Notice of Attendance at PJM Interconnection, L.L.C. Meetings, 10505-10506 [2012-4074]
Download as PDF
Federal Register / Vol. 77, No. 35 / Wednesday, February 22, 2012 / Notices
Anchorage, Alaska 99503–7497; (907)
565–5358 or email at bpetrie@avec.org.
FERC Contact: Carolyn Templeton;
(202) 502–8785 or
carolyn.templeton@ferc.gov.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13272) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: February 14, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–4013 Filed 2–21–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
srobinson on DSK4SPTVN1PROD with NOTICES
Federal Energy Regulatory
Commission
Notice of Attendance at PJM
Interconnection, L.L.C. Meetings
The Federal Energy Regulatory
Commission (Commission) hereby gives
notice that members of the Commission
and Commission staff may attend
upcoming PJM Interconnection, L.L.C.
(PJM) Members Committee meetings, as
well as other PJM committee,
VerDate Mar<15>2010
16:37 Feb 21, 2012
Jkt 226001
subcommittee or task force meetings.1
The Commission and Commission staff
may attend the following meetings:
PJM Members Committee
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
February 21, 2012 (Conference Call)
February 23, 2012 (Wilmington, DE)
March 26, 2012 (Conference Call)
March 29, 2012 (Wilmington, DE)
April 23, 2012 (Conference Call)
April 26, 2012 (Wilmington, DE)
May 17, 2012 (Cleveland, OH)
June 25, 2012 (Conference Call)
June 28, 2012 (Wilmington, DE)
July 23, 2012 (Conference Call)
July 26, 2012 (Wilmington, DE)
September 24, 2012 (Conference Call)
September 27, 2012 (Wilmington, DE)
October 18, 2012 (Conference Call)
October 25, 2012 (Wilmington, DE)
November 26, 2012 (Conference Call)
November 29, 2012 (Wilmington, DE)
PJM Markets and Reliability Committee
•
•
•
•
•
•
•
•
February 23, 2012 (Wilmington, DE)
March 29, 2012 (Wilmington, DE)
April 26, 2012 (Wilmington, DE)
June 28, 2012 (Wilmington, DE)
July 26, 2012 (Wilmington, DE)
September 27, 2012 (Wilmington, DE)
October 25, 2012 (Wilmington, DE)
November 29, 2012 (Wilmington, DE)
PJM Market Implementation Committee
•
•
•
•
•
•
•
•
February 17, 2012 (Wilmington, DE)
March 14, 2012 (Wilmington, DE)
April 11, 2012 (Wilmington, DE)
May 9, 2012 (To Be Determined)
June 13, 2012 (To Be Determined)
July 11, 2012 (To Be Determined)
August 8, 2012 (To Be Determined)
September 12, 2012 (To Be
Determined)
• October 10, 2012 (To Be Determined)
• November 7, 2012 (To Be Determined)
• December 12, 2012 (To Be
Determined)
The discussions at each of the
meetings described above may address
matters at issue in pending proceedings
before the Commission, including the
following currently pending
proceedings:
Docket No. EL05–121, PJM
Interconnection, L.L.C.
Docket Nos. ER06–456, ER06–880,
ER06–954, ER06–1271, EL07–57,
ER07–424, ER07–1186, ER08–229,
ER08–1065, ER09–497, and ER10–
268, PJM Interconnection, L.L.C.
1 For example, PJM subcommittees and task
forces of the standing committees (Operating,
Planning and Market Implementation) and senior
standing committees (Members and Markets and
Reliability) meet on a variety of different topics;
they convene and dissolve on an as-needed basis.
Therefore, the Commission and Commission staff
may monitor the various meetings posted on the
PJM Web site.
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
10505
Docket No. ER07–1186, PJM
Interconnection, L.L.C.
Docket No. EL08–47, PJM
Interconnection, L.L.C.
Docket No. ER08–386, PotomacAppalachian Transmission
Highline, L.L.C.
Docket No. ER08–686, Pepco Holdings,
Inc.
Docket No. ER09–1063, PJM
Interconnection, L.L.C.
Docket No. ER09–1148, PPL Electric
Utilities Corporation
Docket No. ER09–1256, PotomacAppalachian Transmission
Highline, L.L.C.
Docket No. EL10–52, Central
Transmission, L.L.C. v. PJM
Interconnection, L.L.C.
Docket Nos. ER10–253 and EL10–14,
Primary Power, L.L.C.
Docket No. ER11–2183, American
Electric Power Service Corporation
Docket Nos. ER11–2814 and ER11–2815,
PJM Interconnection, L.L.C. and
American Transmission Systems,
Inc.
Docket Nos. ER11–2875 and EL11–20,
PJM Interconnection, L.L.C.
Docket Nos. ER11–3972, PJM
Interconnection, L.L.C.
Docket No. ER11–4106, PJM
Interconnection, L.L.C.
Docket No. ER11–4402, PJM
Interconnection, L.L.C.
Docket No. ER11–4628, PJM
Interconnection, L.L.C.
Docket No. EL12–8, DC Energy, L.L.C.
and DC Energy Mid-Atlantic, L.L.C.
vs. PJM Interconnection, L.L.C.
Docket No. EL12–10, PJM
Interconnection, L.L.C.
Docket No. EL12–19–000, FirstEnergy
Solutions Corporation and
Allegheny Energy Supply Company,
LLC, v. PJM Interconnection, L.L.C.
Docket No. ER12–91, PJM
Interconnection, L.L.C.
Docket No. ER12–92, PJM
Interconnection, L.L.C.
Docket No. ER12–306, Baltimore Gas
and Electric Company
Docket No. ER12–445, PJM
Interconnection, L.L.C.
Docket No. ER12–469, PJM
Interconnection, L.L.C.
Docket No. ER12–513, PJM
Interconnection, L.L.C.
Docket No. ER12–525, PJM
Interconnection, L.L.C.
Docket No. ER12–636, PJM
Interconnection, L.L.C.
Docket No. ER12–718, New York
Independent System Operator, Inc.
Docket No. ER12–759, PJM
Interconnection, L.L.C.
For additional meeting information,
see: https://www.pjm.com/committees-
E:\FR\FM\22FEN1.SGM
22FEN1
10506
Federal Register / Vol. 77, No. 35 / Wednesday, February 22, 2012 / Notices
and-groups.aspx and https://
www.pjm.com/Calendar.aspx.
The meetings are open to
stakeholders. For more information,
contact Valerie Martin, Office of Energy
Market Regulation, Federal Energy
Regulatory Commission at (202) 502–
6139 or Valerie.Martin@ferc.gov.
Dated: February 15, 2012.
Kimberly D. Bose,
Secretary.
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPPT–2003–0004; FRL–9338–7]
Access to Confidential Business
Information by Syracuse Research
Corporation, Inc., and Its Identified
Subcontractor, BeakerTree
Corporation
[FR Doc. 2012–4074 Filed 2–21–12; 8:45 am]
Environmental Protection
Agency (EPA).
ACTION: Notice.
BILLING CODE 6717–01–P
SUMMARY:
AGENCY:
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RM11–9–000]
Locational Exchanges of Wholesale
Electric Power; Notice Terminating
Proceeding
srobinson on DSK4SPTVN1PROD with NOTICES
1. On February 17, 2011, the
Commission issued a Notice of Inquiry
(NOI) concerning the regulatory
treatment of locational exchanges of
wholesale electric power. The
Commission sought guidance as to the
circumstances under which locational
exchanges of wholesale electric power
should be permitted generically and
circumstances under which the
Commission should consider locational
exchanges of wholesale electric power
on a case-by-case basis. The
Commission received 17 comments
from interested parties addressing
various issues presented in the NOI. The
Commission has determined that there
is no basis for continuing this
proceeding through the initiation of a
rulemaking process and, instead,
addresses related issues in an order
issued contemporaneously with this
order.1 Therefore, the Commission is
terminating this proceeding.
The Commission orders:
The Notice of Inquiry issued by the
Commission in this proceeding is
hereby terminated.
By direction of the Commission.
Issued: February 16, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–4071 Filed 2–21–12; 8:45 am]
BILLING CODE 6717–01–P
1 138
FERC ¶ 61,121 (2012).
VerDate Mar<15>2010
16:37 Feb 21, 2012
Jkt 226001
EPA has authorized its
contractor, Syracuse Research
Corporation (SRC), Inc., of North
Syracuse, NY, and its identified
subcontractor BeakerTree Corporation to
access information which has been
submitted to EPA under sections 4, 5, 6,
and 8 of the Toxic Substances Control
Act (TSCA). Some of the information
may be claimed or determined to be
Confidential Business Information (CBI).
DATES: Access to the confidential data
will occur no sooner than February 29,
2012.
FOR FURTHER INFORMATION CONTACT:
For technical information contact:
Pamela Moseley, Information
Management Division (7407M), Office of
Pollution Prevention and Toxics,
Environmental Protection Agency, 1200
Pennsylvania Ave. NW., Washington,
DC 20460–0001; telephone number:
(202) 564–8956; fax number: (202) 564–
8955; email address: moseley.pamela@
epa.gov.
For general information contact: The
TSCA-Hotline, ABVI-Goodwill, 422
South Clinton Ave., Rochester, NY
14620; telephone number: (202) 554–
1404; email address: TSCA-Hotline@
epa.gov.
SUPPLEMENTARY INFORMATION:
All documents in the docket are listed
in the docket index available at https://
www.regulations.gov. Although listed in
the index, some information is not
publicly available, e.g., CBI or other
information whose disclosure is
restricted by statute. Certain other
material, such as copyrighted material,
will be publicly available only in hard
copy. Publicly available docket
materials are available electronically at
https://www.regulations.gov, or, if only
available in hard copy, at the OPPT
Docket. The OPPT Docket is located in
the EPA Docket Center (EPA/DC) at Rm.
3334, EPA West Bldg., 1301
Constitution Ave. NW., Washington,
DC. The EPA/DC Public Reading Room
hours of operation are 8:30 a.m. to 4:30
p.m., Monday through Friday, excluding
legal holidays. The telephone number of
the EPA/DC Public Reading Room is
(202) 566–1744, and the telephone
number for the OPPT Docket is (202)
566–0280. Docket visitors are required
to show photographic identification,
pass through a metal detector, and sign
the EPA visitor log. All visitor bags are
processed through an X-ray machine
and subject to search. Visitors will be
provided an EPA/DC badge that must be
visible at all times in the building and
returned upon departure.
II. What action is the agency taking?
Under EPA contract number EP–W–
12–003, contractor SRC, Inc., of 4225
Running Ridge Road, North Syracuse,
NY; and BeakerTree Corporation of
13402 Birch Bark Court, Fairfax, VA,
will assist the Office of Pollution
Prevention and Toxics (OPPT) by
performing chemistry evaluation of new
and existing chemicals including the
chemistry aspects of their manufacture,
processing, use, potential new uses, and
pollution prevention. They will also
assist in examining documents for
I. General Information
information on chemical structures,
A. Does this notice apply to me?
manufacture, physical/chemical
properties, production volume and
This action is directed to the public
in general. This action may, however, be other pertinent data used in the
assessment of the potential effects of
of interest to all who manufacture,
chemicals. In accordance with 40 CFR
process, or distribute industrial
chemicals. Since other entities may also 2.306(j), EPA has determined that under
EPA contract number EP–W–12–003,
be interested, the Agency has not
SRC and BeakerTree will require access
attempted to describe all the specific
to CBI submitted to EPA under sections
entities that may be affected by this
4, 5, 6, and 8 of TSCA to perform
action. If you have any questions
regarding the applicability of this action successfully the duties specified under
the contract. SRC and BeakerTree
to a particular entity, consult the
personnel will be given access to
technical person listed under FOR
information submitted to EPA under
FURTHER INFORMATION CONTACT.
sections 4, 5, 6, and 8 of TSCA. Some
B. How can I get copies of this document of the information may be claimed or
and other related information?
determined to be CBI.
EPA is issuing this notice to inform
EPA has established a docket for this
all submitters of information under
action under docket identification (ID)
sections 4, 5, 6, and 8 of TSCA that EPA
number EPA–HQ–OPPT–2003–0004.
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
E:\FR\FM\22FEN1.SGM
22FEN1
Agencies
[Federal Register Volume 77, Number 35 (Wednesday, February 22, 2012)]
[Notices]
[Pages 10505-10506]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-4074]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Attendance at PJM Interconnection, L.L.C. Meetings
The Federal Energy Regulatory Commission (Commission) hereby gives
notice that members of the Commission and Commission staff may attend
upcoming PJM Interconnection, L.L.C. (PJM) Members Committee meetings,
as well as other PJM committee, subcommittee or task force meetings.\1\
The Commission and Commission staff may attend the following meetings:
---------------------------------------------------------------------------
\1\ For example, PJM subcommittees and task forces of the
standing committees (Operating, Planning and Market Implementation)
and senior standing committees (Members and Markets and Reliability)
meet on a variety of different topics; they convene and dissolve on
an as-needed basis. Therefore, the Commission and Commission staff
may monitor the various meetings posted on the PJM Web site.
---------------------------------------------------------------------------
PJM Members Committee
February 21, 2012 (Conference Call)
February 23, 2012 (Wilmington, DE)
March 26, 2012 (Conference Call)
March 29, 2012 (Wilmington, DE)
April 23, 2012 (Conference Call)
April 26, 2012 (Wilmington, DE)
May 17, 2012 (Cleveland, OH)
June 25, 2012 (Conference Call)
June 28, 2012 (Wilmington, DE)
July 23, 2012 (Conference Call)
July 26, 2012 (Wilmington, DE)
September 24, 2012 (Conference Call)
September 27, 2012 (Wilmington, DE)
October 18, 2012 (Conference Call)
October 25, 2012 (Wilmington, DE)
November 26, 2012 (Conference Call)
November 29, 2012 (Wilmington, DE)
PJM Markets and Reliability Committee
February 23, 2012 (Wilmington, DE)
March 29, 2012 (Wilmington, DE)
April 26, 2012 (Wilmington, DE)
June 28, 2012 (Wilmington, DE)
July 26, 2012 (Wilmington, DE)
September 27, 2012 (Wilmington, DE)
October 25, 2012 (Wilmington, DE)
November 29, 2012 (Wilmington, DE)
PJM Market Implementation Committee
February 17, 2012 (Wilmington, DE)
March 14, 2012 (Wilmington, DE)
April 11, 2012 (Wilmington, DE)
May 9, 2012 (To Be Determined)
June 13, 2012 (To Be Determined)
July 11, 2012 (To Be Determined)
August 8, 2012 (To Be Determined)
September 12, 2012 (To Be Determined)
October 10, 2012 (To Be Determined)
November 7, 2012 (To Be Determined)
December 12, 2012 (To Be Determined)
The discussions at each of the meetings described above may address
matters at issue in pending proceedings before the Commission,
including the following currently pending proceedings:
Docket No. EL05-121, PJM Interconnection, L.L.C.
Docket Nos. ER06-456, ER06-880, ER06-954, ER06-1271, EL07-57, ER07-424,
ER07-1186, ER08-229, ER08-1065, ER09-497, and ER10-268, PJM
Interconnection, L.L.C.
Docket No. ER07-1186, PJM Interconnection, L.L.C.
Docket No. EL08-47, PJM Interconnection, L.L.C.
Docket No. ER08-386, Potomac-Appalachian Transmission Highline, L.L.C.
Docket No. ER08-686, Pepco Holdings, Inc.
Docket No. ER09-1063, PJM Interconnection, L.L.C.
Docket No. ER09-1148, PPL Electric Utilities Corporation
Docket No. ER09-1256, Potomac-Appalachian Transmission Highline, L.L.C.
Docket No. EL10-52, Central Transmission, L.L.C. v. PJM
Interconnection, L.L.C.
Docket Nos. ER10-253 and EL10-14, Primary Power, L.L.C.
Docket No. ER11-2183, American Electric Power Service Corporation
Docket Nos. ER11-2814 and ER11-2815, PJM Interconnection, L.L.C. and
American Transmission Systems, Inc.
Docket Nos. ER11-2875 and EL11-20, PJM Interconnection, L.L.C.
Docket Nos. ER11-3972, PJM Interconnection, L.L.C.
Docket No. ER11-4106, PJM Interconnection, L.L.C.
Docket No. ER11-4402, PJM Interconnection, L.L.C.
Docket No. ER11-4628, PJM Interconnection, L.L.C.
Docket No. EL12-8, DC Energy, L.L.C. and DC Energy Mid-Atlantic, L.L.C.
vs. PJM Interconnection, L.L.C.
Docket No. EL12-10, PJM Interconnection, L.L.C.
Docket No. EL12-19-000, FirstEnergy Solutions Corporation and Allegheny
Energy Supply Company, LLC, v. PJM Interconnection, L.L.C.
Docket No. ER12-91, PJM Interconnection, L.L.C.
Docket No. ER12-92, PJM Interconnection, L.L.C.
Docket No. ER12-306, Baltimore Gas and Electric Company
Docket No. ER12-445, PJM Interconnection, L.L.C.
Docket No. ER12-469, PJM Interconnection, L.L.C.
Docket No. ER12-513, PJM Interconnection, L.L.C.
Docket No. ER12-525, PJM Interconnection, L.L.C.
Docket No. ER12-636, PJM Interconnection, L.L.C.
Docket No. ER12-718, New York Independent System Operator, Inc.
Docket No. ER12-759, PJM Interconnection, L.L.C.
For additional meeting information, see: https://www.pjm.com/
committees-
[[Page 10506]]
and-groups.aspx and https://www.pjm.com/Calendar.aspx.
The meetings are open to stakeholders. For more information,
contact Valerie Martin, Office of Energy Market Regulation, Federal
Energy Regulatory Commission at (202) 502-6139 or
Valerie.Martin@ferc.gov.
Dated: February 15, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-4074 Filed 2-21-12; 8:45 am]
BILLING CODE 6717-01-P