Port Barre Investments, L.L.C. (d/b/a Bobcat Gas Storage); Notice of Request Under Blanket Authorization, 11530 [2012-4413]
Download as PDF
11530
Federal Register / Vol. 77, No. 38 / Monday, February 27, 2012 / Notices
information at the end of your
comments. For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14356) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: February 16, 2012.
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 14130–000, 14137–000, 14134–
000]
Riverbank Hydro No. 2, LLC, Lock+
Hydro Friends Fund XXXVI, Qualified
Hydro 21, LLC; Notice Announcing
Preliminary Permit Drawing
srobinson on DSK4SPTVN1PROD with NOTICES
[FR Doc. 2012–4433 Filed 2–24–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Citizens Sunrise Transmission LLC;
Citizens Energy Corporation; Notice of
Initiation of Proceeding and Refund
Effective Date
BILLING CODE 6717–01–P
The Commission has received three
preliminary permit applications deemed
filed on April 1, 2011, at 8:30 a.m.,1 for
proposed projects to be located on the
Arkansas River, in Lincoln County and
Jefferson County, Arkansas. The
applications were filed by Riverbank
Hydro No. 2, LLC for Project No. 14130–
000, Lock+ Hydro Friends Fund XXXVI
for Project No. 14137–000, and
Qualified Hydro 21, LLC for Project No.
14134–000.
On February 28, 2012, at 9 a.m.
(Eastern Time), the Secretary of the
Commission, or her designee, will
conduct a random drawing to determine
the filing priority of the applicants
identified in this notice. The
Commission will select among
competing permit applications as
provided in section 4.37 of its
1 Under
the Commission’s Rules of Practice and
Procedure, any document received after regular
business hours is considered filed at 8:30 a.m. on
the next regular business day. 18 CFR
385.2001(a)(2) (2011).
18:10 Feb 24, 2012
Dated: February 21, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[Docket No. EL10–3–001]
[FR Doc. 2012–4404 Filed 2–24–12; 8:45 am]
VerDate Mar<15>2010
regulations.2 The priority established by
this drawing will be used to determine
which applicant, among those with
identical filing times, will be considered
to have the first-filed application.
The drawing is open to the public and
will be held in room 2C, the
Commission Meeting Room, located at
888 First St. NE., Washington, DC
20426. A subsequent notice will be
issued by the Secretary announcing the
results of the drawing.
Jkt 226001
On February 21, 2012, the
Commission issued an order that
initiated a proceeding in Docket No.
EL10–3–001, pursuant to section 206 of
the Federal Power Act (FPA), 16 U.S.C.
824e (2006), to determine the justness
and reasonableness of the rates
proposed by Citizens Sunrise. Citizens
Sunrise Transmission LLC and Citizens
Energy Corporation, 138 FERC ¶ 61,129
(2012).
The refund effective date in Docket
No. EL10–3–001, established pursuant
to section 206(b) of the FPA, will be the
date of publication of this notice in the
Federal Register.
Dated: February 21, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary
[FR Doc. 2012–4436 Filed 2–24–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP12–58–000]
Port Barre Investments, L.L.C. (d/b/a
Bobcat Gas Storage); Notice of
Request Under Blanket Authorization
Take notice that on February 6, 2012
Bobcat Gas Storage (Bobcat), 5400
Westheimer Court, Houston, Texas
77056, filed in the above Docket, a prior
notice request pursuant to sections
157.205, and 157.208 of the
Commission’s regulations under the
Natural Gas Act (NGA), for
authorization to increase the certificated
operating pressure on five supply and
delivery laterals, four of which are
existing and one that is yet to be
constructed, from 1,170 psig to 1,320
psig, located at its natural gas storage
facility in St. Landry Parish, Louisiana,
all as more fully set forth in the
application which is on file with the
Commission and open to public
inspection. The filing may also be
viewed on the Web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.
gov or toll free at (866) 208–3676, or
TTY, contact (202) 502–8659.
Any questions concerning this
application may be directed to Lisa A.
Connolly, General Manager, Rates &
Certificates, Bobcat Gas Storage, P.O.
Box 1642, Houston, Texas 77251–1642
at (713) 627–4102.
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
Natural Gas Act (NGA) (18 CFR 157.205)
file a protest to the request. If no protest
is filed within the time allowed
therefore, the proposed activity shall be
deemed to be authorized effective the
day after the time allowed for protest. If
a protest is filed and not withdrawn
within 30 days after the time allowed
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (www.ferc.gov)
under the ‘‘e-Filing’’ link.
Dated: February 16, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–4413 Filed 2–24–12; 8:45 am]
2 18
PO 00000
CFR 4.37 (2011).
Frm 00051
Fmt 4703
BILLING CODE 6717–01–P
Sfmt 9990
E:\FR\FM\27FEN1.SGM
27FEN1
Agencies
[Federal Register Volume 77, Number 38 (Monday, February 27, 2012)]
[Notices]
[Page 11530]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-4413]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP12-58-000]
Port Barre Investments, L.L.C. (d/b/a Bobcat Gas Storage); Notice
of Request Under Blanket Authorization
Take notice that on February 6, 2012 Bobcat Gas Storage (Bobcat),
5400 Westheimer Court, Houston, Texas 77056, filed in the above Docket,
a prior notice request pursuant to sections 157.205, and 157.208 of the
Commission's regulations under the Natural Gas Act (NGA), for
authorization to increase the certificated operating pressure on five
supply and delivery laterals, four of which are existing and one that
is yet to be constructed, from 1,170 psig to 1,320 psig, located at its
natural gas storage facility in St. Landry Parish, Louisiana, all as
more fully set forth in the application which is on file with the
Commission and open to public inspection. The filing may also be viewed
on the Web at https://www.ferc.gov using the ``eLibrary'' link. Enter
the docket number excluding the last three digits in the docket number
field to access the document. For assistance, please contact FERC
Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 208-
3676, or TTY, contact (202) 502-8659.
Any questions concerning this application may be directed to Lisa
A. Connolly, General Manager, Rates & Certificates, Bobcat Gas Storage,
P.O. Box 1642, Houston, Texas 77251-1642 at (713) 627-4102.
Any person may, within 60 days after the issuance of the instant
notice by the Commission, file pursuant to Rule 214 of the Commission's
Procedural Rules (18 CFR 385.214) a motion to intervene or notice of
intervention. Any person filing to intervene or the Commission's staff
may, pursuant to section 157.205 of the Commission's Regulations under
the Natural Gas Act (NGA) (18 CFR 157.205) file a protest to the
request. If no protest is filed within the time allowed therefore, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for protest. If a protest is filed and not
withdrawn within 30 days after the time allowed for filing a protest,
the instant request shall be treated as an application for
authorization pursuant to section 7 of the NGA.
The Commission strongly encourages electronic filings of comments,
protests, and interventions via the internet in lieu of paper. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site (www.ferc.gov) under the ``e-Filing'' link.
Dated: February 16, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-4413 Filed 2-24-12; 8:45 am]
BILLING CODE 6717-01-P