Southern Star Central Gas Pipeline, Inc.; Notice of Request Under Blanket Authorization, 14517 [2012-5845]

Download as PDF Federal Register / Vol. 77, No. 48 / Monday, March 12, 2012 / Notices restricted service list for the Martin Dam Hydroelectric Project to represent the interests of the Muscogee (Creek) Nation of Oklahoma and the Kialegee Tribal Town of the Muscogee (Creek) Nation: Principal Chief A.D. Ellis, Muscogee (Creek) Nation of Oklahoma, P.O. Box 580, Okmulgee, OK 74447; Mekko Tiger Hobia, Kialegee Tribal Town of the Muscogee, (Creek) Nation, P.O. Box 332, Wetumpka, OK 74883. Dated: March 5, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–5842 Filed 3–9–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP12–73–000] pmangrum on DSK3VPTVN1PROD with NOTICES Southern Star Central Gas Pipeline, Inc.; Notice of Request Under Blanket Authorization Take notice that on February 21, 2012 Southern Star Central Gas Pipeline, Inc. (Southern Star), 4700 State Highway 56, Owensboro, Kentucky 42301, filed in Docket No. CP12–73–000, a Prior Notice request pursuant to sections 157.205 and 157.216 of the Commission’s Regulations under the Natural Gas Act for authorization to replace approximately 3 miles of certain pipeline facilities located in Johnson City, Missouri. Specifically, Southern Star proposes to replace 3 miles of 12inch diameter XT pipeline by constructing approximately 3 miles of 20-inch diameter XM pipeline which is a continuation of the multi-year program initiated in 2008 to construct the Sedalia 20-inch diameter XM pipeline. The proposed replacement will allow Southern Star to meet a requirement from the Department of Transportation for safety reasons and to eliminate obsolete, acetylene-welded pipeline, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the Web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or TTY, (202) 502–8659. Any questions regarding this Application should be directed to Phyllis Medley, Senior Analyst, VerDate Mar<15>2010 14:55 Mar 09, 2012 Jkt 226001 Regulatory Affairs, Southern Star Central Gas Pipeline, Inc., 4700 State Highway 56, Owensboro, Kentucky 42301, or call (270) 852–4653, or fax (270) 852–5010, or by email Phyllis.k.medley@sscgp.com. Any person may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention. Any person filing to intervene or the Commission’s staff may, pursuant to section 157.205 of the Commission’s Regulations under the NGA (18 CFR 157.205) file a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenter’s will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with he Commission’s environmental review process. Environmental commenter’s will not be required to serve copies of filed documents on all other parties. However, the non-party commentary, will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests, and interventions via the internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (www.ferc.gov) under the ‘‘e-Filing’’ link. Dated: March 5, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–5845 Filed 3–9–12; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 14517 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commission Staff Attendance at MISO Meetings The Federal Energy Regulatory Commission hereby gives notice that members of the Commission and Commission staff may attend the following MISO-related meetings: Order 1000 Right of First Refusal (ROFR) Task Team, March 23, 2012, 9 a.m.–3 p.m. ET. MISO Headquarters, 720 City Center Drive, Carmel, IN 46032. Further information may be found at www.midwestiso.org. The above-referenced meetings are open to the public. The discussions at each of the meetings described above may address matters at issue in the following proceedings: Docket No. RM01–5, Electronic Tariff Filings. Docket Nos. ER04–691, EL04–104 and ER04–106, et al., Midwest Independent Transmission System Operator, Inc., et al. Docket No. ER05–6, et al., Midwest Independent Transmission System Operator, Inc., et al. Docket No. ER05–636, Midwest Independent Transmission System Operator, Inc. Order No. 890, Preventing Undue Discrimination and Preference in Transmission Service. Docket Nos. ER06–18, et al., Midwest Independent Transmission System Operator, Inc. Docket No. ER06–56, Midwest Independent Transmission System Operator, Inc. Docket No. ER06–192, Midwest Independent Transmission System Operator, Inc. Order Nos. 693 and 693–A, Mandatory Reliability Standards for Bulk-Power System. Docket No. AD07–12, Reliability Standard Compliance and Enforcement in Regions with Independent System Operators and Regional Transmission Organizations. Docket No. ER07–1182, Midwest Independent Transmission System Operator, Inc. Docket No. ER07–1372, Midwest Independent Transmission System Operator, Inc. Docket Nos. RR07–2, et al., Delegation Agreement Between the North American Electric Reliability Corporation and Midwest Reliability Organization, et al. Docket No. EL08–32, Central Minnesota Municipal Power Agency and E:\FR\FM\12MRN1.SGM 12MRN1

Agencies

[Federal Register Volume 77, Number 48 (Monday, March 12, 2012)]
[Notices]
[Page 14517]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-5845]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP12-73-000]


Southern Star Central Gas Pipeline, Inc.; Notice of Request Under 
Blanket Authorization

    Take notice that on February 21, 2012 Southern Star Central Gas 
Pipeline, Inc. (Southern Star), 4700 State Highway 56, Owensboro, 
Kentucky 42301, filed in Docket No. CP12-73-000, a Prior Notice request 
pursuant to sections 157.205 and 157.216 of the Commission's 
Regulations under the Natural Gas Act for authorization to replace 
approximately 3 miles of certain pipeline facilities located in Johnson 
City, Missouri. Specifically, Southern Star proposes to replace 3 miles 
of 12-inch diameter XT pipeline by constructing approximately 3 miles 
of 20-inch diameter XM pipeline which is a continuation of the multi-
year program initiated in 2008 to construct the Sedalia 20-inch 
diameter XM pipeline. The proposed replacement will allow Southern Star 
to meet a requirement from the Department of Transportation for safety 
reasons and to eliminate obsolete, acetylene-welded pipeline, all as 
more fully set forth in the application which is on file with the 
Commission and open to public inspection. The filing may also be viewed 
on the Web at https://www.ferc.gov using the ``eLibrary'' link. Enter 
the docket number excluding the last three digits in the docket number 
field to access the document. For assistance, contact FERC at 
FERCOnlineSupport@ferc.gov or call toll-free, (866) 208-3676 or TTY, 
(202) 502-8659.
    Any questions regarding this Application should be directed to 
Phyllis Medley, Senior Analyst, Regulatory Affairs, Southern Star 
Central Gas Pipeline, Inc., 4700 State Highway 56, Owensboro, Kentucky 
42301, or call (270) 852-4653, or fax (270) 852-5010, or by email 
Phyllis.k.medley@sscgp.com.
    Any person may, within 60 days after the issuance of the instant 
notice by the Commission, file pursuant to Rule 214 of the Commission's 
Procedural Rules (18 CFR 385.214) a motion to intervene or notice of 
intervention. Any person filing to intervene or the Commission's staff 
may, pursuant to section 157.205 of the Commission's Regulations under 
the NGA (18 CFR 157.205) file a protest to the request. If no protest 
is filed within the time allowed therefore, the proposed activity shall 
be deemed to be authorized effective the day after the time allowed for 
protest. If a protest is filed and not withdrawn within 30 days after 
the time allowed for filing a protest, the instant request shall be 
treated as an application for authorization pursuant to section 7 of 
the NGA.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenter's will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with he Commission's environmental review process. 
Environmental commenter's will not be required to serve copies of filed 
documents on all other parties. However, the non-party commentary, will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests, and interventions via the internet in lieu of paper. See 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site (www.ferc.gov) under the ``e-Filing'' link.

    Dated: March 5, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-5845 Filed 3-9-12; 8:45 am]
BILLING CODE 6717-01-P