Lock+ Hydro Friends Fund XLV, FFP Project 2, LLC; Notice Announcing Filing Priority for Preliminary Permit Applications, 14775 [2012-5995]

Download as PDF Federal Register / Vol. 77, No. 49 / Tuesday, March 13, 2012 / Notices 14775 979TH—MEETING; REGULAR MEETING—Continued March 15, 2012, 10 a.m. Item No. Docket No. Company E–34 ............. ER11–3967–003 EL05–121–006 PJM Interconnection, L.L.C. Gas G–1 .............. G–2 .............. G–3 .............. RP11–1999–002 RP11–2569–002 RP11–2569–003 OR12–7–000 Texas Gas Transmission, LLC. Texas Gas Transmission, LLC. Magellan Pipeline Company, L.P. Hydro H–1 ............... H–2 ............... H–3 ............... P–14107–000 P–739–026 P–2738–081 Lock+Hydro Friends Fund I. Appalachian Power Company. New York State Electric and Gas Corporation. Certificates C–1 ............... C–2 ............... CP11–44–001 RP11–1597–001 CP11–523–000 Tennessee Gas Pipeline Company. Sawgrass Storage, L.L.C. Dated: March 8, 2012. Kimberly D. Bose, Secretary. DEPARTMENT OF ENERGY A free webcast of this event is available through www.ferc.gov. Anyone with Internet access who desires to view this event can do so by navigating to www.ferc.govs’ Calendar of Events and locating this event in the Calendar. The event will contain a link to its Web cast. The Capitol Connection provides technical support for the free Web cast. It also offers access to this event via television in the DC area and via phone bridge for a fee. If you have any questions, visit www.CapitolConnection.org or contact Danelle Springer or David Reininger at 703–993–3100. Immediately following the conclusion of the Commission Meeting, a press briefing will be held in the Commission Meeting Room. Members of the public may view this briefing in the designated overflow room. This statement is intended to notify the public that the press briefings that follow Commission meetings may now be viewed remotely at Commission headquarters, but will not be telecast through the Capitol Connection service. mstockstill on DSK4VPTVN1PROD with NOTICES [FR Doc. 2012–6108 Filed 3–9–12; 11:15 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Project Nos. 14180–000, 14193–000] [Project No. 14335–000] Lock+ Hydro Friends Fund XLV, FFP Project 2, LLC; Notice Announcing Filing Priority for Preliminary Permit Applications Stoughton Water Power Company; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On February 22, 2012, the Commission held a drawing to determine priority among competing preliminary permit applications with identical filing times. In the event that the Commission concludes that none of the applicants’ plans are better adapted than the others to develop, conserve, and utilize in the public interest the water resources of the region at issue, the priority established by this drawing will serve as the tiebreaker. Based on the drawing, the order of priority is as follows: On December 7, 2011, the Stoughton Water Power Company filed an application for a preliminary permit under section 4(f) of the Federal Power Act proposing to study the feasibility of the proposed Stoughton Dam Water Power Project No. 14335, to be located at the existing Stoughton Dam on the Yahara River, near the City of Stoughton, in Dane County, Wisconsin. The Stoughton Dam is owned by the City of Stoughton. The proposed project would consist of: (1) The existing Stoughton Dam; (2) an existing 70-foot-long by 38-foot-wide concrete powerhouse; (3) two new or refurbished hydropower turbines and generators having a total combined generating capacity of 192 kilowatts; (4) an existing 200-foot-long by 40-footwide headrace; (5) a 25-foot-long, 12kilovolt transmission line; and (6) appurtenant facilities. The project would have an estimated annual generation of 450,000 kilowatt-hours. Applicant Contact: Mr. Thomas J. Reiss, Jr., P.O. Box 553, 319 Hart Street Watertown, WI 53094; (920) 261–2319. FERC Contact: Tyrone A. Williams, (202) 502–6331. 1. Lock+ Hydro Friends Fund XLV. 2. FFP Project 2, LLC Project No. 14180– 000. Project No. 14193– 000. Dated: March 7, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2012–5995 Filed 3–12–12; 8:45 am] BILLING CODE 6717–01–P VerDate Mar<15>2010 18:29 Mar 12, 2012 Jkt 226001 PO 00000 Frm 00052 Fmt 4703 Sfmt 4703 E:\FR\FM\13MRN1.SGM 13MRN1

Agencies

[Federal Register Volume 77, Number 49 (Tuesday, March 13, 2012)]
[Notices]
[Page 14775]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-5995]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project Nos. 14180-000, 14193-000]


Lock+ Hydro Friends Fund XLV, FFP Project 2, LLC; Notice 
Announcing Filing Priority for Preliminary Permit Applications

    On February 22, 2012, the Commission held a drawing to determine 
priority among competing preliminary permit applications with identical 
filing times. In the event that the Commission concludes that none of 
the applicants' plans are better adapted than the others to develop, 
conserve, and utilize in the public interest the water resources of the 
region at issue, the priority established by this drawing will serve as 
the tiebreaker. Based on the drawing, the order of priority is as 
follows:

1. Lock+ Hydro Friends Fund XLV...........  Project No. 14180-000.
2. FFP Project 2, LLC.....................  Project No. 14193-000.
 


    Dated: March 7, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012-5995 Filed 3-12-12; 8:45 am]
BILLING CODE 6717-01-P