Environmental Impacts Statements; Notice of Availability, 9652 [2012-3801]
Download as PDF
9652
Federal Register / Vol. 77, No. 33 / Friday, February 17, 2012 / Notices
Carol.Griffiths@ed.gov. Individuals who
use a telecommunications device for the
deaf (TDD) may call the Federal
Information Relay Service at 1–800–
877–8339 between 8 a.m. and 8 p.m.,
Eastern Standard Time, Monday
through Friday.
Electronic Access to This Document
The official version of this document
is the document published in the
Federal Register. Free Internet access to
the official edition of the Federal
Register and the Code of Federal
Regulations is available via the Federal
Digital System at: www.gpo.gov/fdsys.
At this site you can view this document,
as well as all other documents of this
Department published in the Federal
Register, in text or Adobe Portable
Document Format (PDF). To use PDF,
you must have Adobe Acrobat Reader,
which is available free at the site.
You may also access documents of the
Department published in the Federal
Register by using the article search
feature at: www.federalregister.gov.
Specifically, through the advanced
search feature at this site, you can limit
your search to documents published by
the Department.
Eduardo M. Ochoa,
Assistant Secretary for Postsecondary
Education.
[FR Doc. 2012–3783 Filed 2–16–12; 8:45 am]
BILLING CODE P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–9001–6]
Environmental Impacts Statements;
Notice of Availability
mstockstill on DSK4VPTVN1PROD with NOTICES
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7146 or https://www.epa.gov/
compliance/nepa/
Weekly receipt of Environmental Impact
Statements
Filed 02/06/2012 Through 02/10/2012
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act
requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EIS are available at: https://
www.epa.gov/compliance/nepa/
eisdata.html.
EIS No. 20120031, Final EIS, DOE, GA,
ADOPTION—Vogtle Electric
Generating Plant, Unit 3 and 4,
Issuance a Loan Guarantee to Support
Funding for Construction, Burke
County, GA, Review Period Ends: 03/
VerDate Mar<15>2010
19:08 Feb 16, 2012
Jkt 226001
19/2012, Contact: Matthew McMillen
202–586–7248 The Department of
Energy has adopted the Nuclear
Regulatory Commission’s FEIS
20080322 filed 08/15/2008 and FSEIS
20110088 filed 03/18/2011. DOE was
not a Cooperating Agency on the
above FEIS and FSEIS. Under Section
1506.3(b) of the CEQ Regulations, the
FEIS must be recirculated for a 30-day
Wait Period. This document is
available on the Internet at:
www.energy.gov/nepa.
EIS No. 20120032, Final EIS, NOAA, 00,
Amendment 18A to the Fishery
Management Plan for the SnapperGrouper Fishery of the South Atlantic
Region, To Limit Participation and
Effort in the Black Sea Bass Pot
Fishery, South Atlantic Region, NC,
SC, FL, and GA, Review Period Ends:
03/19/2012, Contact: Dr. Roy E.
Crabtree 727–824–5305.
EIS No. 20120033, Draft EIS, BLM, AZ,
Restoration Design Energy Project,
Identifying Lands Across Arizona
Suitable for Renewable Energy
Development, AZ, Comment Period
Ends: 05/16/2012, Contact: Kathy
Pedrick 602–417–9235.
EIS No. 20120034, Draft EIS, USFS, CA,
Harris Vegetation Management
Project, To Improve Forest Health and
Restore Fire-Adapted Ecosystem
Characteristic on National Forest
System Land, Implementation,
Shasta-McCloud Management Unit,
Shasta-Trinity National Forest,
Siskiyou County, CA, Comment
Period Ends: 04/02/2012, Contact:
Emelia Barnum 530–926–4511.
EIS No. 20120035, Draft EIS, USACE,
NC, US 64 Improvements, Widening
from Columbia to US 264 and
Replacement of Lindsey C. Warren
Bridge, USCG Bridge Permit, Tyrrell
and Dare Counties, NC, Comment
Period Ends: 04/02/2012, Contact: Bill
Biddlecome 910–251–4558.
EIS No. 20120036, Draft EIS, FHWA,
TN, SR–126 (Memorial Boulevard)
Corridor Improvement Project, from
East Center Street to Interstate 81,
Funding, USACE Section 404 Permit,
Sullivan County, TN, Comment
Period Ends: 04/02/2012, Contact:
Charles J. O’Neill 615–781–5770.
Amended Notices
EIS No. 20110353, Draft EIS, USFS, UT,
Fishlake National Forest Oil and Gas
Leasing Analysis Project, To
Exploration, Development, and
Production of Mineral and Energy
Resources and Reclamation of
Activities, Beaver, Garfield, Iron, Juab,
Millard, Piute, Sanpete, Sevier, and
Wayne Counties, UT, Comment
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
Period Ends: 04/02/2012, Contact:
Diane Freeman 435–896–1050. This
document is available on the Internet
at: https://fs.usda.gov/goto/fishlake/
projects.
Revision to FR Notice Published 10/
21/2011:
Re-opening Comment Period to End
4/2/2012 due to two appendices that
was inadvertently not included in the
Draft EIS.
EIS No. 20110438, Draft EIS, USFS, ID,
Scriver Integrated Restoration Project,
Improve Watershed Conditions by
Reducing Road-Related Impacts to
Wildlife, Fish, Soil, and Water
Resources and Restoration of 2010
Forest Plan Vegetation Conditions,
Emmett Ranger District, Boise
National Forest, Boise and Valley
Counties, ID, Comment Period Ends:
03/05/2012, Contact: Melissa Yenko
208–373–4245.
Revision to FR Notice Published 02/
30/2011:
Extending Comment Period from 2/
13/2012 to 3/5/2012.
Dated: February 14, 2012.
Cliff Rader,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 2012–3801 Filed 2–16–12; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–9631–5]
Proposed CERCLA Administrative
Cost Recovery Settlement; Lake
Linden Superfund Site in Lake Linden,
Houghton County, MI
Environmental Protection
Agency.
ACTION: Notice; request for public
comment.
AGENCY:
In accordance with Section
122(i) of the Comprehensive
Environmental Response,
Compensation, and Liability Act, as
amended (‘‘CERCLA’’), 42 U.S.C.
9622(i), notice is hereby given of a
proposed administrative settlement for
recovery of past response costs
concerning the Lake Linden Superfund
Site in Lake Linden, Houghton County,
Michigan with Honeywell Specialty
Materials, LLC. The settlement requires
the settling party to pay $357,149.47 to
the Hazardous Substance Superfund.
The settlement includes a covenant not
to sue the settling party pursuant to
Section 107(a) of CERCLA, 42 U.S.C.
9607(a). For thirty (30) days following
the date of publication of this notice, the
SUMMARY:
E:\FR\FM\17FEN1.SGM
17FEN1
Agencies
[Federal Register Volume 77, Number 33 (Friday, February 17, 2012)]
[Notices]
[Page 9652]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-3801]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-9001-6]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7146 or https://www.epa.gov/compliance/nepa/
Weekly receipt of Environmental Impact Statements
Filed 02/06/2012 Through 02/10/2012
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act requires that EPA make public
its comments on EISs issued by other Federal agencies. EPA's comment
letters on EIS are available at: https://www.epa.gov/compliance/nepa/eisdata.html.
EIS No. 20120031, Final EIS, DOE, GA, ADOPTION--Vogtle Electric
Generating Plant, Unit 3 and 4, Issuance a Loan Guarantee to Support
Funding for Construction, Burke County, GA, Review Period Ends: 03/19/
2012, Contact: Matthew McMillen 202-586-7248 The Department of Energy
has adopted the Nuclear Regulatory Commission's FEIS 20080322 filed 08/
15/2008 and FSEIS 20110088 filed 03/18/2011. DOE was not a Cooperating
Agency on the above FEIS and FSEIS. Under Section 1506.3(b) of the CEQ
Regulations, the FEIS must be recirculated for a 30-day Wait Period.
This document is available on the Internet at: www.energy.gov/nepa.
EIS No. 20120032, Final EIS, NOAA, 00, Amendment 18A to the Fishery
Management Plan for the Snapper-Grouper Fishery of the South Atlantic
Region, To Limit Participation and Effort in the Black Sea Bass Pot
Fishery, South Atlantic Region, NC, SC, FL, and GA, Review Period Ends:
03/19/2012, Contact: Dr. Roy E. Crabtree 727-824-5305.
EIS No. 20120033, Draft EIS, BLM, AZ, Restoration Design Energy
Project, Identifying Lands Across Arizona Suitable for Renewable Energy
Development, AZ, Comment Period Ends: 05/16/2012, Contact: Kathy
Pedrick 602-417-9235.
EIS No. 20120034, Draft EIS, USFS, CA, Harris Vegetation Management
Project, To Improve Forest Health and Restore Fire-Adapted Ecosystem
Characteristic on National Forest System Land, Implementation, Shasta-
McCloud Management Unit, Shasta-Trinity National Forest, Siskiyou
County, CA, Comment Period Ends: 04/02/2012, Contact: Emelia Barnum
530-926-4511.
EIS No. 20120035, Draft EIS, USACE, NC, US 64 Improvements, Widening
from Columbia to US 264 and Replacement of Lindsey C. Warren Bridge,
USCG Bridge Permit, Tyrrell and Dare Counties, NC, Comment Period Ends:
04/02/2012, Contact: Bill Biddlecome 910-251-4558.
EIS No. 20120036, Draft EIS, FHWA, TN, SR-126 (Memorial Boulevard)
Corridor Improvement Project, from East Center Street to Interstate 81,
Funding, USACE Section 404 Permit, Sullivan County, TN, Comment Period
Ends: 04/02/2012, Contact: Charles J. O'Neill 615-781-5770.
Amended Notices
EIS No. 20110353, Draft EIS, USFS, UT, Fishlake National Forest Oil and
Gas Leasing Analysis Project, To Exploration, Development, and
Production of Mineral and Energy Resources and Reclamation of
Activities, Beaver, Garfield, Iron, Juab, Millard, Piute, Sanpete,
Sevier, and Wayne Counties, UT, Comment Period Ends: 04/02/2012,
Contact: Diane Freeman 435-896-1050. This document is available on the
Internet at: https://fs.usda.gov/goto/fishlake/projects.
Revision to FR Notice Published 10/21/2011:
Re-opening Comment Period to End 4/2/2012 due to two appendices
that was inadvertently not included in the Draft EIS.
EIS No. 20110438, Draft EIS, USFS, ID, Scriver Integrated Restoration
Project, Improve Watershed Conditions by Reducing Road-Related Impacts
to Wildlife, Fish, Soil, and Water Resources and Restoration of 2010
Forest Plan Vegetation Conditions, Emmett Ranger District, Boise
National Forest, Boise and Valley Counties, ID, Comment Period Ends:
03/05/2012, Contact: Melissa Yenko 208-373-4245.
Revision to FR Notice Published 02/30/2011:
Extending Comment Period from 2/13/2012 to 3/5/2012.
Dated: February 14, 2012.
Cliff Rader,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 2012-3801 Filed 2-16-12; 8:45 am]
BILLING CODE 6560-50-P