Reliable Storage 1 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 9229-9230 [2012-3661]

Download as PDF Federal Register / Vol. 77, No. 32 / Thursday, February 16, 2012 / Notices Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: February 9, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2012–3600 Filed 2–15–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13305–002] Whitestone Power and Communications; Notice of Teleconference a. Date and Time of Meeting: Tuesday, February 21, 2012, starting at 2 p.m. and ending at 4 p.m. (Eastern Standard Time). b. FERC Contact: Dianne Rodman, (202) 502–6077 or dianne.rodman@ferc.gov. c. Purpose of Meeting: Commission staff will meet with Whitestone Power and Communications (Whitestone) to discuss the need for environmental monitoring for the Microturbine Hydrokinetic River-In-Stream Energy Conversion Power Project (also known as the Whitestone Poncelet RISEC Project), which would be located on the Tanana River near Delta Junction, Alaska. d. All local, state, and federal agencies, Indian tribes, and other interested parties are invited to participate by phone. Please call Dianne Rodman by February 16, 2012, to RSVP and to receive specific instructions on how to participate. Dated: February 10, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2012–3632 Filed 2–15–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission srobinson on DSK4SPTVN1PROD with NOTICES [Project No. 13–023] Green Island Power Authority; Notice of Meeting and Teleconference a. Date and Time of Meeting: Wednesday March 21, 2012, beginning at 10 a.m. EST. b. Place: Commission Headquarters, 888 First Street NE., Washington, DC 20426, Room 62–26. VerDate Mar<15>2010 16:31 Feb 15, 2012 Jkt 226001 c. FERC Contact: Tom Dean, (202) 502–6041. d. Purpose of Meeting: To discuss authorizations and approvals that may be needed for, and the U.S. Army Corps of Engineers’ (Corps) position on, proposed modifications to the facilities and operation of the Corps’ Green Island Lock and Dam (see attached agenda for complete list of topics). e. All local, state, and federal agencies, Indian tribes, and other interested parties are invited to participate either in person or by phone. Please call Tom Dean at (202) 502–6041 by Wednesday, March 14, 2012, to receive specific instructions on how to participate. f. FERC conferences are accessible under section 508 of the Rehabilitation Act of 1973. For accessibility accommodations please send an email to accessibility@ferc.gov or call toll free (866) 208–3372 (voice) or 202–502–8659 (TTY), or send a FAX to 202–208–2106 with the required accommodations. g. A summary of the teleconference will be placed in the public record for the project. Dated: February 10, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2012–3631 Filed 2–15–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14152–000] Reliable Storage 1 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On March 25, 2011, Reliable Storage 1 LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of hydropower near the town of Monterey, in Putnam County, Tennessee. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed pumped storage project would consist of the following: (1) A 70foot-high, 7,500-foot-long earth embankment dam; (2) an upper reservoir with a surface area of 100 acres PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 9229 and an 7,100 acre-foot storage capacity; (3) a 120-foot-high, 920-foot-long earth embankment dam creating; (4) a lower reservoir with a surface area of 220 acres and an 7,300 acre-foot storage capacity; (5) one 30-foot-diameter, 3,200-foot-long penstock; (6) a bifurcation to three penstocks each 16-foot-diameter, and 100-foot-long; (7) an underground powerhouse/pumping station containing three pump/generating units with a total generating capacity of 600 megawatts; (8) a 30-foot-diameter, 700foot-long tailrace tunnel; (9) a 24-footdiameter, 2,000-foot-long access tunnel; (10) a substation; (11) a 1.4-mile-long, 500 kV transmission line to an existing distribution line; and (12) a 6,300-footlong access road. The proposed project would have an average annual generation of 1,500,000 megawatt-hours (MWh), which would be sold to a local utility. Applicant Contact: Mr. Daniel R. Irvin, Free Flow Power Corporation, 239 Causeway Street Suite 300, Boston MA 01244; phone (978) 252–7631. FERC Contact: Michael Spencer, (202) 502–6093. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY, contact (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of the Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–14152–000) in the docket number E:\FR\FM\16FEN1.SGM 16FEN1 9230 Federal Register / Vol. 77, No. 32 / Thursday, February 16, 2012 / Notices field to access the document. For assistance, contact FERC Online Support. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Dated: February 10, 2012. Kimberly D. Bose, Secretary. [Project Nos. 14180–000; 14193–000] Lock+ Hydro Friends Fund XLV; FFP Project 2, LLC; Notice Announcing Preliminary Permit Drawing [FR Doc. 2012–3661 Filed 2–15–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14181–000; 14195–000] Lock+ Hydro Friends Fund XLIII; FFP Project 53, LLC; Notice Announcing Preliminary Permit Drawing The Commission has received two preliminary permit applications deemed filed on May 3, 2011, at 8:30 a.m.,1 for proposed projects to be located on the Tombigbee River, in Greene and Sumter counties, Alabama. The applications were filed by Lock+ Hydro Friends Fund XLIII for Project No. 14181–000, and FFP Project 53, LLC for Project No. 14195–000. On February 22, 2012, at 9 a.m. (Eastern Time), the Secretary of the Commission, or her designee, will conduct a random drawing to determine the filing priority of the applicants identified in this notice. The Commission will select among competing permit applications as provided in section 4.37 of its regulations.2 The priority established by this drawing will be used to determine which applicant, among those with identical filing times, will be considered to have the first-filed application. The drawing is open to the public and will be held in Room 2C, the Commission Meeting Room, located at 888 First St. NE., Washington, DC 20426. A subsequent notice will be issued by the Secretary announcing the results of the drawing. Dated: February 10, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. BILLING CODE 6717–01–P [FR Doc. 2012–3636 Filed 2–15–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Project No. 14178–000; Project No. 14190– 000] Lock+ Hydro Friends Fund XLVII; FFP Project 52, LLC; Notice Announcing Preliminary Permit Drawing 1 Under 1 Under the Commission’s Rules of Practice and Procedure, any document received after regular business hours is considered filed at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2) (2011). 2 18 CFR 4.37 (2011). VerDate Mar<15>2010 16:31 Feb 15, 2012 Jkt 226001 the Commission’s Rules of Practice and Procedure, any document received after regular business hours is considered filed at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2) (2011). 2 18 CFR 4.37 (2011). 1 Under the Commission’s Rules of Practice and Procedure, any document received after regular PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 Dated: February 10, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2012–3635 Filed 2–15–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14131–000; Project No. 14138– 000; Project No. 14135–000] Dated: February 10, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. The Commission has received two preliminary permit applications deemed filed on May 3, 2011, at 8:30 a.m.,1 for [FR Doc. 2012–3637 Filed 2–15–12; 8:45 am] srobinson on DSK4SPTVN1PROD with NOTICES The Commission has received two preliminary permit applications deemed filed on May 3, 2011, at 8:30 a.m.,1 for proposed projects to be located on the Arkansas River, in Pulaski County, Arkansas. The applications were filed by Lock+ Hydro Friends Fund XLV for Project No. 14180–000 and FFP Project 2, LLC for Project No. 14193–000. On February 22, 2012, at 9 a.m. (Eastern Time), the Secretary of the Commission, or her designee, will conduct a random drawing to determine the filing priority of the applicants identified in this notice. The Commission will select among competing permit applications as provided in section 4.37 of its regulations.2 The priority established by this drawing will be used to determine which applicant, among those with identical filing times, will be considered to have the first-filed application. The drawing is open to the public and will be held in room 2C, the Commission Meeting Room, located at 888 First Street NE., Washington, DC 20426. A subsequent notice will be issued by the Secretary announcing the results of the drawing. proposed projects to be located on the Arkansas River, in Perry County and Faulkner County, Arkansas. The applications were filed by Lock+ Hydro Friends Fund XLVII for Project No. 14178–000, and FFP Project 52, LLC for Project No. 14190–000. On February 22, 2012, at 9 a.m. (Eastern Time), the Secretary of the Commission, or her designee, will conduct a random drawing to determine the filing priority of the applicants identified in this notice. The Commission will select among competing permit applications as provided in section 4.37 of its regulations.2 The priority established by this drawing will be used to determine which applicant, among those with identical filing times, will be considered to have the first-filed application. The drawing is open to the public and will be held in room 2C, the Commission Meeting Room, located at 888 First St. NE., Washington, DC 20426. A subsequent notice will be issued by the Secretary announcing the results of the drawing. Riverbank Hydro No. 1, LLC; Lock+ Hydro Friends Fund XXXVII; Qualified Hydro 20, LLC; Notice Announcing Preliminary Permit Drawing The Commission has received three preliminary permit applications deemed filed on April 1, 2011, at 8:30 a.m.,1 for proposed projects to be located on the Tombigbee River, in Monroe County, Mississippi. The applications were filed by Riverbank Hydro No. 1, LLC for Project No. 14131–000, Lock+ Hydro Friends Fund XXXVII for Project No. 14138–000, and Qualified Hydro 20, LLC for Project No. 14135–000. On February 22, 2012, at 9 a.m. (Eastern Time), the Secretary of the business hours is considered filed at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2) (2011). 2 18 CFR 4.37 (2011). 1 Under the Commission’s Rules of Practice and Procedure, any document received after regular business hours is considered filed at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2) (2011). E:\FR\FM\16FEN1.SGM 16FEN1

Agencies

[Federal Register Volume 77, Number 32 (Thursday, February 16, 2012)]
[Notices]
[Pages 9229-9230]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-3661]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 14152-000]


 Reliable Storage 1 LLC; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

    On March 25, 2011, Reliable Storage 1 LLC filed an application, 
pursuant to section 4(f) of the Federal Power Act, proposing to study 
the feasibility of hydropower near the town of Monterey, in Putnam 
County, Tennessee. The sole purpose of a preliminary permit, if issued, 
is to grant the permit holder priority to file a license application 
during the permit term. A preliminary permit does not authorize the 
permit holder to perform any land-disturbing activities or otherwise 
enter upon lands or waters owned by others without the owners' express 
permission.
    The proposed pumped storage project would consist of the following: 
(1) A 70-foot-high, 7,500-foot-long earth embankment dam; (2) an upper 
reservoir with a surface area of 100 acres and an 7,100 acre-foot 
storage capacity; (3) a 120-foot-high, 920-foot-long earth embankment 
dam creating; (4) a lower reservoir with a surface area of 220 acres 
and an 7,300 acre-foot storage capacity; (5) one 30-foot-diameter, 
3,200-foot-long penstock; (6) a bifurcation to three penstocks each 16-
foot-diameter, and 100-foot-long; (7) an underground powerhouse/pumping 
station containing three pump/generating units with a total generating 
capacity of 600 megawatts; (8) a 30-foot-diameter, 700-foot-long 
tailrace tunnel; (9) a 24-foot-diameter, 2,000-foot-long access tunnel; 
(10) a substation; (11) a 1.4-mile-long, 500 kV transmission line to an 
existing distribution line; and (12) a 6,300-foot-long access road. The 
proposed project would have an average annual generation of 1,500,000 
megawatt-hours (MWh), which would be sold to a local utility.
    Applicant Contact: Mr. Daniel R. Irvin, Free Flow Power 
Corporation, 239 Causeway Street Suite 300, Boston MA 01244; phone 
(978) 252-7631.
    FERC Contact: Michael Spencer, (202) 502-6093.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and 
competing applications may be filed electronically via the Internet. 
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
Web site https://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support at FERCOnlineSupport@ferc.gov; call toll-free at (866) 208-
3676; or, for TTY, contact (202) 502-8659. Although the Commission 
strongly encourages electronic filing, documents may also be paper-
filed. To paper-file, mail an original and seven copies to: Kimberly D. 
Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street 
NE., Washington, DC 20426.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of the 
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-14152-000) in the docket number

[[Page 9230]]

field to access the document. For assistance, contact FERC Online 
Support.

    Dated: February 10, 2012.
 Kimberly D. Bose,
 Secretary.
[FR Doc. 2012-3661 Filed 2-15-12; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.