Port Barre Investments, L.L.C. (d/b/a Bobcat Gas Storage); Notice of Request Under Blanket Authorization, 11530 [2012-4413]

Download as PDF 11530 Federal Register / Vol. 77, No. 38 / Monday, February 27, 2012 / Notices information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1–866–208–3676, or for TTY, (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–14356) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: February 16, 2012. Kimberly D. Bose, Secretary. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14130–000, 14137–000, 14134– 000] Riverbank Hydro No. 2, LLC, Lock+ Hydro Friends Fund XXXVI, Qualified Hydro 21, LLC; Notice Announcing Preliminary Permit Drawing srobinson on DSK4SPTVN1PROD with NOTICES [FR Doc. 2012–4433 Filed 2–24–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Citizens Sunrise Transmission LLC; Citizens Energy Corporation; Notice of Initiation of Proceeding and Refund Effective Date BILLING CODE 6717–01–P The Commission has received three preliminary permit applications deemed filed on April 1, 2011, at 8:30 a.m.,1 for proposed projects to be located on the Arkansas River, in Lincoln County and Jefferson County, Arkansas. The applications were filed by Riverbank Hydro No. 2, LLC for Project No. 14130– 000, Lock+ Hydro Friends Fund XXXVI for Project No. 14137–000, and Qualified Hydro 21, LLC for Project No. 14134–000. On February 28, 2012, at 9 a.m. (Eastern Time), the Secretary of the Commission, or her designee, will conduct a random drawing to determine the filing priority of the applicants identified in this notice. The Commission will select among competing permit applications as provided in section 4.37 of its 1 Under the Commission’s Rules of Practice and Procedure, any document received after regular business hours is considered filed at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2) (2011). 18:10 Feb 24, 2012 Dated: February 21, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. [Docket No. EL10–3–001] [FR Doc. 2012–4404 Filed 2–24–12; 8:45 am] VerDate Mar<15>2010 regulations.2 The priority established by this drawing will be used to determine which applicant, among those with identical filing times, will be considered to have the first-filed application. The drawing is open to the public and will be held in room 2C, the Commission Meeting Room, located at 888 First St. NE., Washington, DC 20426. A subsequent notice will be issued by the Secretary announcing the results of the drawing. Jkt 226001 On February 21, 2012, the Commission issued an order that initiated a proceeding in Docket No. EL10–3–001, pursuant to section 206 of the Federal Power Act (FPA), 16 U.S.C. 824e (2006), to determine the justness and reasonableness of the rates proposed by Citizens Sunrise. Citizens Sunrise Transmission LLC and Citizens Energy Corporation, 138 FERC ¶ 61,129 (2012). The refund effective date in Docket No. EL10–3–001, established pursuant to section 206(b) of the FPA, will be the date of publication of this notice in the Federal Register. Dated: February 21, 2012. Nathaniel J. Davis, Sr., Deputy Secretary [FR Doc. 2012–4436 Filed 2–24–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP12–58–000] Port Barre Investments, L.L.C. (d/b/a Bobcat Gas Storage); Notice of Request Under Blanket Authorization Take notice that on February 6, 2012 Bobcat Gas Storage (Bobcat), 5400 Westheimer Court, Houston, Texas 77056, filed in the above Docket, a prior notice request pursuant to sections 157.205, and 157.208 of the Commission’s regulations under the Natural Gas Act (NGA), for authorization to increase the certificated operating pressure on five supply and delivery laterals, four of which are existing and one that is yet to be constructed, from 1,170 psig to 1,320 psig, located at its natural gas storage facility in St. Landry Parish, Louisiana, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the Web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc. gov or toll free at (866) 208–3676, or TTY, contact (202) 502–8659. Any questions concerning this application may be directed to Lisa A. Connolly, General Manager, Rates & Certificates, Bobcat Gas Storage, P.O. Box 1642, Houston, Texas 77251–1642 at (713) 627–4102. Any person may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention. Any person filing to intervene or the Commission’s staff may, pursuant to section 157.205 of the Commission’s Regulations under the Natural Gas Act (NGA) (18 CFR 157.205) file a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. The Commission strongly encourages electronic filings of comments, protests, and interventions via the internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (www.ferc.gov) under the ‘‘e-Filing’’ link. Dated: February 16, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012–4413 Filed 2–24–12; 8:45 am] 2 18 PO 00000 CFR 4.37 (2011). Frm 00051 Fmt 4703 BILLING CODE 6717–01–P Sfmt 9990 E:\FR\FM\27FEN1.SGM 27FEN1

Agencies

[Federal Register Volume 77, Number 38 (Monday, February 27, 2012)]
[Notices]
[Page 11530]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-4413]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP12-58-000]


Port Barre Investments, L.L.C. (d/b/a Bobcat Gas Storage); Notice 
of Request Under Blanket Authorization

    Take notice that on February 6, 2012 Bobcat Gas Storage (Bobcat), 
5400 Westheimer Court, Houston, Texas 77056, filed in the above Docket, 
a prior notice request pursuant to sections 157.205, and 157.208 of the 
Commission's regulations under the Natural Gas Act (NGA), for 
authorization to increase the certificated operating pressure on five 
supply and delivery laterals, four of which are existing and one that 
is yet to be constructed, from 1,170 psig to 1,320 psig, located at its 
natural gas storage facility in St. Landry Parish, Louisiana, all as 
more fully set forth in the application which is on file with the 
Commission and open to public inspection. The filing may also be viewed 
on the Web at https://www.ferc.gov using the ``eLibrary'' link. Enter 
the docket number excluding the last three digits in the docket number 
field to access the document. For assistance, please contact FERC 
Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 208-
3676, or TTY, contact (202) 502-8659.
    Any questions concerning this application may be directed to Lisa 
A. Connolly, General Manager, Rates & Certificates, Bobcat Gas Storage, 
P.O. Box 1642, Houston, Texas 77251-1642 at (713) 627-4102.
    Any person may, within 60 days after the issuance of the instant 
notice by the Commission, file pursuant to Rule 214 of the Commission's 
Procedural Rules (18 CFR 385.214) a motion to intervene or notice of 
intervention. Any person filing to intervene or the Commission's staff 
may, pursuant to section 157.205 of the Commission's Regulations under 
the Natural Gas Act (NGA) (18 CFR 157.205) file a protest to the 
request. If no protest is filed within the time allowed therefore, the 
proposed activity shall be deemed to be authorized effective the day 
after the time allowed for protest. If a protest is filed and not 
withdrawn within 30 days after the time allowed for filing a protest, 
the instant request shall be treated as an application for 
authorization pursuant to section 7 of the NGA.
    The Commission strongly encourages electronic filings of comments, 
protests, and interventions via the internet in lieu of paper. See 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site (www.ferc.gov) under the ``e-Filing'' link.

    Dated: February 16, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-4413 Filed 2-24-12; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.