Town of Walden, Colorado; Notice of Application, 11524-11525 [2012-4406]
Download as PDF
11524
Federal Register / Vol. 77, No. 38 / Monday, February 27, 2012 / Notices
addressed in the environmental
document. The times and locations of
these meetings are as follows:
Daytime Scoping Meeting
Date and Time: Wednesday, March
14, 2012, 9 a.m.–12 p.m.
Location: Shilo Inn Suites Hotel, 2500
Almond St., Klamath Falls, OR 97601.
Phone Number: (541) 885–7980.
Evening Scoping Meeting
Date and Time: Tuesday, March 13,
2012, 6 p.m.–9 p.m.
Location: Malin City Park Hall, 2307
Third Street, Malin, OR 97632.
Phone Number: (541) 723–2021.
Scoping Document 1 (SD1), which
outlines the subject areas to be
addressed in the environmental
document, was mailed to the
individuals and entities on the
Commission’s mailing list. Copies of
SD1 will be available at the scoping
meetings, or may be viewed on the Web
at https://www.ferc.gov, using the
‘‘eLibrary’’ link. Follow the directions
for accessing information in paragraph
n. Based on all oral and written
comments, a Scoping Document 2 (SD2)
may be issued. SD2 may include a
revised process plan and schedule, as
well as a list of issues, identified
through the scoping process.
Environmental Site Review
The potential applicant and
Commission staff will conduct an
Environmental Site Review of the
project on Tuesday, April 13, 2012,
starting at 1 p.m. In addition to the
scoping meetings, we will be
conducting an environmental site
review on Tuesday, March 13, 2012. All
interested participants should meet no
later than 1 p.m. in the parking lot of
Malin City Park Hall, 2307 Third Street,
Malin, OR 97632. All participants are
responsible for their own transportation.
srobinson on DSK4SPTVN1PROD with NOTICES
Meeting Objectives
At the scoping meetings, staff will: (1)
Initiate scoping of the issues; (2) review
and discuss existing conditions and
resource management objectives; (3)
review and discuss existing information
and identify preliminary information
and study needs; (4) review and discuss
the process plan and schedule for prefiling activity that incorporates the time
frames provided for in Part 5 of the
Commission’s regulations and, to the
extent possible, maximizes coordination
of federal, state, and tribal permitting
and certification processes; and (5)
discuss the appropriateness of any
federal or state agency or Indian tribe
acting as a cooperating agency for
VerDate Mar<15>2010
18:10 Feb 24, 2012
Jkt 226001
development of an environmental
document.
Meeting participants should come
prepared to discuss their issues and/or
concerns. Please review the PAD in
preparation for the scoping meetings.
Directions on how to obtain a copy of
the PAD and SD1 are included in item
n. of this document.
Meeting Procedures
The meetings will be recorded by a
stenographer and will be placed in the
public records of the project.
Dated: February 16, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–4412 Filed 2–24–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP12–54–000]
Town of Walden, Colorado; Notice of
Application
Take notice that on February 1, 2012,
Town of Walden, Colorado (Walden)
filed with the Federal Energy Regulatory
Commission (Commission) an
application under section 7(f) of the
Natural Gas Act (NGA) for
determination of a service area within
which Walden may, without further
Commission authorization, provide
natural gas distribution service to
customers in Colorado and Wyoming.
Walden requests that the Commission:
(1) Determine that Walden is a local
distribution company for purposes of
Section 311 of the NGPA; (2) grant
Walden a service area determination
pursuant to Section 7(f) of the NGA as
described in the body of this
Application; (3) grant Walden a waiver
of all regulatory, accounting, and
reporting requirements applicable to
natural gas companies under the NGA
and the NGPA with respect to the
activities covered by this Application
and the designated service area; and (4)
grant such further relief as the
Commission may deem appropriate, all
as more fully set forth in the application
which is on file with the Commission
and open to public inspection. This
filing is available for review at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Any questions regarding the
application should be directed to Bruce
S. Asay, Esq., 1807 Capitol Avenue
#203, Cheyenne, WY 82001, or
telephone 307–632–2888 or by email
basay@associatedlegal.com or to Steven
Shute, contract operator of Walden Gas
at P.O. Box 1054, Glenwood Springs, CO
81602 or telephone 970–928–9208 or by
email pipeline@rof.net.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
seven copies of filings made in the
proceeding with the Commission and
must mail a copy to the applicant and
to every other party. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
E:\FR\FM\27FEN1.SGM
27FEN1
Federal Register / Vol. 77, No. 38 / Monday, February 27, 2012 / Notices
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and seven copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
Comment Date: March 8, 2012.
Dated: February 16, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–4406 Filed 2–24–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
srobinson on DSK4SPTVN1PROD with NOTICES
Federal Energy Regulatory
Commission
Combined Notice of Filings #2
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC12–68–000.
Applicants: Stephentown Regulation
Services LLC.
VerDate Mar<15>2010
18:10 Feb 24, 2012
Jkt 226001
Description: Request of Stephentown
Regulation Services LLC.
Filed Date: 2/16/12.
Accession Number: 20120216–5217.
Comments Due: 5 p.m. ET 2/28/12.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2131–001.
Applicants: Grand Ridge Energy LLC.
Description: Supplement to June 20,
2011 Triennial Report of of Grand Ridge
Energy LLC.
Filed Date: 2/17/12.
Accession Number: 20120217–5087.
Comments Due: 5 p.m. ET 3/9/12.
Docket Numbers: ER10–2137–001.
Applicants: Beech Ridge Energy LLC.
Description: Supplement to June 20,
2011 Triennial Report of Beech Ridge
Energy LLC.
Filed Date: 2/17/12.
Accession Number: 20120217–5086.
Comments Due: 5 p.m. ET 3/9/12.
Docket Numbers: ER10–2138–001;
ER10–2139–001.
Applicants: Grand Ridge Energy II
LLC, Grand Ridge Energy III LLC.
Description: Supplement to June 20,
2011 Triennial Report of Grand Ridge
Energy II LLC, et al.
Filed Date: 2/17/12.
Accession Number: 20120217–5088.
Comments Due: 5 p.m. ET 3/9/12.
Docket Numbers: ER10–2140–001.
Applicants: Grand Ridge Energy IV
LLC.
Description: Supplement to June 20,
2011 Triennial Report of Grand Ridge
Energy IV LLC.
Filed Date: 2/17/12.
Accession Number: 20120217–5089.
Comments Due: 5 p.m. ET 3/9/12.
Docket Numbers: ER10–2141–001.
Applicants: Grand Ridge Energy V
LLC.
Description: Supplement to June 20,
2011 Triennial Report of Grand Ridge
Energy V LLC.
Filed Date: 2/17/12.
Accession Number: 20120217–5084.
Comments Due: 5 p.m. ET 3/9/12.
Docket Numbers: ER12–161–002.
Applicants: Bishop Hill Energy LLC.
Description: Change in Status Notice
of Bishop Hill Energy LLC.
Filed Date: 2/17/12.
Accession Number: 20120217–5128.
Comments Due: 5 p.m. ET 3/9/12.
Docket Numbers: ER12–667–001.
Applicants: ITC Midwest LLC.
Description: Supplemental Filing of
ITC Midwest—Northern States Power
205 Filing to be effective 2/21/2012.
Filed Date: 2/17/12.
Accession Number: 20120217–5037.
Comments Due: 5 p.m. ET 3/9/12.
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
11525
Docket Numbers: ER12–1113–000.
Applicants: Midwest Independent
Transmission System Operator, Inc.,
International Transmission Company.
Description: ITC–DTE River Rouge to
be effective 4/17/2012 under ER12–
1113.
Filed Date: 2/17/12.
Accession Number: 20120217–5034.
Comments Due: 5 p.m. ET 3/9/12.
Docket Numbers: ER12–1114–000.
Applicants: ITC Midwest LLC.
Description: Filing of a Transmission
Agreement to be effective 2/29/2012.
Filed Date: 2/17/12.
Accession Number: 20120217–5047.
Comments Due: 5 p.m. ET 3/9/12.
Docket Numbers: ER12–1115–000.
Applicants: PacifiCorp.
Description: BPA AC Intertie
Agreement 6th Revised to be effective 4/
18/2012.
Filed Date: 2/17/12.
Accession Number: 20120217–5072.
Comments Due: 5 p.m. ET 3/9/12.
Docket Numbers: ER12–1117–000.
Applicants: Consolidated Edison
Company of New York.
Description: Revisions to PASNY/
EDDS tariffs to be effective 2/20/2012.
Filed Date: 2/17/12.
Accession Number: 20120217–5073.
Comments Due: 5 p.m. ET 3/9/12.
Docket Numbers: ER12–1118–000.
Applicants: Southern California
Edison Company.
Description: Amended SGIA SCE–
FlexEnergy, LLC Lamb Canyon Project
to be effective 2/18/2012.
Filed Date: 2/17/12.
Accession Number: 20120217–5075.
Comments Due: 5 p.m. ET 3/9/12.
Docket Numbers: ER12–1119–000.
Applicants: Southern California
Edison Company.
Description: Amended Expedited
Service and Interconnection Agreement
Wintec Energy, Ltd., Wintec V to be
effective 2/18/2012.
Filed Date: 2/17/12.
Accession Number: 20120217–5076.
Comments Due: 5 p.m. ET 3/9/12.
Docket Numbers: ER12–1120–000.
Applicants: ITC Midwest LLC.
Description: ITC Midwest LLC
submits tariff filing per 35.13(a)(2)(iii:
Filing of Interconnection Agreement to
be effective 4/19/2012.
Filed Date: 2/17/12.
Accession Number: 20120217–5090.
Comments Due: 5 p.m. ET 3/9/12.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
E:\FR\FM\27FEN1.SGM
27FEN1
Agencies
[Federal Register Volume 77, Number 38 (Monday, February 27, 2012)]
[Notices]
[Pages 11524-11525]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-4406]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP12-54-000]
Town of Walden, Colorado; Notice of Application
Take notice that on February 1, 2012, Town of Walden, Colorado
(Walden) filed with the Federal Energy Regulatory Commission
(Commission) an application under section 7(f) of the Natural Gas Act
(NGA) for determination of a service area within which Walden may,
without further Commission authorization, provide natural gas
distribution service to customers in Colorado and Wyoming. Walden
requests that the Commission: (1) Determine that Walden is a local
distribution company for purposes of Section 311 of the NGPA; (2) grant
Walden a service area determination pursuant to Section 7(f) of the NGA
as described in the body of this Application; (3) grant Walden a waiver
of all regulatory, accounting, and reporting requirements applicable to
natural gas companies under the NGA and the NGPA with respect to the
activities covered by this Application and the designated service area;
and (4) grant such further relief as the Commission may deem
appropriate, all as more fully set forth in the application which is on
file with the Commission and open to public inspection. This filing is
available for review at the Commission in the Public Reference Room or
may be viewed on the Commission's Web site web at https://www.ferc.gov
using the ``eLibrary'' link. Enter the docket number excluding the last
three digits in the docket number field to access the document. For
assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-
free, (886) 208-3676 or TYY, (202) 502-8659.
Any questions regarding the application should be directed to Bruce
S. Asay, Esq., 1807 Capitol Avenue 203, Cheyenne, WY 82001, or
telephone 307-632-2888 or by email basay@associatedlegal.com or to
Steven Shute, contract operator of Walden Gas at P.O. Box 1054,
Glenwood Springs, CO 81602 or telephone 970-928-9208 or by email
pipeline@rof.net.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party to the proceedings for this project should, on or
before the comment date stated below file with the Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a
motion to intervene in accordance with the requirements of the
Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211) and the Regulations under the NGA (18 CFR 157.10). A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies of all
documents filed by the applicant and by all other parties. A party must
submit seven copies of filings made in the proceeding with the
Commission and must mail a copy to the applicant and to every other
party. Only parties to the proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to intervene in order to have
comments considered. The second way to participate is by filing with
the
[[Page 11525]]
Secretary of the Commission, as soon as possible, an original and two
copies of comments in support of or in opposition to this project. The
Commission will consider these comments in determining the appropriate
action to be taken, but the filing of a comment alone will not serve to
make the filer a party to the proceeding. The Commission's rules
require that persons filing comments in opposition to the project
provide copies of their protests only to the party or parties directly
involved in the protest.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commentors will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commentors will not be required to serve copies of filed
documents on all other parties. However, the non-party commentors will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and seven copies of the protest or intervention to
the Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426.
Comment Date: March 8, 2012.
Dated: February 16, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-4406 Filed 2-24-12; 8:45 am]