Drawbridge Operation Regulations; Cape Fear River, Wilmington, NC, 12475-12476 [2012-4918]

Download as PDF Federal Register / Vol. 77, No. 41 / Thursday, March 1, 2012 / Rules and Regulations Sector Mobile Date Sponsor/Name Sector Mobile location Safety zone MS Gulf Coast Boaters Rendezvous/MS Gulf Coast Billfish Classic. New Year’s Eve Celebration/ City of Mobile. Biloxi Channel, Biloxi, MS ..... Biloxi Channel, all waters extending 200 yards around channel buoy No. 26. Mobile Channel, all waters extending 500 feet around position 30°41′50″ N, 088°02′13″ W. Back Bay Biloxi, Bounded by the following coordinates: Eastern boundary; Latitude 30°25′47.6″ N, Longitude 088°54′13.6″ W, to Latitude 30°24′43″ N, Longitude 088°54′13.6″ W. Western Boundary; Latitude 30°25′25.6″ N, Longitude 088°56′9″ W, to Latitude 30°24′55″ N, Longitude 088°56′9″ W. Gulf of Mexico to include all waters 1.75 nautical miles east and 1.5 nautical miles west of position 30°19′36″ N, 087°08′23″ W and extending 1000 yards south of Pensacola Beach creating a box, referred to as the ‘‘Show Box’’. Santa Rosa Sound to include all waters from Deer Point to Sharp Point and all waters within Little Sabine Bay. 149 ...... 8 October ....................... 150 ...... 9 December 31st ........... 151 ...... 10 2 Days; Mid March to end of April. Angels Over the Bay/Keesler Air Force Base. Back Bay Biloxi, Biloxi, MS ... 152 ...... 11 4 Days; 2nd weekend in July. Blue Angels Air Show/Naval Air Station Pensacola. Gulf of Mexico & Santa Rosa Sound, Pensacola, FL. Dated: February 3, 2012. Roy A. Nash, Rear Admiral, U.S. Coast Guard, Commander, Eighth Coast Guard District. [FR Doc. 2012–4930 Filed 2–29–12; 8:45 am] BILLING CODE 9110–04–P DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG–2011–1168] Coast Guard, DHS. Notice of temporary deviation from regulations. AGENCY: ACTION: The Commander, Fifth Coast Guard District, has issued a temporary deviation from the regulations governing the operation of the Cape Fear Memorial Bridge, across the Cape Fear River, mile 26.8, at Wilmington, NC. The deviation restricts the operation of the draw span to facilitate the structural repairs and painting of the bridge. DATES: This deviation is effective from 7 a.m. on March 1, 2012 until 11 p.m. on May 31, 2012. tkelley on DSK3SPTVN1PROD with RULES SUMMARY: 16:41 Feb 29, 2012 Jkt 226001 Mobile Channel, Mobile, AL .. Documents mentioned in this preamble as being available in the docket USCG–2011–1168 and are available online by going to https:// www.regulations.gov, inserting USCG– 2011–1168 in the ‘‘Keywords’’ box, and then clicking ‘‘Search’’. This material is also available for inspection or copying the Docket Management Facility (M–30), U.S. Department of Transportation, West Building Ground Floor, Room W12–140, 1200 New Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal Holidays. ADDRESSES: If you have questions on this rule, call or email Mr. Bill H. Brazier, Bridge Management Specialist, Fifth Coast Guard District, telephone (757) 398– 6422, email Bill.H.Brazier@uscg.mil. If you have questions on reviewing the docket, call Renne V. Wright, Program Manager, Docket Operations, (202) 366– 9826. FOR FURTHER INFORMATION CONTACT: Drawbridge Operation Regulations; Cape Fear River, Wilmington, NC VerDate Mar<15>2010 12475 The North Carolina Department of Transportation, who owns and operates this vertical-lift type drawbridge, has requested a temporary deviation from the current operating regulations set out in 33 CFR 117.5, to facilitate the structural repair of the bridge. SUPPLEMENTARY INFORMATION: PO 00000 Frm 00039 Fmt 4700 Sfmt 4700 Under the regular operating schedule for this temporary deviation period, the bridge opens on signal as required by 33 CFR 117.5. The Cape Fear Memorial Bridge across the Cape Fear River mile 26.8, at Wilmington NC has vertical clearances in the full open and closed positions of 135 feet and 65 feet above mean high water, respectively. Under this temporary deviation to facilitate the structural repairs and painting, the drawbridge will operate as follows: Need not open from 7 a.m. on March 1, 2012 until and including 11 p.m. on May 31, 2012; except, vessel openings will be provided if at least three hours advance notice is given to the bridge tender at (910) 251–5773 or via marine radio on channel 18 VHF. Typical vessel traffic on the Cape Fear River includes a variety of vessels from freighters, tug and barge traffic, and recreational vessels. Vessels that can pass under the bridge without a bridge opening may continue to do so at anytime. The drawbridge is able to open for emergencies. The Coast Guard has carefully coordinated the restrictions with commercial and recreational waterway users. The Coast Guard will inform all users of the waterway through our Local and Broadcast Notice to Mariners of the E:\FR\FM\01MRR1.SGM 01MRR1 12476 Federal Register / Vol. 77, No. 41 / Thursday, March 1, 2012 / Rules and Regulations closure periods for the bridge so that vessels can arrange their transits to minimize any impacts caused by the temporary deviation. In accordance with 33 CFR 117.35(e), the drawbridge must return to its original operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: February 10, 2012. Waverly W. Gregory, Jr., Bridge Program Manager, Fifth Coast Guard District. [FR Doc. 2012–4918 Filed 2–29–12; 8:45 am] BILLING CODE 9110–04–P DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG–2012–0012] RIN 1625–AA09 Drawbridge Operation Regulation; Curtis Creek, Baltimore, MD Coast Guard, DHS. Notice of temporary deviation from regulations. AGENCY: ACTION: The Coast Guard has issued a temporary deviation from the operating schedule that governs the I–695 Bridge, across Curtis Creek, mile 1.0, at Baltimore, MD. This deviation allows the bridge to operate on a restricted schedule including six (6) multi-day closures to complete structural repairs. DATES: This deviation is effective from 6 a.m. on March 1, 2012, to 11:59 p.m. on July 17, 2012. The deviation has been enforced with actual notice since February 10, 2012. ADDRESSES: Documents mentioned in this preamble as being available in the docket are part of docket USCG–2012– 0012 and are available online by going to www.regulations.gov, inserting USCG–2012–0012 in the ‘‘Keyword’’ box, and clicking ‘‘Search.’’ This material is also available for inspection or copying at the Docket Management Facility (M–30), U.S. Department of Transportation, West Building Ground Floor, Room W12–140, 1200 New Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. FOR FURTHER INFORMATION CONTACT: If you have questions on this rule, call Bill H. Brazier, Bridge Management Specialist, Fifth Coast Guard District; tkelley on DSK3SPTVN1PROD with RULES SUMMARY: VerDate Mar<15>2010 16:41 Feb 29, 2012 Jkt 226001 telephone 757–398–6422, email Bill.H.Brazier@uscg.mil. If you have questions on viewing the docket, call Renee V. Wright, Program Manager, Docket Operations, telephone 202–366– 9826. SUPPLEMENTARY INFORMATION: The Maryland Transportation Authority, who owns and operates this double-leaf bascule drawbridge, has requested a temporary deviation from the current operating schedule set out in 33 CFR 117.557 which requires the bridge to open on signal if at least a one-hour advance notice is given to the Maryland Transit Authority in Baltimore. The I–695 Bridge has a vertical clearance in the closed position of 58 feet, above mean high water. Under this temporary deviation to facilitate the replacement of the grid deck, floor beams and stringers, the drawbridge will be closed for six (6) multi-day periods from 7 a.m. on February 10, 2012, through 7 a.m. May 17, 2012, as is more specifically set out below. During these closure periods no vessel openings will be provided. At all others times, vessel openings will be provided on signal if at least 24 hours advance notice is given. This temporary deviation will not significantly disrupt vessel traffic because mariners can plan their trips to pass through the bridge between the closure periods when the bridge will be fully operational and vessels that can pass under the bridge without a bridge opening may do so at all times. There is no alternate route for vessels and the bridge will not be able to open in the event of an emergency during the stated closure periods. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35. During this deviation, the bridge will operate as follows: (1) From 6 a.m. on February 10 through 11:59 p.m. on July 17, 2012, will open on signal if at least 24 hours advance notice is given, except (2) The bridge need not open during the following specified closure periods: (i) From 7 a.m. on February 10, 2012 until 7 a.m. on February 15, 2012; (ii) From 7 a.m. on February 18, 2012 until 7 a.m. on February 24, 2012; (iii) From 7 a.m. on February 28, 2012 until 7 a.m. on March 10, 2012; (iv) From 7 a.m. on April 12 until 7 a.m. on April 19, 2012; (v) From 7 a.m. on April 28, 2012 until 7 a.m. on May 4, 2012; and (vi) From 7 a.m. on May 7, 2012 until 7 a.m. on May 17, 2012. PO 00000 Frm 00040 Fmt 4700 Sfmt 4700 Dated: January 30, 2012. William D. Lee, Rear Admiral, U.S. Coast Guard, Commander, Fifth Coast Guard District. [FR Doc. 2012–4929 Filed 2–29–12; 8:45 am] BILLING CODE 9110–04–P DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG–2012–0108] Drawbridge Operation Regulation; Lake Pontchartrain, Between Jefferson and St. Tammany Parishes, LA Coast Guard, DHS. Notice of temporary deviation from regulations. AGENCY: ACTION: The Commander, Eighth Coast Guard District has issued a temporary deviation from the regulations governing the operation of the north bascule span of the Greater New Orleans Expressway Commission Causeway across Lake Pontchartrain between Metairie, Jefferson Parish and Mandeville, St. Tammany Parish, Louisiana. This deviation allows the draws of the bridge to remain closed to navigation for four days to allow for the repair and maintenance of mechanical parts of the bascule. DATES: This deviation is effective from 6 a.m. on Tuesday, March 13, 2012 until 6 p.m. on Friday, March 16, 2012. ADDRESSES: Documents mentioned in this preamble as being available in the docket are part of docket USCG–2012– 0108 and are available online by going to https://www.regulations.gov, inserting USCG–2012–0108 in the ‘‘Keyword’’ box and then clicking ‘‘Search.’’ They are also available for inspection or copying at the Docket Management Facility (M–30), U.S. Department of Transportation, West Building Ground Floor, Room W12–140, 1200 New Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. FOR FURTHER INFORMATION CONTACT: If you have questions on this rule, call or email Mr. Jim Wetherington, Bridge Specialist, Eighth Coast Guard District Bridge Branch, U.S. Coast Guard; telephone 504–671–2128 or email james.r.wetherington@uscg.mil. If you have questions on viewing the docket, call Renee V. Wright, Program Manager, Docket Operations, telephone 202–366– 9826. SUMMARY: E:\FR\FM\01MRR1.SGM 01MRR1

Agencies

[Federal Register Volume 77, Number 41 (Thursday, March 1, 2012)]
[Rules and Regulations]
[Pages 12475-12476]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-4918]


-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2011-1168]


Drawbridge Operation Regulations; Cape Fear River, Wilmington, NC

AGENCY: Coast Guard, DHS.

ACTION: Notice of temporary deviation from regulations.

-----------------------------------------------------------------------

SUMMARY: The Commander, Fifth Coast Guard District, has issued a 
temporary deviation from the regulations governing the operation of the 
Cape Fear Memorial Bridge, across the Cape Fear River, mile 26.8, at 
Wilmington, NC. The deviation restricts the operation of the draw span 
to facilitate the structural repairs and painting of the bridge.

DATES: This deviation is effective from 7 a.m. on March 1, 2012 until 
11 p.m. on May 31, 2012.

ADDRESSES: Documents mentioned in this preamble as being available in 
the docket USCG-2011-1168 and are available online by going to https://www.regulations.gov, inserting USCG-2011-1168 in the ``Keywords'' box, 
and then clicking ``Search''. This material is also available for 
inspection or copying the Docket Management Facility (M-30), U.S. 
Department of Transportation, West Building Ground Floor, Room W12-140, 
1200 New Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5 
p.m., Monday through Friday, except Federal Holidays.

FOR FURTHER INFORMATION CONTACT: If you have questions on this rule, 
call or email Mr. Bill H. Brazier, Bridge Management Specialist, Fifth 
Coast Guard District, telephone (757) 398-6422, email 
Bill.H.Brazier@uscg.mil. If you have questions on reviewing the docket, 
call Renne V. Wright, Program Manager, Docket Operations, (202) 366-
9826.

SUPPLEMENTARY INFORMATION: The North Carolina Department of 
Transportation, who owns and operates this vertical-lift type 
drawbridge, has requested a temporary deviation from the current 
operating regulations set out in 33 CFR 117.5, to facilitate the 
structural repair of the bridge.
    Under the regular operating schedule for this temporary deviation 
period, the bridge opens on signal as required by 33 CFR 117.5.
    The Cape Fear Memorial Bridge across the Cape Fear River mile 26.8, 
at Wilmington NC has vertical clearances in the full open and closed 
positions of 135 feet and 65 feet above mean high water, respectively.
    Under this temporary deviation to facilitate the structural repairs 
and painting, the drawbridge will operate as follows: Need not open 
from 7 a.m. on March 1, 2012 until and including 11 p.m. on May 31, 
2012; except, vessel openings will be provided if at least three hours 
advance notice is given to the bridge tender at (910) 251-5773 or via 
marine radio on channel 18 VHF.
    Typical vessel traffic on the Cape Fear River includes a variety of 
vessels from freighters, tug and barge traffic, and recreational 
vessels. Vessels that can pass under the bridge without a bridge 
opening may continue to do so at anytime. The drawbridge is able to 
open for emergencies.
    The Coast Guard has carefully coordinated the restrictions with 
commercial and recreational waterway users. The Coast Guard will inform 
all users of the waterway through our Local and Broadcast Notice to 
Mariners of the

[[Page 12476]]

closure periods for the bridge so that vessels can arrange their 
transits to minimize any impacts caused by the temporary deviation.
    In accordance with 33 CFR 117.35(e), the drawbridge must return to 
its original operating schedule immediately at the end of the 
designated time period. This deviation from the operating regulations 
is authorized under 33 CFR 117.35.

    Dated: February 10, 2012.
Waverly W. Gregory, Jr.,
Bridge Program Manager, Fifth Coast Guard District.
[FR Doc. 2012-4918 Filed 2-29-12; 8:45 am]