Stoughton Water Power Company; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 14775-14776 [2012-5976]

Download as PDF Federal Register / Vol. 77, No. 49 / Tuesday, March 13, 2012 / Notices 14775 979TH—MEETING; REGULAR MEETING—Continued March 15, 2012, 10 a.m. Item No. Docket No. Company E–34 ............. ER11–3967–003 EL05–121–006 PJM Interconnection, L.L.C. Gas G–1 .............. G–2 .............. G–3 .............. RP11–1999–002 RP11–2569–002 RP11–2569–003 OR12–7–000 Texas Gas Transmission, LLC. Texas Gas Transmission, LLC. Magellan Pipeline Company, L.P. Hydro H–1 ............... H–2 ............... H–3 ............... P–14107–000 P–739–026 P–2738–081 Lock+Hydro Friends Fund I. Appalachian Power Company. New York State Electric and Gas Corporation. Certificates C–1 ............... C–2 ............... CP11–44–001 RP11–1597–001 CP11–523–000 Tennessee Gas Pipeline Company. Sawgrass Storage, L.L.C. Dated: March 8, 2012. Kimberly D. Bose, Secretary. DEPARTMENT OF ENERGY A free webcast of this event is available through www.ferc.gov. Anyone with Internet access who desires to view this event can do so by navigating to www.ferc.govs’ Calendar of Events and locating this event in the Calendar. The event will contain a link to its Web cast. The Capitol Connection provides technical support for the free Web cast. It also offers access to this event via television in the DC area and via phone bridge for a fee. If you have any questions, visit www.CapitolConnection.org or contact Danelle Springer or David Reininger at 703–993–3100. Immediately following the conclusion of the Commission Meeting, a press briefing will be held in the Commission Meeting Room. Members of the public may view this briefing in the designated overflow room. This statement is intended to notify the public that the press briefings that follow Commission meetings may now be viewed remotely at Commission headquarters, but will not be telecast through the Capitol Connection service. mstockstill on DSK4VPTVN1PROD with NOTICES [FR Doc. 2012–6108 Filed 3–9–12; 11:15 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Project Nos. 14180–000, 14193–000] [Project No. 14335–000] Lock+ Hydro Friends Fund XLV, FFP Project 2, LLC; Notice Announcing Filing Priority for Preliminary Permit Applications Stoughton Water Power Company; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On February 22, 2012, the Commission held a drawing to determine priority among competing preliminary permit applications with identical filing times. In the event that the Commission concludes that none of the applicants’ plans are better adapted than the others to develop, conserve, and utilize in the public interest the water resources of the region at issue, the priority established by this drawing will serve as the tiebreaker. Based on the drawing, the order of priority is as follows: On December 7, 2011, the Stoughton Water Power Company filed an application for a preliminary permit under section 4(f) of the Federal Power Act proposing to study the feasibility of the proposed Stoughton Dam Water Power Project No. 14335, to be located at the existing Stoughton Dam on the Yahara River, near the City of Stoughton, in Dane County, Wisconsin. The Stoughton Dam is owned by the City of Stoughton. The proposed project would consist of: (1) The existing Stoughton Dam; (2) an existing 70-foot-long by 38-foot-wide concrete powerhouse; (3) two new or refurbished hydropower turbines and generators having a total combined generating capacity of 192 kilowatts; (4) an existing 200-foot-long by 40-footwide headrace; (5) a 25-foot-long, 12kilovolt transmission line; and (6) appurtenant facilities. The project would have an estimated annual generation of 450,000 kilowatt-hours. Applicant Contact: Mr. Thomas J. Reiss, Jr., P.O. Box 553, 319 Hart Street Watertown, WI 53094; (920) 261–2319. FERC Contact: Tyrone A. Williams, (202) 502–6331. 1. Lock+ Hydro Friends Fund XLV. 2. FFP Project 2, LLC Project No. 14180– 000. Project No. 14193– 000. Dated: March 7, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2012–5995 Filed 3–12–12; 8:45 am] BILLING CODE 6717–01–P VerDate Mar<15>2010 18:29 Mar 12, 2012 Jkt 226001 PO 00000 Frm 00052 Fmt 4703 Sfmt 4703 E:\FR\FM\13MRN1.SGM 13MRN1 14776 Federal Register / Vol. 77, No. 49 / Tuesday, March 13, 2012 / Notices Deadline for filing comments, motions to intervene, and competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–14335–000) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: March 6, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–5976 Filed 3–12–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP12–74–000] mstockstill on DSK4VPTVN1PROD with NOTICES El Paso Natural Gas Company; Notice of Amendment to Presidential Permit Take notice that on February 20, 2012, El Paso Natural Gas Company (El Paso), P.O. Box 1087, Colorado Springs, Colorado, filed an application in Docket No. CP12–74–000, to amend its Presidential Permit granted in Docket No. CP93–253–000 on November 29, 1993, as amended by orders issued June 11, 1997 and January 31, 2002. In its VerDate Mar<15>2010 18:29 Mar 12, 2012 Jkt 226001 amendment, El Paso requests that its Samalayuca Presidential Permit for the existing international border crossing located in El Paso County, Texas (Samalayuca Crossing) be amended to increase the daily export capacity from 308,000 Mcf/d to 544,500 Mcf/d of natural gas from the United States to Mexico. No new facilities will be added nor will there be any physical changes or modifications to the upstream facilities or the Samalayuca Crossing, all as more fully set forth in the application which is on file with the Commission and open for public inspection. Any questions regarding the applications should be directed to Susan Stires, Director, Regulatory Affairs, El Paso Western Pipelines, Two North Nevada Avenue, P.O. Box 1087, Colorado Springs, Colorado 80944, or call at 719–667–7514, or email at susan.stires@elpaso.com. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 7 copies of filings made with the PO 00000 Frm 00053 Fmt 4703 Sfmt 4703 Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 7 copies of the protest or intervention to the Federal Energy regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call E:\FR\FM\13MRN1.SGM 13MRN1

Agencies

[Federal Register Volume 77, Number 49 (Tuesday, March 13, 2012)]
[Notices]
[Pages 14775-14776]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-5976]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14335-000]


Stoughton Water Power Company; Notice of Preliminary Permit 
Application Accepted for Filing and Soliciting Comments, Motions To 
Intervene, and Competing Applications

    On December 7, 2011, the Stoughton Water Power Company filed an 
application for a preliminary permit under section 4(f) of the Federal 
Power Act proposing to study the feasibility of the proposed Stoughton 
Dam Water Power Project No. 14335, to be located at the existing 
Stoughton Dam on the Yahara River, near the City of Stoughton, in Dane 
County, Wisconsin. The Stoughton Dam is owned by the City of Stoughton.
    The proposed project would consist of: (1) The existing Stoughton 
Dam; (2) an existing 70-foot-long by 38-foot-wide concrete powerhouse; 
(3) two new or refurbished hydropower turbines and generators having a 
total combined generating capacity of 192 kilowatts; (4) an existing 
200-foot-long by 40-foot-wide headrace; (5) a 25-foot-long, 12-kilovolt 
transmission line; and (6) appurtenant facilities. The project would 
have an estimated annual generation of 450,000 kilowatt-hours.
    Applicant Contact: Mr. Thomas J. Reiss, Jr., P.O. Box 553, 319 Hart 
Street Watertown, WI 53094; (920) 261-2319.
    FERC Contact: Tyrone A. Williams, (202) 502-6331.

[[Page 14776]]

    Deadline for filing comments, motions to intervene, and competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and 
competing applications may be filed electronically via the Internet. 
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676, 
or for TTY, (202) 502-8659. Although the Commission strongly encourages 
electronic filing, documents may also be paper-filed. To paper-file, 
mail an original and seven copies to: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 888 First Street NE., Washington, 
DC 20426.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14335-000) in the docket number field to 
access the document. For assistance, contact FERC Online Support.

    Dated: March 6, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-5976 Filed 3-12-12; 8:45 am]
BILLING CODE 6717-01-P