Lock+ Hydro Friends Fund IV; FFP Project 55, LLC; Notice Announcing Preliminary Permit Drawing, 9231-9232 [2012-3639]

Download as PDF Federal Register / Vol. 77, No. 32 / Thursday, February 16, 2012 / Notices Commission, or her designee, will conduct a random drawing to determine the filing priority of the applicants identified in this notice. The Commission will select among competing permit applications as provided in section 4.37 of its regulations.2 The priority established by this drawing will be used to determine which applicant, among those with identical filing times, will be considered to have the first-filed application. The drawing is open to the public and will be held in room 2C, the Commission Meeting Room, located at 888 First St. NE., Washington, DC 20426. A subsequent notice will be issued by the Secretary announcing the results of the drawing. Dated: February 10, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. DEPARTMENT OF ENERGY Dated: February 10, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. [Project Nos. 14188–000; 14200–000] [FR Doc. 2012–3633 Filed 2–15–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14189–000; 14198–000] Lock+ Hydro Friends Fund XL; FFP Project 56, LLC; Notice Announcing Preliminary Permit Drawing [FR Doc. 2012–3634 Filed 2–15–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13824–000; Project No. 13826– 000] FFP Missouri 17, LLC; BOST2 Hydroelectric, LLC; Notice Announcing Preliminary Permit Drawing srobinson on DSK4SPTVN1PROD with NOTICES Commission Meeting Room, located at 888 First Street NE., Washington, DC 20426. A subsequent notice will be issued by the Secretary announcing the results of the drawing. The Commission has received two preliminary permit applications deemed filed on August 6, 2010, at 8:30 a.m.,1 for proposed projects to be located on the Ouachita River, in Caldwell Parish, Louisiana. The applications were filed by FFP Missouri 17, LLC for Project No. 13824–000 and BOST2 Hydroelectric, LLC for Project No. 13826–000. On February 22, 2012, at 9 a.m. (Eastern Time), the Secretary of the Commission, or her designee, will conduct a random drawing to determine the filing priority of the applicants identified in this notice. The Commission will select among competing permit applications as provided in section 4.37 of its regulations.2 The priority established by this drawing will be used to determine which applicant, among those with identical filing times, will be considered to have the first-filed application. The drawing is open to the public and will be held in room 2C, the 9231 The Commission has received two preliminary permit applications deemed filed on May 3, 2011, at 8:30 a.m.,1 for proposed projects to be located on the Kentucky River, in Henry County and Owen County, Kentucky. The applications were filed by Lock+ Hydro Friends Fund XL for Project No. 14189– 000 and FFP Project 56, LLC for Project No. 14198–000. On February 22, 2012, at 9 a.m. (Eastern Time), the Secretary of the Commission, or her designee, will conduct a random drawing to determine the filing priority of the applicants identified in this notice. The Commission will select among competing permit applications as provided in section 4.37 of its regulations.2 The priority established by this drawing will be used to determine which applicant, among those with identical filing times, will be considered to have the first-filed application. The drawing is open to the public and will be held in room 2C, the Commission Meeting Room, located at 888 First St. NE., Washington, DC 20426. A subsequent notice will be issued by the Secretary announcing the results of the drawing. Federal Energy Regulatory Commission Lock+ Hydro Friends Fund XXVIII; FFP Project 59, LLC; Notice Announcing Preliminary Permit Drawing The Commission has received two preliminary permit applications deemed filed on May 3, 2011, at 8:30 a.m.,1 for proposed projects to be located on the Kentucky River, in Jessamine County and Garrard County, Kentucky. The applications were filed by Lock+ Hydro Friends Fund XXVIII for Project No. 14188–000 and FFP Project 59, LLC for Project No. 14200–000. On February 22, 2012, at 9 a.m. (Eastern Time), the Secretary of the Commission, or her designee, will conduct a random drawing to determine the filing priority of the applicants identified in this notice. The Commission will select among competing permit applications as provided in section 4.37 of its regulations.2 The priority established by this drawing will be used to determine which applicant, among those with identical filing times, will be considered to have the first-filed application. The drawing is open to the public and will be held in room 2C, the Commission Meeting Room, located at 888 First St. NE., Washington, DC 20426. A subsequent notice will be issued by the Secretary announcing the results of the drawing. Dated: February 10, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2012–3628 Filed 2–15–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14185–000; 14196–000] Lock+ Hydro Friends Fund IV; FFP Project 55, LLC; Notice Announcing Preliminary Permit Drawing [FR Doc. 2012–3629 Filed 2–15–12; 8:45 am] BILLING CODE 6717–01–P CFR 4.37 (2011). the Commission’s Rules of Practice and Procedure, any document received after regular business hours is considered filed at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2) (2011). 2 CFR 4.37 (2011). Dated: February 10, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. The Commission has received two preliminary permit applications deemed 1 Under the Commission’s Rules of Practice and Procedure, any document received after regular business hours is considered filed at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2) (2011). 2 18 CFR 4.37 (2011). 1 Under the Commission’s Rules of Practice and Procedure, any document received after regular business hours is considered filed at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2) (2011). 2 18 CFR 4.37 (2011). 2 18 1 Under VerDate Mar<15>2010 16:31 Feb 15, 2012 Jkt 226001 PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 E:\FR\FM\16FEN1.SGM 16FEN1 9232 Federal Register / Vol. 77, No. 32 / Thursday, February 16, 2012 / Notices filed on May 3, 2011, at 8:30 a.m.,1 for proposed projects to be located on the Kentucky River, in Henry County and Owen County, Kentucky. The applications were filed by Lock+ Hydro Friends Fund IV for Project No. 14185– 000 and FFP Project 55, LLC for Project No. 14196–000. On February 22, 2012, at 9 a.m. (Eastern Time), the Secretary of the Commission, or her designee, will conduct a random drawing to determine the filing priority of the applicants identified in this notice. The Commission will select among competing permit applications as provided in section 4.37 of its regulations.2 The priority established by this drawing will be used to determine which applicant, among those with identical filing times, will be considered to have the first-filed application. The drawing is open to the public and will be held in room 2C, the Commission Meeting Room, located at 888 First St. NE., Washington, DC 20426. A subsequent notice will be issued by the Secretary announcing the results of the drawing. Dated: February 10, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. Commission, or her designee, will conduct a random drawing to determine the filing priority of the applicants identified in this notice. The Commission will select among competing permit applications as provided in section 4.37 of its regulations.2 The priority established by this drawing will be used to determine which applicant, among those with identical filing times, will be considered to have the first-filed application. The drawing is open to the public and will be held in room 2C, the Commission Meeting Room, located at 888 First St. NE., Washington, DC 20426. A subsequent notice will be issued by the Secretary announcing the results of the drawing. Dated: February 10, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2012–3638 Filed 2–15–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [FR Doc. 2012–3639 Filed 2–15–12; 8:45 am] Lock+ Hydro Friends Fund XXXIV; FFP Project 58, LLC; Notice Announcing Preliminary Permit Drawing DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14184–000; 14191–000] Lock+ Hydro Friends Fund XXXVIII; FFP Project 1, LLC; Notice Announcing Preliminary Permit Drawing srobinson on DSK4SPTVN1PROD with NOTICES The Commission has received two preliminary permit applications deemed filed on May 3, 2011, at 8:30 a.m.,1 for proposed projects to be located on the Arkansas River, in Jefferson County, Arkansas. The applications were filed by Lock+ Hydro Friends Fund XXXVIII for Project No. 14184–000 and FFP Project 1, LLC for Project No. 14191– 000. On February 22, 2012, at 9 a.m. (Eastern Time), the Secretary of the 1 Under the Commission’s Rules of Practice and Procedure, any document received after regular business hours is considered filed at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2) (2011). 2 18 CFR 4.37 (2011). 1 Under the Commission’s Rules of Practice and Procedure, any document received after regular business hours is considered filed at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2) (2011). VerDate Mar<15>2010 16:31 Feb 15, 2012 Jkt 226001 Dated: February 10, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2012–3627 Filed 2–15–12; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14186–000; Project No. 14197– 000] [Project No. 14187–000; Project No. 14199– 000] BILLING CODE 6717–01–P The drawing is open to the public and will be held in room 2C, the Commission Meeting Room, located at 888 First St. NE., Washington, DC 20426. A subsequent notice will be issued by the Secretary announcing the results of the drawing. The Commission has received two preliminary permit applications deemed filed on May 3, 2011, at 8:30 a.m.,1 for proposed projects to be located on the Kentucky River, in Mercer County and Woodford County, Kentucky. The applications were filed by Lock+ Hydro Friends Fund XXXIV for Project No. 14187–000 and FFP Project 58, LLC for Project No. 14199–000. On February 22, 2012, at 9 a.m. (Eastern Time), the Secretary of the Commission, or her designee, will conduct a random drawing to determine the filing priority of the applicants identified in this notice. The Commission will select among competing permit applications as provided in section 4.37 of its regulations.2 The priority established by this drawing will be used to determine which applicant, among those with identical filing times, will be considered to have the first-filed application. Lock+ Hydro Friends Fund XXXV; FFP Project 57, LLC; Notice Announcing Preliminary Permit Drawing The Commission has received two preliminary permit applications deemed filed on May 3, 2011, at 8:30 a.m.,1 for proposed projects to be located on the Kentucky River, in Franklin County, Kentucky. The applications were filed by Lock+ Hydro Friends Fund XXXV for Project No. 14186–000 and FFP Project 57, LLC for Project No. 14197–000. On February 22, 2012, at 9 a.m. (Eastern Time), the Secretary of the Commission, or her designee, will conduct a random drawing to determine the filing priority of the applicants identified in this notice. The Commission will select among competing permit applications as provided in section 4.37 of its regulations.2 The priority established by this drawing will be used to determine which applicant, among those with identical filing times, will be considered to have the first-filed application. The drawing is open to the public and will be held in room 2C, the Commission Meeting Room, located at 888 First St. NE., Washington, DC 20426. A subsequent notice will be issued by the Secretary announcing the results of the drawing. Dated: February 10, 2012. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2012–3626 Filed 2–15–12; 8:45 am] BILLING CODE 6717–01–P 2 18 CFR 4.37 (2011). 1 Under the Commission’s Rules of Practice and Procedure, any document received after regular business hours is considered filed at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2) (2011). 2 18 CFR 4.37 (2011). PO 00000 Frm 00035 Fmt 4703 Sfmt 9990 1 Under the Commission’s Rules of Practice and Procedure, any document received after regular business hours is considered filed at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2) (2011). 2 18 CFR 4.37 (2011). E:\FR\FM\16FEN1.SGM 16FEN1

Agencies

[Federal Register Volume 77, Number 32 (Thursday, February 16, 2012)]
[Notices]
[Pages 9231-9232]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-3639]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project Nos. 14185-000; 14196-000]


Lock+ Hydro Friends Fund IV; FFP Project 55, LLC; Notice 
Announcing Preliminary Permit Drawing

    The Commission has received two preliminary permit applications 
deemed

[[Page 9232]]

filed on May 3, 2011, at 8:30 a.m.,\1\ for proposed projects to be 
located on the Kentucky River, in Henry County and Owen County, 
Kentucky. The applications were filed by Lock+ Hydro Friends Fund IV 
for Project No. 14185-000 and FFP Project 55, LLC for Project No. 
14196-000.
---------------------------------------------------------------------------

    \1\ Under the Commission's Rules of Practice and Procedure, any 
document received after regular business hours is considered filed 
at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2) 
(2011).
---------------------------------------------------------------------------

    On February 22, 2012, at 9 a.m. (Eastern Time), the Secretary of 
the Commission, or her designee, will conduct a random drawing to 
determine the filing priority of the applicants identified in this 
notice. The Commission will select among competing permit applications 
as provided in section 4.37 of its regulations.\2\ The priority 
established by this drawing will be used to determine which applicant, 
among those with identical filing times, will be considered to have the 
first-filed application.
---------------------------------------------------------------------------

    \2\ 18 CFR 4.37 (2011).
---------------------------------------------------------------------------

    The drawing is open to the public and will be held in room 2C, the 
Commission Meeting Room, located at 888 First St. NE., Washington, DC 
20426. A subsequent notice will be issued by the Secretary announcing 
the results of the drawing.

    Dated: February 10, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012-3639 Filed 2-15-12; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.