Drawbridge Operation Regulations; Cape Fear River, Wilmington, NC, 12475-12476 [2012-4918]
Download as PDF
Federal Register / Vol. 77, No. 41 / Thursday, March 1, 2012 / Rules and Regulations
Sector
Mobile
Date
Sponsor/Name
Sector Mobile location
Safety zone
MS Gulf Coast Boaters Rendezvous/MS Gulf Coast
Billfish Classic.
New Year’s Eve Celebration/
City of Mobile.
Biloxi Channel, Biloxi, MS .....
Biloxi Channel, all waters extending 200 yards around
channel buoy No. 26.
Mobile Channel, all waters
extending 500 feet around
position 30°41′50″ N,
088°02′13″ W.
Back Bay Biloxi, Bounded by
the following coordinates:
Eastern boundary; Latitude
30°25′47.6″ N, Longitude
088°54′13.6″ W, to Latitude
30°24′43″ N, Longitude
088°54′13.6″ W. Western
Boundary; Latitude
30°25′25.6″ N, Longitude
088°56′9″ W, to Latitude
30°24′55″ N, Longitude
088°56′9″ W.
Gulf of Mexico to include all
waters 1.75 nautical miles
east and 1.5 nautical miles
west of position 30°19′36″
N, 087°08′23″ W and extending 1000 yards south
of Pensacola Beach creating a box, referred to as
the ‘‘Show Box’’. Santa
Rosa Sound to include all
waters from Deer Point to
Sharp Point and all waters
within Little Sabine Bay.
149 ......
8
October .......................
150 ......
9
December 31st ...........
151 ......
10
2 Days; Mid March to
end of April.
Angels Over the Bay/Keesler
Air Force Base.
Back Bay Biloxi, Biloxi, MS ...
152 ......
11
4 Days; 2nd weekend
in July.
Blue Angels Air Show/Naval
Air Station Pensacola.
Gulf of Mexico & Santa Rosa
Sound, Pensacola, FL.
Dated: February 3, 2012.
Roy A. Nash,
Rear Admiral, U.S. Coast Guard, Commander,
Eighth Coast Guard District.
[FR Doc. 2012–4930 Filed 2–29–12; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2011–1168]
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
The Commander, Fifth Coast
Guard District, has issued a temporary
deviation from the regulations
governing the operation of the Cape Fear
Memorial Bridge, across the Cape Fear
River, mile 26.8, at Wilmington, NC.
The deviation restricts the operation of
the draw span to facilitate the structural
repairs and painting of the bridge.
DATES: This deviation is effective from
7 a.m. on March 1, 2012 until 11 p.m.
on May 31, 2012.
tkelley on DSK3SPTVN1PROD with RULES
SUMMARY:
16:41 Feb 29, 2012
Jkt 226001
Mobile Channel, Mobile, AL ..
Documents mentioned in
this preamble as being available in the
docket USCG–2011–1168 and are
available online by going to https://
www.regulations.gov, inserting USCG–
2011–1168 in the ‘‘Keywords’’ box, and
then clicking ‘‘Search’’. This material is
also available for inspection or copying
the Docket Management Facility (M–30),
U.S. Department of Transportation,
West Building Ground Floor, Room
W12–140, 1200 New Jersey Avenue SE.,
Washington, DC 20590, between 9 a.m.
and 5 p.m., Monday through Friday,
except Federal Holidays.
ADDRESSES:
If
you have questions on this rule, call or
email Mr. Bill H. Brazier, Bridge
Management Specialist, Fifth Coast
Guard District, telephone (757) 398–
6422, email Bill.H.Brazier@uscg.mil. If
you have questions on reviewing the
docket, call Renne V. Wright, Program
Manager, Docket Operations, (202) 366–
9826.
FOR FURTHER INFORMATION CONTACT:
Drawbridge Operation Regulations;
Cape Fear River, Wilmington, NC
VerDate Mar<15>2010
12475
The North
Carolina Department of Transportation,
who owns and operates this vertical-lift
type drawbridge, has requested a
temporary deviation from the current
operating regulations set out in 33 CFR
117.5, to facilitate the structural repair
of the bridge.
SUPPLEMENTARY INFORMATION:
PO 00000
Frm 00039
Fmt 4700
Sfmt 4700
Under the regular operating schedule
for this temporary deviation period, the
bridge opens on signal as required by 33
CFR 117.5.
The Cape Fear Memorial Bridge
across the Cape Fear River mile 26.8, at
Wilmington NC has vertical clearances
in the full open and closed positions of
135 feet and 65 feet above mean high
water, respectively.
Under this temporary deviation to
facilitate the structural repairs and
painting, the drawbridge will operate as
follows: Need not open from 7 a.m. on
March 1, 2012 until and including
11 p.m. on May 31, 2012; except, vessel
openings will be provided if at least
three hours advance notice is given to
the bridge tender at (910) 251–5773 or
via marine radio on channel 18 VHF.
Typical vessel traffic on the Cape Fear
River includes a variety of vessels from
freighters, tug and barge traffic, and
recreational vessels. Vessels that can
pass under the bridge without a bridge
opening may continue to do so at
anytime. The drawbridge is able to open
for emergencies.
The Coast Guard has carefully
coordinated the restrictions with
commercial and recreational waterway
users. The Coast Guard will inform all
users of the waterway through our Local
and Broadcast Notice to Mariners of the
E:\FR\FM\01MRR1.SGM
01MRR1
12476
Federal Register / Vol. 77, No. 41 / Thursday, March 1, 2012 / Rules and Regulations
closure periods for the bridge so that
vessels can arrange their transits to
minimize any impacts caused by the
temporary deviation.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its
original operating schedule immediately
at the end of the designated time period.
This deviation from the operating
regulations is authorized under 33 CFR
117.35.
Dated: February 10, 2012.
Waverly W. Gregory, Jr.,
Bridge Program Manager, Fifth Coast Guard
District.
[FR Doc. 2012–4918 Filed 2–29–12; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2012–0012]
RIN 1625–AA09
Drawbridge Operation Regulation;
Curtis Creek, Baltimore, MD
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the I–695 Bridge,
across Curtis Creek, mile 1.0, at
Baltimore, MD. This deviation allows
the bridge to operate on a restricted
schedule including six (6) multi-day
closures to complete structural repairs.
DATES: This deviation is effective from
6 a.m. on March 1, 2012, to 11:59 p.m.
on July 17, 2012. The deviation has been
enforced with actual notice since
February 10, 2012.
ADDRESSES: Documents mentioned in
this preamble as being available in the
docket are part of docket USCG–2012–
0012 and are available online by going
to www.regulations.gov, inserting
USCG–2012–0012 in the ‘‘Keyword’’
box, and clicking ‘‘Search.’’ This
material is also available for inspection
or copying at the Docket Management
Facility (M–30), U.S. Department of
Transportation, West Building Ground
Floor, Room W12–140, 1200 New Jersey
Avenue SE., Washington, DC 20590,
between 9 a.m. and 5 p.m., Monday
through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this rule, call Bill
H. Brazier, Bridge Management
Specialist, Fifth Coast Guard District;
tkelley on DSK3SPTVN1PROD with RULES
SUMMARY:
VerDate Mar<15>2010
16:41 Feb 29, 2012
Jkt 226001
telephone 757–398–6422, email
Bill.H.Brazier@uscg.mil. If you have
questions on viewing the docket, call
Renee V. Wright, Program Manager,
Docket Operations, telephone 202–366–
9826.
SUPPLEMENTARY INFORMATION: The
Maryland Transportation Authority,
who owns and operates this double-leaf
bascule drawbridge, has requested a
temporary deviation from the current
operating schedule set out in 33 CFR
117.557 which requires the bridge to
open on signal if at least a one-hour
advance notice is given to the Maryland
Transit Authority in Baltimore.
The I–695 Bridge has a vertical
clearance in the closed position of 58
feet, above mean high water.
Under this temporary deviation to
facilitate the replacement of the grid
deck, floor beams and stringers, the
drawbridge will be closed for six (6)
multi-day periods from 7 a.m. on
February 10, 2012, through 7 a.m. May
17, 2012, as is more specifically set out
below. During these closure periods no
vessel openings will be provided. At all
others times, vessel openings will be
provided on signal if at least 24 hours
advance notice is given.
This temporary deviation will not
significantly disrupt vessel traffic
because mariners can plan their trips to
pass through the bridge between the
closure periods when the bridge will be
fully operational and vessels that can
pass under the bridge without a bridge
opening may do so at all times. There
is no alternate route for vessels and the
bridge will not be able to open in the
event of an emergency during the stated
closure periods.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
During this deviation, the bridge will
operate as follows:
(1) From 6 a.m. on February 10
through 11:59 p.m. on July 17, 2012,
will open on signal if at least 24 hours
advance notice is given, except
(2) The bridge need not open during
the following specified closure periods:
(i) From 7 a.m. on February 10, 2012
until 7 a.m. on February 15, 2012;
(ii) From 7 a.m. on February 18, 2012
until 7 a.m. on February 24, 2012;
(iii) From 7 a.m. on February 28, 2012
until 7 a.m. on March 10, 2012;
(iv) From 7 a.m. on April 12 until
7 a.m. on April 19, 2012;
(v) From 7 a.m. on April 28, 2012
until 7 a.m. on May 4, 2012; and
(vi) From 7 a.m. on May 7, 2012 until
7 a.m. on May 17, 2012.
PO 00000
Frm 00040
Fmt 4700
Sfmt 4700
Dated: January 30, 2012.
William D. Lee,
Rear Admiral, U.S. Coast Guard, Commander,
Fifth Coast Guard District.
[FR Doc. 2012–4929 Filed 2–29–12; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2012–0108]
Drawbridge Operation Regulation;
Lake Pontchartrain, Between Jefferson
and St. Tammany Parishes, LA
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
The Commander, Eighth
Coast Guard District has issued a
temporary deviation from the
regulations governing the operation of
the north bascule span of the Greater
New Orleans Expressway Commission
Causeway across Lake Pontchartrain
between Metairie, Jefferson Parish and
Mandeville, St. Tammany Parish,
Louisiana. This deviation allows the
draws of the bridge to remain closed to
navigation for four days to allow for the
repair and maintenance of mechanical
parts of the bascule.
DATES: This deviation is effective from
6 a.m. on Tuesday, March 13, 2012 until
6 p.m. on Friday, March 16, 2012.
ADDRESSES: Documents mentioned in
this preamble as being available in the
docket are part of docket USCG–2012–
0108 and are available online by going
to https://www.regulations.gov, inserting
USCG–2012–0108 in the ‘‘Keyword’’
box and then clicking ‘‘Search.’’ They
are also available for inspection or
copying at the Docket Management
Facility (M–30), U.S. Department of
Transportation, West Building Ground
Floor, Room W12–140, 1200 New Jersey
Avenue SE., Washington, DC 20590,
between 9 a.m. and 5 p.m., Monday
through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this rule, call or
email Mr. Jim Wetherington, Bridge
Specialist, Eighth Coast Guard District
Bridge Branch, U.S. Coast Guard;
telephone 504–671–2128 or email
james.r.wetherington@uscg.mil. If you
have questions on viewing the docket,
call Renee V. Wright, Program Manager,
Docket Operations, telephone 202–366–
9826.
SUMMARY:
E:\FR\FM\01MRR1.SGM
01MRR1
Agencies
[Federal Register Volume 77, Number 41 (Thursday, March 1, 2012)]
[Rules and Regulations]
[Pages 12475-12476]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-4918]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2011-1168]
Drawbridge Operation Regulations; Cape Fear River, Wilmington, NC
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, Fifth Coast Guard District, has issued a
temporary deviation from the regulations governing the operation of the
Cape Fear Memorial Bridge, across the Cape Fear River, mile 26.8, at
Wilmington, NC. The deviation restricts the operation of the draw span
to facilitate the structural repairs and painting of the bridge.
DATES: This deviation is effective from 7 a.m. on March 1, 2012 until
11 p.m. on May 31, 2012.
ADDRESSES: Documents mentioned in this preamble as being available in
the docket USCG-2011-1168 and are available online by going to https://www.regulations.gov, inserting USCG-2011-1168 in the ``Keywords'' box,
and then clicking ``Search''. This material is also available for
inspection or copying the Docket Management Facility (M-30), U.S.
Department of Transportation, West Building Ground Floor, Room W12-140,
1200 New Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5
p.m., Monday through Friday, except Federal Holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this rule,
call or email Mr. Bill H. Brazier, Bridge Management Specialist, Fifth
Coast Guard District, telephone (757) 398-6422, email
Bill.H.Brazier@uscg.mil. If you have questions on reviewing the docket,
call Renne V. Wright, Program Manager, Docket Operations, (202) 366-
9826.
SUPPLEMENTARY INFORMATION: The North Carolina Department of
Transportation, who owns and operates this vertical-lift type
drawbridge, has requested a temporary deviation from the current
operating regulations set out in 33 CFR 117.5, to facilitate the
structural repair of the bridge.
Under the regular operating schedule for this temporary deviation
period, the bridge opens on signal as required by 33 CFR 117.5.
The Cape Fear Memorial Bridge across the Cape Fear River mile 26.8,
at Wilmington NC has vertical clearances in the full open and closed
positions of 135 feet and 65 feet above mean high water, respectively.
Under this temporary deviation to facilitate the structural repairs
and painting, the drawbridge will operate as follows: Need not open
from 7 a.m. on March 1, 2012 until and including 11 p.m. on May 31,
2012; except, vessel openings will be provided if at least three hours
advance notice is given to the bridge tender at (910) 251-5773 or via
marine radio on channel 18 VHF.
Typical vessel traffic on the Cape Fear River includes a variety of
vessels from freighters, tug and barge traffic, and recreational
vessels. Vessels that can pass under the bridge without a bridge
opening may continue to do so at anytime. The drawbridge is able to
open for emergencies.
The Coast Guard has carefully coordinated the restrictions with
commercial and recreational waterway users. The Coast Guard will inform
all users of the waterway through our Local and Broadcast Notice to
Mariners of the
[[Page 12476]]
closure periods for the bridge so that vessels can arrange their
transits to minimize any impacts caused by the temporary deviation.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its original operating schedule immediately at the end of the
designated time period. This deviation from the operating regulations
is authorized under 33 CFR 117.35.
Dated: February 10, 2012.
Waverly W. Gregory, Jr.,
Bridge Program Manager, Fifth Coast Guard District.
[FR Doc. 2012-4918 Filed 2-29-12; 8:45 am]
BILLING CODE 9110-04-P