Lock+ Hydro Friends Fund XLIV; FFP Project 51, LLC; Notice Announcing Preliminary Permit Drawing, 9915-9916 [2012-3883]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 77, No. 34 / Tuesday, February 21, 2012 / Notices
Description: 2012–2–9 WAPA–TSGT
Limon Dyn Mtr 320–PSCo to be
effective 3/11/2011.
Filed Date: 2/9/12.
Accession Number: 20120209–5042.
Comments Due: 5 p.m. ET 3/1/12.
Docket Numbers: ER12–1035–000.
Applicants: PJM Interconnection,
LLC, Virginia Electric and Power
Company.
Description: Dominion submits PJM
Tariff Attachment H–16AA per
Settlement Agreement to be effective 12/
31/9998.
Filed Date: 2/9/12.
Accession Number: 20120209–5058.
Comments Due: 5 p.m. ET 3/1/12.
Docket Numbers: ER12–1036–000.
Applicants: Spinning Spur
Interconnect LLC.
Description: Spinning Spur
Interconnect Baseline Filing—
Concurrences to CFA & Company
Agreement to be effective 4/8/2012.
Filed Date: 2/9/12.
Accession Number: 20120209–5071.
Comments Due: 5 p.m. ET 3/1/12.
Docket Numbers: ER12–1037–000.
Applicants: South Carolina Electric &
Gas Company.
Description: New Horizon Assignment
of NITSA and NOA to be effective 8/30/
2010.
Filed Date: 2/9/12.
Accession Number: 20120209–5096.
Comments Due: 5 p.m. ET 3/1/12.
Take notice that the Commission
received the following land acquisition
reports:
Docket Numbers: LA11–4–000.
Applicants: Iberdrola Renewables,
Inc., Atlantic Renewable Projects II LLC,
Barton Windpower LLC, Big Horn Wind
Project LLC, Big Horn II Wind Project
LLC, Blue Creek Wind Farm LLC,
Buffalo Ridge I LLC, Buffalo Ridge II
LLC, Casselman Windpower LLC,
Colorado Green Holdings LLC, Dillon
Wind LLC, Dry Lake Wind Power, LLC,
Dry Lake Wind Power II LLC, Elk River
Windfarm, LLC, Elm Creek Wind, LLC,
Elm Creek Wind II LLC, Farmers City
Wind, LLC, Flat Rock Windpower LLC,
Flat Rock Windpower II LLC, Flying
Cloud Power Partners, LLC,
Hardscrabble Wind Power LLC, Hay
Canyon Wind LLC, Juniper Canyon
Wind Power LLC, Klamath Energy LLC,
Klamath Generation LLC, Klondike
Wind Power LLC, Klondike Wind Power
II LLC, Klondike Wind Power III LLC,
Leaning Juniper Wind Power II LLC,
Lempster Wind, LLC, Locust Ridge
Wind Farm, LLC, Locust Ridge II, LLC,
Manzana Wind LLC, MinnDakota Wind
LLC, Moraine Wind LLC, Moraine Wind
II LLC, Mountain View Power Partners
III, LLC, New England Wind, LLC, New
VerDate Mar<15>2010
17:29 Feb 17, 2012
Jkt 226001
Harvest Wind Project LLC, Northern
Iowa Windpower II LLC, Pebble Springs
Wind LLC, Providence Heights Wind,
LLC, Rugby Wind LLC, San Luis Solar
LLC, Shiloh I Wind Project, LLC, South
Chestnut LLC, Star Point Wind Project
LLC, Streator-Cayuga Ridge Wind Power
LLC, Trimont Wind I LLC, Twin Buttes
Wind LLC.
Description: Land Acquisition Report
of Atlantic Renewable Projects II LLC, et
al.
Filed Date: 2/8/12.
Accession Number: 20120208–5148.
Comments Due: 5 p.m. ET 2/29/12.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 09, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–3886 Filed 2–17–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice Announcing Preliminary Permit
Drawing
Lock+ Hydro Friends
Fund XLI.
FFP Project 54, LLC
Project No. 14182–000
Project No. 14192–000
The Commission has received two
preliminary permit applications deemed
filed on May 3, 2011, at 8:30 a.m.,1 for
proposed projects to be located on the
Tombigbee River, in Pickens County,
Alabama. The applications were filed by
Lock+ Hydro Friends Fund XLI for
Project No. 14182–000 and FFP Project
54, LLC for Project No. 14192–000.
On February 22, 2012, at 9:00 a.m.
(Eastern Time), the Secretary of the
Commission, or her designee, will
conduct a random drawing to determine
the filing priority of the applicants
identified in this notice. The
Commission will select among
competing permit applications as
provided in section 4.37 of its
regulations.2 The priority established by
this drawing will be used to determine
which applicant, among those with
identical filing times, will be considered
to have the first-filed application.
The drawing is open to the public and
will be held in room 2C, the
Commission Meeting Room, located at
888 First St. NE., Washington, DC
20426. A subsequent notice will be
issued by the Secretary announcing the
results of the drawing.
Dated: February 13, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–3884 Filed 2–17–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14179–000; Project No. 14194–
000]
Lock+ Hydro Friends Fund XLIV; FFP
Project 51, LLC; Notice Announcing
Preliminary Permit Drawing
The Commission has received two
preliminary permit applications deemed
filed on May 3, 2011, at 8:30 a.m.,1 for
proposed projects to be located on the
Arkansas River, in Jefferson County,
Arkansas. The applications were filed
by Lock+ Hydro Friends Fund XLIV for
Project No. 14179–000 and FFP Project
51, LLC for Project No. 14194–000.
On February 22, 2012, at 9 a.m.
(Eastern Time), the Secretary of the
Commission, or her designee, will
conduct a random drawing to determine
the filing priority of the applicants
identified in this notice. The
Commission will select among
competing permit applications as
provided in section 4.37 of its
regulations.2 The priority established by
this drawing will be used to determine
which applicant, among those with
2 18
CFR 4.37 (2011).
the Commission’s Rules of Practice and
Procedure, any document received after regular
business hours is considered filed at 8:30 a.m. on
the next regular business day. 18 CFR
385.2001(a)(2) (2011).
2 18 CFR 4.37 (2011).
1 Under
1 Under the Commission’s Rules of Practice and
Procedure, any document received after regular
business hours is considered filed at 8:30 a.m. on
the next regular business day. 18 CFR
385.2001(a)(2) (2011).
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
9915
E:\FR\FM\21FEN1.SGM
21FEN1
9916
Federal Register / Vol. 77, No. 34 / Tuesday, February 21, 2012 / Notices
identical filing times, will be considered
to have the first-filed application.
The drawing is open to the public and
will be held in room 2C, the
Commission Meeting Room, located at
888 First St. NE., Washington, DC
20426. A subsequent notice will be
issued by the Secretary announcing the
results of the drawing.
Dated: February 13, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 14130–000; 14137–000]
Riverbank Hydro No. 2, LLC; Lock+
Hydro Friends Fund XXXVI; Notice
Announcing Preliminary Permit
Drawing
mstockstill on DSK4VPTVN1PROD with NOTICES
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Williston Basin Interstate Pipeline
Company; Notice of Request Under
Blanket Authorization
BILLING CODE 6717–01–P
The Commission has received two
preliminary permit applications deemed
filed on April 1, 2011, at 8:30 a.m.,1 for
proposed projects to be located on the
Arkansas River, in Lincoln County and
Jefferson County, Arkansas. The
applications were filed by Riverbank
Hydro No. 2, LLC for Project No. 14130–
000 and Lock+ Hydro Friends Fund
XXXVI for Project No. 14137–000.
On February 22, 2012, at 9 a.m.
(Eastern Time), the Secretary of the
Commission, or her designee, will
conduct a random drawing to determine
the filing priority of the applicants
identified in this notice. The
Commission will select among
competing permit applications as
provided in section 4.37 of its
regulations.2 The priority established by
this drawing will be used to determine
which applicant, among those with
identical filing times, will be considered
to have the first-filed application.
The drawing is open to the public and
will be held in room 2C, the
Commission Meeting Room, located at
888 First St. NE., Washington, DC
20426. A subsequent notice will be
issued by the Secretary announcing the
results of the drawing.
1 Under the Commission’s Rules of Practice and
Procedure, any document received after regular
business hours is considered filed at 8:30 a.m. on
the next regular business day. 18 CFR
385.2001(a)(2) (2011).
2 18 CFR 4.37 (2011).
17:29 Feb 17, 2012
[FR Doc. 2012–3882 Filed 2–17–12; 8:45 am]
[Docket No. CP12–57–000]
[FR Doc. 2012–3883 Filed 2–17–12; 8:45 am]
VerDate Mar<15>2010
Dated: February 13, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
Jkt 226001
Take notice that on February 6, 2012,
Williston Basin Interstate Pipeline
Company (Williston Basin), 1250 West
Century Avenue, Bismarck, North
Dakota 58503, filed in Docket No. CP12–
57–000, an application pursuant to
section 157.21 of the Commission’s
Regulations under the Natural Gas Act
(NGA) as amended, to replace natural
gas compression facilities at its Elk
Basin compressor station in Park
County, Wyoming, under Williston
Basin’s blanket certificate issued in
Docket No. CP82–487–000 et al., 1 all as
more fully set forth in the application
which is on file with the Commission
and open to the public for inspection.
Williston Basin proposes to replace
two natural gas-fired 225-horsepower
(HP) compressor units installed in 1941,
two natural gas-fired 330–HP
compressor units installed in 1950, and
one natural gas-fired 1,100–HP
compressor unit installed in 1970 with
one electric-driven 2,500–HP
compressor unit. Williston Basin states
that the new 2,500–HP electric
compressor unit will also increase the
certificated horsepower at the Elk Basin
compressor station from 4,610 HP to
4,900 Hp. Williston Basin estimates that
the proposed electric replacement
compressor unit would cost $8,706,486
to install.
Any questions concerning this
application may be directed to Keith A.
Tiggelaar, Director of Regulatory Affairs,
Williston Basin Interstate Pipeline
Company, 1250 West Century Avenue,
Bismarck, North Dakota 58503,
telephone (701) 530–1560 or Email:
keith.tiggelaar@wbip.com.
This filing is available for review at
the Commission or may be viewed on
the Commission’s web site at https://
www.ferc.gov, using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
filed to access the document. For
assistance, please contact FERC Online
1 30
PO 00000
FERC ¶ 61,143 (1985).
Frm 00029
Fmt 4703
Sfmt 4703
Support at FERC
OnlineSupport@ferc.gov or call toll-free
at (866) 206–3676, or, for TTY, contact
(202) 502–8659. Comments, protests and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
intervenors to file electronically.
Any person or the Commission’s staff
may, within 60 days after issuance of
the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and pursuant to Section
157.205 of the regulations under the
NGA (18 CFR 157.205), a protest to the
request. If no protest is filed within the
time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for filing a protest. If a
protest is filed and not withdrawn
within 30 days after the allowed time
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to Section 7 of
the NGA.
Dated: February 10, 2012.
Kimberly D. Bose,
Secretary.
[FR Doc. 2012–3817 Filed 2–17–12; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–9633–7]
California State Motor Vehicle and
Nonroad Engine Pollution Control
Standards; Mobile Cargo Handling
Equipment Regulation at Ports and
Intermodal Rail Yards; Notice of
Decision
Environmental Protection
Agency (EPA).
ACTION: Notice of decision granting an
authorization and waiver of preemption
for California’s mobile cargo handling
equipment regulation at ports and
intermodal rail yards.
AGENCY:
Pursuant to section 209(e) of
the Clean Air Act (Act), 42 U.S.C.
7543(e), EPA is granting California its
request for authorization to enforce it
emission standards and other
requirements for its mobile cargo
handling equipment regulation. To the
extent that the mobile cargo handling
equipment regulation pertains to the
control of emissions from new motor
vehicles or new motor vehicle engines
SUMMARY:
E:\FR\FM\21FEN1.SGM
21FEN1
Agencies
[Federal Register Volume 77, Number 34 (Tuesday, February 21, 2012)]
[Notices]
[Pages 9915-9916]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-3883]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14179-000; Project No. 14194-000]
Lock+ Hydro Friends Fund XLIV; FFP Project 51, LLC; Notice
Announcing Preliminary Permit Drawing
The Commission has received two preliminary permit applications
deemed filed on May 3, 2011, at 8:30 a.m.,\1\ for proposed projects to
be located on the Arkansas River, in Jefferson County, Arkansas. The
applications were filed by Lock+ Hydro Friends Fund XLIV for Project
No. 14179-000 and FFP Project 51, LLC for Project No. 14194-000.
---------------------------------------------------------------------------
\1\ Under the Commission's Rules of Practice and Procedure, any
document received after regular business hours is considered filed
at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2)
(2011).
---------------------------------------------------------------------------
On February 22, 2012, at 9 a.m. (Eastern Time), the Secretary of
the Commission, or her designee, will conduct a random drawing to
determine the filing priority of the applicants identified in this
notice. The Commission will select among competing permit applications
as provided in section 4.37 of its regulations.\2\ The priority
established by this drawing will be used to determine which applicant,
among those with
[[Page 9916]]
identical filing times, will be considered to have the first-filed
application.
---------------------------------------------------------------------------
\2\ 18 CFR 4.37 (2011).
---------------------------------------------------------------------------
The drawing is open to the public and will be held in room 2C, the
Commission Meeting Room, located at 888 First St. NE., Washington, DC
20426. A subsequent notice will be issued by the Secretary announcing
the results of the drawing.
Dated: February 13, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012-3883 Filed 2-17-12; 8:45 am]
BILLING CODE 6717-01-P