License Amendment Request From Westinghouse Electric Company, LLC, Hematite Decommissioning Project, 16077-16082 [2012-6541]
Download as PDF
Federal Register / Vol. 77, No. 53 / Monday, March 19, 2012 / Notices
I. Accessing Information and
Submitting Comments
NUCLEAR REGULATORY
COMMISSION
[Docket No. 70–0036; NRC–2012–0054]
License Amendment Request From
Westinghouse Electric Company, LLC,
Hematite Decommissioning Project
Nuclear Regulatory
Commission.
AGENCY:
License amendment request;
opportunity to provide comments,
request a hearing and to petition for
leave to intervene, and Order.
ACTION:
Submit comments by May 18,
2012. Requests for a hearing or leave to
intervene must be filed by May 18,
2012. Any potential party as defined in
Title 10 of the Code of Federal
Regulations (10 CFR) 2.4, who believes
access to Sensitive Unclassified NonSafeguards Information (SUNSI) and/or
Safeguards Information (SGI) is
necessary to respond to this notice must
request document access by March 29,
2012.
DATES:
You may access information
and comment submissions related to
this document, which the NRC
possesses and is publically available, by
searching on https://www.regulations.gov
under Docket ID NRC–2012–0054.
You may submit comments by the
following methods:
• Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2012–0054. Address
questions about NRC dockets to Carol
Gallagher; telephone: 301–492–3668;
email: Carol.Gallagher@nrc.gov.
• Mail comments to: Cindy Bladey,
Chief, Rules, Announcements, and
Directives Branch (RADB), Office of
Administration, Mail Stop: TWB–05–
B01M, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001.
• Fax comments to: RADB at 301–
492–3446.
For additional direction on accessing
information and submitting comments,
see ‘‘Accessing Information and
Submitting Comments’’ in the
SUPPLEMENTARY INFORMATION section of
this document.
emcdonald on DSK29S0YB1PROD with NOTICES
ADDRESSES:
John
J. Hayes, Office of Federal and State
Materials and Environmental
Management Programs, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001, telephone: 301–415–
5928; email: John.Hayes@nrc.gov.
FOR FURTHER INFORMATION CONTACT:
SUPPLEMENTARY INFORMATION:
VerDate Mar<15>2010
13:40 Mar 16, 2012
Jkt 226001
A. Accessing Information
Please refer to Docket ID NRC–2012–
0054 when contacting the NRC about
the availability of information regarding
this document. You may access
information related to this document,
which the NRC possesses and is
publicly-available, by the following
methods:
• Federal Rulemaking Web Site: Go to
https://www.regulations.gov and search
for Docket ID NRC–2012–0054.
• NRC’s Agencywide Documents
Access and Management System
(ADAMS): You may access publiclyavailable documents online in the NRC
Library at https://www.nrc.gov/readingrm/adams.html. To begin the search,
select ‘‘ADAMS Public Documents’’ and
then select ‘‘Begin Web-based ADAMS
Search.’’ For problems with ADAMS,
please contact the NRC’s Public
Document Room (PDR) reference staff at
1–800–397–4209, 301–415–4737, or by
email to pdr.resource@nrc.gov.
• NRC’s PDR: You may examine and
purchase copies of public documents at
the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852.
B. Submitting Comments
Please include Docket ID NRC–2012–
0054 in the subject line of your
comment submission, in order to ensure
that the NRC is able to make your
comment submission available to the
public in this docket.
The NRC cautions you not to include
identifying or contact information in
comment submissions that you do not
want to be publicly disclosed. The NRC
posts all comment submissions at
https://www.regulations.gov as well as
enters the comment submissions into
ADAMS, and the NRC does not edit
comment submissions to remove
identifying or contact information.
If you are requesting or aggregating
comments from other persons for
submission to the NRC, then you should
inform those persons not to include
identifying or contact information in
their comment submissions that they do
not want to be publicly disclosed. Your
request should state that the NRC will
not edit comment submissions to
remove such information before making
the comment submissions available to
the public or entering the comment
submissions into ADAMS.
II. Introduction
The U.S. Nuclear Regulatory
Commission (NRC or the Commission)
has received a license amendment
PO 00000
Frm 00084
Fmt 4703
Sfmt 4703
16077
application from Westinghouse Electric
Company, LLC (WEC or the licensee),
dated January 16, 2012, for disposal of
NRC-licensed source, byproduct, and
special nuclear material pursuant to 10
CFR 20.2002 from its former fuel cycle
facility located in Festus, Missouri. The
licensee holds NRC License No. SNM–
33 and is authorized to conduct
decommissioning activities at the
facility. The amendment requests
authorization for WEC to transfer
decommissioning waste from the facility
to U.S. Ecology Idaho, Inc., a Resource
Conservation and Recovery Act (RCRA)
Subtitle C disposal facility located near
Grand View, Idaho. The U.S. Ecology
Idaho facility is regulated by the Idaho
Department of Environmental Quality
and is not an NRC-licensed facility.
Pursuant to 10 CFR 30.11 and 70.17,
WEC’s application also requests that
U.S. Ecology be granted exemptions
from the licensing requirements of 10
CFR 30.3 and 70.3 for byproduct and
special nuclear material, respectively, so
that the U.S. Ecology may accept the
material under the terms of its facility
permit.
An NRC administrative review,
documented in a letter to WEC dated
February 3, 2012, (ADAMS Accession
No. ML120240300) found the
application acceptable to begin a
technical review. If the NRC approves
the amendment, the approval will be
documented in an amendment to NRC
License No. SNM–33. However, before
approving the proposed amendment, the
NRC will need to make the findings
required by the Atomic Energy Act of
1954, as amended, and the NRC’s
regulations. These findings will be
documented in a Safety Evaluation
Report and an Environmental
Assessment.
III. Opportunity To Request a Hearing
and Petitions for Leave To Intervene
Requirements for hearing requests and
petitions for leave to intervene are
found in 10 CFR 2.309, ‘‘Hearing
Requests, Petitions to Intervene,
Requirements for Standing, and
Contentions.’’ Interested persons should
consult 10 CFR 2.309, which is available
at the NRC’s PDR, Room O1–F21, One
White Flint North, 11555 Rockville
Pike, Rockville, MD 20852. You may
also call the PDR at 1–800–397–4209 or
301–415–4737. The NRC regulations are
also accessible online in the NRC
Library at https://www.nrc.govreadingrm/adams.html.
Any person whose interest may be
affected by this proceeding and who
wishes to participate as a party in the
proceeding must file a written petition
for leave to intervene. As required by 10
E:\FR\FM\19MRN1.SGM
19MRN1
emcdonald on DSK29S0YB1PROD with NOTICES
16078
Federal Register / Vol. 77, No. 53 / Monday, March 19, 2012 / Notices
CFR 2.309, a petition for leave to
intervene shall set forth with
particularity the interest of the
petitioner in the proceeding and how
that interest may be affected by the
results of the proceeding. The petition
must provide the name, address, and
telephone number of the petitioner and
specifically explain the reasons why
intervention should be permitted with
particular reference to the following
factors: (1) The nature of the petitioner’s
right under the Act to be made a party
to the proceeding; (2) the nature and
extent of the petitioner’s property,
financial, or other interest in the
proceeding; and (3) the possible effect of
any order that may be entered in the
proceeding on the petitioner’s interest.
A petition for leave to intervene must
also include a specification of the
contentions that the petitioner seeks to
have litigated in the hearing. For each
contention, the petitioner must provide
a specific statement of the issue of law
or fact to be raised or controverted, as
well as a brief explanation of the basis
for the contention. Additionally, the
petitioner must demonstrate that the
issue raised by each contention is
within the scope of the proceeding and
is material to the findings the NRC must
make to support the granting of a license
amendment in response to the
application. The petition must also
include a concise statement of the
alleged facts or expert opinions which
support the position of the petitioner
and on which the petitioner intends to
rely at hearing, together with references
to the specific sources and documents
on which the petitioner intends to rely.
Finally, the petition must provide
sufficient information to show that a
genuine dispute exists with the
applicant on a material issue of law or
fact, including references to specific
portions of the application for
amendment that the petitioner disputes
and the supporting reasons for each
dispute, or, if the petitioner believes
that the application for amendment fails
to contain information on a relevant
matter as required by law, the
identification of each failure and the
supporting reasons for the petitioner’s
belief. Each contention must be one
that, if proven, would entitle the
petitioner to relief.
Those permitted to intervene become
parties to the proceeding, subject to any
limitations in the order granting leave to
intervene, and have the opportunity to
participate fully in the conduct of the
hearing with respect to resolution of
that person’s admitted contentions,
including the opportunity to present
evidence and to submit a crossexamination plan for cross-examination
VerDate Mar<15>2010
13:40 Mar 16, 2012
Jkt 226001
of witnesses, consistent with NRC
regulations, policies, and procedures.
The Atomic Safety and Licensing Board
(the Licensing Board) will set the time
and place for any prehearing
conferences and evidentiary hearings,
and the appropriate notices will be
provided.
Non-timely petitions for leave to
intervene and contentions, amended
petitions, and supplemental petitions
will not be entertained absent a
determination by the Commission, the
Licensing Board or a Presiding Officer
that the petition should be granted and/
or the contentions should be admitted
based upon a balancing of the factors
specified in 10 CFR 2.309(c)(1)(i)(viii).
A State, county, municipality,
Federally-recognized Indian tribe, or
agencies thereof, may submit a petition
to the Commission to participate as a
party under 10 CFR 2.309(d)(2). The
petition should state the nature and
extent of the petitioner’s interest in the
proceeding. The petition should be
submitted to the Commission by May
18, 2012. The petition must be filed in
accordance with the filing instructions
in Section IV of this document, and
should meet the requirements for
petitions for leave to intervene set forth
in this section, except that State and
Federally-recognized Indian tribes do
not need to address the standing
requirements in 10 CFR 2.309(d)(1) if
the facility is located within its
boundaries. The entities listed above
could also seek to participate in a
hearing as a nonparty pursuant to 10
CFR 2.315(c).
Any person who does not wish, or is
not qualified, to become a party to this
proceeding may request permission to
make a limited appearance pursuant to
the provisions of 10 CFR 2.315(a). A
person making a limited appearance
may make an oral or written statement
of position on the issues, but may not
otherwise participate in the proceeding.
A limited appearance may be made at
any session of the hearing or at any
prehearing conference, subject to such
limits and conditions as may be
imposed by the Licensing Board.
Persons desiring to make a limited
appearance are requested to inform the
Secretary of the Commission by May 18,
2012.
IV. Electronic Submissions (E-Filing)
All documents filed in NRC
adjudicatory proceedings, including a
request for hearing, a petition for leave
to intervene, any motion or other
document filed in the proceeding prior
to the submission of a request for
hearing or petition to intervene, and
documents filed by interested
PO 00000
Frm 00085
Fmt 4703
Sfmt 4703
governmental entities participating
under 10 CFR 2.315(c), must be filed in
accordance with the NRC E-Filing rule
(72 FR 49139, August 28, 2007). The EFiling process requires participants to
submit and serve all adjudicatory
documents over the internet, or in some
cases to mail copies on electronic
storage media. Participants may not
submit paper copies of their filings
unless they seek an exemption in
accordance with the procedures
described below.
To comply with the procedural
requirements of E-Filing, at least 10
days prior to the filing deadline, the
participant should contact the Office of
the Secretary by email at
hearing.docket@nrc.gov, or by telephone
at 301–415–1677, to request (1) a digital
identification (ID) certificate, which
allows the participant (or its counselor
representative) to digitally sign
documents and access the E-Submittal
server for any proceeding in which it is
participating; and (2) advise the
Secretary that the participant will be
submitting a request or petition for
hearing (even in instances in which the
participant, or its counselor
representative, already holds an NRCissued digital ID certificate). Based upon
this information, the Secretary will
establish an electronic docket for the
hearing in this proceeding if the
Secretary has not already established an
electronic docket.
Information about applying for a
digital ID certificate is available on the
NRC’s public Web site at https://
www.nrc.gov/site-help/e-submittals/
apply-certificates.html. System
requirements for accessing the ESubmittal server are detailed in the
NRC’s ‘‘Guidance for Electronic
Submission,’’ which is available on the
agency’s public Web site at https://
www.nrc.gov/site-help/esubmittals.html.
Participants may attempt to use other
software not listed on the Web site, but
should note that the NRC’s E-Filing
system does not support unlisted
software, and the NRC Meta System
Help Desk will not be able to offer
assistance in using unlisted software.
If a participant is electronically
submitting a document to the NRC in
accordance with the E-Filing rule, the
participant must file the document
using the NRC’s online, Web-based
submission form. In order to serve
documents through the Electronic
Information Exchange System, users
will be required to install a Web
browser plug-in from the NRC Web site.
Further information on the Web-based
submission form, including the
installation of the Web browser plug-in,
is available on the NRC’s public Web
E:\FR\FM\19MRN1.SGM
19MRN1
emcdonald on DSK29S0YB1PROD with NOTICES
Federal Register / Vol. 77, No. 53 / Monday, March 19, 2012 / Notices
site at https://www.nrc.gov/site-help/esubmittals.html.
Once a participant has obtained a
digital ID certificate and a docket has
been created, the participant can then
submit a request for hearing or petition
for leave to intervene. Submissions
should be in Portable Document Format
(PDF) in accordance with the NRC
guidance available on the NRC public
Web site at https://www.nrc.gov/sitehelp/e-submittals.html. A filing is
considered complete at the time the
documents are submitted through the
NRC’s E-Filing system. To be timely, an
electronic filing must be submitted to
the E-Filing system no later than 11:59
p.m. Eastern Time on the due date.
Upon receipt of a transmission, the EFiling system time-stamps the document
and sends the submitter an email notice
confirming receipt of the document. The
E-Filing system also distributes an email
notice that provides access to the
document to the NRC’ Office of the
General Counsel and any others who
have advised the Office of the Secretary
that they wish to participate in the
proceeding, so that the filer need not
serve the documents on those
participants separately. Therefore,
applicants and other participants (or
their counselor or representative) must
apply for and receive a digital lD
certificate before a hearing request/
petition to intervene is filed so that they
can obtain access to the document via
the E-Filing system.
A person filing electronically using
the agency’s adjudicatory E-Filing
system may seek assistance by
contacting the NRC Meta System Help
Desk through the ‘‘Contact Us’’ link
located on the NRC Web site at https://
www.nrc.gov/site-helple-submitta/
s.htm/ by email at
MSHOResource@nrc.gov, or by a tollfree call at 1–866–672–7640. The NRC
Meta System Help Desk is available
between 8 a.m. and 8 p.m., Eastern
Time, Monday through Friday,
excluding government holidays.
Participants who believe that they
have a good cause for not submitting
documents electronically must file an
exemption request, in accordance with
10 CFR 2.302(g), with their initial paper
filing requesting authorization to
continue to submit documents in paper
format. Such filings must be submitted
by: (1) First class mail addressed to the
Office of the Secretary of the
Commission, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, Attention: Rulemaking and
Adjudications Staff; or (2) courier,
express mail, or expedited delivery
service to the Office of the Secretary,
Sixteenth Floor, One White Flint North,
VerDate Mar<15>2010
13:40 Mar 16, 2012
Jkt 226001
11555 Rockville Pike, Rockville,
Maryland, 20852, Attention:
Rulemaking and Adjudications Staff.
Participants filing a document in this
manner are responsible for serving the
document on all other participants.
Filing is considered complete by firstclass mail as of the time of deposit in
the mail, or by courier, express mail, or
expedited delivery service upon
depositing the document with the
provider of the service. A presiding
officer, having granted an exemption
request from using E-Filing, may require
a participant or party to use E-Filing if
the presiding officer subsequently
determines that the reason for granting
the exemption from use of E-Filing no
longer exists.
Documents submitted in adjudicatory
proceedings will appear in the NRC’s
electronic hearing docket which is
available to the public at https://
ehd1.nrc.gov/ehd/, unless excluded
pursuant to an order of the Commission,
or the presiding officer. Participants are
requested not to include personal
privacy information, such as social
security numbers, home addresses, or
home phone numbers in their filings,
unless an NRC regulation or other law
requires submission of such
information. With respect to
copyrighted works, except for limited
excerpts that serve the purpose of the
adjudicatory filings and would
constitute a Fair Use application,
participants are requested not to include
copyrighted materials in their
submission.
Petitions for leave to intervene must
be filed no later than 60 days from
March 19, 2012. Non-timely filings will
not be entertained absent a
determination by the presiding officer
that the petition or request should be
granted or the contentions should be
admitted, based on a balancing of the
factors specified in 10 CFR
2.309(c)(1)(i)–(viii).
Order Imposing Procedures for Access
to Sensitive Unclassified NonSafeguards Information and Safeguards
Information for Contention Preparation
A. This Order contains instructions
regarding how potential parties to this
proceeding may request access to
documents containing sensitive
unclassified information (including
Sensitive Unclassified Non-Safeguards
Information (SUNSI) and Safeguards
Information (SGI)). Requirements for
access to SGI are primarily set forth in
10 CFR parts 2 and 73. Nothing in this
Order is intended to conflict with the
SGI regulations.
B. Within 10 days after publication of
this notice of hearing and opportunity to
PO 00000
Frm 00086
Fmt 4703
Sfmt 4703
16079
petition for leave to intervene, any
potential party who believes access to
SUNSI or SGI is necessary to respond to
this notice may request access to SUNSI
or SGI. A ‘‘potential party’’ is any
person who intends to participate as a
party by demonstrating standing and
filing an admissible contention under 10
CFR 2.309. Requests for access to SUNSI
or SGI submitted later than 10 days after
publication will not be considered
absent a showing of good cause for the
late filing, addressing why the request
could not have been filed earlier.
C. The requestor shall submit a letter
requesting permission to access SUNSI,
SGI, or both to the Office of the
Secretary, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, Attention: Rulemakings and
Adjudications Staff, and provide a copy
to the Associate General Counsel for
Hearings, Enforcement and
Administration, Office of the General
Counsel, Washington, DC 20555–0001.
The expedited delivery or courier mail
address for both offices is: U.S. Nuclear
Regulatory Commission, 11555
Rockville Pike, Rockville, Maryland
20852. The email address for the Office
of the Secretary and the Office of the
General Counsel are
Hearing.Docket@nrc.gov and
OGCmailcenter@nrc.gov, respectively.1
The request must include the following
information:
(1) A description of the licensing
action with a citation to this Federal
Register notice;
(2) The name and address of the
potential party and a description of the
potential party’s particularized interest
that could be harmed by the action
identified in C.(1);
(3) If the request is for SUNSI, the
identity of the individual or entity
requesting access to SUNSI and the
requestor’s basis for the need for the
information in order to meaningfully
participate in this adjudicatory
proceeding. In particular, the request
must explain why publicly-available
versions of the information requested
would not be sufficient to provide the
basis and specificity for a proffered
contention; and
(4) If the request is for SGI, the
identity of each individual who would
have access to SGI if the request is
granted, including the identity of any
expert, consultant, or assistant who will
aid the requestor in evaluating the SGI.
1 While a request for hearing or petition to
intervene in this proceeding must comply with the
filing requirements of the NRC’s ‘‘E-Filing Rule,’’
the initial request to access SUNSI and/or SGI
under these procedures should be submitted as
described in this paragraph.
E:\FR\FM\19MRN1.SGM
19MRN1
16080
Federal Register / Vol. 77, No. 53 / Monday, March 19, 2012 / Notices
emcdonald on DSK29S0YB1PROD with NOTICES
In addition, the request must contain
the following information:
(a) A statement that explains each
individual’s ‘‘need to know’’ the SGI, as
required by 10 CFR 73.2 and 10 CFR
73.22(b)(1). Consistent with the
definition of ‘‘need to know’’ as stated
in 10 CFR 73.2, the statement must
explain:
(i) Specifically why the requestor
believes that the information is
necessary to enable the requestor to
proffer and/or adjudicate a specific
contention in this proceeding; 2 and
(ii) The technical competence
(demonstrable knowledge, skill, training
or education) of the requestor to
effectively utilize the requested SGI to
provide the basis and specificity for a
proffered contention. The technical
competence of a potential party or its
counsel may be shown by reliance on a
qualified expert, consultant, or assistant
who satisfies these criteria.
(b) A completed Form SF–85,
‘‘Questionnaire for Non-Sensitive
Positions’’ for each individual who
would have access to SGI. The
completed Form SF–85 will be used by
the Office of Administration to conduct
the background check required for
access to SGI, as required by 10 CFR
part 2, subpart G and 10 CFR
73.22(b)(2), to determine the requestor’s
trustworthiness and reliability. For
security reasons, Form SF–85 can only
be submitted electronically through the
electronic questionnaire for
investigations processing (e-QIP) Web
site, a secure Web site that is owned and
operated by the Office of Personnel
Management. To obtain online access to
the form, the requestor should contact
the NRC’s Office of Administration at
301–492–3524.3
(c) A completed Form FD–258
(fingerprint card), signed in original ink,
and submitted in accordance with 10
CFR 73.57(d). Copies of Form FD–258
may be obtained by writing the Office of
Information Services, U.S. Nuclear
Regulatory Commission, Washington,
DC 20555–0001, by calling 301–415–
5877, or by email to
Forms.Resource@nrc.gov. The
2 Broad SGI requests under these procedures are
unlikely to meet the standard for need to know;
furthermore, staff redaction of information from
requested documents before their release may be
appropriate to comport with this requirement.
These procedures do not authorize unrestricted
disclosure or less scrutiny of a requestor’s need to
know than ordinarily would be applied in
connection with an already-admitted contention or
non-adjudicatory access to SGI.
3 The requestor will be asked to provide his or her
full name, social security number, date and place
of birth, telephone number, and email address.
After providing this information, the requestor
usually should be able to obtain access to the online
form within one business day.
VerDate Mar<15>2010
13:40 Mar 16, 2012
Jkt 226001
fingerprint card will be used to satisfy
the requirements of 10 CFR part 2, 10
CFR 73.22(b)(1), and Section 149 of the
Atomic Energy Act of 1954, as amended,
which mandates that all persons with
access to SGI must be fingerprinted for
an FBI identification and criminal
history records check.
(d) A check or money order payable
in the amount of $ 200.00 4 to the U.S.
Nuclear Regulatory Commission for
each individual for whom the request
for access has been submitted.
(e) If the requestor or any individual
who will have access to SGI believes
they belong to one or more of the
categories of individuals that are exempt
from the criminal history records check
and background check requirements in
10 CFR 73.59, the requestor should also
provide a statement identifying which
exemption the requestor is invoking and
explaining the requestor’s basis for
believing that the exemption applies.
While processing the request, the Office
of Administration, Personnel Security
Branch, will make a final determination
whether the claimed exemption applies.
Alternatively, the requestor may contact
the Office of Administration for an
evaluation of their exemption status
prior to submitting their request.
Persons who are exempt from the
background check are not required to
complete the SF–85 or Form FD–258;
however, all other requirements for
access to SGI, including the need to
know, are still applicable.
Note: Copies of documents and materials
required by paragraphs C.(4)(b), (c), and (d)
of this Order must be sent to the following
address: Office of Administration, U.S.
Nuclear Regulatory Commission, Personnel
Security Branch, Mail Stop TWB–05–B32M,
Washington, DC 20555–0001.
These documents and materials should not
be included with the request letter to the
Office of the Secretary, but the request letter
should state that the forms and fees have
been submitted as required above.
D. To avoid delays in processing
requests for access to SGI, the requestor
should review all submitted materials
for completeness and accuracy
(including legibility) before submitting
them to the NRC. The NRC will return
incomplete packages to the sender
without processing.
E. Based on an evaluation of the
information submitted under paragraphs
C.(3) or C.(4) above, as applicable, the
NRC staff will determine within 10 days
of receipt of the request whether:
(1) There is a reasonable basis to
believe the petitioner is likely to
4 This fee is subject to change pursuant to the
Office of Personnel Management’s adjustable billing
rates.
PO 00000
Frm 00087
Fmt 4703
Sfmt 4703
establish standing to participate in this
NRC proceeding; and
(2) The requestor has established a
legitimate need for access to SUNSI or
need to know the SGI requested.
F. For requests for access to SUNSI, if
the NRC staff determines that the
requestor satisfies both E.(1) and E.(2)
above, the NRC staff will notify the
requestor in writing that access to
SUNSI has been granted. The written
notification will contain instructions on
how the requestor may obtain copies of
the requested documents, and any other
conditions that may apply to access to
those documents. These conditions may
include, but are not limited to, the
signing of a Non-Disclosure Agreement
or Affidavit, or Protective Order 5 setting
forth terms and conditions to prevent
the unauthorized or inadvertent
disclosure of SUNSI by each individual
who will be granted access to SUNSI.
G. For requests for access to SGI, if the
NRC staff determines that the requestor
has satisfied both E.(1) and E.(2) above,
the Office of Administration will then
determine, based upon completion of
the background check, whether the
proposed recipient is trustworthy and
reliable, as required for access to SGI by
10 CFR 73.22(b). If the Office of
Administration determines that the
individual or individuals are
trustworthy and reliable, the NRC will
promptly notify the requestor in writing.
The notification will provide the names
of approved individuals as well as the
conditions under which the SGI will be
provided. Those conditions may
include, but not be limited to, the
signing of a Non-Disclosure Agreement
or Affidavit, or Protective Order 6 by
each individual who will be granted
access to SGI.
H. Release and Storage of SGI. Prior
to providing SGI to the requestor, the
NRC staff will conduct (as necessary) an
inspection to confirm that the
recipient’s information protection
system is sufficient to satisfy the
requirements of 10 CFR 73.22.
Alternatively, recipients may opt to
view SGI at an approved SGI storage
location rather than establish their own
SGI protection program to meet SGI
protection requirements.
5 Any motion for Protective Order or draft NonDisclosure Affidavit or Agreement for SUNSI must
be filed with the presiding officer or the Chief
Administrative Judge if the presiding officer has not
yet been designated, within 30 days of the deadline
for the receipt of the written access request.
6 Any motion for Protective Order or draft NonDisclosure Affidavit or Agreement for SGI must be
filed with the presiding officer or the Chief
Administrative Judge if the presiding officer has not
yet been designated, within 180 days of the
deadline for the receipt of the written access
request.
E:\FR\FM\19MRN1.SGM
19MRN1
Federal Register / Vol. 77, No. 53 / Monday, March 19, 2012 / Notices
I. Filing of Contentions. Any
contentions in these proceedings that
are based upon the information received
as a result of the request made for
SUNSI or SGI must be filed by the
requestor no later than 25 days after the
requestor is granted access to that
information. However, if more than 25
days remain between the date the
petitioner is granted access to the
information and the deadline for filing
all other contentions (as established in
the notice of hearing or opportunity for
hearing), the petitioner may file its
SUNSI or SGI contentions by that later
deadline.
J. Review of Denials of Access.
(1) If the request for access to SUNSI
or SGI is denied by the NRC staff either
after a determination on standing and
requisite need, or after a determination
on trustworthiness and reliability, the
NRC staff shall immediately notify the
requestor in writing, briefly stating the
reason or reasons for the denial.
(2) Before the Office of
Administration makes an adverse
determination regarding the proposed
recipient(s) trustworthiness and
reliability for access to SGI, the Office
of Administration, in accordance with
10 CFR 2.705(c)(3)(iii), must provide the
proposed recipient(s) any records that
were considered in the trustworthiness
and reliability determination, including
those required to be provided under 10
CFR 73.57(e)(1), so that the proposed
recipient(s) have an opportunity to
correct or explain the record.
(3) The requestor may challenge the
NRC staff’s adverse determination with
respect to access to SUNSI by filing a
challenge within 5 days of receipt of
that determination with: (a) The
presiding officer designated in this
proceeding; (b) if no presiding officer
has been appointed, the Chief
Administrative Judge, or if he or she is
unavailable, another administrative
judge, or an administrative law judge
with jurisdiction pursuant to 10 CFR
2.318(a); or (c) if another officer has
been designated to rule on information
access issues, with that officer.
(4) The requestor may challenge the
NRC staff’s or Office of Administration’s
adverse determination with respect to
access to SGI by filing a request for
review in accordance with 10 CFR
2.705(c)(3)(iv). Further appeals of
decisions under this paragraph must be
made pursuant to 10 CFR 2.311.
K. Review of Grants of Access. A
party other than the requestor may
challenge an NRC staff determination
granting access to SUNSI or SGI whose
release would harm that party’s interest
independent of the proceeding. Such a
challenge must be filed with the Chief
Administrative Judge within 5 days of
16081
the notification by the NRC staff of its
grant of access.
If challenges to the NRC staff
determinations are filed, these
procedures give way to the normal
process for litigating disputes
concerning access to information. The
availability of interlocutory review by
the Commission of orders ruling on
such NRC staff determinations (whether
granting or denying access) is governed
by 10 CFR 2.311.7
L. The Commission expects that the
NRC staff and presiding officers (and
any other reviewing officers) will
consider and resolve requests for access
to SUNSI or SGI, and motions for
protective orders, in a timely fashion in
order to minimize any unnecessary
delays in identifying those petitioners
who have standing and who have
propounded contentions meeting the
specificity and basis requirements in 10
CFR part 2. Attachment 1 to this Order
summarizes the general target schedule
for processing and resolving requests
under these procedures.
It is so ordered.
Dated at Rockville, Maryland this 13th day
of March, 2012.
For the Nuclear Regulatory Commission.
Annette L. Vietti-Cook,
Secretary of the Commission.
ATTACHMENT 1—GENERAL TARGET SCHEDULE FOR PROCESSING AND RESOLVING REQUESTS FOR ACCESS TO SENSITIVE
UNCLASSIFIED NON-SAFEGUARDS INFORMATION AND SAFEGUARDS INFORMATION IN THIS PROCEEDING
Day
Event/Activity
0 .............
Publication of Federal Register notice of hearing and opportunity to petition for leave to intervene, including order with instructions
for access requests.
Deadline for submitting requests for access to Sensitive Unclassified Non-Safeguards Information (SUNSI) and/or Safeguards Information (SGI) with information: supporting the standing of a potential party identified by name and address; describing the need for
the information in order for the potential party to participate meaningfully in an adjudicatory proceeding; demonstrating that access
should be granted (e.g., showing technical competence for access to SGI); and, for SGI, including application fee for fingerprint/
background check.
Deadline for submitting petition for intervention containing: (i) Demonstration of standing; (ii) all contentions whose formulation does
not require access to SUNSI and/or SGI (+25 Answers to petition for intervention; +7 requestor/petitioner reply).
Nuclear Regulatory Commission (NRC) staff informs the requestor of the staff’s determination whether the request for access provides a reasonable basis to believe standing can be established and shows (1) need for SUNSI or (2) need to know for SGI. (For
SUNSI, NRC staff also informs any party to the proceeding whose interest independent of the proceeding would be harmed by the
release of the information.) If NRC staff makes the finding of need for SUNSI and likelihood of standing, NRC staff begins document processing (preparation of redactions or review of redacted documents). If NRC staff makes the finding of need to know for
SGI and likelihood of standing, NRC staff begins background check (including fingerprinting for a criminal history records check),
information processing (preparation of redactions or review of redacted documents), and readiness inspections.
If NRC staff finds no ‘‘need,’’ no ‘‘need to know,’’ or no likelihood of standing, the deadline for requestor/petitioner to file a motion
seeking a ruling to reverse the NRC staff’s denial of access; NRC staff files copy of access determination with the presiding officer
(or Chief Administrative Judge or other designated officer, as appropriate). If NRC staff finds ‘‘need’’ for SUNSI, the deadline for
any party to the proceeding whose interest independent of the proceeding would be harmed by the release of the information to
file a motion seeking a ruling to reverse the NRC staff’s grant of access.
Deadline for NRC staff reply to motions to reverse NRC staff determination(s).
(Receipt +30) If NRC staff finds standing and need for SUNSI, deadline for NRC staff to complete information processing and file
motion for Protective Order and draft Non-Disclosure Affidavit. Deadline for applicant/licensee to file Non-Disclosure Agreement for
SUNSI.
10 ...........
60 ...........
20 ...........
emcdonald on DSK29S0YB1PROD with NOTICES
25 ...........
30 ...........
40 ...........
7 Requestors should note that the filing
requirements of the NRC’s E-Filing Rule (72 FR
49139; August 28, 2007) apply to appeals of NRC
VerDate Mar<15>2010
13:40 Mar 16, 2012
Jkt 226001
staff determinations (because they must be served
on a presiding officer or the Commission, as
PO 00000
Frm 00088
Fmt 4703
Sfmt 4703
applicable), but not to the initial SUNSI/SGI request
submitted to the NRC staff under these procedures.
E:\FR\FM\19MRN1.SGM
19MRN1
16082
Federal Register / Vol. 77, No. 53 / Monday, March 19, 2012 / Notices
ATTACHMENT 1—GENERAL TARGET SCHEDULE FOR PROCESSING AND RESOLVING REQUESTS FOR ACCESS TO SENSITIVE
UNCLASSIFIED NON-SAFEGUARDS INFORMATION AND SAFEGUARDS INFORMATION IN THIS PROCEEDING—Continued
Day
Event/Activity
190 .........
(Receipt +180) If NRC staff finds standing, need to know for SGI, and trustworthiness and reliability, deadline for NRC staff to file
motion for Protective Order and draft Non-disclosure Affidavit (or to make a determination that the proposed recipient of SGI is not
trustworthy or reliable). Note: Before the Office of Administration makes an adverse determination regarding access to SGI, the
proposed recipient must be provided an opportunity to correct or explain information.
Deadline for petitioner to seek reversal of a final adverse NRC staff trustworthiness or reliability determination either before the presiding officer or another designated officer under 10 CFR 2.705(c)(3)(iv).
If access granted: Issuance of presiding officer or other designated officer decision on motion for protective order for access to sensitive information (including schedule for providing access and submission of contentions) or decision reversing a final adverse determination by the NRC staff.
Deadline for filing executed Non-Disclosure Affidavits. Access provided to SUNSI and/or SGI consistent with decision issuing the
protective order.
Deadline for submission of contentions whose development depends upon access to SUNSI and/or SGI. However, if more than 25
days remain between the petitioner’s receipt of (or access to) the information and the deadline for filing all other contentions (as
established in the notice of hearing or opportunity for hearing), the petitioner may file its SUNSI or SGI contentions by that later
deadline.
(Contention receipt +25) Answers to contentions whose development depends upon access to SUNSI and/or SGI.
(Answer receipt +7) Petitioner/Intervenor reply to answers.
Decision on contention admission.
205 .........
A ............
A + 3 ......
A + 28 ....
A + 53 ....
A + 60 ....
>A + 60 ..
[FR Doc. 2012–6541 Filed 3–16–12; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
Advisory Committee on Reactor
Safeguards (ACRS), Meeting of the
ACRS Subcommittee on Planning and
Procedures; Notice of Meeting
emcdonald on DSK29S0YB1PROD with NOTICES
The ACRS Subcommittee on Planning
and Procedures will hold a meeting on
April 11, 2012, Room T–2B3, 11545
Rockville Pike, Rockville, Maryland.
The entire meeting will be open to
public attendance, with the exception of
a portion that may be closed pursuant
to 5 U.S.C. 552b (c)(2) and (6) to discuss
organizational and personnel matters
that relate solely to the internal
personnel rules and practices of the
ACRS, and information the release of
which would constitute a clearly
unwarranted invasion of personal
privacy.
The agenda for the subject meeting
shall be as follows:
Wednesday, April 11, 2012—11 a.m.
Until 12 p.m.
The Subcommittee will discuss
proposed ACRS activities and related
matters. The Subcommittee will gather
information, analyze relevant issues and
facts, and formulate proposed positions
and actions, as appropriate, for
deliberation by the Full Committee.
Members of the public desiring to
provide oral statements and/or written
comments should notify the Designated
Federal Official (DFO), Antonio Dias
(Telephone 301–415–6805 or Email:
Antonio.Dias@nrc.gov) five days prior to
the meeting, if possible, so that
VerDate Mar<15>2010
13:40 Mar 16, 2012
Jkt 226001
arrangements can be made. Thirty-five
hard copies of each presentation or
handout should be provided to the DFO
thirty minutes before the meeting. In
addition, one electronic copy of each
presentation should be emailed to the
DFO one day before the meeting. If an
electronic copy cannot be provided
within this timeframe, presenters
should provide the DFO with a CD
containing each presentation at least
thirty minutes before the meeting.
Electronic recordings will be permitted
only during those portions of the
meeting that are open to the public.
Detailed procedures for the conduct of
and participation in ACRS meetings
were published in the Federal Register
on October 17, 2011, (76 FR 64126–
64127).
Information regarding changes to the
agenda, whether the meeting has been
canceled or rescheduled, and the time
allotted to present oral statements can
be obtained by contacting the identified
DFO. Moreover, in view of the
possibility that the schedule for ACRS
meetings may be adjusted by the
Chairman as necessary to facilitate the
conduct of the meeting, persons
planning to attend should check with
the DFO if such rescheduling would
result in a major inconvenience.
If attending this meeting, please enter
through the One White Flint North
building, 11555 Rockville Pike,
Rockville, MD. After registering with
security, please contact Mr. Theron
Brown (240–888–9835) to be escorted to
the meeting room.
PO 00000
Frm 00089
Fmt 4703
Sfmt 4703
Dated: March 7, 2012.
Cayetano Santos,
Chief, Reactor Safety Branch, Advisory
Committee on Reactor Safeguards.
[FR Doc. 2012–6543 Filed 3–16–12; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[EA–12–051; NRC–2012–0067; Docket Nos.
(as shown in Attachment 1), License Nos.
(as shown in Attachment 1), or
Construction Permit Nos. (as shown in
Attachment 1)]
In the Matter of All Power Reactor
Licensees and Holders of Construction
Permits in Active Or Deferred Status:
Order Modifying Licenses With Regard
To Reliable Spent Fuel Pool
Instrumentation (Effective
Immediately)
I
The Licensees and construction
permit (CP) holders1 identified in
Attachment 1 to this Order hold licenses
issued by the U.S. Nuclear Regulatory
Commission (NRC or Commission)
authorizing operation and/or
construction of nuclear power plants in
accordance with the Atomic Energy Act
of 1954, as amended, and Title 10 of the
Code of Federal Regulations (10 CFR)
Part 50, ‘‘Domestic Licensing of
Production and Utilization Facilities,’’
and Part 52, ‘‘Licenses, Certifications,
and Approvals for Nuclear Power
Plants.’’
1 CP holders, as used in this Order, includes CPs,
in active or deferred status, as identified in
Attachment 1 to this Order (i.e., Watts Bar, Unit 2;
and Bellefonte, Units 1 and 2)
E:\FR\FM\19MRN1.SGM
19MRN1
Agencies
[Federal Register Volume 77, Number 53 (Monday, March 19, 2012)]
[Notices]
[Pages 16077-16082]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-6541]
[[Page 16077]]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. 70-0036; NRC-2012-0054]
License Amendment Request From Westinghouse Electric Company,
LLC, Hematite Decommissioning Project
AGENCY: Nuclear Regulatory Commission.
ACTION: License amendment request; opportunity to provide comments,
request a hearing and to petition for leave to intervene, and Order.
-----------------------------------------------------------------------
DATES: Submit comments by May 18, 2012. Requests for a hearing or leave
to intervene must be filed by May 18, 2012. Any potential party as
defined in Title 10 of the Code of Federal Regulations (10 CFR) 2.4,
who believes access to Sensitive Unclassified Non-Safeguards
Information (SUNSI) and/or Safeguards Information (SGI) is necessary to
respond to this notice must request document access by March 29, 2012.
ADDRESSES: You may access information and comment submissions related
to this document, which the NRC possesses and is publically available,
by searching on https://www.regulations.gov under Docket ID NRC-2012-
0054.
You may submit comments by the following methods:
Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2012-0054. Address
questions about NRC dockets to Carol Gallagher; telephone: 301-492-
3668; email: Carol.Gallagher@nrc.gov.
Mail comments to: Cindy Bladey, Chief, Rules,
Announcements, and Directives Branch (RADB), Office of Administration,
Mail Stop: TWB-05-B01M, U.S. Nuclear Regulatory Commission, Washington,
DC 20555-0001.
Fax comments to: RADB at 301-492-3446.
For additional direction on accessing information and submitting
comments, see ``Accessing Information and Submitting Comments'' in the
SUPPLEMENTARY INFORMATION section of this document.
FOR FURTHER INFORMATION CONTACT: John J. Hayes, Office of Federal and
State Materials and Environmental Management Programs, U.S. Nuclear
Regulatory Commission, Washington, DC 20555-0001, telephone: 301-415-
5928; email: John.Hayes@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Accessing Information and Submitting Comments
A. Accessing Information
Please refer to Docket ID NRC-2012-0054 when contacting the NRC
about the availability of information regarding this document. You may
access information related to this document, which the NRC possesses
and is publicly-available, by the following methods:
Federal Rulemaking Web Site: Go to https://www.regulations.gov and search for Docket ID NRC-2012-0054.
NRC's Agencywide Documents Access and Management System
(ADAMS): You may access publicly-available documents online in the NRC
Library at https://www.nrc.gov/reading-rm/adams.html. To begin the
search, select ``ADAMS Public Documents'' and then select ``Begin Web-
based ADAMS Search.'' For problems with ADAMS, please contact the NRC's
Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-
4737, or by email to pdr.resource@nrc.gov.
NRC's PDR: You may examine and purchase copies of public
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852.
B. Submitting Comments
Please include Docket ID NRC-2012-0054 in the subject line of your
comment submission, in order to ensure that the NRC is able to make
your comment submission available to the public in this docket.
The NRC cautions you not to include identifying or contact
information in comment submissions that you do not want to be publicly
disclosed. The NRC posts all comment submissions at https://www.regulations.gov as well as enters the comment submissions into
ADAMS, and the NRC does not edit comment submissions to remove
identifying or contact information.
If you are requesting or aggregating comments from other persons
for submission to the NRC, then you should inform those persons not to
include identifying or contact information in their comment submissions
that they do not want to be publicly disclosed. Your request should
state that the NRC will not edit comment submissions to remove such
information before making the comment submissions available to the
public or entering the comment submissions into ADAMS.
II. Introduction
The U.S. Nuclear Regulatory Commission (NRC or the Commission) has
received a license amendment application from Westinghouse Electric
Company, LLC (WEC or the licensee), dated January 16, 2012, for
disposal of NRC-licensed source, byproduct, and special nuclear
material pursuant to 10 CFR 20.2002 from its former fuel cycle facility
located in Festus, Missouri. The licensee holds NRC License No. SNM-33
and is authorized to conduct decommissioning activities at the
facility. The amendment requests authorization for WEC to transfer
decommissioning waste from the facility to U.S. Ecology Idaho, Inc., a
Resource Conservation and Recovery Act (RCRA) Subtitle C disposal
facility located near Grand View, Idaho. The U.S. Ecology Idaho
facility is regulated by the Idaho Department of Environmental Quality
and is not an NRC-licensed facility. Pursuant to 10 CFR 30.11 and
70.17, WEC's application also requests that U.S. Ecology be granted
exemptions from the licensing requirements of 10 CFR 30.3 and 70.3 for
byproduct and special nuclear material, respectively, so that the U.S.
Ecology may accept the material under the terms of its facility permit.
An NRC administrative review, documented in a letter to WEC dated
February 3, 2012, (ADAMS Accession No. ML120240300) found the
application acceptable to begin a technical review. If the NRC approves
the amendment, the approval will be documented in an amendment to NRC
License No. SNM-33. However, before approving the proposed amendment,
the NRC will need to make the findings required by the Atomic Energy
Act of 1954, as amended, and the NRC's regulations. These findings will
be documented in a Safety Evaluation Report and an Environmental
Assessment.
III. Opportunity To Request a Hearing and Petitions for Leave To
Intervene
Requirements for hearing requests and petitions for leave to
intervene are found in 10 CFR 2.309, ``Hearing Requests, Petitions to
Intervene, Requirements for Standing, and Contentions.'' Interested
persons should consult 10 CFR 2.309, which is available at the NRC's
PDR, Room O1-F21, One White Flint North, 11555 Rockville Pike,
Rockville, MD 20852. You may also call the PDR at 1-800-397-4209 or
301-415-4737. The NRC regulations are also accessible online in the NRC
Library at https://www.nrc.govreading-rm/adams.html.
Any person whose interest may be affected by this proceeding and
who wishes to participate as a party in the proceeding must file a
written petition for leave to intervene. As required by 10
[[Page 16078]]
CFR 2.309, a petition for leave to intervene shall set forth with
particularity the interest of the petitioner in the proceeding and how
that interest may be affected by the results of the proceeding. The
petition must provide the name, address, and telephone number of the
petitioner and specifically explain the reasons why intervention should
be permitted with particular reference to the following factors: (1)
The nature of the petitioner's right under the Act to be made a party
to the proceeding; (2) the nature and extent of the petitioner's
property, financial, or other interest in the proceeding; and (3) the
possible effect of any order that may be entered in the proceeding on
the petitioner's interest.
A petition for leave to intervene must also include a specification
of the contentions that the petitioner seeks to have litigated in the
hearing. For each contention, the petitioner must provide a specific
statement of the issue of law or fact to be raised or controverted, as
well as a brief explanation of the basis for the contention.
Additionally, the petitioner must demonstrate that the issue raised by
each contention is within the scope of the proceeding and is material
to the findings the NRC must make to support the granting of a license
amendment in response to the application. The petition must also
include a concise statement of the alleged facts or expert opinions
which support the position of the petitioner and on which the
petitioner intends to rely at hearing, together with references to the
specific sources and documents on which the petitioner intends to rely.
Finally, the petition must provide sufficient information to show that
a genuine dispute exists with the applicant on a material issue of law
or fact, including references to specific portions of the application
for amendment that the petitioner disputes and the supporting reasons
for each dispute, or, if the petitioner believes that the application
for amendment fails to contain information on a relevant matter as
required by law, the identification of each failure and the supporting
reasons for the petitioner's belief. Each contention must be one that,
if proven, would entitle the petitioner to relief.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene,
and have the opportunity to participate fully in the conduct of the
hearing with respect to resolution of that person's admitted
contentions, including the opportunity to present evidence and to
submit a cross-examination plan for cross-examination of witnesses,
consistent with NRC regulations, policies, and procedures. The Atomic
Safety and Licensing Board (the Licensing Board) will set the time and
place for any prehearing conferences and evidentiary hearings, and the
appropriate notices will be provided.
Non-timely petitions for leave to intervene and contentions,
amended petitions, and supplemental petitions will not be entertained
absent a determination by the Commission, the Licensing Board or a
Presiding Officer that the petition should be granted and/or the
contentions should be admitted based upon a balancing of the factors
specified in 10 CFR 2.309(c)(1)(i)(viii).
A State, county, municipality, Federally-recognized Indian tribe,
or agencies thereof, may submit a petition to the Commission to
participate as a party under 10 CFR 2.309(d)(2). The petition should
state the nature and extent of the petitioner's interest in the
proceeding. The petition should be submitted to the Commission by May
18, 2012. The petition must be filed in accordance with the filing
instructions in Section IV of this document, and should meet the
requirements for petitions for leave to intervene set forth in this
section, except that State and Federally-recognized Indian tribes do
not need to address the standing requirements in 10 CFR 2.309(d)(1) if
the facility is located within its boundaries. The entities listed
above could also seek to participate in a hearing as a nonparty
pursuant to 10 CFR 2.315(c).
Any person who does not wish, or is not qualified, to become a
party to this proceeding may request permission to make a limited
appearance pursuant to the provisions of 10 CFR 2.315(a). A person
making a limited appearance may make an oral or written statement of
position on the issues, but may not otherwise participate in the
proceeding. A limited appearance may be made at any session of the
hearing or at any prehearing conference, subject to such limits and
conditions as may be imposed by the Licensing Board. Persons desiring
to make a limited appearance are requested to inform the Secretary of
the Commission by May 18, 2012.
IV. Electronic Submissions (E-Filing)
All documents filed in NRC adjudicatory proceedings, including a
request for hearing, a petition for leave to intervene, any motion or
other document filed in the proceeding prior to the submission of a
request for hearing or petition to intervene, and documents filed by
interested governmental entities participating under 10 CFR 2.315(c),
must be filed in accordance with the NRC E-Filing rule (72 FR 49139,
August 28, 2007). The E-Filing process requires participants to submit
and serve all adjudicatory documents over the internet, or in some
cases to mail copies on electronic storage media. Participants may not
submit paper copies of their filings unless they seek an exemption in
accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least 10
days prior to the filing deadline, the participant should contact the
Office of the Secretary by email at hearing.docket@nrc.gov, or by
telephone at 301-415-1677, to request (1) a digital identification (ID)
certificate, which allows the participant (or its counselor
representative) to digitally sign documents and access the E-Submittal
server for any proceeding in which it is participating; and (2) advise
the Secretary that the participant will be submitting a request or
petition for hearing (even in instances in which the participant, or
its counselor representative, already holds an NRC-issued digital ID
certificate). Based upon this information, the Secretary will establish
an electronic docket for the hearing in this proceeding if the
Secretary has not already established an electronic docket.
Information about applying for a digital ID certificate is
available on the NRC's public Web site at https://www.nrc.gov/site-help/e-submittals/apply-certificates.html. System requirements for accessing
the E-Submittal server are detailed in the NRC's ``Guidance for
Electronic Submission,'' which is available on the agency's public Web
site at https://www.nrc.gov/site-help/esubmittals.html. Participants may
attempt to use other software not listed on the Web site, but should
note that the NRC's E-Filing system does not support unlisted software,
and the NRC Meta System Help Desk will not be able to offer assistance
in using unlisted software.
If a participant is electronically submitting a document to the NRC
in accordance with the E-Filing rule, the participant must file the
document using the NRC's online, Web-based submission form. In order to
serve documents through the Electronic Information Exchange System,
users will be required to install a Web browser plug-in from the NRC
Web site. Further information on the Web-based submission form,
including the installation of the Web browser plug-in, is available on
the NRC's public Web
[[Page 16079]]
site at https://www.nrc.gov/site-help/e-submittals.html.
Once a participant has obtained a digital ID certificate and a
docket has been created, the participant can then submit a request for
hearing or petition for leave to intervene. Submissions should be in
Portable Document Format (PDF) in accordance with the NRC guidance
available on the NRC public Web site at https://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the time the
documents are submitted through the NRC's E-Filing system. To be
timely, an electronic filing must be submitted to the E-Filing system
no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of
a transmission, the E-Filing system time-stamps the document and sends
the submitter an email notice confirming receipt of the document. The
E-Filing system also distributes an email notice that provides access
to the document to the NRC' Office of the General Counsel and any
others who have advised the Office of the Secretary that they wish to
participate in the proceeding, so that the filer need not serve the
documents on those participants separately. Therefore, applicants and
other participants (or their counselor or representative) must apply
for and receive a digital lD certificate before a hearing request/
petition to intervene is filed so that they can obtain access to the
document via the E-Filing system.
A person filing electronically using the agency's adjudicatory E-
Filing system may seek assistance by contacting the NRC Meta System
Help Desk through the ``Contact Us'' link located on the NRC Web site
at https://www.nrc.gov/site-helple-submitta/s.htm/ by email at
MSHOResource@nrc.gov, or by a toll-free call at 1-866-672-7640. The NRC
Meta System Help Desk is available between 8 a.m. and 8 p.m., Eastern
Time, Monday through Friday, excluding government holidays.
Participants who believe that they have a good cause for not
submitting documents electronically must file an exemption request, in
accordance with 10 CFR 2.302(g), with their initial paper filing
requesting authorization to continue to submit documents in paper
format. Such filings must be submitted by: (1) First class mail
addressed to the Office of the Secretary of the Commission, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or
expedited delivery service to the Office of the Secretary, Sixteenth
Floor, One White Flint North, 11555 Rockville Pike, Rockville,
Maryland, 20852, Attention: Rulemaking and Adjudications Staff.
Participants filing a document in this manner are responsible for
serving the document on all other participants. Filing is considered
complete by first-class mail as of the time of deposit in the mail, or
by courier, express mail, or expedited delivery service upon depositing
the document with the provider of the service. A presiding officer,
having granted an exemption request from using E-Filing, may require a
participant or party to use E-Filing if the presiding officer
subsequently determines that the reason for granting the exemption from
use of E-Filing no longer exists.
Documents submitted in adjudicatory proceedings will appear in the
NRC's electronic hearing docket which is available to the public at
https://ehd1.nrc.gov/ehd/, unless excluded pursuant to an order of the
Commission, or the presiding officer. Participants are requested not to
include personal privacy information, such as social security numbers,
home addresses, or home phone numbers in their filings, unless an NRC
regulation or other law requires submission of such information. With
respect to copyrighted works, except for limited excerpts that serve
the purpose of the adjudicatory filings and would constitute a Fair Use
application, participants are requested not to include copyrighted
materials in their submission.
Petitions for leave to intervene must be filed no later than 60
days from March 19, 2012. Non-timely filings will not be entertained
absent a determination by the presiding officer that the petition or
request should be granted or the contentions should be admitted, based
on a balancing of the factors specified in 10 CFR 2.309(c)(1)(i)-
(viii).
Order Imposing Procedures for Access to Sensitive Unclassified Non-
Safeguards Information and Safeguards Information for Contention
Preparation
A. This Order contains instructions regarding how potential parties
to this proceeding may request access to documents containing sensitive
unclassified information (including Sensitive Unclassified Non-
Safeguards Information (SUNSI) and Safeguards Information (SGI)).
Requirements for access to SGI are primarily set forth in 10 CFR parts
2 and 73. Nothing in this Order is intended to conflict with the SGI
regulations.
B. Within 10 days after publication of this notice of hearing and
opportunity to petition for leave to intervene, any potential party who
believes access to SUNSI or SGI is necessary to respond to this notice
may request access to SUNSI or SGI. A ``potential party'' is any person
who intends to participate as a party by demonstrating standing and
filing an admissible contention under 10 CFR 2.309. Requests for access
to SUNSI or SGI submitted later than 10 days after publication will not
be considered absent a showing of good cause for the late filing,
addressing why the request could not have been filed earlier.
C. The requestor shall submit a letter requesting permission to
access SUNSI, SGI, or both to the Office of the Secretary, U.S. Nuclear
Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemakings and Adjudications Staff, and provide a copy to the
Associate General Counsel for Hearings, Enforcement and Administration,
Office of the General Counsel, Washington, DC 20555-0001. The expedited
delivery or courier mail address for both offices is: U.S. Nuclear
Regulatory Commission, 11555 Rockville Pike, Rockville, Maryland 20852.
The email address for the Office of the Secretary and the Office of the
General Counsel are Hearing.Docket@nrc.gov and OGCmailcenter@nrc.gov,
respectively.\1\ The request must include the following information:
---------------------------------------------------------------------------
\1\ While a request for hearing or petition to intervene in this
proceeding must comply with the filing requirements of the NRC's
``E-Filing Rule,'' the initial request to access SUNSI and/or SGI
under these procedures should be submitted as described in this
paragraph.
---------------------------------------------------------------------------
(1) A description of the licensing action with a citation to this
Federal Register notice;
(2) The name and address of the potential party and a description
of the potential party's particularized interest that could be harmed
by the action identified in C.(1);
(3) If the request is for SUNSI, the identity of the individual or
entity requesting access to SUNSI and the requestor's basis for the
need for the information in order to meaningfully participate in this
adjudicatory proceeding. In particular, the request must explain why
publicly-available versions of the information requested would not be
sufficient to provide the basis and specificity for a proffered
contention; and
(4) If the request is for SGI, the identity of each individual who
would have access to SGI if the request is granted, including the
identity of any expert, consultant, or assistant who will aid the
requestor in evaluating the SGI.
[[Page 16080]]
In addition, the request must contain the following information:
(a) A statement that explains each individual's ``need to know''
the SGI, as required by 10 CFR 73.2 and 10 CFR 73.22(b)(1). Consistent
with the definition of ``need to know'' as stated in 10 CFR 73.2, the
statement must explain:
(i) Specifically why the requestor believes that the information is
necessary to enable the requestor to proffer and/or adjudicate a
specific contention in this proceeding; \2\ and
---------------------------------------------------------------------------
\2\ Broad SGI requests under these procedures are unlikely to
meet the standard for need to know; furthermore, staff redaction of
information from requested documents before their release may be
appropriate to comport with this requirement. These procedures do
not authorize unrestricted disclosure or less scrutiny of a
requestor's need to know than ordinarily would be applied in
connection with an already-admitted contention or non-adjudicatory
access to SGI.
---------------------------------------------------------------------------
(ii) The technical competence (demonstrable knowledge, skill,
training or education) of the requestor to effectively utilize the
requested SGI to provide the basis and specificity for a proffered
contention. The technical competence of a potential party or its
counsel may be shown by reliance on a qualified expert, consultant, or
assistant who satisfies these criteria.
(b) A completed Form SF-85, ``Questionnaire for Non-Sensitive
Positions'' for each individual who would have access to SGI. The
completed Form SF-85 will be used by the Office of Administration to
conduct the background check required for access to SGI, as required by
10 CFR part 2, subpart G and 10 CFR 73.22(b)(2), to determine the
requestor's trustworthiness and reliability. For security reasons, Form
SF-85 can only be submitted electronically through the electronic
questionnaire for investigations processing (e-QIP) Web site, a secure
Web site that is owned and operated by the Office of Personnel
Management. To obtain online access to the form, the requestor should
contact the NRC's Office of Administration at 301-492-3524.\3\
---------------------------------------------------------------------------
\3\ The requestor will be asked to provide his or her full name,
social security number, date and place of birth, telephone number,
and email address. After providing this information, the requestor
usually should be able to obtain access to the online form within
one business day.
---------------------------------------------------------------------------
(c) A completed Form FD-258 (fingerprint card), signed in original
ink, and submitted in accordance with 10 CFR 73.57(d). Copies of Form
FD-258 may be obtained by writing the Office of Information Services,
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, by
calling 301-415-5877, or by email to Forms.Resource@nrc.gov. The
fingerprint card will be used to satisfy the requirements of 10 CFR
part 2, 10 CFR 73.22(b)(1), and Section 149 of the Atomic Energy Act of
1954, as amended, which mandates that all persons with access to SGI
must be fingerprinted for an FBI identification and criminal history
records check.
(d) A check or money order payable in the amount of $ 200.00 \4\ to
the U.S. Nuclear Regulatory Commission for each individual for whom the
request for access has been submitted.
---------------------------------------------------------------------------
\4\ This fee is subject to change pursuant to the Office of
Personnel Management's adjustable billing rates.
---------------------------------------------------------------------------
(e) If the requestor or any individual who will have access to SGI
believes they belong to one or more of the categories of individuals
that are exempt from the criminal history records check and background
check requirements in 10 CFR 73.59, the requestor should also provide a
statement identifying which exemption the requestor is invoking and
explaining the requestor's basis for believing that the exemption
applies. While processing the request, the Office of Administration,
Personnel Security Branch, will make a final determination whether the
claimed exemption applies. Alternatively, the requestor may contact the
Office of Administration for an evaluation of their exemption status
prior to submitting their request. Persons who are exempt from the
background check are not required to complete the SF-85 or Form FD-258;
however, all other requirements for access to SGI, including the need
to know, are still applicable.
Note: Copies of documents and materials required by paragraphs
C.(4)(b), (c), and (d) of this Order must be sent to the following
address: Office of Administration, U.S. Nuclear Regulatory
Commission, Personnel Security Branch, Mail Stop TWB-05-B32M,
Washington, DC 20555-0001.
These documents and materials should not be included with the
request letter to the Office of the Secretary, but the request
letter should state that the forms and fees have been submitted as
required above.
D. To avoid delays in processing requests for access to SGI, the
requestor should review all submitted materials for completeness and
accuracy (including legibility) before submitting them to the NRC. The
NRC will return incomplete packages to the sender without processing.
E. Based on an evaluation of the information submitted under
paragraphs C.(3) or C.(4) above, as applicable, the NRC staff will
determine within 10 days of receipt of the request whether:
(1) There is a reasonable basis to believe the petitioner is likely
to establish standing to participate in this NRC proceeding; and
(2) The requestor has established a legitimate need for access to
SUNSI or need to know the SGI requested.
F. For requests for access to SUNSI, if the NRC staff determines
that the requestor satisfies both E.(1) and E.(2) above, the NRC staff
will notify the requestor in writing that access to SUNSI has been
granted. The written notification will contain instructions on how the
requestor may obtain copies of the requested documents, and any other
conditions that may apply to access to those documents. These
conditions may include, but are not limited to, the signing of a Non-
Disclosure Agreement or Affidavit, or Protective Order \5\ setting
forth terms and conditions to prevent the unauthorized or inadvertent
disclosure of SUNSI by each individual who will be granted access to
SUNSI.
---------------------------------------------------------------------------
\5\ Any motion for Protective Order or draft Non-Disclosure
Affidavit or Agreement for SUNSI must be filed with the presiding
officer or the Chief Administrative Judge if the presiding officer
has not yet been designated, within 30 days of the deadline for the
receipt of the written access request.
---------------------------------------------------------------------------
G. For requests for access to SGI, if the NRC staff determines that
the requestor has satisfied both E.(1) and E.(2) above, the Office of
Administration will then determine, based upon completion of the
background check, whether the proposed recipient is trustworthy and
reliable, as required for access to SGI by 10 CFR 73.22(b). If the
Office of Administration determines that the individual or individuals
are trustworthy and reliable, the NRC will promptly notify the
requestor in writing. The notification will provide the names of
approved individuals as well as the conditions under which the SGI will
be provided. Those conditions may include, but not be limited to, the
signing of a Non-Disclosure Agreement or Affidavit, or Protective Order
\6\ by each individual who will be granted access to SGI.
---------------------------------------------------------------------------
\6\ Any motion for Protective Order or draft Non-Disclosure
Affidavit or Agreement for SGI must be filed with the presiding
officer or the Chief Administrative Judge if the presiding officer
has not yet been designated, within 180 days of the deadline for the
receipt of the written access request.
---------------------------------------------------------------------------
H. Release and Storage of SGI. Prior to providing SGI to the
requestor, the NRC staff will conduct (as necessary) an inspection to
confirm that the recipient's information protection system is
sufficient to satisfy the requirements of 10 CFR 73.22. Alternatively,
recipients may opt to view SGI at an approved SGI storage location
rather than establish their own SGI protection program to meet SGI
protection requirements.
[[Page 16081]]
I. Filing of Contentions. Any contentions in these proceedings that
are based upon the information received as a result of the request made
for SUNSI or SGI must be filed by the requestor no later than 25 days
after the requestor is granted access to that information. However, if
more than 25 days remain between the date the petitioner is granted
access to the information and the deadline for filing all other
contentions (as established in the notice of hearing or opportunity for
hearing), the petitioner may file its SUNSI or SGI contentions by that
later deadline.
J. Review of Denials of Access.
(1) If the request for access to SUNSI or SGI is denied by the NRC
staff either after a determination on standing and requisite need, or
after a determination on trustworthiness and reliability, the NRC staff
shall immediately notify the requestor in writing, briefly stating the
reason or reasons for the denial.
(2) Before the Office of Administration makes an adverse
determination regarding the proposed recipient(s) trustworthiness and
reliability for access to SGI, the Office of Administration, in
accordance with 10 CFR 2.705(c)(3)(iii), must provide the proposed
recipient(s) any records that were considered in the trustworthiness
and reliability determination, including those required to be provided
under 10 CFR 73.57(e)(1), so that the proposed recipient(s) have an
opportunity to correct or explain the record.
(3) The requestor may challenge the NRC staff's adverse
determination with respect to access to SUNSI by filing a challenge
within 5 days of receipt of that determination with: (a) The presiding
officer designated in this proceeding; (b) if no presiding officer has
been appointed, the Chief Administrative Judge, or if he or she is
unavailable, another administrative judge, or an administrative law
judge with jurisdiction pursuant to 10 CFR 2.318(a); or (c) if another
officer has been designated to rule on information access issues, with
that officer.
(4) The requestor may challenge the NRC staff's or Office of
Administration's adverse determination with respect to access to SGI by
filing a request for review in accordance with 10 CFR 2.705(c)(3)(iv).
Further appeals of decisions under this paragraph must be made pursuant
to 10 CFR 2.311.
K. Review of Grants of Access. A party other than the requestor may
challenge an NRC staff determination granting access to SUNSI or SGI
whose release would harm that party's interest independent of the
proceeding. Such a challenge must be filed with the Chief
Administrative Judge within 5 days of the notification by the NRC staff
of its grant of access.
If challenges to the NRC staff determinations are filed, these
procedures give way to the normal process for litigating disputes
concerning access to information. The availability of interlocutory
review by the Commission of orders ruling on such NRC staff
determinations (whether granting or denying access) is governed by 10
CFR 2.311.\7\
---------------------------------------------------------------------------
\7\ Requestors should note that the filing requirements of the
NRC's E-Filing Rule (72 FR 49139; August 28, 2007) apply to appeals
of NRC staff determinations (because they must be served on a
presiding officer or the Commission, as applicable), but not to the
initial SUNSI/SGI request submitted to the NRC staff under these
procedures.
---------------------------------------------------------------------------
L. The Commission expects that the NRC staff and presiding officers
(and any other reviewing officers) will consider and resolve requests
for access to SUNSI or SGI, and motions for protective orders, in a
timely fashion in order to minimize any unnecessary delays in
identifying those petitioners who have standing and who have propounded
contentions meeting the specificity and basis requirements in 10 CFR
part 2. Attachment 1 to this Order summarizes the general target
schedule for processing and resolving requests under these procedures.
It is so ordered.
Dated at Rockville, Maryland this 13th day of March, 2012.
For the Nuclear Regulatory Commission.
Annette L. Vietti-Cook,
Secretary of the Commission.
Attachment 1--General Target Schedule for Processing and Resolving
Requests for Access to Sensitive Unclassified Non-Safeguards Information
and Safeguards Information in This Proceeding
------------------------------------------------------------------------
Day Event/Activity
------------------------------------------------------------------------
0.................... Publication of Federal Register notice of hearing
and opportunity to petition for leave to
intervene, including order with instructions for
access requests.
10................... Deadline for submitting requests for access to
Sensitive Unclassified Non-Safeguards
Information (SUNSI) and/or Safeguards
Information (SGI) with information: supporting
the standing of a potential party identified by
name and address; describing the need for the
information in order for the potential party to
participate meaningfully in an adjudicatory
proceeding; demonstrating that access should be
granted (e.g., showing technical competence for
access to SGI); and, for SGI, including
application fee for fingerprint/background
check.
60................... Deadline for submitting petition for intervention
containing: (i) Demonstration of standing; (ii)
all contentions whose formulation does not
require access to SUNSI and/or SGI (+25 Answers
to petition for intervention; +7 requestor/
petitioner reply).
20................... Nuclear Regulatory Commission (NRC) staff informs
the requestor of the staff's determination
whether the request for access provides a
reasonable basis to believe standing can be
established and shows (1) need for SUNSI or (2)
need to know for SGI. (For SUNSI, NRC staff also
informs any party to the proceeding whose
interest independent of the proceeding would be
harmed by the release of the information.) If
NRC staff makes the finding of need for SUNSI
and likelihood of standing, NRC staff begins
document processing (preparation of redactions
or review of redacted documents). If NRC staff
makes the finding of need to know for SGI and
likelihood of standing, NRC staff begins
background check (including fingerprinting for a
criminal history records check), information
processing (preparation of redactions or review
of redacted documents), and readiness
inspections.
25................... If NRC staff finds no ``need,'' no ``need to
know,'' or no likelihood of standing, the
deadline for requestor/petitioner to file a
motion seeking a ruling to reverse the NRC
staff's denial of access; NRC staff files copy
of access determination with the presiding
officer (or Chief Administrative Judge or other
designated officer, as appropriate). If NRC
staff finds ``need'' for SUNSI, the deadline for
any party to the proceeding whose interest
independent of the proceeding would be harmed by
the release of the information to file a motion
seeking a ruling to reverse the NRC staff's
grant of access.
30................... Deadline for NRC staff reply to motions to
reverse NRC staff determination(s).
40................... (Receipt +30) If NRC staff finds standing and
need for SUNSI, deadline for NRC staff to
complete information processing and file motion
for Protective Order and draft Non-Disclosure
Affidavit. Deadline for applicant/licensee to
file Non-Disclosure Agreement for SUNSI.
[[Page 16082]]
190.................. (Receipt +180) If NRC staff finds standing, need
to know for SGI, and trustworthiness and
reliability, deadline for NRC staff to file
motion for Protective Order and draft Non-
disclosure Affidavit (or to make a determination
that the proposed recipient of SGI is not
trustworthy or reliable). Note: Before the
Office of Administration makes an adverse
determination regarding access to SGI, the
proposed recipient must be provided an
opportunity to correct or explain information.
205.................. Deadline for petitioner to seek reversal of a
final adverse NRC staff trustworthiness or
reliability determination either before the
presiding officer or another designated officer
under 10 CFR 2.705(c)(3)(iv).
A.................... If access granted: Issuance of presiding officer
or other designated officer decision on motion
for protective order for access to sensitive
information (including schedule for providing
access and submission of contentions) or
decision reversing a final adverse determination
by the NRC staff.
A + 3................ Deadline for filing executed Non-Disclosure
Affidavits. Access provided to SUNSI and/or SGI
consistent with decision issuing the protective
order.
A + 28............... Deadline for submission of contentions whose
development depends upon access to SUNSI and/or
SGI. However, if more than 25 days remain
between the petitioner's receipt of (or access
to) the information and the deadline for filing
all other contentions (as established in the
notice of hearing or opportunity for hearing),
the petitioner may file its SUNSI or SGI
contentions by that later deadline.
A + 53............... (Contention receipt +25) Answers to contentions
whose development depends upon access to SUNSI
and/or SGI.
A + 60............... (Answer receipt +7) Petitioner/Intervenor reply
to answers.
>A + 60.............. Decision on contention admission.
------------------------------------------------------------------------
[FR Doc. 2012-6541 Filed 3-16-12; 8:45 am]
BILLING CODE 7590-01-P