Lock+ Hydro Friends Fund XLV, FFP Project 2, LLC; Notice Announcing Filing Priority for Preliminary Permit Applications, 14775 [2012-5995]
Download as PDF
Federal Register / Vol. 77, No. 49 / Tuesday, March 13, 2012 / Notices
14775
979TH—MEETING; REGULAR MEETING—Continued
March 15, 2012, 10 a.m.
Item No.
Docket No.
Company
E–34 .............
ER11–3967–003
EL05–121–006
PJM Interconnection, L.L.C.
Gas
G–1 ..............
G–2 ..............
G–3 ..............
RP11–1999–002
RP11–2569–002
RP11–2569–003
OR12–7–000
Texas Gas Transmission, LLC.
Texas Gas Transmission, LLC.
Magellan Pipeline Company, L.P.
Hydro
H–1 ...............
H–2 ...............
H–3 ...............
P–14107–000
P–739–026
P–2738–081
Lock+Hydro Friends Fund I.
Appalachian Power Company.
New York State Electric and Gas Corporation.
Certificates
C–1 ...............
C–2 ...............
CP11–44–001
RP11–1597–001
CP11–523–000
Tennessee Gas Pipeline Company.
Sawgrass Storage, L.L.C.
Dated: March 8, 2012.
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
A free webcast of this event is
available through www.ferc.gov. Anyone
with Internet access who desires to view
this event can do so by navigating to
www.ferc.govs’ Calendar of Events and
locating this event in the Calendar. The
event will contain a link to its Web cast.
The Capitol Connection provides
technical support for the free Web cast.
It also offers access to this event via
television in the DC area and via phone
bridge for a fee. If you have any
questions, visit
www.CapitolConnection.org or contact
Danelle Springer or David Reininger at
703–993–3100.
Immediately following the conclusion
of the Commission Meeting, a press
briefing will be held in the Commission
Meeting Room. Members of the public
may view this briefing in the designated
overflow room. This statement is
intended to notify the public that the
press briefings that follow Commission
meetings may now be viewed remotely
at Commission headquarters, but will
not be telecast through the Capitol
Connection service.
mstockstill on DSK4VPTVN1PROD with NOTICES
[FR Doc. 2012–6108 Filed 3–9–12; 11:15 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Project Nos. 14180–000, 14193–000]
[Project No. 14335–000]
Lock+ Hydro Friends Fund XLV, FFP
Project 2, LLC; Notice Announcing
Filing Priority for Preliminary Permit
Applications
Stoughton Water Power Company;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On February 22, 2012, the
Commission held a drawing to
determine priority among competing
preliminary permit applications with
identical filing times. In the event that
the Commission concludes that none of
the applicants’ plans are better adapted
than the others to develop, conserve,
and utilize in the public interest the
water resources of the region at issue,
the priority established by this drawing
will serve as the tiebreaker. Based on
the drawing, the order of priority is as
follows:
On December 7, 2011, the Stoughton
Water Power Company filed an
application for a preliminary permit
under section 4(f) of the Federal Power
Act proposing to study the feasibility of
the proposed Stoughton Dam Water
Power Project No. 14335, to be located
at the existing Stoughton Dam on the
Yahara River, near the City of
Stoughton, in Dane County, Wisconsin.
The Stoughton Dam is owned by the
City of Stoughton.
The proposed project would consist
of: (1) The existing Stoughton Dam; (2)
an existing 70-foot-long by 38-foot-wide
concrete powerhouse; (3) two new or
refurbished hydropower turbines and
generators having a total combined
generating capacity of 192 kilowatts; (4)
an existing 200-foot-long by 40-footwide headrace; (5) a 25-foot-long, 12kilovolt transmission line; and (6)
appurtenant facilities. The project
would have an estimated annual
generation of 450,000 kilowatt-hours.
Applicant Contact: Mr. Thomas J.
Reiss, Jr., P.O. Box 553, 319 Hart Street
Watertown, WI 53094; (920) 261–2319.
FERC Contact: Tyrone A. Williams,
(202) 502–6331.
1. Lock+ Hydro
Friends Fund XLV.
2. FFP Project 2, LLC
Project No. 14180–
000.
Project No. 14193–
000.
Dated: March 7, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–5995 Filed 3–12–12; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
18:29 Mar 12, 2012
Jkt 226001
PO 00000
Frm 00052
Fmt 4703
Sfmt 4703
E:\FR\FM\13MRN1.SGM
13MRN1
Agencies
[Federal Register Volume 77, Number 49 (Tuesday, March 13, 2012)]
[Notices]
[Page 14775]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-5995]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project Nos. 14180-000, 14193-000]
Lock+ Hydro Friends Fund XLV, FFP Project 2, LLC; Notice
Announcing Filing Priority for Preliminary Permit Applications
On February 22, 2012, the Commission held a drawing to determine
priority among competing preliminary permit applications with identical
filing times. In the event that the Commission concludes that none of
the applicants' plans are better adapted than the others to develop,
conserve, and utilize in the public interest the water resources of the
region at issue, the priority established by this drawing will serve as
the tiebreaker. Based on the drawing, the order of priority is as
follows:
1. Lock+ Hydro Friends Fund XLV........... Project No. 14180-000.
2. FFP Project 2, LLC..................... Project No. 14193-000.
Dated: March 7, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012-5995 Filed 3-12-12; 8:45 am]
BILLING CODE 6717-01-P