Riverbank Hydro No. 1, LLC; Lock+ Hydro Friends Fund XXXVII; Qualified Hydro 20, LLC; Notice Announcing Preliminary Permit Drawing, 9230-9231 [2012-3634]
Download as PDF
9230
Federal Register / Vol. 77, No. 32 / Thursday, February 16, 2012 / Notices
field to access the document. For
assistance, contact FERC Online
Support.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Dated: February 10, 2012.
Kimberly D. Bose,
Secretary.
[Project Nos. 14180–000; 14193–000]
Lock+ Hydro Friends Fund XLV; FFP
Project 2, LLC; Notice Announcing
Preliminary Permit Drawing
[FR Doc. 2012–3661 Filed 2–15–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 14181–000; 14195–000]
Lock+ Hydro Friends Fund XLIII; FFP
Project 53, LLC; Notice Announcing
Preliminary Permit Drawing
The Commission has received two
preliminary permit applications deemed
filed on May 3, 2011, at 8:30 a.m.,1 for
proposed projects to be located on the
Tombigbee River, in Greene and Sumter
counties, Alabama. The applications
were filed by Lock+ Hydro Friends
Fund XLIII for Project No. 14181–000,
and FFP Project 53, LLC for Project No.
14195–000.
On February 22, 2012, at 9 a.m.
(Eastern Time), the Secretary of the
Commission, or her designee, will
conduct a random drawing to determine
the filing priority of the applicants
identified in this notice. The
Commission will select among
competing permit applications as
provided in section 4.37 of its
regulations.2 The priority established by
this drawing will be used to determine
which applicant, among those with
identical filing times, will be considered
to have the first-filed application.
The drawing is open to the public and
will be held in Room 2C, the
Commission Meeting Room, located at
888 First St. NE., Washington, DC
20426. A subsequent notice will be
issued by the Secretary announcing the
results of the drawing.
Dated: February 10, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
BILLING CODE 6717–01–P
[FR Doc. 2012–3636 Filed 2–15–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[ Project No. 14178–000; Project No. 14190–
000]
Lock+ Hydro Friends Fund XLVII; FFP
Project 52, LLC; Notice Announcing
Preliminary Permit Drawing
1 Under
1 Under the Commission’s Rules of Practice and
Procedure, any document received after regular
business hours is considered filed at 8:30 a.m. on
the next regular business day. 18 CFR
385.2001(a)(2) (2011).
2 18 CFR 4.37 (2011).
VerDate Mar<15>2010
16:31 Feb 15, 2012
Jkt 226001
the Commission’s Rules of Practice and
Procedure, any document received after regular
business hours is considered filed at 8:30 a.m. on
the next regular business day. 18 CFR
385.2001(a)(2) (2011).
2 18 CFR 4.37 (2011).
1 Under the Commission’s Rules of Practice and
Procedure, any document received after regular
PO 00000
Frm 00033
Fmt 4703
Sfmt 4703
Dated: February 10, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–3635 Filed 2–15–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14131–000; Project No. 14138–
000; Project No. 14135–000]
Dated: February 10, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
The Commission has received two
preliminary permit applications deemed
filed on May 3, 2011, at 8:30 a.m.,1 for
[FR Doc. 2012–3637 Filed 2–15–12; 8:45 am]
srobinson on DSK4SPTVN1PROD with NOTICES
The Commission has received two
preliminary permit applications deemed
filed on May 3, 2011, at 8:30 a.m.,1 for
proposed projects to be located on the
Arkansas River, in Pulaski County,
Arkansas. The applications were filed
by Lock+ Hydro Friends Fund XLV for
Project No. 14180–000 and FFP Project
2, LLC for Project No. 14193–000.
On February 22, 2012, at 9 a.m.
(Eastern Time), the Secretary of the
Commission, or her designee, will
conduct a random drawing to determine
the filing priority of the applicants
identified in this notice. The
Commission will select among
competing permit applications as
provided in section 4.37 of its
regulations.2 The priority established by
this drawing will be used to determine
which applicant, among those with
identical filing times, will be considered
to have the first-filed application.
The drawing is open to the public and
will be held in room 2C, the
Commission Meeting Room, located at
888 First Street NE., Washington, DC
20426. A subsequent notice will be
issued by the Secretary announcing the
results of the drawing.
proposed projects to be located on the
Arkansas River, in Perry County and
Faulkner County, Arkansas. The
applications were filed by Lock+ Hydro
Friends Fund XLVII for Project No.
14178–000, and FFP Project 52, LLC for
Project No. 14190–000.
On February 22, 2012, at 9 a.m.
(Eastern Time), the Secretary of the
Commission, or her designee, will
conduct a random drawing to determine
the filing priority of the applicants
identified in this notice. The
Commission will select among
competing permit applications as
provided in section 4.37 of its
regulations.2 The priority established by
this drawing will be used to determine
which applicant, among those with
identical filing times, will be considered
to have the first-filed application.
The drawing is open to the public and
will be held in room 2C, the
Commission Meeting Room, located at
888 First St. NE., Washington, DC
20426. A subsequent notice will be
issued by the Secretary announcing the
results of the drawing.
Riverbank Hydro No. 1, LLC; Lock+
Hydro Friends Fund XXXVII; Qualified
Hydro 20, LLC; Notice Announcing
Preliminary Permit Drawing
The Commission has received three
preliminary permit applications deemed
filed on April 1, 2011, at 8:30 a.m.,1 for
proposed projects to be located on the
Tombigbee River, in Monroe County,
Mississippi. The applications were filed
by Riverbank Hydro No. 1, LLC for
Project No. 14131–000, Lock+ Hydro
Friends Fund XXXVII for Project No.
14138–000, and Qualified Hydro 20,
LLC for Project No. 14135–000.
On February 22, 2012, at 9 a.m.
(Eastern Time), the Secretary of the
business hours is considered filed at 8:30 a.m. on
the next regular business day. 18 CFR
385.2001(a)(2) (2011).
2 18 CFR 4.37 (2011).
1 Under the Commission’s Rules of Practice and
Procedure, any document received after regular
business hours is considered filed at 8:30 a.m. on
the next regular business day. 18 CFR
385.2001(a)(2) (2011).
E:\FR\FM\16FEN1.SGM
16FEN1
Federal Register / Vol. 77, No. 32 / Thursday, February 16, 2012 / Notices
Commission, or her designee, will
conduct a random drawing to determine
the filing priority of the applicants
identified in this notice. The
Commission will select among
competing permit applications as
provided in section 4.37 of its
regulations.2 The priority established by
this drawing will be used to determine
which applicant, among those with
identical filing times, will be considered
to have the first-filed application.
The drawing is open to the public and
will be held in room 2C, the
Commission Meeting Room, located at
888 First St. NE., Washington, DC
20426. A subsequent notice will be
issued by the Secretary announcing the
results of the drawing.
Dated: February 10, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
DEPARTMENT OF ENERGY
Dated: February 10, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[Project Nos. 14188–000; 14200–000]
[FR Doc. 2012–3633 Filed 2–15–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 14189–000; 14198–000]
Lock+ Hydro Friends Fund XL; FFP
Project 56, LLC; Notice Announcing
Preliminary Permit Drawing
[FR Doc. 2012–3634 Filed 2–15–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13824–000; Project No. 13826–
000]
FFP Missouri 17, LLC; BOST2
Hydroelectric, LLC; Notice Announcing
Preliminary Permit Drawing
srobinson on DSK4SPTVN1PROD with NOTICES
Commission Meeting Room, located at
888 First Street NE., Washington, DC
20426. A subsequent notice will be
issued by the Secretary announcing the
results of the drawing.
The Commission has received two
preliminary permit applications deemed
filed on August 6, 2010, at 8:30 a.m.,1
for proposed projects to be located on
the Ouachita River, in Caldwell Parish,
Louisiana. The applications were filed
by FFP Missouri 17, LLC for Project No.
13824–000 and BOST2 Hydroelectric,
LLC for Project No. 13826–000.
On February 22, 2012, at 9 a.m.
(Eastern Time), the Secretary of the
Commission, or her designee, will
conduct a random drawing to determine
the filing priority of the applicants
identified in this notice. The
Commission will select among
competing permit applications as
provided in section 4.37 of its
regulations.2 The priority established by
this drawing will be used to determine
which applicant, among those with
identical filing times, will be considered
to have the first-filed application.
The drawing is open to the public and
will be held in room 2C, the
9231
The Commission has received two
preliminary permit applications deemed
filed on May 3, 2011, at 8:30 a.m.,1 for
proposed projects to be located on the
Kentucky River, in Henry County and
Owen County, Kentucky. The
applications were filed by Lock+ Hydro
Friends Fund XL for Project No. 14189–
000 and FFP Project 56, LLC for Project
No. 14198–000.
On February 22, 2012, at 9 a.m.
(Eastern Time), the Secretary of the
Commission, or her designee, will
conduct a random drawing to determine
the filing priority of the applicants
identified in this notice. The
Commission will select among
competing permit applications as
provided in section 4.37 of its
regulations.2 The priority established by
this drawing will be used to determine
which applicant, among those with
identical filing times, will be considered
to have the first-filed application.
The drawing is open to the public and
will be held in room 2C, the
Commission Meeting Room, located at
888 First St. NE., Washington, DC
20426. A subsequent notice will be
issued by the Secretary announcing the
results of the drawing.
Federal Energy Regulatory
Commission
Lock+ Hydro Friends Fund XXVIII; FFP
Project 59, LLC; Notice Announcing
Preliminary Permit Drawing
The Commission has received two
preliminary permit applications deemed
filed on May 3, 2011, at 8:30 a.m.,1 for
proposed projects to be located on the
Kentucky River, in Jessamine County
and Garrard County, Kentucky. The
applications were filed by Lock+ Hydro
Friends Fund XXVIII for Project No.
14188–000 and FFP Project 59, LLC for
Project No. 14200–000.
On February 22, 2012, at 9 a.m.
(Eastern Time), the Secretary of the
Commission, or her designee, will
conduct a random drawing to determine
the filing priority of the applicants
identified in this notice. The
Commission will select among
competing permit applications as
provided in section 4.37 of its
regulations.2 The priority established by
this drawing will be used to determine
which applicant, among those with
identical filing times, will be considered
to have the first-filed application.
The drawing is open to the public and
will be held in room 2C, the
Commission Meeting Room, located at
888 First St. NE., Washington, DC
20426. A subsequent notice will be
issued by the Secretary announcing the
results of the drawing.
Dated: February 10, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012–3628 Filed 2–15–12; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 14185–000; 14196–000]
Lock+ Hydro Friends Fund IV; FFP
Project 55, LLC; Notice Announcing
Preliminary Permit Drawing
[FR Doc. 2012–3629 Filed 2–15–12; 8:45 am]
BILLING CODE 6717–01–P
CFR 4.37 (2011).
the Commission’s Rules of Practice and
Procedure, any document received after regular
business hours is considered filed at 8:30 a.m. on
the next regular business day. 18 CFR
385.2001(a)(2) (2011).
2 CFR 4.37 (2011).
Dated: February 10, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
The Commission has received two
preliminary permit applications deemed
1 Under the Commission’s Rules of Practice and
Procedure, any document received after regular
business hours is considered filed at 8:30 a.m. on
the next regular business day. 18 CFR
385.2001(a)(2) (2011).
2 18 CFR 4.37 (2011).
1 Under the Commission’s Rules of Practice and
Procedure, any document received after regular
business hours is considered filed at 8:30 a.m. on
the next regular business day. 18 CFR
385.2001(a)(2) (2011).
2 18 CFR 4.37 (2011).
2 18
1 Under
VerDate Mar<15>2010
16:31 Feb 15, 2012
Jkt 226001
PO 00000
Frm 00034
Fmt 4703
Sfmt 4703
E:\FR\FM\16FEN1.SGM
16FEN1
Agencies
[Federal Register Volume 77, Number 32 (Thursday, February 16, 2012)]
[Notices]
[Pages 9230-9231]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2012-3634]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14131-000; Project No. 14138-000; Project No. 14135-000]
Riverbank Hydro No. 1, LLC; Lock+ Hydro Friends Fund XXXVII;
Qualified Hydro 20, LLC; Notice Announcing Preliminary Permit Drawing
The Commission has received three preliminary permit applications
deemed filed on April 1, 2011, at 8:30 a.m.,\1\ for proposed projects
to be located on the Tombigbee River, in Monroe County, Mississippi.
The applications were filed by Riverbank Hydro No. 1, LLC for Project
No. 14131-000, Lock+ Hydro Friends Fund XXXVII for Project No. 14138-
000, and Qualified Hydro 20, LLC for Project No. 14135-000.
---------------------------------------------------------------------------
\1\ Under the Commission's Rules of Practice and Procedure, any
document received after regular business hours is considered filed
at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2)
(2011).
---------------------------------------------------------------------------
On February 22, 2012, at 9 a.m. (Eastern Time), the Secretary of
the
[[Page 9231]]
Commission, or her designee, will conduct a random drawing to determine
the filing priority of the applicants identified in this notice. The
Commission will select among competing permit applications as provided
in section 4.37 of its regulations.\2\ The priority established by this
drawing will be used to determine which applicant, among those with
identical filing times, will be considered to have the first-filed
application.
---------------------------------------------------------------------------
\2\ 18 CFR 4.37 (2011).
---------------------------------------------------------------------------
The drawing is open to the public and will be held in room 2C, the
Commission Meeting Room, located at 888 First St. NE., Washington, DC
20426. A subsequent notice will be issued by the Secretary announcing
the results of the drawing.
Dated: February 10, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012-3634 Filed 2-15-12; 8:45 am]
BILLING CODE 6717-01-P