Yakima River Basin Conservation Advisory Group Charter Renewal, 16558 [2012-6768]
Download as PDF
16558
Federal Register / Vol. 77, No. 55 / Wednesday, March 21, 2012 / Notices
Tina
Orcutt, Superintendent, Hampton
National Historic Site, 535 Hampton
Road, Towson, Maryland 21286–1397,
(410) 823–1309 ext. 101.
Dated: January 27, 2012.
Dennis R. Reidenbach,
Regional Director, Northeast Region, National
Park Service.
The NPS
prepared a Draft GMP/EIS to evaluate
alternatives to guide the development
and future management of Hampton
NHS. Alternative 1 would continue
current management direction and
visitor experience. Alternative 2 would
remove post-1948 development and
consolidate administrative functions in
an effort to recreate the feeling of the
Hampton Estate near the end of its
period of greatest significance (mid to
late 19th century). Alternative 3, the
NPS preferred alternative, would
expand the visitor experience to include
the entire story of the park from the 19th
century through the changes of activity
and ownership in the 20th century;
broaden the stories to include all those
who lived and worked at the mansion,
the plantations and related Ridgely
family enterprises; and provide visitor
services and accommodate park
operations within the historic and
modern buildings existing on the
property now. Alternative 3 was also
identified as the Environmentally
Preferred Alternative. The Draft GMP/
EIS was available for public and agency
review from October 11, 2010, through
December 24, 2010. Printed copies of
the Draft GMP/EIS were available at the
locations listed above and online at the
NPS PEPC Web site (https://
parkplanning.nps.gov/hamp). Three
public open houses were held in
November, 2010.
The Final GMP/EIS responds to, and
incorporates, agency and public
comments received on the Draft GMP/
EIS. Agency and public comments with
NPS responses are provided on page 135
of the Final GMP/EIS. After careful
review of all comments received,
Alternative 3 remains the NPS preferred
alternative for the new GMP for
Hampton NHS. The public release of the
Final GMP/EIS will be followed by a noaction period that will end no sooner
than 30 days from the date of
publication by the Environmental
Protection Agency of a Notice of
Availability of the Final GMP/EIS in the
Federal Register. After the 30-day no
action period, a Record of Decision will
be prepared to document the selected
alternative and set forth any stipulations
for implementation of the GMP.
BILLING CODE 4312–56–P
needs and programs. Alternative 2
addresses the refuge purposes, issues,
and relevant mandates, and is consistent
with principles of sound fish and
wildlife management.
FOR FURTHER INFORMATION CONTACT:
Dated: November 10, 2011.
Hugh Morrison,
Acting Regional Director, Pacific Region,
Portland, Oregon.
SUPPLEMENTARY INFORMATION:
[FR Doc. 2012–6250 Filed 3–20–12; 8:45 am]
BILLING CODE 4310–55–P
DEPARTMENT OF THE INTERIOR
National Park Service
[NPS–NER–HPPC–0206–9480; 4350–HAMP–
409]
General Management Plan/Final
Environmental Impact Statement,
Hampton National Historic Site,
Maryland
National Park Service, Interior.
Notice of availability.
AGENCY:
ACTION:
The National Park Service
(NPS) announces the availability of the
Final Environmental Impact Statement
for the General Management Plan (Final
GMP/EIS) for Hampton National
Historic Site (NHS), Maryland. The
Final GMP/EIS identifies Alternative 3
as the NPS preferred alternative for the
new GMP for Hampton NHS. When
approved, the GMP will provide
guidance to park management for
administration, development, and
interpretation of park resources over the
next 20 years.
DATES: The NPS will execute a Record
of Decision (ROD) no sooner than 30
days after the date of publication by the
Environmental Protection Agency of a
Notice of Availability of the Final GMP/
EIS in the Federal Register.
ADDRESSES: The Final GMP/EIS is
available for online at the NPS Planning,
Environment, and Public Comment
(PEPC) Web site (https://
parkplanning.nps.gov/hamp), and the
park’s Web site (https://www.nps.gov/
hamp). Printed hardcopies can be
viewed at the following locations:
Hampton National Historic Site, 535
Hampton Lane, Towson, Maryland
21286.
Fort McHenry National and Historic
Shrine, End of East Fort Avenue,
Baltimore, Maryland 21230.
Towson Branch Library/Baltimore
County Library, 320 York Avenue,
Towson, Maryland 21204.
Baltimore County Tourism Office and
Towson Chamber of Commerce, 44
West Chesapeake Avenue, Towson,
Maryland 21204.
erowe on DSK2VPTVN1PROD with NOTICES
SUMMARY:
VerDate Mar<15>2010
15:15 Mar 20, 2012
Jkt 226001
PO 00000
[FR Doc. 2012–6757 Filed 3–20–12; 8:45 am]
DEPARTMENT OF THE INTERIOR
Bureau of Reclamation
Yakima River Basin Conservation
Advisory Group Charter Renewal
Bureau of Reclamation,
Interior.
ACTION: Notice of renewal.
AGENCY:
Following consultation with
the General Services Administration,
notice is hereby given that the Secretary
of the Interior is renewing the charter
for the Yakima River Basin Conservation
Advisory Group (CAG). The purpose of
the CAG is to provide recommendations
to the Secretary of the Interior and the
State of Washington on the structure
and implementation of the Yakima
River Basin Water Conservation
Program.
The basin conservation program is
structured to provide economic
incentives with cooperative Federal,
State, and local funding to stimulate the
identification and implementation of
structural and nonstructural costeffective water conservation measures in
the Yakima River basin. Improvements
in the efficiency of water delivery and
use will result in improved streamflows
for fish and wildlife and improve the
reliability of water supplies for
irrigation.
SUMMARY:
Mr.
Timothy McCoy, Manager, Yakima
River Basin Water Enhancement Project,
telephone 509–575–5848, extension
209.
FOR FURTHER INFORMATION CONTACT:
This
notice is published in accordance with
Section 9(a)(2) of the Federal Advisory
Committee Act of 1972 (Pub. L. 92–463,
as amended). The certification of
renewal is published below.
SUPPLEMENTARY INFORMATION:
Certification
I hereby certify that Charter renewal
of the Yakima River Basin Conservation
Advisory Group is in the public interest
in connection with the performance of
duties imposed on the Department of
the Interior.
Ken Salazar,
Secretary of the Interior.
[FR Doc. 2012–6768 Filed 3–20–12; 8:45 am]
BILLING CODE 4310–MN–P
Frm 00044
Fmt 4703
Sfmt 9990
E:\FR\FM\21MRN1.SGM
21MRN1
Agencies
[Federal Register Volume 77, Number 55 (Wednesday, March 21, 2012)]
[Notices]
[Page 16558]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-6768]
-----------------------------------------------------------------------
DEPARTMENT OF THE INTERIOR
Bureau of Reclamation
Yakima River Basin Conservation Advisory Group Charter Renewal
AGENCY: Bureau of Reclamation, Interior.
ACTION: Notice of renewal.
-----------------------------------------------------------------------
SUMMARY: Following consultation with the General Services
Administration, notice is hereby given that the Secretary of the
Interior is renewing the charter for the Yakima River Basin
Conservation Advisory Group (CAG). The purpose of the CAG is to provide
recommendations to the Secretary of the Interior and the State of
Washington on the structure and implementation of the Yakima River
Basin Water Conservation Program.
The basin conservation program is structured to provide economic
incentives with cooperative Federal, State, and local funding to
stimulate the identification and implementation of structural and
nonstructural cost-effective water conservation measures in the Yakima
River basin. Improvements in the efficiency of water delivery and use
will result in improved streamflows for fish and wildlife and improve
the reliability of water supplies for irrigation.
FOR FURTHER INFORMATION CONTACT: Mr. Timothy McCoy, Manager, Yakima
River Basin Water Enhancement Project, telephone 509-575-5848,
extension 209.
SUPPLEMENTARY INFORMATION: This notice is published in accordance with
Section 9(a)(2) of the Federal Advisory Committee Act of 1972 (Pub. L.
92-463, as amended). The certification of renewal is published below.
Certification
I hereby certify that Charter renewal of the Yakima River Basin
Conservation Advisory Group is in the public interest in connection
with the performance of duties imposed on the Department of the
Interior.
Ken Salazar,
Secretary of the Interior.
[FR Doc. 2012-6768 Filed 3-20-12; 8:45 am]
BILLING CODE 4310-MN-P