Southern Star Central Gas Pipeline, Inc.; Notice of Request Under Blanket Authorization, 14517 [2012-5845]
Download as PDF
Federal Register / Vol. 77, No. 48 / Monday, March 12, 2012 / Notices
restricted service list for the Martin Dam
Hydroelectric Project to represent the
interests of the Muscogee (Creek) Nation
of Oklahoma and the Kialegee Tribal
Town of the Muscogee (Creek) Nation:
Principal Chief A.D. Ellis, Muscogee
(Creek) Nation of Oklahoma, P.O. Box
580, Okmulgee, OK 74447; Mekko Tiger
Hobia, Kialegee Tribal Town of the
Muscogee, (Creek) Nation, P.O. Box 332,
Wetumpka, OK 74883.
Dated: March 5, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–5842 Filed 3–9–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP12–73–000]
pmangrum on DSK3VPTVN1PROD with NOTICES
Southern Star Central Gas Pipeline,
Inc.; Notice of Request Under Blanket
Authorization
Take notice that on February 21, 2012
Southern Star Central Gas Pipeline, Inc.
(Southern Star), 4700 State Highway 56,
Owensboro, Kentucky 42301, filed in
Docket No. CP12–73–000, a Prior Notice
request pursuant to sections 157.205
and 157.216 of the Commission’s
Regulations under the Natural Gas Act
for authorization to replace
approximately 3 miles of certain
pipeline facilities located in Johnson
City, Missouri. Specifically, Southern
Star proposes to replace 3 miles of 12inch diameter XT pipeline by
constructing approximately 3 miles of
20-inch diameter XM pipeline which is
a continuation of the multi-year
program initiated in 2008 to construct
the Sedalia 20-inch diameter XM
pipeline. The proposed replacement
will allow Southern Star to meet a
requirement from the Department of
Transportation for safety reasons and to
eliminate obsolete, acetylene-welded
pipeline, all as more fully set forth in
the application which is on file with the
Commission and open to public
inspection. The filing may also be
viewed on the Web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
Application should be directed to
Phyllis Medley, Senior Analyst,
VerDate Mar<15>2010
14:55 Mar 09, 2012
Jkt 226001
Regulatory Affairs, Southern Star
Central Gas Pipeline, Inc., 4700 State
Highway 56, Owensboro, Kentucky
42301, or call (270) 852–4653, or fax
(270) 852–5010, or by email
Phyllis.k.medley@sscgp.com.
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
NGA (18 CFR 157.205) file a protest to
the request. If no protest is filed within
the time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
authorization pursuant to section 7 of
the NGA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenter’s will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with he Commission’s
environmental review process.
Environmental commenter’s will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentary,
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (www.ferc.gov)
under the ‘‘e-Filing’’ link.
Dated: March 5, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–5845 Filed 3–9–12; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
14517
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commission Staff
Attendance at MISO Meetings
The Federal Energy Regulatory
Commission hereby gives notice that
members of the Commission and
Commission staff may attend the
following MISO-related meetings:
Order 1000 Right of First Refusal
(ROFR) Task Team, March 23, 2012,
9 a.m.–3 p.m. ET.
MISO Headquarters, 720 City Center
Drive, Carmel, IN 46032.
Further information may be found at
www.midwestiso.org.
The above-referenced meetings are
open to the public.
The discussions at each of the
meetings described above may address
matters at issue in the following
proceedings:
Docket No. RM01–5, Electronic Tariff
Filings.
Docket Nos. ER04–691, EL04–104 and
ER04–106, et al., Midwest Independent
Transmission System Operator, Inc., et
al.
Docket No. ER05–6, et al., Midwest
Independent Transmission System
Operator, Inc., et al.
Docket No. ER05–636, Midwest
Independent Transmission System
Operator, Inc.
Order No. 890, Preventing Undue
Discrimination and Preference in
Transmission Service.
Docket Nos. ER06–18, et al., Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER06–56, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER06–192, Midwest
Independent Transmission System
Operator, Inc.
Order Nos. 693 and 693–A,
Mandatory Reliability Standards for
Bulk-Power System.
Docket No. AD07–12, Reliability
Standard Compliance and Enforcement
in Regions with Independent System
Operators and Regional Transmission
Organizations.
Docket No. ER07–1182, Midwest
Independent Transmission System
Operator, Inc.
Docket No. ER07–1372, Midwest
Independent Transmission System
Operator, Inc.
Docket Nos. RR07–2, et al., Delegation
Agreement Between the North American
Electric Reliability Corporation and
Midwest Reliability Organization, et al.
Docket No. EL08–32, Central
Minnesota Municipal Power Agency and
E:\FR\FM\12MRN1.SGM
12MRN1
Agencies
[Federal Register Volume 77, Number 48 (Monday, March 12, 2012)]
[Notices]
[Page 14517]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-5845]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP12-73-000]
Southern Star Central Gas Pipeline, Inc.; Notice of Request Under
Blanket Authorization
Take notice that on February 21, 2012 Southern Star Central Gas
Pipeline, Inc. (Southern Star), 4700 State Highway 56, Owensboro,
Kentucky 42301, filed in Docket No. CP12-73-000, a Prior Notice request
pursuant to sections 157.205 and 157.216 of the Commission's
Regulations under the Natural Gas Act for authorization to replace
approximately 3 miles of certain pipeline facilities located in Johnson
City, Missouri. Specifically, Southern Star proposes to replace 3 miles
of 12-inch diameter XT pipeline by constructing approximately 3 miles
of 20-inch diameter XM pipeline which is a continuation of the multi-
year program initiated in 2008 to construct the Sedalia 20-inch
diameter XM pipeline. The proposed replacement will allow Southern Star
to meet a requirement from the Department of Transportation for safety
reasons and to eliminate obsolete, acetylene-welded pipeline, all as
more fully set forth in the application which is on file with the
Commission and open to public inspection. The filing may also be viewed
on the Web at https://www.ferc.gov using the ``eLibrary'' link. Enter
the docket number excluding the last three digits in the docket number
field to access the document. For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call toll-free, (866) 208-3676 or TTY,
(202) 502-8659.
Any questions regarding this Application should be directed to
Phyllis Medley, Senior Analyst, Regulatory Affairs, Southern Star
Central Gas Pipeline, Inc., 4700 State Highway 56, Owensboro, Kentucky
42301, or call (270) 852-4653, or fax (270) 852-5010, or by email
Phyllis.k.medley@sscgp.com.
Any person may, within 60 days after the issuance of the instant
notice by the Commission, file pursuant to Rule 214 of the Commission's
Procedural Rules (18 CFR 385.214) a motion to intervene or notice of
intervention. Any person filing to intervene or the Commission's staff
may, pursuant to section 157.205 of the Commission's Regulations under
the NGA (18 CFR 157.205) file a protest to the request. If no protest
is filed within the time allowed therefore, the proposed activity shall
be deemed to be authorized effective the day after the time allowed for
protest. If a protest is filed and not withdrawn within 30 days after
the time allowed for filing a protest, the instant request shall be
treated as an application for authorization pursuant to section 7 of
the NGA.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commenter's will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with he Commission's environmental review process.
Environmental commenter's will not be required to serve copies of filed
documents on all other parties. However, the non-party commentary, will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests, and interventions via the internet in lieu of paper. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site (www.ferc.gov) under the ``e-Filing'' link.
Dated: March 5, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-5845 Filed 3-9-12; 8:45 am]
BILLING CODE 6717-01-P