mar<15>2010
19:32 Mar 23, 2012
Jkt 226001
o. Agency Comments: Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Dated: March 20, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–7154 Filed 3–23–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12690–005]
Public Utility District No. 1 of
Snohomish County, WA; Notice of
Application Tendered for Filing With
the Commission and Establishing
Procedural Schedule for Licensing and
Deadline for Submission of Final
Amendments
Take notice that the following
hydrokinetic pilot project license
application has been filed with the
Commission and is available for public
inspection.
a. Type of Application: License for
Pilot Project.
b. Project No.: 12690–005.
c. Date Filed: March 1, 2012.
d. Applicant: Public Utility District
No. 1 of Snohomish County,
Washington (Snohomish PUD).
e. Name of Project: Admiralty Inlet
Pilot Tidal Project.
f. Location: On the east side of
Admiralty Inlet in Puget Sound,
Washington, about 1 kilometer west of
Whidbey Island, entirely within Island
County, Washington. The project would
not occupy any federal lands.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–828(c).
h. Applicant Contact: Steven J. Klein,
Public Utility District of Snohomish
County, Washington, P.O. Box 1107,
2320, California Street, Everett, WA
98206–1107; (425) 783–8473.
i. FERC Contact: David Turner (202)
502–6091.
j. This application is not ready for
environmental analysis at this time.
k. With this notice, we are asking
federal, state, local, and tribal agencies
with jurisdiction and/or expertise with
respect to environmental issues to
cooperate with us in the preparation of
PO 00000
Frm 00065
Fmt 4703
Sfmt 4703
the environmental document. Agencies
who would like to request cooperating
status should follow the instructions for
filing described below.
All documents may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
l. The proposed Admiralty Inlet Pilot
Tidal Project would consist of (1) two
19.7-foot-diameter Open-Centre
Turbines supplied by OpenHydro Group
Ltd., mounted on completely submerged
gravity foundations; (2) two
transmission cables, which run from the
turbines to the cable termination vault;
(3) two transmission cables from the
cable termination vault to the proposed
cable control building; (4) a proposed
cable control building housing the
power conditioning and monitoring
equipment; (5) a transmission cable
bringing power from the cable control
building to an existing 12.47-kV
transmission line; and (6) appurtenant
facilities for operation and maintenance.
The estimated average annual
generation of the project is 216,000
kilowatt-hours.
m. Locations of the Application: A
copy of the application is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support. A copy is also available for
inspection and reproduction at the
address in item (h) above.
n. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
o. Procedural Schedule:
The application will be processed
according to the following preliminary
Hydro Licensing Schedule. Revisions to
the schedule may be made as
appropriate.
E:\FR\FM\26MRN1.SGM
26MRN1
Federal Register / Vol. 77, No. 58 / Monday, March 26, 2012 / Notices
Milestone
Filing of requested additional information.
Commission issues
REA notice.
Filing of recommendations, preliminary
terms and conditions,
and preliminary
fishway prescriptions.
Commission issues Single EA.
Comments on EA .........
Target date
April 16, 2012.
April 23, 2012.
May 23, 2012.
July 23, 2012.
August 22, 2012.
p. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Dated: March 16, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–7150 Filed 3–23–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
tkelley on DSK3SPTVN1PROD with NOTICES
Combined Notice of Filings #2
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC12–82–000.
Applicants: Ridgeline Alternative
Energy, LLC, Wolverine Creek Goshen
Interconnection LLC.
Description: Joint Application for
Authorization under Section 203 of the
Federal Power Act and Request for
Confidential Treatment, Expedited
Consideration and Waivers of Ridgeline
Alternative Energy, LLC and Wolverine
Creek Goshen Interconnection.
Filed Date: 3/16/12.
Accession Number: 20120316–5077.
Comments Due: 5 p.m. ET 4/6/12.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2384–001;
ER10–2383–001.
Applicants: Mountain Wind Power
LLC, Mountain Wind Power II LLC.
Description: Notice of Non-Material
Change in Status of Mountain Wind
Power, LLC, et al.
Filed Date: 3/14/12.
Accession Number: 20120314–5134.
Comments Due: 5 p.m. ET 4/4/12.
Docket Numbers: ER11–3420–004.
Applicants: Gridway Energy Corp.
Description: Supplemental Data
Response to be effective 3/16/2012.
Filed Date: 3/16/12.
VerDate Mar<15>2010
19:32 Mar 23, 2012
Jkt 226001
Accession Number: 20120316–5025.
Comments Due: 5 p.m. ET 4/6/12.
Docket Numbers: ER12–665–002.
Applicants: ITC Midwest LLC.
Description: ITC Midwest LLC
submits tariff filing per 35.17(b):
Amendment Filing to be effective
2/21/2012.
Filed Date: 3/16/12.
Accession Number: 20120316–5075.
Comments Due: 5 p.m. ET 4/6/12.
Docket Numbers: ER12–1275–000.
Applicants: Wisconsin Public Service
Corporation.
Description: Annual PEB/PBOP Filing
Wisconsin Public Service Corporation to
be effective 4/1/2012.
Filed Date: 3/16/12.
Accession Number: 20120316–5019.
Comments Due: 5 p.m. ET 4/6/12.
Docket Numbers: ER12–1276–000.
Applicants: PPL EnergyPlus, LLC.
Description: Certificate of
Concurrence to be effective 12/22/2011.
Filed Date: 3/16/12.
Accession Number: 20120316–5027.
Comments Due: 5 p.m. ET 4/6/12.
Docket Numbers: ER12–1277–000.
Applicants: The Legacy Energy
Group, LLC.
Description: The Legacy Energy
Group, LLC Market Based Rate Tariff to
be effective 3/19/2012.
Filed Date: 3/16/12.
Accession Number: 20120316–5044.
Comments Due: 5 p.m. ET 4/6/12.
Docket Numbers: ER12–1278–000.
Applicants: Southern California
Edison Company.
Description: Amended Letter
Agreement SCE–Rising Tree Wind Farm
LLC to be effective 3/17/2012.
Filed Date: 3/16/12.
Accession Number: 20120316–5048.
Comments Due: 5 p.m. ET 4/6/12.
Docket Numbers: ER12–1279–000.
Applicants: BluCo Energy LLC.
Description: Baseline Filing to be
effective 3/16/2012.
Filed Date: 3/16/12.
Accession Number: 20120316–5049.
Comments Due: 5 p.m. ET 4/6/12.
Docket Numbers: ER12–1280–000.
Applicants: Wolverine Creek Energy
LLC.
Description: Filing of Amended
Common Facilities Agreement to be
effective 3/16/2012.
Filed Date: 3/16/12.
Accession Number: 20120316–5055.
Comments Due: 5 p.m. ET 4/6/12.
Docket Numbers: ER12–1281–000.
Applicants: Wolverine Creek Goshen
Interconnection LLC.
Description: Filing of Amended
Common Facilities Agreement to be
effective 3/16/2012.
PO 00000
Frm 00066
Fmt 4703
Sfmt 4703
17467
Filed Date: 3/16/12.
Accession Number: 20120316–5057.
Comments Due: 5 p.m. ET 4/6/12.
Docket Numbers: ER12–1282–000.
Applicants: Southwest Power Pool,
Inc.
Description: Southwest Power Pool,
Inc. submits tariff filing per
35.13(a)(2)(iii): Revisions to Section
23—Sale or Assignment of Transmission
Service & Att. A–1 to be effective
3/16/2012.
Filed Date: 3/16/12.
Accession Number: 20120316–5099.
Comments Due: 5 p.m. ET 4/6/12.
Docket Numbers: ER12–1283–000.
Applicants: Midwest Independent
Transmission System Operator, Inc.
Description: Midwest Independent
Transmission System Operator, Inc.
submits tariff filing per 35.13(a)(2)(iii):
03–16–12 Module E–2 to be effective
10/1/2012.
Filed Date: 3/16/12.
Accession Number: 20120316–5105.
Comments Due: 5 p.m. ET 4/6/12.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 16, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–7140 Filed 3–23–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER11–2494–002.
Applicants: Mountain Wind Power II
LLC.
E:\FR\FM\26MRN1.SGM
26MRN1
Agencies
[Federal Register Volume 77, Number 58 (Monday, March 26, 2012)]
[Notices]
[Pages 17466-17467]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-7150]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12690-005]
Public Utility District No. 1 of Snohomish County, WA; Notice of
Application Tendered for Filing With the Commission and Establishing
Procedural Schedule for Licensing and Deadline for Submission of Final
Amendments
Take notice that the following hydrokinetic pilot project license
application has been filed with the Commission and is available for
public inspection.
a. Type of Application: License for Pilot Project.
b. Project No.: 12690-005.
c. Date Filed: March 1, 2012.
d. Applicant: Public Utility District No. 1 of Snohomish County,
Washington (Snohomish PUD).
e. Name of Project: Admiralty Inlet Pilot Tidal Project.
f. Location: On the east side of Admiralty Inlet in Puget Sound,
Washington, about 1 kilometer west of Whidbey Island, entirely within
Island County, Washington. The project would not occupy any federal
lands.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-828(c).
h. Applicant Contact: Steven J. Klein, Public Utility District of
Snohomish County, Washington, P.O. Box 1107, 2320, California Street,
Everett, WA 98206-1107; (425) 783-8473.
i. FERC Contact: David Turner (202) 502-6091.
j. This application is not ready for environmental analysis at this
time.
k. With this notice, we are asking federal, state, local, and
tribal agencies with jurisdiction and/or expertise with respect to
environmental issues to cooperate with us in the preparation of the
environmental document. Agencies who would like to request cooperating
status should follow the instructions for filing described below.
All documents may be filed electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site https://www.ferc.gov/docs-filing/efiling.asp. For assistance,
please contact FERC Online Support at FERCOnlineSupport@ferc.gov or
toll free at 1-866-208-3676, or for TTY, (202) 502-8659. Although the
Commission strongly encourages electronic filing, documents may also be
paper-filed. To paper-file, mail an original and seven copies to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
l. The proposed Admiralty Inlet Pilot Tidal Project would consist
of (1) two 19.7-foot-diameter Open-Centre Turbines supplied by
OpenHydro Group Ltd., mounted on completely submerged gravity
foundations; (2) two transmission cables, which run from the turbines
to the cable termination vault; (3) two transmission cables from the
cable termination vault to the proposed cable control building; (4) a
proposed cable control building housing the power conditioning and
monitoring equipment; (5) a transmission cable bringing power from the
cable control building to an existing 12.47-kV transmission line; and
(6) appurtenant facilities for operation and maintenance. The estimated
average annual generation of the project is 216,000 kilowatt-hours.
m. Locations of the Application: A copy of the application is
available for review at the Commission in the Public Reference Room or
may be viewed on the Commission's Web site at https://www.ferc.gov using
the ``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, contact FERC Online Support. A copy is also available for
inspection and reproduction at the address in item (h) above.
n. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
o. Procedural Schedule:
The application will be processed according to the following
preliminary Hydro Licensing Schedule. Revisions to the schedule may be
made as appropriate.
[[Page 17467]]
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Filing of requested additional April 16, 2012.
information.
Commission issues REA notice......... April 23, 2012.
Filing of recommendations, May 23, 2012.
preliminary terms and conditions,
and preliminary fishway
prescriptions.
Commission issues Single EA.......... July 23, 2012.
Comments on EA....................... August 22, 2012.
------------------------------------------------------------------------
p. Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: March 16, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-7150 Filed 3-23-12; 8:45 am]