Wellhead Power Delano, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 17473 [2012-7144]
Download as PDF
tkelley on DSK3SPTVN1PROD with NOTICES
Federal Register / Vol. 77, No. 58 / Monday, March 26, 2012 / Notices
mitigation and the additional measures
we recommend in the EIS.
The U.S. Environmental Protection
Agency (EPA), U.S. Department of
Transportation, U.S. Army Corps of
Engineers, New York City Mayor’s
Office, and New York City Department
of Environmental Protection
participated as cooperating agencies in
the preparation of the EIS. Cooperating
agencies have jurisdiction by law or
special expertise with respect to
resources potentially affected by the
proposal and participate in the NEPA
analysis. Although the cooperating
agencies provided input to the
conclusions and recommendations
presented in the EIS, the agencies will
present their own conclusions and
recommendations in their respective
Records of Decision for the project.
The final EIS addresses the potential
environmental effects of the following
project facilities:
• Construction and operation of
approximately 15.2 miles of new 30inch-diameter pipeline and 4.8 miles of
42-inch-diameter pipeline;
• Abandonment of 8.95 miles of
existing 12-, 20-, and 24-inch-diameter
pipeline;
• Installation of seven new metering
and regulating (M&R) stations;
• Modifications to four existing
compressor stations and one existing
M&R station; and
• Modifications and installations of
associated valves and piping.
The FERC staff mailed copies of the
EIS to federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American tribes; local
newspapers and libraries in the Project
area; intervenors to the FERC’s
proceeding; and potentially affected
landowners and other interested
individuals and groups. Paper copy
versions of the EIS were mailed to those
specifically requesting them; all others
received a CD version. In addition, the
EIS is available for public viewing on
the FERC’s Web site (www.ferc.gov)
using the eLibrary link. A limited
number of copies are available for
distribution and public inspection at:
Federal Energy Regulatory Commission,
Public Reference Room, 888 First Street
NE., Room 2A, Washington, DC 20426.
(202) 502–8371.
In accordance with the Council on
Environmental Quality’s (CEQ)
regulations implementing NEPA, no
agency decision on a proposed action
may be made until 30 days after the EPA
publishes a notice of availability of the
final EIS in the Federal Register.
However, the CEQ regulations provide
VerDate Mar<15>2010
19:32 Mar 23, 2012
Jkt 226001
an exception to this rule when an
agency decision is subject to a formal
internal appeal process that allows other
agencies or the public to make their
views known. In such cases, the agency
decision may be made at the same time
the notice of the final EIS is published,
allowing both periods to run
concurrently. The Commission decision
for this proposed action is subject to a
30-day rehearing period.
Questions
Additional information about the
Project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site (www.ferc.gov) using the eLibrary
link. Click on the eLibrary link, click on
‘‘General Search,’’ and enter the docket
number excluding the last three digits in
the Docket Number field (i.e., CP11–56).
Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at (866) 208–3676; for TTY, contact
(202) 502–8659. The eLibrary link also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/
esubscribenow.htm.
Dated: March 16, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–7149 Filed 3–23–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER12–1291–000]
Wellhead Power Delano, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of
Wellhead Power Delano, LLC’s
application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
PO 00000
Frm 00072
Fmt 4703
Sfmt 9990
17473
includes a request for blanket
authorization, under 18 CFR Part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR Part 34, of
future issuances of securities and
assumptions of liability, is April 9,
2012.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: March 20, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–7144 Filed 3–23–12; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\26MRN1.SGM
26MRN1
Agencies
[Federal Register Volume 77, Number 58 (Monday, March 26, 2012)]
[Notices]
[Page 17473]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-7144]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER12-1291-000]
Wellhead Power Delano, LLC; Supplemental Notice That Initial
Market-Based Rate Filing Includes Request for Blanket Section 204
Authorization
This is a supplemental notice in the above-referenced proceeding of
Wellhead Power Delano, LLC's application for market-based rate
authority, with an accompanying rate tariff, noting that such
application includes a request for blanket authorization, under 18 CFR
Part 34, of future issuances of securities and assumptions of
liability.
Any person desiring to intervene or to protest should file with the
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426, in accordance with Rules 211 and 214 of the Commission's
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone
filing a motion to intervene or protest must serve a copy of that
document on the Applicant.
Notice is hereby given that the deadline for filing protests with
regard to the applicant's request for blanket authorization, under 18
CFR Part 34, of future issuances of securities and assumptions of
liability, is April 9, 2012.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
14 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426.
The filings in the above-referenced proceeding are accessible in
the Commission's eLibrary system by clicking on the appropriate link in
the above list. They are also available for review in the Commission's
Public Reference Room in Washington, DC. There is an eSubscription link
on the Web site that enables subscribers to receive email notification
when a document is added to a subscribed docket(s). For assistance with
any FERC Online service, please email FERCOnlineSupport@ferc.gov or
call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Dated: March 20, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012-7144 Filed 3-23-12; 8:45 am]
BILLING CODE 6717-01-P