Notice of Designation of Commission Staff as Non-Decisional, 12826-12827 [2012-5064]
Download as PDF
12826
Federal Register / Vol. 77, No. 42 / Friday, March 2, 2012 / Notices
Filed Date: 2/23/12.
Accession Number: 20120223–5087.
Comments Due: 5 p.m. ET 3/6/12.
Docket Numbers: RP12–397–000.
Applicants: Sabine Pipe Line LLC.
Description: Sabine Pipe Line LLC
2012 FRP & UFRP Tariff Filing to be
effective 4/1/2012.
Filed Date: 2/24/12.
Accession Number: 20120224–5000.
Comments Due: 5 p.m. ET 3/7/12.
Docket Numbers: RP12–398–000.
Applicants: Iberdrola Renewables,
Inc., Iberdrola Energy Services LLC.
Description: Petition for Waiver of Gas
Regulations of Iberdrola Renewables,
Inc. and Iberdrola Energy Services LLC.
Filed Date: 2/23/12.
Accession Number: 20120223–5115.
Comments Due: 5 p.m. ET 3/1/12.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
tkelley on DSK3SPTVN1PROD with NOTICES
Filings in Existing Proceedings
Docket Numbers: RP11–1566–010.
Applicants: Tennessee Gas Pipeline
Company, L.L.C.
Description: Rate Case 2011—
Settlement Implementation Clean Up
Sheet No. 19 to be effective 2/1/2012.
Filed Date: 2/23/12.
Accession Number: 20120223–5055.
Comments Due: 5 p.m. ET 3/6/12.
Docket Numbers: RP12–262–001.
Applicants: Midwestern Gas
Transmission Company.
Description: Midwestern Gas
Transmission Company submits tariff
filing per 154.203: RPL Modification
Compliance to be effective N/A.
Filed Date: 2/24/12.
Accession Number: 20120224–5051.
Comments Due: 5 p.m. ET 3/7/12.
Any person desiring to protest in any
the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
and service can be found at: https://
www.ferc.gov/docs-filing/efiling/filingreq.pdf. For other information, call (866)
208–3676 (toll free). For TTY, call (202)
502–8659.
Dated: February 24, 2012.
Nathaniel J. Davis, Sr.
Deputy Secretary.
[FR Doc. 2012–5067 Filed 3–1–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER12–1142–000.
Applicants: PJM Interconnection,
L.L.C., American Transmission Systems,
Incorporation.
Description: FirstEnergy submits FE–
AMP Meter Installation & Maintenance
Service Agreement No. 3199 to be
effective 1/26/2012.
Filed Date: 2/22/12.
Accession Number: 20120222–5121.
Comments Due: 5 p.m. ET 3/14/12.
Docket Numbers: ER12–1143–000.
Applicants: Southwestern Electric
Power Company.
Description: 20120222 Hope PSA
Compliance to be effective 12/17/2010.
Filed Date: 2/22/12.
Accession Number: 20120222–5123.
Comments Due: 5 p.m. ET 3/14/12.
Docket Numbers: ER12–1144–000.
Applicants: WSPP Inc.
Description: New Service Schedule R
to WSPP Agreement to be effective
4/22/2012.
Filed Date: 2/22/12.
Accession Number: 20120222–5126.
Comments Due: 5 p.m. ET 3/14/12.
Docket Numbers: ER12–1145–000.
Applicants: Southwest Power Pool,
Inc.
Description: Southwest Power Pool,
Inc.’s Notice of Cancellation of Large
Generator Interconnection Agreement.
Filed Date: 2/22/12.
Accession Number: 20120222–5148.
Comments Due: 5 p.m. ET 3/14/12.
Take notice that the Commission
received the following PURPA
210(m)(3) filings:
Docket Numbers: QM12–2–001.
Applicants: Public Service Company
of New Mexico.
Description: Supplemental Response
to deficiency letter that amends the
November 30, 2011 filing of Public
Service Company of New Mexico.
Filed Date: 2/22/12.
Accession Number: 20120222–5111.
Comments Due: 5 p.m. ET 3/14/12.
Take notice that the Commission
received the following electric
reliability filings:
Docket Numbers: RR12–4–000.
Applicants: North American Electric
Reliability Corp.
Description: Petition of the North
American Electric Reliability
Corporation for Approval of
Amendments to Delegation Agreement
with Florida Reliability Coordinating
Council—Amendments to FRCC’s
Bylaws and to Exhibit D of the FRCC
Delegation Agreement.
Filed Date: 2/22/12.
Accession Number: 20120222–5151.
Comments Due: 5 p.m. ET 3/14/12.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 23, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–5065 Filed 3–1–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Designation of Commission
Staff as Non-Decisional
Allocation of Capacity on New Merchant Transmission Projects and New Cost-Based, Participant-Funded
Transmission Projects.
Priority Rights to New Participant-Funded Transmission ..........................................................................................
Puget Sound Energy, Inc. ..............................................................................................................................................
VerDate Mar<15>2010
17:01 Mar 01, 2012
Jkt 226001
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
E:\FR\FM\02MRN1.SGM
02MRN1
Docket No. AD12–9–000.
Docket No. AD11–11–000.
Docket No. EL10–72–001.
Federal Register / Vol. 77, No. 42 / Friday, March 2, 2012 / Notices
National Grid Transmission Services Corporation Bangor Hydro Electric Company ..............................................
Rock Island Clean Line LLC .........................................................................................................................................
With respect to the workshop to be
held by Commission staff on February
28, 2012 in Docket No. AD12–9–000, the
following Commission staff are
designated as non-decisional in
deliberations by the Commission in this
docket: Robert McLean, Office of the
General Counsel; David Faerberg, Office
of the General Counsel; David
Maranville, Office of the General
Counsel; and David Hunger, Office of
Energy Policy and Innovation.
Accordingly, pursuant to 18 CFR
385.2202 (2010), they will not serve as
advisors to the Commission with respect
to any of the above-referenced dockets.
Likewise, as non-decisional staff,
pursuant to 18 CFR 385.2201 (2010),
they are prohibited from communicating
with advisory staff concerning any
deliberations with respect to the abovereferenced dockets.
Dated: February 27, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–5064 Filed 3–1–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14241–001]
tkelley on DSK3SPTVN1PROD with NOTICES
Alaska Energy Authority; Notice of
Intent To File License Application,
Filing of Pre-Application Document
(PAD), and Commencement of PreFiling Process; Notice of Intent To
Prepare an Environmental Impact
Statement and Conduct Scoping;
Request for Comments on the PAD
and Scoping Document, and
Identification of Issues and Associated
Study Requests
a. Type of Filing: Notice of Intent to
File License Application for an Original
License and Commencing Pre-filing
Process.
b. Project No.: 14241–000.
c. Date Filed: December 29, 2011.
d. Submitted by: Alaska Energy
Authority (AEA).
e. Name of Project: Susitna-Watana
Hydroelectric Project.
f. Location: On the Susitna River at
river mile 184 above the mouth, near
Cantwell, in Matanuska-Susitna
Borough, Alaska. The project would
occupy federal lands currently
administered by the U.S. Bureau of
Land Management (BLM) but selected
VerDate Mar<15>2010
17:01 Mar 01, 2012
Jkt 226001
for potential acquisition by the State of
Alaska under the Alaska Statehood Act,
state lands administered by the Alaska
Department of Natural Resources, and
private lands owned by Alaska Native
Corporations and others.
g. Filed Pursuant to: 18 CFR Part 5 of
the Commission’s Regulations
h. Potential Applicant Contact:
Wayne Dyok, Susitna-Watana Project
Manager, Alaska Energy Authority, 813
West Northern Lights Boulevard,
Anchorage, AK 99503.
i. FERC Contact: David Turner at
(202) 502–6091 or email at
david.turner@ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item o below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See 94
FERC ¶ 61,076 (2001).
k. With this notice, we are initiating
informal consultation with: (a) The U.S.
Fish and Wildlife Service and/or NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50
CFR, Part 402 and (b) the State Historic
Preservation Officer, as required by
section 106, National Historical
Preservation Act, and the implementing
regulations of the Advisory Council on
Historic Preservation at 36 CFR 800.2.
l. On January 23 and 30, 2012,
respectively, we designated AEA as the
Commission’s non-federal
representative for carrying out informal
consultation, pursuant to section 7 of
the Endangered Species Act and section
106 of the National Historic
Preservation Act.
m. AEA filed with the Commission a
Pre-Application Document (PAD;
including a proposed process plan and
schedule), pursuant to 18 CFR 5.6 of the
Commission’s regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
12827
Docket No. EL11–49–000.
Docket No. ER12–365–000.
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in paragraph h.
Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
o. With this notice, we are soliciting
comments on the PAD and
Commission’s staff Scoping Document 1
(SD1), as well as study requests. All
comments on the PAD and SD1, and
study requests should be sent to the
address above in paragraph h. In
addition, all comments on the PAD and
SD1, study requests, requests for
cooperating agency status, and all
communications to and from
Commission staff related to the merits of
the potential application must be filed
with the Commission. Documents may
be filed electronically via the Internet.
p. See 18 CFR 385.2001(a)(1)(iii) and
the instructions on the Commission’s
Web site https://www.ferc.gov/docsfiling/efiling.asp. Commenters can
submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support.
Although the Commission strongly
encourages electronic filing, documents
may also be paper-filed. To paper-file,
mail an original and seven copies to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
All filings with the Commission must
include on the first page, the project
name (Susitna-Watana Hydroelectric
Project) and number (P–14241–000),
and bear the appropriate heading:
‘‘Comments on Pre-Application
Document,’’ ‘‘Study Requests,’’
‘‘Comments on Scoping Document 1,’’
‘‘Request for Cooperating Agency
Status,’’ or ‘‘Communications to and
from Commission Staff.’’ Any
individual or entity interested in
submitting study requests, commenting
on the PAD or SD1, and any agency
requesting cooperating status must do so
by April 27, 2012.
p. We intend to prepare an
Environmental Impact Statement (EIS)
for this project. The scoping meetings
E:\FR\FM\02MRN1.SGM
02MRN1
Agencies
[Federal Register Volume 77, Number 42 (Friday, March 2, 2012)]
[Notices]
[Pages 12826-12827]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-5064]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Designation of Commission Staff as Non-Decisional
Allocation of Capacity on New Docket No. AD12-9-000.
Merchant Transmission Projects
and New Cost-Based, Participant-
Funded Transmission Projects.
Priority Rights to New Docket No. AD11-11-000.
Participant-Funded Transmission.
Puget Sound Energy, Inc.......... Docket No. EL10-72-001.
[[Page 12827]]
National Grid Transmission Docket No. EL11-49-000.
Services Corporation Bangor
Hydro Electric Company.
Rock Island Clean Line LLC....... Docket No. ER12-365-000.
------------------------------------------------------------------------
With respect to the workshop to be held by Commission staff on
February 28, 2012 in Docket No. AD12-9-000, the following Commission
staff are designated as non-decisional in deliberations by the
Commission in this docket: Robert McLean, Office of the General
Counsel; David Faerberg, Office of the General Counsel; David
Maranville, Office of the General Counsel; and David Hunger, Office of
Energy Policy and Innovation. Accordingly, pursuant to 18 CFR 385.2202
(2010), they will not serve as advisors to the Commission with respect
to any of the above-referenced dockets. Likewise, as non-decisional
staff, pursuant to 18 CFR 385.2201 (2010), they are prohibited from
communicating with advisory staff concerning any deliberations with
respect to the above-referenced dockets.
Dated: February 27, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012-5064 Filed 3-1-12; 8:45 am]
BILLING CODE 6717-01-P