New York Independent System Operator, Inc.; Notice of Petition for Declaratory Order, 13590 [2012-5467]
Download as PDF
13590
Federal Register / Vol. 77, No. 45 / Wednesday, March 7, 2012 / Notices
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on March 21, 2012.
Dated: March 1, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–5540 Filed 3–6–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL12–38–000]
srobinson on DSK4SPTVN1PROD with NOTICES
New York Independent System
Operator, Inc.; Notice of Petition for
Declaratory Order
Take notice that on February 28, 2012,
pursuant to Rule 207 of the Federal
Energy Regulatory Commission’s
(Commission) Rules of Practice and
Procedure, 18 CFR 385.207, New York
Independent System Operator, Inc.
(NYISO), filed a Petition for Declaratory
Order, requesting that the Commission
issue an order providing guidance on
how the NYISO should recover from its
customers the costs assessed pursuant to
the Commission’s December 30, 2010
Order issued in Docket No. ER11–1844–
000.1 NYISO’s petition also seeks
declaration that NYISO not be required
to pay invoices for charges imposed by
Midwest Independent Transmission
System Operator, Inc. until after the
hearing established in December 30
Order has concluded and a final
Commission order has been issued.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
1 Midwest Independent System Operator, Inc., 133
FERC ¶ 61,275 (2010) (December 30 Order).
VerDate Mar<15>2010
18:40 Mar 06, 2012
Jkt 226001
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on March 29, 2012.
Dated: February 29, 2012.
Kimberly D. Bose,
Secretary.
with appropriate environmental
measures, would not constitute a major
federal action significantly affecting the
quality of the human environment.
A copy of the EA is on file with the
Commission and is available for public
inspection. The EA may also be viewed
on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits
in the docket number field, to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
For further information, contact
Brandon Cherry at (202) 502–8328.
Dated: February 29, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–5464 Filed 3–6–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[FR Doc. 2012–5467 Filed 3–6–12; 8:45 am]
[Project No. 2310–193]
BILLING CODE 6717–01–P
Pacific Gas and Electric Company;
Notice of Extension of Time for Filing
of Motions To Intervene and Protests,
Comments, Recommendations,
Preliminary Terms and Conditions,
Preliminary Fishway Prescriptions,
Response Comments, and Final
License Application Amendments
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13583–001—MA]
Crane and Company: Notice of
Availability of Environmental
Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s regulations, 18 CFR part
380 (Order No. 486, 52 FR 47879), the
Office of Energy Projects has reviewed
the application for exemption from
licensing for the Byron Weston
Hydroelectric Project, to be located on
the East Branch of the Housatonic River,
in the Town of Dalton, Berkshire
County, Massachusetts, and has
prepared an Environmental Assessment
(EA). In the EA, Commission staff
analyzes the potential environmental
effects of the project and concludes that
issuing an exemption for the project,
PO 00000
Frm 00062
Fmt 4703
Sfmt 4703
As stated in a letter dated February
24, 2012, in this proceeding by the
Director, Division of Hydropower
Licensing, the date for filing of motions
to intervene and protests, comments,
recommendations, preliminary terms
and conditions, and preliminary
fishway prescriptions, established by
the Commission’s notice issued on
January 19, 2012,1 for the DrumSpaulding Hydroelectric Project No.
2310–193, has been extended to July 31,
2012, with response comments due by
September 14, 2012. The filing of final
1 Notice of Application Accepted for Filing,
Soliciting Motions to Intervene and Protests, Ready
for Environmental Analysis, and Soliciting
Comments, Recommendations, Preliminary Terms
and Conditions, and Preliminary Fishway
Prescriptions.
E:\FR\FM\07MRN1.SGM
07MRN1
Agencies
[Federal Register Volume 77, Number 45 (Wednesday, March 7, 2012)]
[Notices]
[Page 13590]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-5467]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL12-38-000]
New York Independent System Operator, Inc.; Notice of Petition
for Declaratory Order
Take notice that on February 28, 2012, pursuant to Rule 207 of the
Federal Energy Regulatory Commission's (Commission) Rules of Practice
and Procedure, 18 CFR 385.207, New York Independent System Operator,
Inc. (NYISO), filed a Petition for Declaratory Order, requesting that
the Commission issue an order providing guidance on how the NYISO
should recover from its customers the costs assessed pursuant to the
Commission's December 30, 2010 Order issued in Docket No. ER11-1844-
000.\1\ NYISO's petition also seeks declaration that NYISO not be
required to pay invoices for charges imposed by Midwest Independent
Transmission System Operator, Inc. until after the hearing established
in December 30 Order has concluded and a final Commission order has
been issued.
---------------------------------------------------------------------------
\1\ Midwest Independent System Operator, Inc., 133 FERC ] 61,275
(2010) (December 30 Order).
---------------------------------------------------------------------------
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date. On or
before the comment date, it is not necessary to serve motions to
intervene or protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive email
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please email
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5 p.m. Eastern Time on March 29, 2012.
Dated: February 29, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-5467 Filed 3-6-12; 8:45 am]
BILLING CODE 6717-01-P