Stoughton Water Power Company; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 14775-14776 [2012-5976]
Download as PDF
Federal Register / Vol. 77, No. 49 / Tuesday, March 13, 2012 / Notices
14775
979TH—MEETING; REGULAR MEETING—Continued
March 15, 2012, 10 a.m.
Item No.
Docket No.
Company
E–34 .............
ER11–3967–003
EL05–121–006
PJM Interconnection, L.L.C.
Gas
G–1 ..............
G–2 ..............
G–3 ..............
RP11–1999–002
RP11–2569–002
RP11–2569–003
OR12–7–000
Texas Gas Transmission, LLC.
Texas Gas Transmission, LLC.
Magellan Pipeline Company, L.P.
Hydro
H–1 ...............
H–2 ...............
H–3 ...............
P–14107–000
P–739–026
P–2738–081
Lock+Hydro Friends Fund I.
Appalachian Power Company.
New York State Electric and Gas Corporation.
Certificates
C–1 ...............
C–2 ...............
CP11–44–001
RP11–1597–001
CP11–523–000
Tennessee Gas Pipeline Company.
Sawgrass Storage, L.L.C.
Dated: March 8, 2012.
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
A free webcast of this event is
available through www.ferc.gov. Anyone
with Internet access who desires to view
this event can do so by navigating to
www.ferc.govs’ Calendar of Events and
locating this event in the Calendar. The
event will contain a link to its Web cast.
The Capitol Connection provides
technical support for the free Web cast.
It also offers access to this event via
television in the DC area and via phone
bridge for a fee. If you have any
questions, visit
www.CapitolConnection.org or contact
Danelle Springer or David Reininger at
703–993–3100.
Immediately following the conclusion
of the Commission Meeting, a press
briefing will be held in the Commission
Meeting Room. Members of the public
may view this briefing in the designated
overflow room. This statement is
intended to notify the public that the
press briefings that follow Commission
meetings may now be viewed remotely
at Commission headquarters, but will
not be telecast through the Capitol
Connection service.
mstockstill on DSK4VPTVN1PROD with NOTICES
[FR Doc. 2012–6108 Filed 3–9–12; 11:15 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Project Nos. 14180–000, 14193–000]
[Project No. 14335–000]
Lock+ Hydro Friends Fund XLV, FFP
Project 2, LLC; Notice Announcing
Filing Priority for Preliminary Permit
Applications
Stoughton Water Power Company;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
On February 22, 2012, the
Commission held a drawing to
determine priority among competing
preliminary permit applications with
identical filing times. In the event that
the Commission concludes that none of
the applicants’ plans are better adapted
than the others to develop, conserve,
and utilize in the public interest the
water resources of the region at issue,
the priority established by this drawing
will serve as the tiebreaker. Based on
the drawing, the order of priority is as
follows:
On December 7, 2011, the Stoughton
Water Power Company filed an
application for a preliminary permit
under section 4(f) of the Federal Power
Act proposing to study the feasibility of
the proposed Stoughton Dam Water
Power Project No. 14335, to be located
at the existing Stoughton Dam on the
Yahara River, near the City of
Stoughton, in Dane County, Wisconsin.
The Stoughton Dam is owned by the
City of Stoughton.
The proposed project would consist
of: (1) The existing Stoughton Dam; (2)
an existing 70-foot-long by 38-foot-wide
concrete powerhouse; (3) two new or
refurbished hydropower turbines and
generators having a total combined
generating capacity of 192 kilowatts; (4)
an existing 200-foot-long by 40-footwide headrace; (5) a 25-foot-long, 12kilovolt transmission line; and (6)
appurtenant facilities. The project
would have an estimated annual
generation of 450,000 kilowatt-hours.
Applicant Contact: Mr. Thomas J.
Reiss, Jr., P.O. Box 553, 319 Hart Street
Watertown, WI 53094; (920) 261–2319.
FERC Contact: Tyrone A. Williams,
(202) 502–6331.
1. Lock+ Hydro
Friends Fund XLV.
2. FFP Project 2, LLC
Project No. 14180–
000.
Project No. 14193–
000.
Dated: March 7, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–5995 Filed 3–12–12; 8:45 am]
BILLING CODE 6717–01–P
VerDate Mar<15>2010
18:29 Mar 12, 2012
Jkt 226001
PO 00000
Frm 00052
Fmt 4703
Sfmt 4703
E:\FR\FM\13MRN1.SGM
13MRN1
14776
Federal Register / Vol. 77, No. 49 / Tuesday, March 13, 2012 / Notices
Deadline for filing comments, motions
to intervene, and competing
applications (without notices of intent),
or notices of intent to file competing
applications: 60 days from the issuance
of this notice. Competing applications
and notices of intent must meet the
requirements of 18 CFR 4.36.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14335–000) in the docket number
field to access the document. For
assistance, contact FERC Online
Support.
Dated: March 6, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–5976 Filed 3–12–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP12–74–000]
mstockstill on DSK4VPTVN1PROD with NOTICES
El Paso Natural Gas Company; Notice
of Amendment to Presidential Permit
Take notice that on February 20, 2012,
El Paso Natural Gas Company (El Paso),
P.O. Box 1087, Colorado Springs,
Colorado, filed an application in Docket
No. CP12–74–000, to amend its
Presidential Permit granted in Docket
No. CP93–253–000 on November 29,
1993, as amended by orders issued June
11, 1997 and January 31, 2002. In its
VerDate Mar<15>2010
18:29 Mar 12, 2012
Jkt 226001
amendment, El Paso requests that its
Samalayuca Presidential Permit for the
existing international border crossing
located in El Paso County, Texas
(Samalayuca Crossing) be amended to
increase the daily export capacity from
308,000 Mcf/d to 544,500 Mcf/d of
natural gas from the United States to
Mexico. No new facilities will be added
nor will there be any physical changes
or modifications to the upstream
facilities or the Samalayuca Crossing, all
as more fully set forth in the application
which is on file with the Commission
and open for public inspection.
Any questions regarding the
applications should be directed to
Susan Stires, Director, Regulatory
Affairs, El Paso Western Pipelines, Two
North Nevada Avenue, P.O. Box 1087,
Colorado Springs, Colorado 80944, or
call at 719–667–7514, or email at
susan.stires@elpaso.com.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
7 copies of filings made with the
PO 00000
Frm 00053
Fmt 4703
Sfmt 4703
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 7 copies of the protest or
intervention to the Federal Energy
regulatory Commission, 888 First Street
NE., Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
E:\FR\FM\13MRN1.SGM
13MRN1
Agencies
[Federal Register Volume 77, Number 49 (Tuesday, March 13, 2012)]
[Notices]
[Pages 14775-14776]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-5976]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14335-000]
Stoughton Water Power Company; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
On December 7, 2011, the Stoughton Water Power Company filed an
application for a preliminary permit under section 4(f) of the Federal
Power Act proposing to study the feasibility of the proposed Stoughton
Dam Water Power Project No. 14335, to be located at the existing
Stoughton Dam on the Yahara River, near the City of Stoughton, in Dane
County, Wisconsin. The Stoughton Dam is owned by the City of Stoughton.
The proposed project would consist of: (1) The existing Stoughton
Dam; (2) an existing 70-foot-long by 38-foot-wide concrete powerhouse;
(3) two new or refurbished hydropower turbines and generators having a
total combined generating capacity of 192 kilowatts; (4) an existing
200-foot-long by 40-foot-wide headrace; (5) a 25-foot-long, 12-kilovolt
transmission line; and (6) appurtenant facilities. The project would
have an estimated annual generation of 450,000 kilowatt-hours.
Applicant Contact: Mr. Thomas J. Reiss, Jr., P.O. Box 553, 319 Hart
Street Watertown, WI 53094; (920) 261-2319.
FERC Contact: Tyrone A. Williams, (202) 502-6331.
[[Page 14776]]
Deadline for filing comments, motions to intervene, and competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and seven copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14335-000) in the docket number field to
access the document. For assistance, contact FERC Online Support.
Dated: March 6, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-5976 Filed 3-12-12; 8:45 am]
BILLING CODE 6717-01-P