Notice of Designation of Commission Staff as Non-Decisional, 12826-12827 [2012-5064]

Download as PDF 12826 Federal Register / Vol. 77, No. 42 / Friday, March 2, 2012 / Notices Filed Date: 2/23/12. Accession Number: 20120223–5087. Comments Due: 5 p.m. ET 3/6/12. Docket Numbers: RP12–397–000. Applicants: Sabine Pipe Line LLC. Description: Sabine Pipe Line LLC 2012 FRP & UFRP Tariff Filing to be effective 4/1/2012. Filed Date: 2/24/12. Accession Number: 20120224–5000. Comments Due: 5 p.m. ET 3/7/12. Docket Numbers: RP12–398–000. Applicants: Iberdrola Renewables, Inc., Iberdrola Energy Services LLC. Description: Petition for Waiver of Gas Regulations of Iberdrola Renewables, Inc. and Iberdrola Energy Services LLC. Filed Date: 2/23/12. Accession Number: 20120223–5115. Comments Due: 5 p.m. ET 3/1/12. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. tkelley on DSK3SPTVN1PROD with NOTICES Filings in Existing Proceedings Docket Numbers: RP11–1566–010. Applicants: Tennessee Gas Pipeline Company, L.L.C. Description: Rate Case 2011— Settlement Implementation Clean Up Sheet No. 19 to be effective 2/1/2012. Filed Date: 2/23/12. Accession Number: 20120223–5055. Comments Due: 5 p.m. ET 3/6/12. Docket Numbers: RP12–262–001. Applicants: Midwestern Gas Transmission Company. Description: Midwestern Gas Transmission Company submits tariff filing per 154.203: RPL Modification Compliance to be effective N/A. Filed Date: 2/24/12. Accession Number: 20120224–5051. Comments Due: 5 p.m. ET 3/7/12. Any person desiring to protest in any the above proceedings must file in accordance with Rule 211 of the Commission’s Regulations (18 CFR 385.211) on or before 5 p.m. Eastern time on the specified comment date. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, and service can be found at: https:// www.ferc.gov/docs-filing/efiling/filingreq.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: February 24, 2012. Nathaniel J. Davis, Sr. Deputy Secretary. [FR Doc. 2012–5067 Filed 3–1–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER12–1142–000. Applicants: PJM Interconnection, L.L.C., American Transmission Systems, Incorporation. Description: FirstEnergy submits FE– AMP Meter Installation & Maintenance Service Agreement No. 3199 to be effective 1/26/2012. Filed Date: 2/22/12. Accession Number: 20120222–5121. Comments Due: 5 p.m. ET 3/14/12. Docket Numbers: ER12–1143–000. Applicants: Southwestern Electric Power Company. Description: 20120222 Hope PSA Compliance to be effective 12/17/2010. Filed Date: 2/22/12. Accession Number: 20120222–5123. Comments Due: 5 p.m. ET 3/14/12. Docket Numbers: ER12–1144–000. Applicants: WSPP Inc. Description: New Service Schedule R to WSPP Agreement to be effective 4/22/2012. Filed Date: 2/22/12. Accession Number: 20120222–5126. Comments Due: 5 p.m. ET 3/14/12. Docket Numbers: ER12–1145–000. Applicants: Southwest Power Pool, Inc. Description: Southwest Power Pool, Inc.’s Notice of Cancellation of Large Generator Interconnection Agreement. Filed Date: 2/22/12. Accession Number: 20120222–5148. Comments Due: 5 p.m. ET 3/14/12. Take notice that the Commission received the following PURPA 210(m)(3) filings: Docket Numbers: QM12–2–001. Applicants: Public Service Company of New Mexico. Description: Supplemental Response to deficiency letter that amends the November 30, 2011 filing of Public Service Company of New Mexico. Filed Date: 2/22/12. Accession Number: 20120222–5111. Comments Due: 5 p.m. ET 3/14/12. Take notice that the Commission received the following electric reliability filings: Docket Numbers: RR12–4–000. Applicants: North American Electric Reliability Corp. Description: Petition of the North American Electric Reliability Corporation for Approval of Amendments to Delegation Agreement with Florida Reliability Coordinating Council—Amendments to FRCC’s Bylaws and to Exhibit D of the FRCC Delegation Agreement. Filed Date: 2/22/12. Accession Number: 20120222–5151. Comments Due: 5 p.m. ET 3/14/12. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: February 23, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2012–5065 Filed 3–1–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Designation of Commission Staff as Non-Decisional Allocation of Capacity on New Merchant Transmission Projects and New Cost-Based, Participant-Funded Transmission Projects. Priority Rights to New Participant-Funded Transmission .......................................................................................... Puget Sound Energy, Inc. .............................................................................................................................................. VerDate Mar<15>2010 17:01 Mar 01, 2012 Jkt 226001 PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 E:\FR\FM\02MRN1.SGM 02MRN1 Docket No. AD12–9–000. Docket No. AD11–11–000. Docket No. EL10–72–001. Federal Register / Vol. 77, No. 42 / Friday, March 2, 2012 / Notices National Grid Transmission Services Corporation Bangor Hydro Electric Company .............................................. Rock Island Clean Line LLC ......................................................................................................................................... With respect to the workshop to be held by Commission staff on February 28, 2012 in Docket No. AD12–9–000, the following Commission staff are designated as non-decisional in deliberations by the Commission in this docket: Robert McLean, Office of the General Counsel; David Faerberg, Office of the General Counsel; David Maranville, Office of the General Counsel; and David Hunger, Office of Energy Policy and Innovation. Accordingly, pursuant to 18 CFR 385.2202 (2010), they will not serve as advisors to the Commission with respect to any of the above-referenced dockets. Likewise, as non-decisional staff, pursuant to 18 CFR 385.2201 (2010), they are prohibited from communicating with advisory staff concerning any deliberations with respect to the abovereferenced dockets. Dated: February 27, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2012–5064 Filed 3–1–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14241–001] tkelley on DSK3SPTVN1PROD with NOTICES Alaska Energy Authority; Notice of Intent To File License Application, Filing of Pre-Application Document (PAD), and Commencement of PreFiling Process; Notice of Intent To Prepare an Environmental Impact Statement and Conduct Scoping; Request for Comments on the PAD and Scoping Document, and Identification of Issues and Associated Study Requests a. Type of Filing: Notice of Intent to File License Application for an Original License and Commencing Pre-filing Process. b. Project No.: 14241–000. c. Date Filed: December 29, 2011. d. Submitted by: Alaska Energy Authority (AEA). e. Name of Project: Susitna-Watana Hydroelectric Project. f. Location: On the Susitna River at river mile 184 above the mouth, near Cantwell, in Matanuska-Susitna Borough, Alaska. The project would occupy federal lands currently administered by the U.S. Bureau of Land Management (BLM) but selected VerDate Mar<15>2010 17:01 Mar 01, 2012 Jkt 226001 for potential acquisition by the State of Alaska under the Alaska Statehood Act, state lands administered by the Alaska Department of Natural Resources, and private lands owned by Alaska Native Corporations and others. g. Filed Pursuant to: 18 CFR Part 5 of the Commission’s Regulations h. Potential Applicant Contact: Wayne Dyok, Susitna-Watana Project Manager, Alaska Energy Authority, 813 West Northern Lights Boulevard, Anchorage, AK 99503. i. FERC Contact: David Turner at (202) 502–6091 or email at david.turner@ferc.gov. j. Cooperating agencies: Federal, state, local, and tribal agencies with jurisdiction and/or special expertise with respect to environmental issues that wish to cooperate in the preparation of the environmental document should follow the instructions for filing such requests described in item o below. Cooperating agencies should note the Commission’s policy that agencies that cooperate in the preparation of the environmental document cannot also intervene. See 94 FERC ¶ 61,076 (2001). k. With this notice, we are initiating informal consultation with: (a) The U.S. Fish and Wildlife Service and/or NOAA Fisheries under section 7 of the Endangered Species Act and the joint agency regulations thereunder at 50 CFR, Part 402 and (b) the State Historic Preservation Officer, as required by section 106, National Historical Preservation Act, and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2. l. On January 23 and 30, 2012, respectively, we designated AEA as the Commission’s non-federal representative for carrying out informal consultation, pursuant to section 7 of the Endangered Species Act and section 106 of the National Historic Preservation Act. m. AEA filed with the Commission a Pre-Application Document (PAD; including a proposed process plan and schedule), pursuant to 18 CFR 5.6 of the Commission’s regulations. n. A copy of the PAD is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site (https:// www.ferc.gov), using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 12827 Docket No. EL11–49–000. Docket No. ER12–365–000. FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. A copy is also available for inspection and reproduction at the address in paragraph h. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filing and issuances related to this or other pending projects. For assistance, contact FERC Online Support. o. With this notice, we are soliciting comments on the PAD and Commission’s staff Scoping Document 1 (SD1), as well as study requests. All comments on the PAD and SD1, and study requests should be sent to the address above in paragraph h. In addition, all comments on the PAD and SD1, study requests, requests for cooperating agency status, and all communications to and from Commission staff related to the merits of the potential application must be filed with the Commission. Documents may be filed electronically via the Internet. p. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docsfiling/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. All filings with the Commission must include on the first page, the project name (Susitna-Watana Hydroelectric Project) and number (P–14241–000), and bear the appropriate heading: ‘‘Comments on Pre-Application Document,’’ ‘‘Study Requests,’’ ‘‘Comments on Scoping Document 1,’’ ‘‘Request for Cooperating Agency Status,’’ or ‘‘Communications to and from Commission Staff.’’ Any individual or entity interested in submitting study requests, commenting on the PAD or SD1, and any agency requesting cooperating status must do so by April 27, 2012. p. We intend to prepare an Environmental Impact Statement (EIS) for this project. The scoping meetings E:\FR\FM\02MRN1.SGM 02MRN1

Agencies

[Federal Register Volume 77, Number 42 (Friday, March 2, 2012)]
[Notices]
[Pages 12826-12827]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-5064]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


 Notice of Designation of Commission Staff as Non-Decisional

Allocation of Capacity on New      Docket No. AD12-9-000.
 Merchant Transmission Projects
 and New Cost-Based, Participant-
 Funded Transmission Projects.
Priority Rights to New             Docket No. AD11-11-000.
 Participant-Funded Transmission.
Puget Sound Energy, Inc..........  Docket No. EL10-72-001.

[[Page 12827]]

 
National Grid Transmission         Docket No. EL11-49-000.
 Services Corporation Bangor
 Hydro Electric Company.
Rock Island Clean Line LLC.......  Docket No. ER12-365-000.
------------------------------------------------------------------------

    With respect to the workshop to be held by Commission staff on 
February 28, 2012 in Docket No. AD12-9-000, the following Commission 
staff are designated as non-decisional in deliberations by the 
Commission in this docket: Robert McLean, Office of the General 
Counsel; David Faerberg, Office of the General Counsel; David 
Maranville, Office of the General Counsel; and David Hunger, Office of 
Energy Policy and Innovation. Accordingly, pursuant to 18 CFR 385.2202 
(2010), they will not serve as advisors to the Commission with respect 
to any of the above-referenced dockets. Likewise, as non-decisional 
staff, pursuant to 18 CFR 385.2201 (2010), they are prohibited from 
communicating with advisory staff concerning any deliberations with 
respect to the above-referenced dockets.

    Dated: February 27, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012-5064 Filed 3-1-12; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.