Dominion Transmission, Inc.; Notice of Application, 11522-11523 [2012-4414]
Download as PDF
srobinson on DSK4SPTVN1PROD with NOTICES
11522
Federal Register / Vol. 77, No. 38 / Monday, February 27, 2012 / Notices
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
seven copies of filings made in the
proceeding with the Commission and
must mail a copy to the applicant and
to every other party. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
VerDate Mar<15>2010
18:10 Feb 24, 2012
Jkt 226001
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and seven copies of the protest or
intervention to the Federal Energy
regulatory Commission, 888 First Street
NE., Washington, DC 20426.
Comment Date: 5 p.m. Eastern Time
on March 9, 2012.
Dated: February 17, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–4416 Filed 2–24–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP12–59–000]
Dominion Transmission, Inc.; Notice of
Application
On February 10, 2012, Dominion
Transmission, Inc. (DTI) filed with the
Federal Energy Regulatory Commission
(Commission) an application under
section 7(c) of the Natural Gas Act and
the Rules and Regulations of the
Commission’s Regulations for authority
to establish a protective boundary for
the Sabinsville Storage Pool located in
Tioga County, Pennsylvania. The
expansion would further the integrity
and protection of the gas storage field,
as more fully detailed in the
Application. DTI requests that the
Commission issue all required
authorizations by August 1, 2012.
Questions concerning this application
may be directed to Amanda K. Prestage,
Regulatory and Certificates Analyst III,
Dominion Transmission, Inc., 701 East
Cary Street, Richmond, Virginia 23219,
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
by calling 804–771–4416 or by emailing
Amanda.K.Prestage@dom.com.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
seven copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
E:\FR\FM\27FEN1.SGM
27FEN1
Federal Register / Vol. 77, No. 38 / Monday, February 27, 2012 / Notices
the party or parties directly involved in
the protest.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and seven
copies of the protest or intervention to
the Federal Energy Regulatory
Commission, 888 First Street NE.,
Washington, DC 20426. This filing is
accessible on-line at https://www.ferc.gov
using the ‘‘eLibrary’’ link and is
available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
‘‘eSubscription’’ link on the Web site
that enables subscribers to receive email
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please
email FERCOnlineSupport@ferc.gov, or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on March 8, 2012.
Dated: February 16, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–4414 Filed 2–24–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13680–001]
srobinson on DSK4SPTVN1PROD with NOTICES
Bryant Mountain, LLC; Notice of Intent
To File License Application, Filing of
Pre-Application Document (PAD), and
Commencement of Pre-Filing Process;
Notice of Intent To Prepare an
Environmental Impact Statement and
Conduct Scoping; Request for
Comments on the PAD and Scoping
Document, and Identification of Issues
and Associated Study Requests
a. Type of Filing: Notice of Intent to
File License Application for an Original
License and Commencing Pre-filing
Process.
b. Project No.: 13680–001.
c. Dated Filed: December 21, 2011.
d. Submitted By: Bryant Mountain,
LLC.
e. Name of Project: Bryant Mountain
Pumped Storage Hydroelectric Project.
f. Location: Near Malin in Klamath
County, Oregon, on lands administered
by the U.S. Bureau of Reclamation and
private lands.
g. Filed Pursuant to: 18 CFR Part 5 of
the Commission’s Regulations.
h. Potential Applicant Contact: Mr.
Bart O’Keeffe, Bryant Mountain, LLC,
VerDate Mar<15>2010
18:10 Feb 24, 2012
Jkt 226001
P.O. Box 1916, Discovery Bay,
California, 94505, (925) 634–1550 or
email at bmokeeffe@sbcglobal.net.
i. FERC Contact: Ryan Hansen at (202)
502–8074 or email at ryan.hansen@ferc.
gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item o below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See 94
FERC ¶ 61,076 (2001).
k. With this notice, we are initiating
informal consultation with: (a) The U.S.
Fish and Wildlife Service under section
7 of the Endangered Species Act and the
joint agency regulations thereunder at
50 CFR, part 402 and (b) the State
Historic Preservation Officer, as
required by section 106, National
Historical Preservation Act, and the
implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating
Bryant Mountain, LLC, as the
Commission’s non-federal
representative for carrying out informal
consultation, pursuant to section 7 of
the Endangered Species Act and section
106 of the National Historic
Preservation Act.
m. Bryant Mountain, LLC, filed with
the Commission a Pre-Application
Document (PAD; including a proposed
process plan and schedule), pursuant to
18 CFR 5.6 of the Commission’s
regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site (https://www.
ferc.gov), using the ‘‘eLibrary’’ link.
Enter the docket number, excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at FERCONlineSupport@ferc.
gov or toll free at 1–866–208–3676, or
for TTY, (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in
paragraph h.
Register online at https://www.ferc.
gov/docs-filing/esubscription.asp to be
notified via email of new filing and
issuances related to this or other
pending projects. For assistance, contact
FERC Online Support.
o. With this notice, we are soliciting
comments on the PAD and
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
11523
Commission’s staff Scoping Document 1
(SD1), as well as study requests. All
comments on the PAD and SD1, and
study requests should be sent to the
address above in paragraph h. In
addition, all comments on the PAD and
SD1, study requests, requests for
cooperating agency status, and all
communications to and from
Commission staff related to the merits of
the potential application must be filed
with the Commission. Documents may
be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://www.ferc.
gov/docs-filing/ecomment.asp. You
must include your name and contact
information at the end of your
comments. For assistance, please
contact FERC Online Support. Although
the Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
All filings with the Commission must
include on the first page, the project
name (Bryant Mountain Pumped
Storage Hydroelectric Project) and the
project number (P–13680–001), and bear
the appropriate heading: ‘‘Comments on
Pre-Application Document,’’ ‘‘Study
Requests,’’ ‘‘Comments on Scoping
Document 1,’’ ‘‘Request for Cooperating
Agency Status,’’ or ‘‘Communications to
and from Commission Staff.’’ Any
individual or entity interested in
submitting study requests, commenting
on the PAD or SD1, and any agency
requesting cooperating status must do so
by April 16, 2012.
p. We intend to prepare an
Environmental Impact Statement (EIS)
for this project. The scoping meetings
identified below satisfy the NEPA
scoping requirements.
Scoping Meetings
Commission staff will hold two
scoping meetings in the vicinity of the
project at the time and place noted
below. The daytime meeting will focus
on resource agency, Indian tribes, and
non-governmental organization
concerns, while the evening meeting is
primarily for receiving input from the
public. We invite all interested
individuals, organizations, and agencies
to attend one or both of the meetings,
and to assist staff in identifying
particular study needs, as well as the
scope of environmental issues to be
E:\FR\FM\27FEN1.SGM
27FEN1
Agencies
[Federal Register Volume 77, Number 38 (Monday, February 27, 2012)]
[Notices]
[Pages 11522-11523]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-4414]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP12-59-000]
Dominion Transmission, Inc.; Notice of Application
On February 10, 2012, Dominion Transmission, Inc. (DTI) filed with
the Federal Energy Regulatory Commission (Commission) an application
under section 7(c) of the Natural Gas Act and the Rules and Regulations
of the Commission's Regulations for authority to establish a protective
boundary for the Sabinsville Storage Pool located in Tioga County,
Pennsylvania. The expansion would further the integrity and protection
of the gas storage field, as more fully detailed in the Application.
DTI requests that the Commission issue all required authorizations by
August 1, 2012.
Questions concerning this application may be directed to Amanda K.
Prestage, Regulatory and Certificates Analyst III, Dominion
Transmission, Inc., 701 East Cary Street, Richmond, Virginia 23219, by
calling 804-771-4416 or by emailing Amanda.K.Prestage@dom.com.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party to the proceedings for this project should, on or
before the comment date stated below, file with the Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a
motion to intervene in accordance with the requirements of the
Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211) and the Regulations under the NGA (18 CFR 157.10). A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies of all
documents filed by the applicant and by all other parties. A party must
submit seven copies of filings made with the Commission and must mail a
copy to the applicant and to every other party in the proceeding. Only
parties to the proceeding can ask for court review of Commission orders
in the proceeding.
However, a person does not have to intervene in order to have
comments considered. The second way to participate is by filing with
the Secretary of the Commission, as soon as possible, an original and
two copies of comments in support of or in opposition to this project.
The Commission will consider these comments in determining the
appropriate action to be taken, but the filing of a comment alone will
not serve to make the filer a party to the proceeding. The Commission's
rules require that persons filing comments in opposition to the project
provide copies of their protests only to
[[Page 11523]]
the party or parties directly involved in the protest.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and seven copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street NE., Washington, DC
20426. This filing is accessible on-line at https://www.ferc.gov using
the ``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive email
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please email
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5 p.m. Eastern Time on March 8, 2012.
Dated: February 16, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-4414 Filed 2-24-12; 8:45 am]
BILLING CODE 6717-01-P