Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications; Alaska Village Electric Cooperative, 10504-10505 [2012-4013]
Download as PDF
10504
Federal Register / Vol. 77, No. 35 / Wednesday, February 22, 2012 / Notices
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14216–000) in the docket number
field to access the document. For
assistance, contact FERC Online
Support.
Dated: February 15, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–4077 Filed 2–21–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13272–003]
srobinson on DSK4SPTVN1PROD with NOTICES
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing
Applications; Alaska Village Electric
Cooperative
On February 13, 2012, Alaska Village
Electric Cooperative (AVEC) filed an
application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act (FPA), proposing to study the
feasibility of the Old Harbor
Hydroelectric Project (Old Harbor
Project or project) to be located on the
East Fork of Mountain Creek (a Lagoon
Creek tributary), near the town of Old
Harbor, Kodiak Island Borough, Alaska.
The project crosses federal lands of the
Kodiak National Wildlife Refuge. The
sole purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
VerDate Mar<15>2010
16:37 Feb 21, 2012
Jkt 226001
The proposed run-of-river project
would consist of an intake, penstock,
powerhouse, tailrace and constructed
channel, access road and trail, and
transmission line. Power from this
project would be used by the residents
of the city of Old Harbor.
Intake
The intake would consist of a
diversion/cut off weir with a height
ranging from about 4 feet at the spillway
to 6 feet elsewhere and having an
overall length of approximately 100 feet.
The creek bottom is close to bedrock so
the base of the diversion wall would be
a shallow grouted or concrete footing
dug into the stream bed. The weir
would not create any significant
impoundment of water and would only
be high enough to have an intake that
pulls water from the midpoint of the
water column. This would allow
floatable objects and bottom moving
sediments to remain in the creek. A
water filtering system consisting of a
trash rack, diversion gates, and
secondary screens would be
incorporated into the weir structure as
a separate desanding box that would be
partially exposed above grade. The
project diversion and intake works
would consist of concrete, or other
suitable material, with an integral
spillway. A below grade transition with
an above ground air relief inlet pipe
would convey water to a buried High
Density Polyethylene Pipe (HDPE)
pipeline.
Penstock
A 10,100-foot-long penstock
consisting of an 18-inch-diameter HDPE
pipe, a 20-inch-diameter HDPE pipe,
and a 16-inch-diameter steel pipe would
be installed. A total of 7,250 feet of
HDPE would be installed from the
intake and 2,850 feet of steel pipe would
be installed near the powerhouse. The
pipe would be buried 1 to 3 feet
underground and follow the natural
terrain as much as possible. The
pipeline would be located such that
bends would be gradual while
minimizing the amount of excavation
and fill needed.
Powerhouse
The powerhouse would consist of a
30-foot by 35-foot (approximate) by 16foot- high metal building or similar
structure. The building would house the
turbines and associated equipment,
switchgear, controls, and tools and
would be placed on a fill pad. The
power generation equipment would
consist of two Pelton 262 kilowatt (kW)
units with a 480-volt, 3-phase
synchronous generator and switchgear
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
for each unit. Each unit would have a
hydraulic capacity of 5.9 cubic feet per
second (cfs) for a total project peak flow
rate of 11.8 cfs capable of producing 525
kW of power. A bypass flow system for
maintaining environmental flows is not
proposed at this time, since the source
creek runs dry during certain times of
the year.
Tailrace
A tailrace structure and constructed
channel would convey the project flows
approximately 700 feet from the
powerhouse to the nearby lake, known
in the city of Old Harbor as the
Swimming Pond. A culvert would
contain some of the tailrace near the
powerhouse to allow for vehicle travel
over the tailrace. The constructed
channel would convey project flows
1,100 feet from the Swimming Pond to
the headwaters of the Lagoon Creek
tributary.
Access Road and Trail
An approximately 11, 200-foot-long
intake access trail would run between
the intake and the powerhouse
following the penstock route. The 12foot-wide trail would be made of 1 to 2
feet of rock fill placed over a geo-textile
filter fabric. Two gates would be placed
along on the access trail to block the
public from accessing the Kodiak
National Wildlife Refuge on all terrain
vehicles. One gate would be located at
the powerhouse. Another gate would be
placed where an existing trail connects
to the new trail at about 7,000 feet
northwest of the powerhouse. A new
6,800-foot-long by 24-foot-wide
powerhouse access road would extend
from powerhouse to the existing
community drinking water tank access
road. The road would be open to the
public.
Transmission Line
A 6,800-foot-long (1.5-mile), 7.2-kV,
3-phase overhead power line would be
installed from the powerhouse to the
existing power distribution system in
Old Harbor. The transmission line
would follow the powerhouse access
road and drinking water tank road
alignment.
The estimated dependable capacity of
the project is 140 kW. The peak
installed capacity will primarily depend
on economics and the projected increase
in demand. AVEC has chosen to permit
the project with a peak capacity of 525
kW.
Applicant Contact: Brent Petrie;
Manager, Community Development and
Key Accounts; Alaska Village Electric
Cooperative; 4831 Eagle Street,
E:\FR\FM\22FEN1.SGM
22FEN1
Federal Register / Vol. 77, No. 35 / Wednesday, February 22, 2012 / Notices
Anchorage, Alaska 99503–7497; (907)
565–5358 or email at bpetrie@avec.org.
FERC Contact: Carolyn Templeton;
(202) 502–8785 or
carolyn.templeton@ferc.gov.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36. Comments, motions to
intervene, notices of intent, and
competing applications may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13272) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
Dated: February 14, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–4013 Filed 2–21–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
srobinson on DSK4SPTVN1PROD with NOTICES
Federal Energy Regulatory
Commission
Notice of Attendance at PJM
Interconnection, L.L.C. Meetings
The Federal Energy Regulatory
Commission (Commission) hereby gives
notice that members of the Commission
and Commission staff may attend
upcoming PJM Interconnection, L.L.C.
(PJM) Members Committee meetings, as
well as other PJM committee,
VerDate Mar<15>2010
16:37 Feb 21, 2012
Jkt 226001
subcommittee or task force meetings.1
The Commission and Commission staff
may attend the following meetings:
PJM Members Committee
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
February 21, 2012 (Conference Call)
February 23, 2012 (Wilmington, DE)
March 26, 2012 (Conference Call)
March 29, 2012 (Wilmington, DE)
April 23, 2012 (Conference Call)
April 26, 2012 (Wilmington, DE)
May 17, 2012 (Cleveland, OH)
June 25, 2012 (Conference Call)
June 28, 2012 (Wilmington, DE)
July 23, 2012 (Conference Call)
July 26, 2012 (Wilmington, DE)
September 24, 2012 (Conference Call)
September 27, 2012 (Wilmington, DE)
October 18, 2012 (Conference Call)
October 25, 2012 (Wilmington, DE)
November 26, 2012 (Conference Call)
November 29, 2012 (Wilmington, DE)
PJM Markets and Reliability Committee
•
•
•
•
•
•
•
•
February 23, 2012 (Wilmington, DE)
March 29, 2012 (Wilmington, DE)
April 26, 2012 (Wilmington, DE)
June 28, 2012 (Wilmington, DE)
July 26, 2012 (Wilmington, DE)
September 27, 2012 (Wilmington, DE)
October 25, 2012 (Wilmington, DE)
November 29, 2012 (Wilmington, DE)
PJM Market Implementation Committee
•
•
•
•
•
•
•
•
February 17, 2012 (Wilmington, DE)
March 14, 2012 (Wilmington, DE)
April 11, 2012 (Wilmington, DE)
May 9, 2012 (To Be Determined)
June 13, 2012 (To Be Determined)
July 11, 2012 (To Be Determined)
August 8, 2012 (To Be Determined)
September 12, 2012 (To Be
Determined)
• October 10, 2012 (To Be Determined)
• November 7, 2012 (To Be Determined)
• December 12, 2012 (To Be
Determined)
The discussions at each of the
meetings described above may address
matters at issue in pending proceedings
before the Commission, including the
following currently pending
proceedings:
Docket No. EL05–121, PJM
Interconnection, L.L.C.
Docket Nos. ER06–456, ER06–880,
ER06–954, ER06–1271, EL07–57,
ER07–424, ER07–1186, ER08–229,
ER08–1065, ER09–497, and ER10–
268, PJM Interconnection, L.L.C.
1 For example, PJM subcommittees and task
forces of the standing committees (Operating,
Planning and Market Implementation) and senior
standing committees (Members and Markets and
Reliability) meet on a variety of different topics;
they convene and dissolve on an as-needed basis.
Therefore, the Commission and Commission staff
may monitor the various meetings posted on the
PJM Web site.
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
10505
Docket No. ER07–1186, PJM
Interconnection, L.L.C.
Docket No. EL08–47, PJM
Interconnection, L.L.C.
Docket No. ER08–386, PotomacAppalachian Transmission
Highline, L.L.C.
Docket No. ER08–686, Pepco Holdings,
Inc.
Docket No. ER09–1063, PJM
Interconnection, L.L.C.
Docket No. ER09–1148, PPL Electric
Utilities Corporation
Docket No. ER09–1256, PotomacAppalachian Transmission
Highline, L.L.C.
Docket No. EL10–52, Central
Transmission, L.L.C. v. PJM
Interconnection, L.L.C.
Docket Nos. ER10–253 and EL10–14,
Primary Power, L.L.C.
Docket No. ER11–2183, American
Electric Power Service Corporation
Docket Nos. ER11–2814 and ER11–2815,
PJM Interconnection, L.L.C. and
American Transmission Systems,
Inc.
Docket Nos. ER11–2875 and EL11–20,
PJM Interconnection, L.L.C.
Docket Nos. ER11–3972, PJM
Interconnection, L.L.C.
Docket No. ER11–4106, PJM
Interconnection, L.L.C.
Docket No. ER11–4402, PJM
Interconnection, L.L.C.
Docket No. ER11–4628, PJM
Interconnection, L.L.C.
Docket No. EL12–8, DC Energy, L.L.C.
and DC Energy Mid-Atlantic, L.L.C.
vs. PJM Interconnection, L.L.C.
Docket No. EL12–10, PJM
Interconnection, L.L.C.
Docket No. EL12–19–000, FirstEnergy
Solutions Corporation and
Allegheny Energy Supply Company,
LLC, v. PJM Interconnection, L.L.C.
Docket No. ER12–91, PJM
Interconnection, L.L.C.
Docket No. ER12–92, PJM
Interconnection, L.L.C.
Docket No. ER12–306, Baltimore Gas
and Electric Company
Docket No. ER12–445, PJM
Interconnection, L.L.C.
Docket No. ER12–469, PJM
Interconnection, L.L.C.
Docket No. ER12–513, PJM
Interconnection, L.L.C.
Docket No. ER12–525, PJM
Interconnection, L.L.C.
Docket No. ER12–636, PJM
Interconnection, L.L.C.
Docket No. ER12–718, New York
Independent System Operator, Inc.
Docket No. ER12–759, PJM
Interconnection, L.L.C.
For additional meeting information,
see: https://www.pjm.com/committees-
E:\FR\FM\22FEN1.SGM
22FEN1
Agencies
[Federal Register Volume 77, Number 35 (Wednesday, February 22, 2012)]
[Notices]
[Pages 10504-10505]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-4013]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13272-003]
Notice of Preliminary Permit Application Accepted for Filing and
Soliciting Comments, Motions To Intervene, and Competing Applications;
Alaska Village Electric Cooperative
On February 13, 2012, Alaska Village Electric Cooperative (AVEC)
filed an application for a preliminary permit, pursuant to section 4(f)
of the Federal Power Act (FPA), proposing to study the feasibility of
the Old Harbor Hydroelectric Project (Old Harbor Project or project) to
be located on the East Fork of Mountain Creek (a Lagoon Creek
tributary), near the town of Old Harbor, Kodiak Island Borough, Alaska.
The project crosses federal lands of the Kodiak National Wildlife
Refuge. The sole purpose of a preliminary permit, if issued, is to
grant the permit holder priority to file a license application during
the permit term. A preliminary permit does not authorize the permit
holder to perform any land-disturbing activities or otherwise enter
upon lands or waters owned by others without the owners' express
permission.
The proposed run-of-river project would consist of an intake,
penstock, powerhouse, tailrace and constructed channel, access road and
trail, and transmission line. Power from this project would be used by
the residents of the city of Old Harbor.
Intake
The intake would consist of a diversion/cut off weir with a height
ranging from about 4 feet at the spillway to 6 feet elsewhere and
having an overall length of approximately 100 feet. The creek bottom is
close to bedrock so the base of the diversion wall would be a shallow
grouted or concrete footing dug into the stream bed. The weir would not
create any significant impoundment of water and would only be high
enough to have an intake that pulls water from the midpoint of the
water column. This would allow floatable objects and bottom moving
sediments to remain in the creek. A water filtering system consisting
of a trash rack, diversion gates, and secondary screens would be
incorporated into the weir structure as a separate desanding box that
would be partially exposed above grade. The project diversion and
intake works would consist of concrete, or other suitable material,
with an integral spillway. A below grade transition with an above
ground air relief inlet pipe would convey water to a buried High
Density Polyethylene Pipe (HDPE) pipeline.
Penstock
A 10,100-foot-long penstock consisting of an 18-inch-diameter HDPE
pipe, a 20-inch-diameter HDPE pipe, and a 16-inch-diameter steel pipe
would be installed. A total of 7,250 feet of HDPE would be installed
from the intake and 2,850 feet of steel pipe would be installed near
the powerhouse. The pipe would be buried 1 to 3 feet underground and
follow the natural terrain as much as possible. The pipeline would be
located such that bends would be gradual while minimizing the amount of
excavation and fill needed.
Powerhouse
The powerhouse would consist of a 30-foot by 35-foot (approximate)
by 16-foot- high metal building or similar structure. The building
would house the turbines and associated equipment, switchgear,
controls, and tools and would be placed on a fill pad. The power
generation equipment would consist of two Pelton 262 kilowatt (kW)
units with a 480-volt, 3-phase synchronous generator and switchgear for
each unit. Each unit would have a hydraulic capacity of 5.9 cubic feet
per second (cfs) for a total project peak flow rate of 11.8 cfs capable
of producing 525 kW of power. A bypass flow system for maintaining
environmental flows is not proposed at this time, since the source
creek runs dry during certain times of the year.
Tailrace
A tailrace structure and constructed channel would convey the
project flows approximately 700 feet from the powerhouse to the nearby
lake, known in the city of Old Harbor as the Swimming Pond. A culvert
would contain some of the tailrace near the powerhouse to allow for
vehicle travel over the tailrace. The constructed channel would convey
project flows 1,100 feet from the Swimming Pond to the headwaters of
the Lagoon Creek tributary.
Access Road and Trail
An approximately 11, 200-foot-long intake access trail would run
between the intake and the powerhouse following the penstock route. The
12-foot-wide trail would be made of 1 to 2 feet of rock fill placed
over a geo-textile filter fabric. Two gates would be placed along on
the access trail to block the public from accessing the Kodiak National
Wildlife Refuge on all terrain vehicles. One gate would be located at
the powerhouse. Another gate would be placed where an existing trail
connects to the new trail at about 7,000 feet northwest of the
powerhouse. A new 6,800-foot-long by 24-foot-wide powerhouse access
road would extend from powerhouse to the existing community drinking
water tank access road. The road would be open to the public.
Transmission Line
A 6,800-foot-long (1.5-mile), 7.2-kV, 3-phase overhead power line
would be installed from the powerhouse to the existing power
distribution system in Old Harbor. The transmission line would follow
the powerhouse access road and drinking water tank road alignment.
The estimated dependable capacity of the project is 140 kW. The
peak installed capacity will primarily depend on economics and the
projected increase in demand. AVEC has chosen to permit the project
with a peak capacity of 525 kW.
Applicant Contact: Brent Petrie; Manager, Community Development and
Key Accounts; Alaska Village Electric Cooperative; 4831 Eagle Street,
[[Page 10505]]
Anchorage, Alaska 99503-7497; (907) 565-5358 or email at
bpetrie@avec.org.
FERC Contact: Carolyn Templeton; (202) 502-8785 or
carolyn.templeton@ferc.gov.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and seven copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-13272) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: February 14, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012-4013 Filed 2-21-12; 8:45 am]